Lawyer in Vietnam Dr. Oliver Massmann – RENEWABLE ENERGY AND
FEED IN TARIFFS – QUO VADIS - INTERVIEW WITH
MERGERMARKET
1. Dear Dr. Massmann, a government official recently stated that the MoIT probably
had enough solar projects in the pipeline, explaining for that fact that such new FIT
will be much more lower than the current one (as quoted by Mr. Nguyen Ninh Hai,
Deputy Director of New and Renewable Energy Department, MOIT), do you agree
with this statement and why? Is there any other reason that you think make sense for
planning a new upcoming FiT for solar?
OM: The number of approved solar projects has gone far beyond the target capacity
in the National Power Master Plan VII (as amended). The Government has to issue
a new national power master plan (PDP VIII) to reflect the new target following the
market status. In addition, the grid does not have enough capacity to absorb all output
from solar projects at the moment and has to be upgraded. This process should take
around 1-5 years. The current FiT is also very attractive to foreign investors and high
compared to some other countries. For these reasons, the Government has to issue a
new FIT to slow down the development of solar projects, thus having time to
improve the grid and complete the legal framework.
2. With the market now anticipating the new FiT for solar, which is underway, what
is the current situation of those solar projects seeking to be the last one to enjoy the
9.35 US cents feed in tariff? Do you think the anticipation for the new FiT has
triggered/ or will trigger a rise in deal value for renewables in Vietnam in the
meantime? Perhaps in Ninh Thuan province? If so, by roughly how much %?
OM: Solar projects seeking to be the last one to enjoy the current FIT now have to
accelerate their development process so that they will come into commercial
operation by 30 June 2019. If they cannot (and this is the current situation of many
solar projects), the investors tend to delay the construction and wait to see what
will happen after 30 June. I am aware that the new FIT is only one of the options,
besides auction or a hybrid option. The Government has not yet decided on the
final model. Ninh Thuan is already overloaded and investors should look for
opportunities in other provinces.
3. Besides the new FiT, what changes would you like to see in the new PPA for
projects coming into operation after 30 June 2019? Can you rank these changes
from most needed, needed to have, and good to have for the long-term outlook of
M&A deals in renewables? Can you briefly explain the reasons for the ranking as
well?
OM: The bankability of the PPA is of utmost importance. Without this, the
investors find it very hard obtaining financing for their projects. Another change I
expect is a clear indication of whether the PPA is a take-or-pay agreement. This
will help investors secure and ensure the profits and revenue of their projects. The
last change but also of not less importance is a dispute resolution clause which
provides international arbitration to be an option to resolve the dispute. This could
be a great concern for foreign investors, especially those of large utility scale
projects.
4. From talking to a market source, the current FiT rate for wind energy projects is
profitable enough for investors and he himself as an investor doesn’t want the FiT
rate for wind energy projects to go up any more. What would be your argument for
the hike in wind FiT and how would it benefit the long-term outlook of M&A deals
in wind energy projects?
OM: I believe the reason for a recent increase in the wind FiT is to improve
profitability of the projects, help investors to recover the investment capital more
quickly and arrange a better financing deal with the banks. I note that the PPA is
only for 20 years, so if it takes too long to recover the capital, together with the
high maintenance cost after that, the investors will no longer be interested in
keeping the projects. The new wind FIT will make wind projects more attractive to
investors for acquisitions as there is still room for further development after the
projects have recovered their investment capital.
Please do not hesitate to contact Dr. Oliver Massmann under
omassmann@duanemorris.com or any lawyers in our office listing if you have any
questions or want to know more details on the above. Dr. Oliver Massmann is the
General Director of Duane Morris Vietnam LLC.

More Related Content

What's hot

Renewable energy policy analysis in asia 2010
Renewable energy policy analysis in asia 2010Renewable energy policy analysis in asia 2010
Renewable energy policy analysis in asia 2010
CCM Intelligence
 

What's hot (14)

Evaluation of United Power Generation & Development – Financial & Strategic ...
Evaluation of United Power Generation & Development  – Financial & Strategic ...Evaluation of United Power Generation & Development  – Financial & Strategic ...
Evaluation of United Power Generation & Development – Financial & Strategic ...
 
