SlideShare a Scribd company logo
1 of 14
Download to read offline
HVAC (AHU)
Validation
Noor Nabi
Deputy ManagerValidation & Qualification
 What is HVAC system?
 Objective of HVAC.
 What is the Full form of HVAC?
 HVAC basic parts.
 HVAC validation and Reference Guidelines
 Test perform during HVAC Validation.
 Frequency of HVAC validation test or Requalification.
 Preventive maintenance of HVAC.
Contents
The full form of HVAC system is Heating, Ventilation, and Air Conditioning. HVAC systems generally control
temperature, humidity, and quality of air in a building or any occupied space. The main goal of the HVAC system is to
create and maintain a comfortable environment for the occupant within a building.
 There are basically seven main processes required to achieve the full meaning of HVAC and they are listed and
explained below:-
I.
II.
III.
IV.
V.
VI.
VII.
Heating
Cooling
Humidifying
Dehumidifying
Cleaning
Ventilation
Air Movement
WhatisHVACSystem? &
ObjectivesofHVACSystem
The main objective of an HVAC system is to provide a comfortable environment for the humans living in that space,
but there are many other objectives for using this system: creating a suitable environment for farm animals for their
optimal health, creating a suitable environment for the patients in a hospital, maintaining a suitable temperature for
cold food storage, clean room maintain in pharma industries and many more such type of objectives.

HVAC OBJECTIVE

HVAC SYSTEM





In the word HVAC “H” stands for Heating, “V” stands forVentilation and “AC” stands for Air Conditioning.
H = Heating (Increase or decrease the temperature of water or air)
V =Ventilation (Supply right amount of clean and fresh air)
AC = Air Conditioning
As mentioned above, the term “HVAC” when properly used means the total control of temperature,
moisture in the air (humidity), the supply of fresh outside air for ventilation, filtration of airborne particles
in the air, and the movement of the air in the occupied space.
WhatistheFullformofHVAC?
&
HVACbasicparts.








Furnace
Heat Exchanger
Evaporator Coil
CondensingUnit
Refrigerant Lines
Thermostat
Ducts
Vents

BASIC HVAC PARTS

FULL FORM OF HVAC
HVAC is subjected to the following set of performance test to demonstrate and establish that the
equipment is working under within its designs specifications.
As well as
HVAC Validation is performed for a variety of reasons. To ensure that the design of the facility is fit
for its intended purpose; to ensure that the facility, equipment, and environment meets User
Requirement Specifications (URS); to ensure that the facility, equipment, and environment meet
defined regulatory requirements; to ensure that the facility, equipment, and its environment
function together as a system to meet defined standards.
HVAC validationandReference
Guidelines
HVAC validations as per ISO 14644-1,2,3, EU GMP Annex-15 GMP, WHO-TRS-937, WHO-TRS-961,
Schedule M (National Regulatory Body) guidelines for all room classifications.

HVAC Validation reference guidelines

HVAC Validation
Distribution Test (AIR
test)
TEST
STUDY
HVAC
validation
Test
HVAC
validation
Test
frequency
Air Velocity, Air Volume and
BALANCING)
HEPA Filter Integrity Test (PAO
NON VIABLE PARTICLE COUNT
RECOVERY TIME TEST
AIR FLOW PATTERN
12 months
12 months
ISO-6-8: 12 months
ISO-5: 6months
24 months
24 months
zone*
mins.
filters
0.01%
FPM
HVAC
validation
Test
Variables Normal area Protected area Controlled area Clean
Recovery test Not required Not required NMT 20 mins. NMT 20
Filters Not required 10µ filters 0.3µ filters
0.3µ
PAO Test N/A N/A NMT 0.01%
NMT
Air changes Not required N/A
ISO class 6 > 60/hour
ISO class 7 > 40/hour N/A
ISO class 8 > 20/hour
Airflow velocity N/A N/A N/A 90 ± 20%
Yes,
Airflow visualization N/A N/A Yes, smoke test smoke
test
Equipment Used: Anemometer (vane type/Hot Wire)
Methodology:
To demonstrate that the air system is balanced and capable of delivering sufficient air volume to maintain a minimum
cross sectional velocity under the absolute filter
These tests are executed in every room where an absolute terminal filter module is installed.
Keep the Hot wire Anemometer range as 0 - 1500 FPM.
Keep the probe at 150 mm below the filter grill and velocity recording to be noted.
One filter requires minimum 5 tests spots. Measure the air velocity at 4 corners and 1 center of the filter. CFM = Avg.
of Air Velocity x Area of supply grill
Measure velocity at the center of each grid at the 6-inch height.
Allow no object within 10 ft. of the Anemometer. Minimize the no. of people during at rest testing.
Measurement should be taken for a minimum of 10 seconds.
Calculate the FPM and Air changes per hour.






