1. Roadway & Streetscape Design Remediation 2/10/11 Key Map Remediation Plan Station Gumbes Brower Mill Egypt
2. Deceleration Zone Dramatic speed limit signage and visual cues to slow down traffic as it enters the village Streetscape Amenities Gateways Architectural Structural features to frame transition zones & encourage controlled speeds. Oaks’ existing historic features, General Store, RR structures etc, should be the basis for the Station Ave gateway Nodes High-impact visual gateway for drivers carried out with pedestrian-safe boxes at Station and Brower Aves. Colored and textured crosswalks, countdown signals for pedestrians, median refuges, and pedestrian signage for drivers. etc, should be the basis for the Station Ave gateway Refuge & Planted Medians Protection, beautification, signage & lighting opportunities. Potential for integrating infiltration measures. Street Trees Street trees at proper intervals slow traffic, limit the heat island effect and minimize the impact of the widened roadway. Cultural/Historic Markers Ped. Safe Porkchop Islands Bulb-outs/Curb Extensions Reduce cartway to 9ft lanes @ gateway to neighborhood. Lighting & Signage Backlit signs to reduce req’d street lighting. Full cut off lighting Horizontal Offsets Legend