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
 
State aid in the Energy Sector: State aid Guidelines
State aid in the Energy Sector: State aid GuidelinesState aid in the Energy Sector: State aid Guidelines
State aid in the Energy Sector: State aid Guidelines
 
National monetisation pipeline
National monetisation pipelineNational monetisation pipeline
National monetisation pipeline
 
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
 
Indian Fiscal Budget 2013-14: Analysis on Energy Sector
Indian Fiscal Budget 2013-14: Analysis on Energy SectorIndian Fiscal Budget 2013-14: Analysis on Energy Sector
Indian Fiscal Budget 2013-14: Analysis on Energy Sector
 
Week10 assignment
Week10 assignmentWeek10 assignment
Week10 assignment
 
The oil & gas upstream market in Italy - A quick outlook of opportunities and...
The oil & gas upstream market in Italy - A quick outlook of opportunities and...The oil & gas upstream market in Italy - A quick outlook of opportunities and...
The oil & gas upstream market in Italy - A quick outlook of opportunities and...
 
Power generation in mp
Power generation in mpPower generation in mp
Power generation in mp
 
Ad as 0810
Ad as 0810Ad as 0810
Ad as 0810
 
Final project finance for development - Afghanistan
Final project finance for development - AfghanistanFinal project finance for development - Afghanistan
Final project finance for development - Afghanistan
 
Renewable energy policy analysis in asia 2010
Renewable energy policy analysis in asia 2010Renewable energy policy analysis in asia 2010
Renewable energy policy analysis in asia 2010
 
Policy and Infrastructure Development
Policy and Infrastructure DevelopmentPolicy and Infrastructure Development
Policy and Infrastructure Development
 
Vietnam - Power Development Master Plan 8 - what you must know:
Vietnam - Power Development Master Plan 8 - what you must know: Vietnam - Power Development Master Plan 8 - what you must know:
Vietnam - Power Development Master Plan 8 - what you must know:
 

Similar to Lawyer in Vietnam Dr. Oliver Massmann – RENEWABLE ENERGY AND FEED IN TARIFFS – QUO VADIS - INTERVIEW WITH MERGERMARKET

Similar to Lawyer in Vietnam Dr. Oliver Massmann – RENEWABLE ENERGY AND FEED IN TARIFFS – QUO VADIS - INTERVIEW WITH MERGERMARKET (20)

VIETNAM - THE NEW LAW ON PUBLIC PRIVATE PARTNERSHIPS - MAIN IMPROVEMENTS OVER...
VIETNAM - THE NEW LAW ON PUBLIC PRIVATE PARTNERSHIPS - MAIN IMPROVEMENTS OVER...VIETNAM - THE NEW LAW ON PUBLIC PRIVATE PARTNERSHIPS - MAIN IMPROVEMENTS OVER...
VIETNAM - THE NEW LAW ON PUBLIC PRIVATE PARTNERSHIPS - MAIN IMPROVEMENTS OVER...
 
Lawyer in Vietnam Dr. Oliver Massmann MINING
Lawyer in Vietnam Dr. Oliver Massmann MININGLawyer in Vietnam Dr. Oliver Massmann MINING
Lawyer in Vietnam Dr. Oliver Massmann MINING
 
Vietnam – Green Growth – 2015
Vietnam – Green Growth – 2015Vietnam – Green Growth – 2015
Vietnam – Green Growth – 2015
 
Vietnam - Hanoi Times interviewing Dr. Oliver Massmann on adoption of Global ...
Vietnam - Hanoi Times interviewing Dr. Oliver Massmann on adoption of Global ...Vietnam - Hanoi Times interviewing Dr. Oliver Massmann on adoption of Global ...
Vietnam - Hanoi Times interviewing Dr. Oliver Massmann on adoption of Global ...
 
Energy Sector
Energy SectorEnergy Sector
Energy Sector
 
Vietnam – Power Energy Action Plan – With Outlook on the Major Trade Agreemen...
Vietnam – Power Energy Action Plan – With Outlook on the Major Trade Agreemen...Vietnam – Power Energy Action Plan – With Outlook on the Major Trade Agreemen...
Vietnam – Power Energy Action Plan – With Outlook on the Major Trade Agreemen...
 
VIETNAM - SOLAR POWER BREAKING NEWS – EXTENSION PROPOSAL BY MINISTRY OF PLANN...
VIETNAM - SOLAR POWER BREAKING NEWS – EXTENSION PROPOSAL BY MINISTRY OF PLANN...VIETNAM - SOLAR POWER BREAKING NEWS – EXTENSION PROPOSAL BY MINISTRY OF PLANN...
VIETNAM - SOLAR POWER BREAKING NEWS – EXTENSION PROPOSAL BY MINISTRY OF PLANN...
 
