2. Check your name off the chart
Failure to complete homework = video
completion after school today
3. Groups of 4
Discuss questions from your WSQ
Prepare a question to present to the class
4. Are netbooks available? 1 to each group?
Emailed to CFC, who will then upload to
Facebook group and Moodle
1a: In your group, identify the potential risks
involved with Ki o Rahi (at least three for each
category). The categories are: People,
equipment, environment (5 mins)
1b: For each risk, develop strategies to manage
these in a way that protects the physical and
emotional safety of participants (5 mins)
5. RISKS SAFETY MANAGEMENT
People: People:
1. Not understanding rules 1. Make sure people are briefed prior
to the activity.
Equipment:
Equipment:
2. Concussion from soft ball
2. Wear a helmet
Environment:
Environment:
3. Hitting head on ceiling
3. Build the ceiling higher!
6. 2a: Think about your participation in Ki o Rahi
yesterday. Have a look at the Hellison’s
model and think about what level you were
performing at.
For each member of the group, list the level
you performed at and briefly justify why. (5
mins)
Eg: Condo: Level 0 because I got angry and
swore at the teacher. Then I got in a fight with
Jim.
7. 3a: Come up with 5 specific actions or
behaviours to improve the level of social
responsibility in your group (5 mins)
8. 4a: Explain how you could manage the
following group situations so the influence on
peoples social well being was a positive one:
i) a group member not wanting to do
something everyone else in the group was
ii) a group member undermining the leaders
authority
iii) a group member harassing another
member of the group
(10 mins)