2. JURONG DATA CENTRE DEVELOPMENT
CURRENTLY MAJORITY
OWNED BY JAPAN LAND (S)
LIMITED
SGX LISTED
COMPLETED A DATA CENTRE
PROJECT IN TOKYO –
LARGEST RECENTLY
CONSTRUCTED – 18,000SQM
4. MECHANICAL AND ELECTRICAL
DUAL REDUNDANT 22KV INCOMING MAINS
UP TO 6 MVA DEDICATED POWER TRANSFORMERS IN N+N
CONFIGURATION TO EACH FLOOR
UP TO 6 MVA OF GENERATORS IN N+1 CONFIGURATION TO
EACH FLOOR
CHILLED WATER SYSTEM CONFIGURED IN N+N RISER WITH N
+1 CHILLER CONFIGURATION
48 HOURS FUEL & WATER STORAGE