3. KOTA SUPER THERMAL POWER PLANT IS A COAL BASED
STEAM POWER PLANT
IT IS LOCATED ON THE BANK OF CHAMBEL RIVER.
TOTAL GENERATION CAPACITY IS 1240MW.
CENTRAL ELECTRICAL AUTHORITY WAS PREPARED THE
PROJECT OF THIS PLANT IN APRIL,1973.
4. AVAILABILITY OF WATER
NEARNESS TO LOAD CENTER
SUPPLY OF FUEL
TRANSPORTATION FACILITIES
TYPE AND COST OF LAND
5. GENERATION CAPACITYGENERATION CAPACITY
STAGES UNITS CAPACITY
STAGE :- 1 UNIT NO. 1 110MW
UNIT NO. 2 110MW
STAGE :- 2 UNIT NO.3 210MW
UNIT NO. 4 210MW
STAGE :- 3 UNIT NO. 5 210MW
STAGE :- 4 UNIT NO. 6 195MW
STAGE :- 5 UNIT NO. 7 195MW
6. Coal handling plant is the first and initiate term
of the plant.
coal plant is the heart of the plant .
11. A Boiler (or Steam Generator) is a closed vessel in which water,
under pressure is converted into steam.
(i)Fire Tube Boiler (ii) Water Tube Boiler
Water Tube Boiler:- In this type of boiler
water flows inside the tubes and hot gases
flow outside the tubes.
Furnace:- Furnace is primary part of the boiler
where the chemical energy of coal is converted
into thermal energy by combustion.
12.
13. Three type of turbine
*Intermediate pressure turbine
*Low pressure turbine
*High pressure turbine
Basic principle: As steam enters moving parts of turbine change of
momentum takes place which results work done
Kinetic energy of steam Mechanical (rotational) energyTurbineTurbine
14. * The percentage of ash in coal varies from 5% in
good quality coal to about 40% in poor quality coal.
* Electrostatic Precipitator is used in ash handling plant to
remove fly ash.
* The stations use some conveyor arrangement to carry ash to
dump sites directly or for carrying and loading it to trucks
and wagons which transport it to the site of disposal.