HVAC validationtestmethodology




Calculation of Air Change Per Hour:
ACPH =
Actual CFM x 60
Volume of Area

Air Velocity, Air Volume and Distribution Test (AIR BALANCING)
Equipment Used: PAO smoke generator & Aerosol Photometer
Methodology:
To demonstrate that the air system is balanced and capable of delivering sufficient air volume to maintain a minimum
cross sectional velocity under the absolute filter
Filter integrity test is performed after Operational air velocities have been verified and adjusted.
Introduce the PAO / Aerosol as a challenge agent into the upstream side of the filter system and
searching for leaks downstream with an aerosol photometer.
Adjust the aerosol photometer such that the pressure is in the range of 1.5 to 2 kg or 20psi (Pascal per
inch).
Position of the smoke generator to the pre filter so that PAO aerosol will be introduced into the
upstream system ahead of HEPA filters.
Once the 100% setting are established at the upstream sides turn the instrument knob to downstream.
Keep the scanning probe1inch below the HEPA filter grill, and start scanning the HEPA filter face area by
holding the probe one inch away from the filter.
Ensure that the scanning speed does not exceed 20 ft /min velocity.
If any leak is observed, then take out the grill and retest it. Assure that the leakage is coming through the
side or housing of the fitment part or HEPA Filter itself.
If fitment leakage is there, tightening the HEPA filter fitment with pressure plate can arrest it. And if the
HEPA filter leakage is still there, the joint can be sealed by silicon sealant, but should not exceed more
than 5% of the surface area.



HVAC validationtestmethodology







HEPA Filter Integrity Test (PAO test)
Equipment Used: Particle Counter
Methodology:



Ensure that the area should be cleaned and air handling unit is kept ON for at least two hours before taking particle count.
Sample one cubic feet air per minute under normalized mode.
Identify the number as per 14644-1: 2015 list below-
HVAC validationtestmethodology




The number of locations shall be rounded up to the nearest higher number.
If the number of location is one, then minimum two samples shall be taken at that location
Identify the locations in the room cover critical locations first.
Set the Particle Counter sample time is minimum 01 min. for class ISO-6, ISO-7, ISO-8 at working height of about 1 meter from the ground level collect the data
for 0.5 µ and 5.0 µ particle for rest condition.
Set the Particle Counter sample time is minimum 1000 Liters for class ISO-5 at working height of about 1 meter from the ground level collect the data for 0.5 µ
and 5.0 µ particle for both rest & operation condition.

Area of clean room (m2) less than or equal to Min. number of sample location to be testedNL
2 1
4 2
6 3
If area is more than 1000 m2
> 1000 mtr N = 27[A/1000]

NON VIABLE PARTICLE COUNT TEST
HVAC validationtestmethodology
Grade
Maximumnumber of permitted particles per cubic meter equal to or
above
At Operation
0.5µ 5.0µ
ISO class 5 3500 29
Maximumnumber of permitted particlesper cubic meter equal to or
above
Grade
At rest
0.5µ 5.0µ
ISO class 5 3520 -
ISO class 6 35,200 293
ISO class 7 352,000 2,930
ISO class 8 35,200,00 29,300

NON VIABLE PARTICLE COUNT TEST Acceptance Criteria:
Equipment Used: Smoke/Foggenerator,Video Camera,Dry ice/ Glycerin+ Water
Methodology:
Glycerin + water should be used for smoke test.
During airflow test should be used properly gowning as per sop.
For results recording provision of video shooting should be made.
Put ON the AHU of the area for which smoke test is to be done.
Generate the fume through the smoke generator and hold it perpendicular to direction of the air flow.
Intensesmoke will be generatedshowingthe airflow direction.Take the video shootingfrom upside downtowards the return
filter.






