3. EDUCATION & QUALIFICATIONS
University of Greenwich, London - MA Landscape Architecture, Landscape Architecture 2012
University of Greenwich, London - Certificate in Landscape Design, Landscape Design 2011
University of Life Sciences, Lublin, Poland - M.Sc. Engineer in Horticulture, Horticulture 2009
WORK EXPERIENCE
Intern, Wilder Associates, London April 2013 to July 2013
Produce graphics by hand, AutoCAD and Adobe Photoshop
Prepare presentations in Power Point and packages for clients in Adobe InDesign
Prepare draft drawings for conceptual and schematic design phase
Research on the given subject
Participate in meetings with clients and one day training on new software from Micro Drainage
Administrative experience in managing the office
Intern,| Battle McCarthy Consulting Engineers and Landscape Architects, London February 2013
Help in designing and completing the project for competition
Prepare technical drawings in AutoCAD; additional work in Adobe Photoshop
Intern, Labourer,|Felin research farm at the University of Life Sciences, Lublin, Poland Sep 2007 to Nov 2007
each week training in different departments
assistance with every day duties of personnel at the University
ADDITIONAL INFORMATION
Languages: English (Advanced), German (Basic), Polish (mother tongue)
IT skills: AutoCAD, Adobe Photoshop CS5,Adobe InDesign, ArcGIS, Google Sketchup, Microsoft Suite
4. Table of Contents
1. Wilder Associates Internship
2. Battle McCarthy Internship
3. Royals Business Park at the Royal albert Dock,
london - MA main project
4. Garden Design at Hadlow College Grounds
5. Theme Project
5. 130
Pavers from recycled material natural
colour 自然色再生材料铺地
Vehicular route
行车路线
VIP drop off
VIP 下客处
Public drop off
下客处
Deliveries
运送
Fire escape route
防火通道
Exhibition route
展览通道
Pedestrian route
人行道
Entrance axis
主轴线
1492-GL-02 Access and circulation 交通流线
Public drop off
下客处
Fire escape route
防火通道
Entrance
入口
Wetland
湿地
Frontage landscape
正面景观
Public drop off zone
下客区
VIP drop off zone
VIP下客区
Visual buffering
视觉缓冲
Exhibition zone
展览区
Ground level access is divided
into three main streams. Office
workers who arrive by car will
proceed to basement level and
take elevators directly to the office
areas of the building. Visitors who
arrive by car will be dropped off on
the north side of the building and
those arriving by bus will access
from the south, both making use
of the central axis spine, running
north-south at ground level. This
axis also becomes a central break
our space, providing views of the
mountains and the lake at upper
levels of the building.
A special VIP drop off at the
eastern end of the building allows
special guests to be brought direct
to the commercial lobby, while
exhibition visitors and conference
delegates a brought in via the
central corridor.
进入建筑主要有三个入口。
开车到达的上班族从地下室
乘电梯直达办公室。 开车到
达的访客从建筑北面进入,
乘公车到达的访客从南面进
入。 地面中央轴线贯穿南
北,即从空间上进行分割,
又为远处湖光山色提供观景
台。
东面的VIP下客处 使得重要
客人直接进入商务中心。一
般访客和从会人员从中央通
LEGEND 图例
135
130
1492-04 SUDS Strategy 可持续城市排水系统
Surface collection
from soft areas
植被表面雨水收集
Surface collection from
hard surfaces
硬质路面雨水收集
Sub-surface drainage
地表排水
Pumped water supply
水泵供水
Surface rill
地面浅沟
Biofiltration zone
生物过滤区
Pond
池塘
LEGEND 图例
The surface water management strategy is integrated
into the building design, providing capture of rain water
and improved microclimate.
The strategy is divided into two main components:
1. Capture and Treatment of Rainwater
Rainwater from the roof level pavilions is directed into
surface water attenuation and biofiltration pond, where
it is treated prior to storage at basement level. It is
important to provide as much contact with plant material
as possible in order to remove suspended solids and
organic material prior to tank storage.
2. Attenuation and flood mitigation.
Excess water collected in basement tanks is discharged
into the ground level landscape , where it is joined by
run off from vehicular and pedestrian surfaces. It is
then led through a series of attenuation and filtration
ponds to ensure that the site has a green field equivalent
discharge quantity.
In this case we would be aiming for discharge volume of
1.25 l/s (2.5 l/s/ha).
The site will eventually discharge into Meixi Lake and the
scheme ensures that the quality objectives set down in
the Eco City guidelines are adhered to or exceeded.