Draft Decision on Supporting Regime for Solar Power Projects
Draft Decision on Supporting Regime for Solar Power Projects Draft Decision on Supporting Regime for Solar Power Projects
Draft Decision on Supporting Regime for Solar Power Projects
 
VIETNAM – WATER PROJECTS – LAWS ON PUBLIC PRIVATE PARTNERSHIPS – GLOBAL WATER...
VIETNAM – WATER PROJECTS – LAWS ON PUBLIC PRIVATE PARTNERSHIPS – GLOBAL WATER...VIETNAM – WATER PROJECTS – LAWS ON PUBLIC PRIVATE PARTNERSHIPS – GLOBAL WATER...
VIETNAM – WATER PROJECTS – LAWS ON PUBLIC PRIVATE PARTNERSHIPS – GLOBAL WATER...
 
Renewable energy
Renewable energyRenewable energy
Renewable energy
 
Vietnam - Investing in Wind Energy - The Guide
Vietnam - Investing in Wind Energy - The GuideVietnam - Investing in Wind Energy - The Guide
Vietnam - Investing in Wind Energy - The Guide
 
Vietnam – Mining Action Plan – Issues and Solutions – Impact of the Major Tra...
Vietnam – Mining Action Plan – Issues and Solutions – Impact of the Major Tra...Vietnam – Mining Action Plan – Issues and Solutions – Impact of the Major Tra...
Vietnam – Mining Action Plan – Issues and Solutions – Impact of the Major Tra...
 
VIETNAM – POWER ENERGY – TRANSITION AND PDP8 – HOW THE EVFTA AND THE EVIPA AN...
VIETNAM – POWER ENERGY – TRANSITION AND PDP8 – HOW THE EVFTA AND THE EVIPA AN...VIETNAM – POWER ENERGY – TRANSITION AND PDP8 – HOW THE EVFTA AND THE EVIPA AN...
VIETNAM – POWER ENERGY – TRANSITION AND PDP8 – HOW THE EVFTA AND THE EVIPA AN...
 
VIETNAM – AUTOMOTIVE SECTOR – CURRENT ISSUES AND SOLUTIONS FOR INVESTMENT AND...
VIETNAM – AUTOMOTIVE SECTOR – CURRENT ISSUES AND SOLUTIONS FOR INVESTMENT AND...VIETNAM – AUTOMOTIVE SECTOR – CURRENT ISSUES AND SOLUTIONS FOR INVESTMENT AND...
VIETNAM – AUTOMOTIVE SECTOR – CURRENT ISSUES AND SOLUTIONS FOR INVESTMENT AND...
 
VIETNAM – RENEWABLE ENERGY – NEW FEED IN TARIFFS FOR WIND ENERGY - AMAZING DE...
VIETNAM – RENEWABLE ENERGY – NEW FEED IN TARIFFS FOR WIND ENERGY - AMAZING DE...VIETNAM – RENEWABLE ENERGY – NEW FEED IN TARIFFS FOR WIND ENERGY - AMAZING DE...
VIETNAM – RENEWABLE ENERGY – NEW FEED IN TARIFFS FOR WIND ENERGY - AMAZING DE...
 
Vietnam _Green Growth
Vietnam _Green GrowthVietnam _Green Growth
Vietnam _Green Growth
 
Vietnam - Wind Power - Moving towards completion - With the newly-proposed w...
 Vietnam - Wind Power - Moving towards completion - With the newly-proposed w... Vietnam - Wind Power - Moving towards completion - With the newly-proposed w...
Vietnam - Wind Power - Moving towards completion - With the newly-proposed w...
 
VIETNAM – RENEWABLE ENERGIES - Identifying the Amazing Development - what you...
VIETNAM – RENEWABLE ENERGIES - Identifying the Amazing Development - what you...VIETNAM – RENEWABLE ENERGIES - Identifying the Amazing Development - what you...
VIETNAM – RENEWABLE ENERGIES - Identifying the Amazing Development - what you...
 
Focus: Energy
Focus: EnergyFocus: Energy
Focus: Energy
 
INVESTING IN LIQUEFIED NATURAL GAS (LNG) IN VIETNAM
INVESTING IN LIQUEFIED NATURAL GAS (LNG) IN VIETNAM INVESTING IN LIQUEFIED NATURAL GAS (LNG) IN VIETNAM
INVESTING IN LIQUEFIED NATURAL GAS (LNG) IN VIETNAM
 

More from Dr. Oliver Massmann

More from Dr. Oliver Massmann (20)

YOU ARE WARMLY INVITED - Solar & Storage Live Vietnam 2024
YOU ARE WARMLY INVITED - Solar & Storage Live Vietnam 2024YOU ARE WARMLY INVITED - Solar & Storage Live Vietnam 2024
YOU ARE WARMLY INVITED - Solar & Storage Live Vietnam 2024
 