HVAC validationtestmethodology

AcceptanceCriteria:
Air should flow from the higher-pressure zone to low pressure zone.
The air should flow towards the return air filter or grill.

AIR FLOW PATTERN TEST
Equipment Used: Particle counter

Methodology:
 Glycerin + water should be used for smoke test.
Clean the area and all the equipments before starting the counter.
Set the particles counter and sampling probe should be positioned vertically upward.
Contaminate the area by opening the doors of the room and increasing the man movement in the room. Contaminate the
room until the particle number goes beyond the acceptance limit and reading shall be further continued to get the higher
level.
Take the printout of the maximum particle number in the area.
Start the particle counter with at least 10 cycles set to the particle counter.
The number of particles shall decrease slowly and at the end it will come to normal cleanliness class condition.
The time shall be calculated from the start of the particle count to the time where the number of particles comes under
the limit of the desired cleanliness class.
The recovery period shall be given as the time required getting the classified class conditions from unclassified
conditions, shall be express in minutes and area should be recovered within 20 minutes.
HVAC validationtestmethodology

RECOVERY TIME TEST
HVACPreventivemaintenance
PMissoimportanttomaintainHVAC
efficiency .
Itshouldbeperformedquarterly.

Preventive maintenance of HVAC

More Related Content

What's hot

Protocol for compressed air validation
Protocol for compressed air  validationProtocol for compressed air  validation
Protocol for compressed air validationAvinash Verma
 
Hvac validation protocol
Hvac validation protocolHvac validation protocol
Hvac validation protocolvivekccpr21
 
Validation of pharaceutical water system and pure steam
Validation of pharaceutical water system and pure steamValidation of pharaceutical water system and pure steam
Validation of pharaceutical water system and pure steamJp Prakash
 
Validation utility system
Validation utility systemValidation utility system
Validation utility systemPRANJAY PATIL
 
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...Palash Das
 
Validation of water
Validation of waterValidation of water
Validation of wateranilak123
 
Validation of HVAC pharma geeta TUBE (Utility Systems)
Validation of HVAC pharma geeta TUBE (Utility Systems)Validation of HVAC pharma geeta TUBE (Utility Systems)
Validation of HVAC pharma geeta TUBE (Utility Systems)Saikat Bagchi
 
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptxAUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptxShankar Maind Patil
 
EQUIPMENT VALIDATION : HOT AIR OVEN
EQUIPMENT VALIDATION : HOT AIR OVENEQUIPMENT VALIDATION : HOT AIR OVEN
EQUIPMENT VALIDATION : HOT AIR OVENSagar Savale
 
Auditing of quality assurance and maintenance of engineering department
Auditing of quality assurance and   maintenance of engineering departmentAuditing of quality assurance and   maintenance of engineering department
Auditing of quality assurance and maintenance of engineering departmentPriyanka Kandhare
 
Validation Of System For Compressed Air Quality
Validation Of System For Compressed Air Quality   Validation Of System For Compressed Air Quality
Validation Of System For Compressed Air Quality Imtiaz Rastgar
 
Risk Issues Environmental Monitoring of Cleanrooms
Risk Issues Environmental Monitoring of CleanroomsRisk Issues Environmental Monitoring of Cleanrooms
Risk Issues Environmental Monitoring of Cleanroomsnetomoney
 

What's hot (20)

Presentation on HVAC
Presentation on HVAC Presentation on HVAC
Presentation on HVAC
 
Protocol for compressed air validation
Protocol for compressed air  validationProtocol for compressed air  validation
Protocol for compressed air validation
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 
Hvac validation protocol
Hvac validation protocolHvac validation protocol
Hvac validation protocol
 
