3. AFFORDABLE
SUSTAINABLERELIABLE
Vietnam power industry key country agenda
$148B investment required by 2030
Need for capital / Access to finance
Need for local skill enhancement
Utilizing local talents and capabilities
Interruption duration
… 38 hrs/yr
Interruption frequency
… 13 times/yr
11% power demand growth
8% CO2 emission
10%+ renewable
by 2030
GDP growth rate at 6%+
Source: SAIDI & SAIFI data, EVN Vietnam Electricity Annual Report 2016 l Investment data, PDP7 – Generation & Grid (split 75:25)
5. 1. Status Quo
Case: A power plant in Vietnam
320MW CCGT (2 blocks of 3x1) Reliability/
Flexibility
Growth
(MW)
Emissions
2. Upgrade
Meets NOx goal, moderate capex
Full understanding of trade-offs, to drive the optimized outcome
Cost
(OPEX)
Comply
Low efficiency @43% / High NOx BASELINE
Cost
(Capex)
3. Repowering: advanced small GTs
More MW, more reliability & flexibility,
low emissions, high capex
4. Repowering: advanced large GT
More MW, low emissions,
limited flexibility, high capex
+12% -11%
+21% -20%
Competing options for upgrade
10. THANK YOU
This document is the confidential property of GE Power, a division of General Electric Company. No part of this document may be copied, distributed
or reproduced in whole or in part, nor disclosed to any third party without the written permission of GE Power.