VIETNAM — Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due ...
VIETNAM — Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due ...VIETNAM — Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due ...
VIETNAM — Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due ...
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
 
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTSVIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
 
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
 
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
 
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
 
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
 
Vietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsVietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key Highlights
 
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
 
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
 
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
 
Vietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key HighlightsVietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key Highlights
 
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
 
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
 
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
 
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
 
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
 

Recently uploaded

一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
mefyqyn
 
一比一原版(UOL毕业证书)利物浦大学毕业证成绩单原件一模一样
一比一原版(UOL毕业证书)利物浦大学毕业证成绩单原件一模一样一比一原版(UOL毕业证书)利物浦大学毕业证成绩单原件一模一样
一比一原版(UOL毕业证书)利物浦大学毕业证成绩单原件一模一样
mefyqyn
 
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
mefyqyn
 
一比一原版(Indiana State毕业证书)印第安纳州立大学毕业证成绩单原件一模一样
一比一原版(Indiana State毕业证书)印第安纳州立大学毕业证成绩单原件一模一样一比一原版(Indiana State毕业证书)印第安纳州立大学毕业证成绩单原件一模一样
一比一原版(Indiana State毕业证书)印第安纳州立大学毕业证成绩单原件一模一样
mefyqyn
 
一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样
一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样
一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样
mefyqyn
 
一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样
一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样
一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样
mefyqyn
 
Termination of Employees under the Labor Code.pptx
Termination of Employees under the Labor Code.pptxTermination of Employees under the Labor Code.pptx
Termination of Employees under the Labor Code.pptx
BrV
 
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
mefyqyn
 

Recently uploaded (20)

Petitioner Moot Memorial including Charges and Argument Advanced.docx
Petitioner Moot Memorial including Charges and Argument Advanced.docxPetitioner Moot Memorial including Charges and Argument Advanced.docx
Petitioner Moot Memorial including Charges and Argument Advanced.docx
 
IRDA role in Insurance sector in India .pptx
IRDA role in Insurance sector in India .pptxIRDA role in Insurance sector in India .pptx
IRDA role in Insurance sector in India .pptx
 
File Taxes Online Simple Steps for Efficient Filing.pdf
File Taxes Online Simple Steps for Efficient Filing.pdfFile Taxes Online Simple Steps for Efficient Filing.pdf
File Taxes Online Simple Steps for Efficient Filing.pdf
 
Respondent Moot Memorial including Charges and Argument Advanced.docx
Respondent Moot Memorial including Charges and Argument Advanced.docxRespondent Moot Memorial including Charges and Argument Advanced.docx
Respondent Moot Memorial including Charges and Argument Advanced.docx
 
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
 
一比一原版(UOL毕业证书)利物浦大学毕业证成绩单原件一模一样
一比一原版(UOL毕业证书)利物浦大学毕业证成绩单原件一模一样一比一原版(UOL毕业证书)利物浦大学毕业证成绩单原件一模一样
一比一原版(UOL毕业证书)利物浦大学毕业证成绩单原件一模一样
 
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
 
一比一原版(Indiana State毕业证书)印第安纳州立大学毕业证成绩单原件一模一样
一比一原版(Indiana State毕业证书)印第安纳州立大学毕业证成绩单原件一模一样一比一原版(Indiana State毕业证书)印第安纳州立大学毕业证成绩单原件一模一样
一比一原版(Indiana State毕业证书)印第安纳州立大学毕业证成绩单原件一模一样
 
Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[
Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[
Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[
 
一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样
一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样
一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样
 
HOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASES
HOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASESHOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASES
HOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASES
 
Does Apple Neurotechnology Patents Go To Far?
Does Apple  Neurotechnology Patents Go To Far?Does Apple  Neurotechnology Patents Go To Far?
Does Apple Neurotechnology Patents Go To Far?
 
posts-harmful-to-secular-structure-of-the-country-539103-1.pdf
posts-harmful-to-secular-structure-of-the-country-539103-1.pdfposts-harmful-to-secular-structure-of-the-country-539103-1.pdf
posts-harmful-to-secular-structure-of-the-country-539103-1.pdf
 
How Can an Attorney Help With My Car Accident Claim?
How Can an Attorney Help With My Car Accident Claim?How Can an Attorney Help With My Car Accident Claim?
How Can an Attorney Help With My Car Accident Claim?
 