Validation of pharaceutical water system and pure steam
Validation of pharaceutical water system and pure steamValidation of pharaceutical water system and pure steam
Validation of pharaceutical water system and pure steam
 
HVAC SYSTEM by Pratik
HVAC SYSTEM by PratikHVAC SYSTEM by Pratik
HVAC SYSTEM by Pratik
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 
Air flow validation
Air flow validationAir flow validation
Air flow validation
 
Water system validation
Water system validationWater system validation
Water system validation
 
Validation utility system
Validation utility systemValidation utility system
Validation utility system
 
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
 
HVAC AUDIT.pdf
HVAC AUDIT.pdfHVAC AUDIT.pdf
HVAC AUDIT.pdf
 
Validation of water
Validation of waterValidation of water
Validation of water
 
Validation of HVAC pharma geeta TUBE (Utility Systems)
Validation of HVAC pharma geeta TUBE (Utility Systems)Validation of HVAC pharma geeta TUBE (Utility Systems)
Validation of HVAC pharma geeta TUBE (Utility Systems)
 
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptxAUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
 
Validation of hvac
Validation of hvacValidation of hvac
Validation of hvac
 
EQUIPMENT VALIDATION : HOT AIR OVEN
EQUIPMENT VALIDATION : HOT AIR OVENEQUIPMENT VALIDATION : HOT AIR OVEN
EQUIPMENT VALIDATION : HOT AIR OVEN
 
Auditing of quality assurance and maintenance of engineering department
Auditing of quality assurance and   maintenance of engineering departmentAuditing of quality assurance and   maintenance of engineering department
Auditing of quality assurance and maintenance of engineering department
 
Validation Of System For Compressed Air Quality
Validation Of System For Compressed Air Quality   Validation Of System For Compressed Air Quality
Validation Of System For Compressed Air Quality
 
Risk Issues Environmental Monitoring of Cleanrooms
Risk Issues Environmental Monitoring of CleanroomsRisk Issues Environmental Monitoring of Cleanrooms
Risk Issues Environmental Monitoring of Cleanrooms
 

Similar to HVAC validation.pdf

Notes on validation
Notes on validationNotes on validation
Notes on validationDhruv Desai
 
Contamination Control in Cleanrooms_Dr.A. Amsavel
Contamination Control in Cleanrooms_Dr.A. AmsavelContamination Control in Cleanrooms_Dr.A. Amsavel
Contamination Control in Cleanrooms_Dr.A. AmsavelDr. Amsavel A
 
One slider for qualification and validation of depyrogenation and sterilizati...
One slider for qualification and validation of depyrogenation and sterilizati...One slider for qualification and validation of depyrogenation and sterilizati...
One slider for qualification and validation of depyrogenation and sterilizati...Palash Das
 
VALIDATION OF UTILITY ( HVAC , CLEANING VALIDATION,)
VALIDATION OF UTILITY ( HVAC , CLEANING VALIDATION,)VALIDATION OF UTILITY ( HVAC , CLEANING VALIDATION,)
VALIDATION OF UTILITY ( HVAC , CLEANING VALIDATION,)workfordhandiadeepak
 
Validación De Sistemas De Gases De Proceso
Validación De Sistemas De Gases De ProcesoValidación De Sistemas De Gases De Proceso
Validación De Sistemas De Gases De ProcesoCrown Cork & Seal
 
Guide Book to NABH Standards for Hospitals by Dr.Mahboob Khan Phd
Guide Book to NABH Standards for Hospitals by Dr.Mahboob Khan PhdGuide Book to NABH Standards for Hospitals by Dr.Mahboob Khan Phd
Guide Book to NABH Standards for Hospitals by Dr.Mahboob Khan PhdHealthcare consultant
 
Pharmaceutical Engineering Downflow Booth Testing
Pharmaceutical Engineering Downflow Booth TestingPharmaceutical Engineering Downflow Booth Testing
Pharmaceutical Engineering Downflow Booth TestingEric Ferguson
 
Clean Room - A compendium according to approved guidelines.
Clean Room - A  compendium according to approved guidelines.Clean Room - A  compendium according to approved guidelines.
Clean Room - A compendium according to approved guidelines.Md Mosaruf Hossan
 
