Camb Inov Center Presentation 05 26 09

667 views

Published on

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
667
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • Camb Inov Center Presentation 05 26 09

    1. 1. Multi-Modal Bridges: Lessons from Portland OR Cambridge Innovation Center May 26, 2009 Phil Goff LEED AP www.altaplanning.com
    2. 2. Charles River Basin
    3. 3. B.U. Bridge Mass Ave Bridge N Beacon St Bridge
    4. 4. Downtown Portland and the Willamette River Broadway Steel Burnside Morrison Hawthorne I-405 I-5
    5. 5. Downtown Portland and the Willamette River
    6. 6. BROADWAY BRIDGE
    7. 7. BROADWAY BRIDGE
    8. 8. BROADWAY BRIDGE
    9. 9. STEEL BRIDGE
    10. 10. EASTBANK ESPLANADE
    11. 11. BURNSIDE BRIDGE
    12. 12. MORRISON BRIDGE
    13. 13. MORRISON BRIDGE Pre-1998 conditions 1998 temporary two-way path
    14. 14. MORRISON BRIDGE The Bridge of Green Morrison Bridge Esplanade project
    15. 15. MORRISON BRIDGE 15’ shared path condition View Points
    16. 16. HAWTHORNE BRIDGE
    17. 17. HAWTHORNE BRIDGE
    18. 18. HAWTHORNE BRIDGE
    19. 22. 15 years of bicycle infrastructure: $100 million Interchange along Rt. 26: $125 million
    20. 24. Portland Daily Vehicle Miles Traveled/Person

    ×