Embed-1-1.pdfohediooieoiehohoiefoloeohefoi
Embed-1-1.pdfohediooieoiehohoiefoloeohefoiEmbed-1-1.pdfohediooieoiehohoiefoloeohefoi
Embed-1-1.pdfohediooieoiehohoiefoloeohefoi
 
Trending Topics in ITC Litigation with Knobbe Martens
Trending Topics in ITC Litigation with Knobbe MartensTrending Topics in ITC Litigation with Knobbe Martens
Trending Topics in ITC Litigation with Knobbe Martens
 
一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样
一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样
一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样
 
Asif_Sultan_Syeda_vs_UT_of_J_K.pdf op[ke[k
Asif_Sultan_Syeda_vs_UT_of_J_K.pdf op[ke[kAsif_Sultan_Syeda_vs_UT_of_J_K.pdf op[ke[k
Asif_Sultan_Syeda_vs_UT_of_J_K.pdf op[ke[k
 
Termination of Employees under the Labor Code.pptx
Termination of Employees under the Labor Code.pptxTermination of Employees under the Labor Code.pptx
Termination of Employees under the Labor Code.pptx
 
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
 

Lawyer in Vietnam Dr. Oliver Massmann – RENEWABLE ENERGY AND FEED IN TARIFFS – QUO VADIS - INTERVIEW WITH MERGERMARKET

  • 1. Lawyer in Vietnam Dr. Oliver Massmann – RENEWABLE ENERGY AND FEED IN TARIFFS – QUO VADIS - INTERVIEW WITH MERGERMARKET 1. Dear Dr. Massmann, a government official recently stated that the MoIT probably had enough solar projects in the pipeline, explaining for that fact that such new FIT will be much more lower than the current one (as quoted by Mr. Nguyen Ninh Hai, Deputy Director of New and Renewable Energy Department, MOIT), do you agree with this statement and why? Is there any other reason that you think make sense for planning a new upcoming FiT for solar? OM: The number of approved solar projects has gone far beyond the target capacity in the National Power Master Plan VII (as amended). The Government has to issue a new national power master plan (PDP VIII) to reflect the new target following the market status. In addition, the grid does not have enough capacity to absorb all output from solar projects at the moment and has to be upgraded. This process should take around 1-5 years. The current FiT is also very attractive to foreign investors and high compared to some other countries. For these reasons, the Government has to issue a new FIT to slow down the development of solar projects, thus having time to improve the grid and complete the legal framework. 2. With the market now anticipating the new FiT for solar, which is underway, what is the current situation of those solar projects seeking to be the last one to enjoy the 9.35 US cents feed in tariff? Do you think the anticipation for the new FiT has triggered/ or will trigger a rise in deal value for renewables in Vietnam in the meantime? Perhaps in Ninh Thuan province? If so, by roughly how much %? OM: Solar projects seeking to be the last one to enjoy the current FIT now have to accelerate their development process so that they will come into commercial operation by 30 June 2019. If they cannot (and this is the current situation of many solar projects), the investors tend to delay the construction and wait to see what will happen after 30 June. I am aware that the new FIT is only one of the options,
  • 2. besides auction or a hybrid option. The Government has not yet decided on the final model. Ninh Thuan is already overloaded and investors should look for opportunities in other provinces. 3. Besides the new FiT, what changes would you like to see in the new PPA for projects coming into operation after 30 June 2019? Can you rank these changes from most needed, needed to have, and good to have for the long-term outlook of M&A deals in renewables? Can you briefly explain the reasons for the ranking as well? OM: The bankability of the PPA is of utmost importance. Without this, the investors find it very hard obtaining financing for their projects. Another change I expect is a clear indication of whether the PPA is a take-or-pay agreement. This will help investors secure and ensure the profits and revenue of their projects. The last change but also of not less importance is a dispute resolution clause which provides international arbitration to be an option to resolve the dispute. This could be a great concern for foreign investors, especially those of large utility scale projects. 4. From talking to a market source, the current FiT rate for wind energy projects is profitable enough for investors and he himself as an investor doesn’t want the FiT rate for wind energy projects to go up any more. What would be your argument for the hike in wind FiT and how would it benefit the long-term outlook of M&A deals in wind energy projects? OM: I believe the reason for a recent increase in the wind FiT is to improve profitability of the projects, help investors to recover the investment capital more quickly and arrange a better financing deal with the banks. I note that the PPA is only for 20 years, so if it takes too long to recover the capital, together with the high maintenance cost after that, the investors will no longer be interested in keeping the projects. The new wind FIT will make wind projects more attractive to investors for acquisitions as there is still room for further development after the projects have recovered their investment capital.
  • 3. Please do not hesitate to contact Dr. Oliver Massmann under omassmann@duanemorris.com or any lawyers in our office listing if you have any questions or want to know more details on the above. Dr. Oliver Massmann is the General Director of Duane Morris Vietnam LLC.