Sterile products manufacturing
Sterile products manufacturingSterile products manufacturing
Sterile products manufacturingDr. Samia
 
PDA COURSE - Facility Design
PDA COURSE - Facility DesignPDA COURSE - Facility Design
PDA COURSE - Facility Designmadhmad
 
Technical Process Instruction Work Sample
Technical Process Instruction Work SampleTechnical Process Instruction Work Sample
Technical Process Instruction Work SampleSharon O'Toole
 
USP 797/800 Cleanroom Compliance by Terra Universal
USP 797/800 Cleanroom Compliance by Terra UniversalUSP 797/800 Cleanroom Compliance by Terra Universal
USP 797/800 Cleanroom Compliance by Terra UniversalTerra Universal
 

Similar to HVAC validation.pdf (20)

HVAC training 2020
HVAC  training 2020HVAC  training 2020
HVAC training 2020
 
Notes on validation
Notes on validationNotes on validation
Notes on validation
 
HVAC system
 HVAC system HVAC system
HVAC system
 
Contamination Control in Cleanrooms_Dr.A. Amsavel
Contamination Control in Cleanrooms_Dr.A. AmsavelContamination Control in Cleanrooms_Dr.A. Amsavel
Contamination Control in Cleanrooms_Dr.A. Amsavel
 
One slider for qualification and validation of depyrogenation and sterilizati...
One slider for qualification and validation of depyrogenation and sterilizati...One slider for qualification and validation of depyrogenation and sterilizati...
One slider for qualification and validation of depyrogenation and sterilizati...
 
HVAC
HVACHVAC
HVAC
 
VALIDATION OF UTILITY ( HVAC , CLEANING VALIDATION,)
VALIDATION OF UTILITY ( HVAC , CLEANING VALIDATION,)VALIDATION OF UTILITY ( HVAC , CLEANING VALIDATION,)
VALIDATION OF UTILITY ( HVAC , CLEANING VALIDATION,)
 
Validación De Sistemas De Gases De Proceso
Validación De Sistemas De Gases De ProcesoValidación De Sistemas De Gases De Proceso
Validación De Sistemas De Gases De Proceso
 
Environmental monitoring
Environmental monitoringEnvironmental monitoring
Environmental monitoring
 
Guide Book to NABH Standards for Hospitals by Dr.Mahboob Khan Phd
Guide Book to NABH Standards for Hospitals by Dr.Mahboob Khan PhdGuide Book to NABH Standards for Hospitals by Dr.Mahboob Khan Phd
Guide Book to NABH Standards for Hospitals by Dr.Mahboob Khan Phd
 
Cleanrooms 101
Cleanrooms 101Cleanrooms 101
Cleanrooms 101
 
Pharmaceutical Engineering Downflow Booth Testing
Pharmaceutical Engineering Downflow Booth TestingPharmaceutical Engineering Downflow Booth Testing
Pharmaceutical Engineering Downflow Booth Testing
 
Clean Room - A compendium according to approved guidelines.
Clean Room - A  compendium according to approved guidelines.Clean Room - A  compendium according to approved guidelines.
Clean Room - A compendium according to approved guidelines.
 
Hvac basics
Hvac basicsHvac basics
Hvac basics
 
hvac_basics
hvac_basicshvac_basics
hvac_basics
 
Sterile products manufacturing
Sterile products manufacturingSterile products manufacturing
Sterile products manufacturing
 
PDA COURSE - Facility Design
PDA COURSE - Facility DesignPDA COURSE - Facility Design
PDA COURSE - Facility Design
 
Technical Process Instruction Work Sample
Technical Process Instruction Work SampleTechnical Process Instruction Work Sample
Technical Process Instruction Work Sample
 
USP 797/800 Cleanroom Compliance by Terra Universal
USP 797/800 Cleanroom Compliance by Terra UniversalUSP 797/800 Cleanroom Compliance by Terra Universal
USP 797/800 Cleanroom Compliance by Terra Universal
 
parenteral
parenteralparenteral
parenteral
 

Recently uploaded

Call Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls ServiceCall Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls Servicesonalikaur4
 