地表水管理策略被融合在建筑设计中,
从而最大化捕获和收集雨水,改善局部
气候。
策略主要包括两部分:
1. 雨水的捕获和处理
屋顶阁楼的雨水经引流入地表水沉降池
和生物过滤池后存贮到地下蓄水池。 在
此阶段需最大化和植物接触面积以达到
去除悬浮固体和有机物的目的。
2. 沉淀池和抗洪管理
剩余水被放还到地面植被,和地表水一
起经过一系列的沉淀池和过滤池。该场
地排水量目标为为1.25升/秒(2.5升/秒/
公顷),以保证达到和绿地同等的排水
量。经过滤的剩余水将达到或超过生态
城所设标准,最终排入梅溪湖。
133
Wilder Associates - internship
i started my internship in the wilder associates in the middle of april.
i was working there on everyday basis so i could have had that chance to experi-
ence that office-life in the landscape architecture company.
at the beginning i was preparing sketches (eg. bendera road project) amd doing some
research on the materials, furnitures and planting.
later my role was extended and i was preparing diagrams (autocad & photoshop),
sections (autocad & photoshop) and i was included in conceptual design at the first
stages of the design process.
these three diagrams that I produced for the meixi lake project in china were includ-
ed in the design package that was sent to the client.
1. suds scheme for the entire site
2. access & circulation for the entire site
3. access & circulation for roof level
130
1492-RL-02 Access and circulation 交通要线
Upper wetlands
湿地
Meadow zone
草甸区
Food production
农作物区
PV, wind turbine,
algae tubes demonstration zone
PV, 风力机,微藻能源示范区
Outdoor classroom
室外教室
Urban wetlands
城市湿地
Viewing Points 观景点
Exhibition Route
展览路径
VIP Route
VIP 路径
Science & Technology
科技区
Food Production
食品生产区
Meadow Ecology
草甸生态
Wetland Ecology
湿地生态
Urban Ecology
城市生态
Outdoor Classroom
室外教室
VIP Zone
VIP区
Covered Zone
建筑区
Exhibition Route
展览路径
Viewing Platform
观景台
Buffer planting
缓冲种植带
Exercise Zone
休闲建生区
The roof level of the building offers
an extension of the exhibition
experience by creating a series of
zones through which visitors are
taken on a journey.
The route also provides strategic
vantage points in order to take
in views of the Meixi Lake
development.
Visitors will have an opportunity
to choose various routes, each
culminating at the outdoor
classroom, where the sustainability
credentials of the Eco City can be
explained.
The VIP pavilion at the western
end of the building provides an
exclusive viewing area, where the
emphasis is on greater dwell time
and the ability to entertain guests.
作为绿建展示的一部分,屋
顶花园为访客提供了一个崭
新的体验之旅,同时又成为
一个欣赏梅溪湖的至高点。
访客通过不同的展览路径,
最终汇集于户外教室从而从
理论上更好的了解生态城的
可持续性。
西端的VIP馆提供私人观景
区,更舒适的休息区以及多
样化的娱乐设施。
LEGEND 图例
148
1. 2.
3.
6. Wilder Associates - internship
after the research work on the microclimate, planting, materials and furnitures
the drawings above were produced.
section drawings that show ground level (on the left) and atrium level (on the next
page) were drawn in autocad and then coloured in photoshop.
Also the detailed drawings on the next page were produced the same technique.
130
1492-02 Microclimate 小气候
0
50
100
150
200
250
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
April-June
四月 - 六月
July-September
七月 - 九月
October-December
十月 - 十二月
January-March
一月 - 三月
Longest day
最长日照
Mean day
平均日照
Shortest day
最短日照
0
5
10
15
20
25
30
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0%
5%
10%
15%
20%
N
NNE
NE
ENE
E
ESE
SE
SSE
S
SSW
SW
WSW
W
WNW
NW
NNW
0%
5%
10%
15%
20%
N
NNE
NE
ENE
E
ESE
SE
SSE
S
SSW
SW
WSW
W
WNW
NW
NNW
0%
5%
10%
15%
20%
N
NNE
NE
ENE
E
ESE
SE
SSE
S
SSW
SW
WSW
W
WNW
NW
NNW
0%
5%
10%
15%
20%
N
NNE
NE
ENE
E
ESE
SE
SSE
S
SSW
SW
WSW
W
WNW
NW
NNW
131
Average annual temperature
年平均气温
Sun Path 太阳路径Wind Roses 风玫瑰图
Average annual rainfall
年平均降雨量
130
1492-GL-04 Planting palette 种植方案
Magnolia
Photinia
Gunnera
GlyceriaHimalayacalamus Iris
Euonymus
Calamagrostis
Salix
Cornus Koelreuteria Wildflower meadow
Acer
The planting scheme has
been developed in order
to respond to the colour
themes , created within
the exhibition strategy.