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% SafeBangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safenarwatsonia7
 
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...narwatsonia7
 
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...narwatsonia7
 
Vip Call Girls Anna Salai Chennai 👉 8250192130 ❣️💯 Top Class Girls Available
Vip Call Girls Anna Salai Chennai 👉 8250192130 ❣️💯 Top Class Girls AvailableVip Call Girls Anna Salai Chennai 👉 8250192130 ❣️💯 Top Class Girls Available
Vip Call Girls Anna Salai Chennai 👉 8250192130 ❣️💯 Top Class Girls AvailableNehru place Escorts
 
Bangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% SafeBangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% Safenarwatsonia7
 
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.MiadAlsulami
 
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort ServiceCall Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Serviceparulsinha
 
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdfHemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdfMedicoseAcademics
 
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...narwatsonia7
 
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service LucknowVIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknownarwatsonia7
 
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy GirlsCall Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girlsnehamumbai
 
Call Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Nandini 7001305949 Independent Escort Service BangaloreCall Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalorenarwatsonia7
 
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking ModelsMumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Modelssonalikaur4
 
Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...
Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...
Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...narwatsonia7
 
Call Girls Electronic City Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Electronic City Just Call 7001305949 Top Class Call Girl Service A...Call Girls Electronic City Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Electronic City Just Call 7001305949 Top Class Call Girl Service A...narwatsonia7
 

Recently uploaded (20)

Call Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls ServiceCall Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls Service
 
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
 
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% SafeBangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
 
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
 
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
 
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
 
Vip Call Girls Anna Salai Chennai 👉 8250192130 ❣️💯 Top Class Girls Available
Vip Call Girls Anna Salai Chennai 👉 8250192130 ❣️💯 Top Class Girls AvailableVip Call Girls Anna Salai Chennai 👉 8250192130 ❣️💯 Top Class Girls Available
Vip Call Girls Anna Salai Chennai 👉 8250192130 ❣️💯 Top Class Girls Available
 
Russian Call Girls in Delhi Tanvi ➡️ 9711199012 💋📞 Independent Escort Service...
Russian Call Girls in Delhi Tanvi ➡️ 9711199012 💋📞 Independent Escort Service...Russian Call Girls in Delhi Tanvi ➡️ 9711199012 💋📞 Independent Escort Service...
Russian Call Girls in Delhi Tanvi ➡️ 9711199012 💋📞 Independent Escort Service...
 
Bangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% SafeBangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% Safe
 
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
 
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort ServiceCall Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
 
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdfHemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdf
 
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
 
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
 
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service LucknowVIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
 
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy GirlsCall Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
 
Call Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Nandini 7001305949 Independent Escort Service BangaloreCall Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
 
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking ModelsMumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
 
Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...
Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...
Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...
 
Call Girls Electronic City Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Electronic City Just Call 7001305949 Top Class Call Girl Service A...Call Girls Electronic City Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Electronic City Just Call 7001305949 Top Class Call Girl Service A...
 

HVAC validation.pdf

  • 1. HVAC (AHU) Validation Noor Nabi Deputy ManagerValidation & Qualification
  • 2.  What is HVAC system?  Objective of HVAC.  What is the Full form of HVAC?  HVAC basic parts.  HVAC validation and Reference Guidelines  Test perform during HVAC Validation.  Frequency of HVAC validation test or Requalification.  Preventive maintenance of HVAC. Contents
  • 3. The full form of HVAC system is Heating, Ventilation, and Air Conditioning. HVAC systems generally control temperature, humidity, and quality of air in a building or any occupied space. The main goal of the HVAC system is to create and maintain a comfortable environment for the occupant within a building.  There are basically seven main processes required to achieve the full meaning of HVAC and they are listed and explained below:- I. II. III. IV. V. VI. VII. Heating Cooling Humidifying Dehumidifying Cleaning Ventilation Air Movement WhatisHVACSystem? & ObjectivesofHVACSystem The main objective of an HVAC system is to provide a comfortable environment for the humans living in that space, but there are many other objectives for using this system: creating a suitable environment for farm animals for their optimal health, creating a suitable environment for the patients in a hospital, maintaining a suitable temperature for cold food storage, clean room maintain in pharma industries and many more such type of objectives.  HVAC OBJECTIVE  HVAC SYSTEM
  • 4.      In the word HVAC “H” stands for Heating, “V” stands forVentilation and “AC” stands for Air Conditioning. H = Heating (Increase or decrease the temperature of water or air) V =Ventilation (Supply right amount of clean and fresh air) AC = Air Conditioning As mentioned above, the term “HVAC” when properly used means the total control of temperature, moisture in the air (humidity), the supply of fresh outside air for ventilation, filtration of airborne particles in the air, and the movement of the air in the occupied space. WhatistheFullformofHVAC? & HVACbasicparts.         Furnace Heat Exchanger Evaporator Coil CondensingUnit Refrigerant Lines Thermostat Ducts Vents  BASIC HVAC PARTS  FULL FORM OF HVAC
  • 5. HVAC is subjected to the following set of performance test to demonstrate and establish that the equipment is working under within its designs specifications. As well as HVAC Validation is performed for a variety of reasons. To ensure that the design of the facility is fit for its intended purpose; to ensure that the facility, equipment, and environment meets User Requirement Specifications (URS); to ensure that the facility, equipment, and environment meet defined regulatory requirements; to ensure that the facility, equipment, and its environment function together as a system to meet defined standards. HVAC validationandReference Guidelines HVAC validations as per ISO 14644-1,2,3, EU GMP Annex-15 GMP, WHO-TRS-937, WHO-TRS-961, Schedule M (National Regulatory Body) guidelines for all room classifications.  HVAC Validation reference guidelines  HVAC Validation
  • 6. Distribution Test (AIR test) TEST STUDY HVAC validation Test HVAC validation Test frequency Air Velocity, Air Volume and BALANCING) HEPA Filter Integrity Test (PAO NON VIABLE PARTICLE COUNT RECOVERY TIME TEST AIR FLOW PATTERN 12 months 12 months ISO-6-8: 12 months ISO-5: 6months 24 months 24 months
  • 7. zone* mins. filters 0.01% FPM HVAC validation Test Variables Normal area Protected area Controlled area Clean Recovery test Not required Not required NMT 20 mins. NMT 20 Filters Not required 10µ filters 0.3µ filters 0.3µ PAO Test N/A N/A NMT 0.01% NMT Air changes Not required N/A ISO class 6 > 60/hour ISO class 7 > 40/hour N/A ISO class 8 > 20/hour Airflow velocity N/A N/A N/A 90 ± 20% Yes, Airflow visualization N/A N/A Yes, smoke test smoke test
  • 8. Equipment Used: Anemometer (vane type/Hot Wire) Methodology: To demonstrate that the air system is balanced and capable of delivering sufficient air volume to maintain a minimum cross sectional velocity under the absolute filter These tests are executed in every room where an absolute terminal filter module is installed. Keep the Hot wire Anemometer range as 0 - 1500 FPM. Keep the probe at 150 mm below the filter grill and velocity recording to be noted. One filter requires minimum 5 tests spots. Measure the air velocity at 4 corners and 1 center of the filter. CFM = Avg. of Air Velocity x Area of supply grill Measure velocity at the center of each grid at the 6-inch height. Allow no object within 10 ft. of the Anemometer. Minimize the no. of people during at rest testing. Measurement should be taken for a minimum of 10 seconds. Calculate the FPM and Air changes per hour.       HVAC validationtestmethodology     Calculation of Air Change Per Hour: ACPH = Actual CFM x 60 Volume of Area  Air Velocity, Air Volume and Distribution Test (AIR BALANCING)