The strongest colour -Red
has been used to define
the extent of the site with
the creation of tree ‘book
ends’ to the east ad west
and linear structural
planting to north and
south.
The site frontage is
dominated by blocks of
Magnolia planting, which
provides spring and
autumn interest without
dominating the southern
facade of the building.
The meadow and wetland
planting areas provide
subtle hues of green, gold
and blue and form a lush
and diverse buffer zone
from the main road to the
south and buildings to the
west.
种植方案以呼应展览的颜色主题为
主。抢眼的红色被用来勾画边界:东
西面种植观赏树木,南北面种植成排
灌木。
临街种植玉兰花组,既为春秋两季提
供观赏价值又不会过于高大而遮掩建
了筑墙面。
草甸和湿地种植区以绿色,金色和蓝
色为主,形成道路和建筑之间一个郁
葱而富于变化的缓冲区。
137
130
1492-AL-02 Hardworks palette 硬质材料
Recycled glass 回收玻璃
Granite 花岗岩
Sandstone 沙石
The atrium spaces form a natural
extension of the office space and
provide views to the mountains
or lake beyond. Therefore the
geometry of these courtyards will
be created in a linear approach, in
order to extend the eye line to the
horizon.
Raised planters will also provide
seating and integrate lighting.
Materials such as polished granite
and resin bonded glass will create
a harmony between traditional and
innovative surfaces.
中庭空间既是办公空
间的延伸,又是享受湖
光山色之处。直线形
在中庭中被大肆应用,
从而在视觉上延伸眼
前的景致到远处的天
际线。
架高花槽整合座椅和照
明于一体。材料上选择
抛光花岗岩和树脂粘结
玻璃材料,从而达到传
统和创新之间的和谐。
143
projects that i was involved in:
- bendera road, kenia
- harbour 55, china
- meixi lake, china
- kent county cricket club:
--residential
--grounds
130
Slab
石板
Slab
石板
Slab
石板
Wildflower
meadow
野花草甸
Ornamental grasses
and shrubs
观赏草及灌木
1492-GL-07.1 Typical sections and construction details 剖面图 及细节
scale1:100@A3
scale1:100@A3
SC-GL04
SC-GL04
SC-GL04
VIP drop off
zone
VIP 下客处
block paving made from
recycled materials laid
in linear patterns
回收材料直线铺面
Large Avenue trees
大型行道树
Boardwalk
木板道
Vehicular road
机动车道
Vehicular road
机动车道
Linear planting
at entrance
入口处列植
Reserved central green
spaces in VIP drop off area
中央绿化带
Vehicular circulation route to
VIP drop off area
机动车道至VIP下客处
Vehicular circulation route to
VIP drop off area
机动车道至VIP下客处
Vehicular access to
basement level
机动车道至地下层
Large woodland trees
大型林地树木
4
5
6
Vegetated
swale
植被浅沟
scale1:100@A3
Location plan
141
Expanded
polystyrene void
聚苯乙烯架
Ornamental grasses
and shrubs
观赏草及灌木
Expanded
polystyrene void
聚苯乙烯架
Expanded
polystyrene void
聚苯乙烯架
7. Wilder Associates - internship
130
1492-AL-05 Typical sections and construction details 剖面图及细节
Glass panel
railing
玻璃护栏
Glass panel
railing
玻璃护栏
Expanded
polystyrene void
聚苯乙烯架
Expanded
polystyrene void
聚苯乙烯架
block paving made from
recycled materials laid in
linear patterns
回收材料线型铺地
block paving made from
recycled materials laid in
linear patterns
回收材料线型铺地
block paving made from
recycled materials laid in
linear patterns
回收材料直线型铺地
Concrete blocks with
bespoke seats from
recycled materials
定制回收材料座椅
Ornamental planting
观赏种植
Ornamental planting
观赏植物
Magnolia tree in planter
with seating wall
盆栽木兰及座椅
Magnolia tree in planter
with seating wall
盆栽木兰及座椅
scale1:50@A3
scale1:50@A3 scale1:50@A3
SC-AL2-01 Location plan
Level 2
Location plan
Level 4
SC-AL2-02 SC-AL4-01
146
Protective Fleece
Root barrier
Deck drain
Waterproof layer
防水层、根障、排水
孔甲板
Protective Fleece
Root barrier
Deck drain
Waterproof layer
防水层、根障、排水
孔甲板
Protective Fleece
Root barrier
Deck drain
Waterproof layer
防水层、根障、排水
孔甲板
My role was varied and included:
- research
- conceptual design
- diagramatic drawings
- autocad drawings
- photoshop
- creating indesign documents
8. Battle McCarthy - internship
I came to the battle mccarthy to assist with one of the big project that the
company prepared for the competition in china.
as i came at the later stage the design was already completed and my main role
was to prepare sets of drawings.