  • 9. Equipment Used: PAO smoke generator & Aerosol Photometer Methodology: To demonstrate that the air system is balanced and capable of delivering sufficient air volume to maintain a minimum cross sectional velocity under the absolute filter Filter integrity test is performed after Operational air velocities have been verified and adjusted. Introduce the PAO / Aerosol as a challenge agent into the upstream side of the filter system and searching for leaks downstream with an aerosol photometer. Adjust the aerosol photometer such that the pressure is in the range of 1.5 to 2 kg or 20psi (Pascal per inch). Position of the smoke generator to the pre filter so that PAO aerosol will be introduced into the upstream system ahead of HEPA filters. Once the 100% setting are established at the upstream sides turn the instrument knob to downstream. Keep the scanning probe1inch below the HEPA filter grill, and start scanning the HEPA filter face area by holding the probe one inch away from the filter. Ensure that the scanning speed does not exceed 20 ft /min velocity. If any leak is observed, then take out the grill and retest it. Assure that the leakage is coming through the side or housing of the fitment part or HEPA Filter itself. If fitment leakage is there, tightening the HEPA filter fitment with pressure plate can arrest it. And if the HEPA filter leakage is still there, the joint can be sealed by silicon sealant, but should not exceed more than 5% of the surface area.    HVAC validationtestmethodology        HEPA Filter Integrity Test (PAO test)
  • 10. Equipment Used: Particle Counter Methodology:    Ensure that the area should be cleaned and air handling unit is kept ON for at least two hours before taking particle count. Sample one cubic feet air per minute under normalized mode. Identify the number as per 14644-1: 2015 list below- HVAC validationtestmethodology     The number of locations shall be rounded up to the nearest higher number. If the number of location is one, then minimum two samples shall be taken at that location Identify the locations in the room cover critical locations first. Set the Particle Counter sample time is minimum 01 min. for class ISO-6, ISO-7, ISO-8 at working height of about 1 meter from the ground level collect the data for 0.5 µ and 5.0 µ particle for rest condition. Set the Particle Counter sample time is minimum 1000 Liters for class ISO-5 at working height of about 1 meter from the ground level collect the data for 0.5 µ and 5.0 µ particle for both rest & operation condition.  Area of clean room (m2) less than or equal to Min. number of sample location to be testedNL 2 1 4 2 6 3 If area is more than 1000 m2 > 1000 mtr N = 27[A/1000]  NON VIABLE PARTICLE COUNT TEST
  • 11. HVAC validationtestmethodology Grade Maximumnumber of permitted particles per cubic meter equal to or above At Operation 0.5µ 5.0µ ISO class 5 3500 29 Maximumnumber of permitted particlesper cubic meter equal to or above Grade At rest 0.5µ 5.0µ ISO class 5 3520 - ISO class 6 35,200 293 ISO class 7 352,000 2,930 ISO class 8 35,200,00 29,300  NON VIABLE PARTICLE COUNT TEST Acceptance Criteria:
  • 12. Equipment Used: Smoke/Foggenerator,Video Camera,Dry ice/ Glycerin+ Water Methodology: Glycerin + water should be used for smoke test. During airflow test should be used properly gowning as per sop. For results recording provision of video shooting should be made. Put ON the AHU of the area for which smoke test is to be done. Generate the fume through the smoke generator and hold it perpendicular to direction of the air flow. Intensesmoke will be generatedshowingthe airflow direction.Take the video shootingfrom upside downtowards the return filter.       HVAC validationtestmethodology  AcceptanceCriteria: Air should flow from the higher-pressure zone to low pressure zone. The air should flow towards the return air filter or grill.  AIR FLOW PATTERN TEST
  • 13. Equipment Used: Particle counter  Methodology:  Glycerin + water should be used for smoke test. Clean the area and all the equipments before starting the counter. Set the particles counter and sampling probe should be positioned vertically upward. Contaminate the area by opening the doors of the room and increasing the man movement in the room. Contaminate the room until the particle number goes beyond the acceptance limit and reading shall be further continued to get the higher level. Take the printout of the maximum particle number in the area. Start the particle counter with at least 10 cycles set to the particle counter. The number of particles shall decrease slowly and at the end it will come to normal cleanliness class condition. The time shall be calculated from the start of the particle count to the time where the number of particles comes under the limit of the desired cleanliness class. The recovery period shall be given as the time required getting the classified class conditions from unclassified conditions, shall be express in minutes and area should be recovered within 20 minutes. HVAC validationtestmethodology  RECOVERY TIME TEST