I prepared Autocad drawings for new architectural features in the landscape
like: seasonal biospheres (drawing on the left), new laboratory/research
building (top left), disney botanical biosphere, floating cafe and timber shelter.
9. Battle McCarthy - internship
other assignments included:
- prepare section drawings (autocad and photoshop)
- prepare photomontages/ visualisation
- prepare a plan view of the selected site (photoshop)
10. Royals Business Park Masterplan
the new masterplan converts this
brownfield site into urban mixed-use
area contributing to the character of
dockside to envisage the waterfront as
a hub of activity and opportunity for
urban food production.
Proposed Suds scheme unites the whole
site. Royal albert way is covered with
green bridges to mitigate the noise and
to connect the site with surrounded
area. With 'green carpets' it also coun-
teracts the heat island effect.
11. Royals Business Park - Landscape character assessment & sensitivity to change
landscape character assessment
the tool that I used to help me under-
stand and articulate the character
of the landscape.
it helps indentify the features that
give a locality its
'sense of place' and pinpoints what
makes it different from neighbouring
areas.
landscape quality and sensitivity to change
the assessment of townscape quality/value is the process of eval-
uating different character areas with regard to their character,
condition and aesthetic appeal and then attaching a value to these
areas. it also takes into account an appraisal of the likely value
or importance to the community.
the capacity of the landscape / townscape to accept change of the
type and scale proposed has to be assessed based on the vulnera-
bility of each character area to degradation through the intro-
duction of new features, or through the loss of existing features.
12. the sections show new elements
in the landscape. the attrac-
tions with aquarium, new shop-
ping / market hub, wetland and
water activities at the dock-
front will improve the site so-
cially, ecologically, economically
and aesthetically.
The vision is to return the royal
albert dock to its former glory
as a thriving, vibrant place to
live, work and visit
Royals Business Park - sections
13. Royals Business Park - gis
While doing the assessment
GIS helped me with my work.
I prepered series of draw-
ings that showed me the
right direction in designig
the suds system.
14. Royals Business Park - sketches
the sketches show progress in designing process.
before I took the design to the autocad, first stages of the
design were developed by hand ( two drawings on the left).
in my design i introduced big glass canopies / walls as a type
of barrier against the noise and wind (bottom left).
I also designed the suds system for the entire site. the sketch
below shows particular cells of this scheme.
the drawing above shows the idea of 'sensory garden' with
planting that stimulate all senses.
15. Royals Business Park - photomontages
the photomontages show
four different areas of the
site : the floating fields at
the dockfront, wetland,
new dockfront with glass
canopies and 'sensory gar-
den' next to the newham
councils building.
16. Royals Business Park - construction drawings
construction drawings were drawn in autocad.
1. waterworks construction detail with swale and rigid water
channel sections
2. waterworks construction detail plan view
3. 'Sensory garden' planting plan with planting schedule
1. 2.
3.
17. Garden Design
'colour gallery' garden was a project that I did during my Certificate of land-
scape design year in Hadlow College.
the garden was a part of the broadview gardens that are located in peaceful
picturesque kent countryside.
the objective was to create a garden that invites people for further exploring
of the gardens. the whole process was carried out by hand including final
plan.
18. Garden design - colour and texture plan
this colour and texture plan includes
planting like: evergreen hedge, ornamen-
tal trees and grasses, deciduous and
evergreen shrubs, perennials, ferns and
succulents.
21. Theme Project - urban tranquility - London Bridge & beyond
theme project is a series of
quick photomontages / design
on a given subject.
* no greenery
* no tranquility
* quick pace
* office space around
* boring space
* noise everywhere
* timber deck
* magnificent viewpoint
* noiseproof tunnel covers rail tracks
* different type of planting above rail tracks
before
after
park above the rail tracks
22. Theme Project - context sensitive design - jubilee gardens
* scarce attractions
* less activities
* rectangular shapes
* materials: concrete, limestone,
* water
* boring space
* water pond above the rivers water level
* noise barrier
* underground parking
* in the middle vegetated water ponds in two levels
before
after hill above the underground parking with soundproof barrier
23. before
after
Theme Project - context sensitive design - jubilee gardens
water ponds in the heart of thejubilee gardens water pond on the river thames during winter
can be used as a skating rink