GUIDELINES FOR
CONTRACTOR REGISTRATION
Thank you for your interest in being registered as a contractor on the cidb Register of Contractors.
To ensure successful registration and avoid delays please ensure that you furnish the cidb with all
the necessary information and supporting documents when you apply.
The Construction Industry Development Board
V-2 : 2011
Grade
1
2
3
4
5
6
7
8
9
Tender value less than or equal to (R)
200 000
650 000
2 000 000
4 000 000
6 500 000
13 000 000
40 000 000
130 000 000
No limit
The extension, installation, repair, maintenance or renewal, or removal of asphalt
The development, extension, installation, removal and dismantling, as relevant, associated with building excavations, shaft
sinking and lateral earth support
The development, extension, installation, repair, renewal, removal or alteration of corrosion protection systems (cathodic,
anodic and electrolytic)
Demolition of buildings and engineering infrastructure and blasting
The development, extension, installation, renewal, removal, renovation, alteration or dismantling of fire prevention and
protection infrastructure (drencher and sprinkler systems and fire installation)
The development, extension, installation, renewal, removal, renovation, alteration or dismantling of glazing, curtain walls
and shop fronts
The development, extension, installation, maintenance, renewal, removal, alteration or dismantling, as relevant, of
landscaping, irrigation and horticultural works
The development, extension, installation, repair, maintenance, renewal, removal, renovation, alteration or dismantling of lifts,
escalators, travellators and hoisting machinery
The development, installation, removal, or dismantling, as relevant, of piles and other specialised foundations for buildings
and structures
The installation, renewal, removal, alteration or dismantling, as relevant, road markings and signage
The development, extension, installation, renewal, removal, renovation, alteration or dismantling of structural steelwork
and scaffolding
Timber buildings & structures
The extension, installation, repair, maintenance, renewal, removal, renovation or alteration, as relevant, of the waterproofing
of basements, roofs and walls using specialist systems
The development, extension, installation, renewal, removal, alteration, or dismantling or demolition of water installations and
soil and waste water drainage associated with buildings (wet services and plumbing)
The development, extension, installation, repair, removal, alteration, dismantling or demolition of precast concrete, security
fencing or steel security fencing
TYPES OF WORKS THAT CONTRACTORS CAN REGISTER FOR:
SPECIALIST WORKS
Works identified and defined by the Board that involve specialist capabilities for their execution
SB
SC
SD
SE
SF
SG
SH
SI
SJ
SK
SL
SM
SN
SO
SQ
Application
Received
Compliant?
Application
Registered within
21 Working Days
Annual
Confirmation
Received?
Registration
Updated
3 Year Renewal
Received
Registration
Renewed
Non-Compliant
Letter sent
allowing 60
days before
Cancellation
Registration
suspended after
three months
grace period
Registration
removed from
the register
on the date
of expiry
WHO MUST APPLY?
All contractors seeking to participate in public sector infrastructure delivery must be registered on
the cidb Register of Contractors.
Contractors who are exempted from registration are:
• Home builders, unless they also wish to tender for other kinds of public sector construction work.
• Those who undertake contracts consisting substantially of the provision of labour.
• Those who undertake contracts consisting substantially of the provision of supplies.
WHY REGISTER?
According to the CIDB Act 38 of 2000 no public sector client may award construction contracts to
a contractor who is not registered.The Register grades and categorises contractors according to
their capability to carry out construction projects. There are 9 different grading levels according to
which contractors can be registered. A grade determines the maximum Rand value of a project as
well as the type of construction works a contractor is capable to perform.
TABLE 1(A): TENDER VALUE RANGES
1
2
TABLE 1(B): MORE CLASSES OF CONSTRUCTION WORKS (Schedule 3 of the regulations)
ELECTRICAL ENGINEERING WORKS - BUILDING (EB) - Electrical certificate Required
ELECTRICAL ENGINEERING WORKS - INFRASTRUCTURE (EP)
GENERAL BUILDING WORKS (GB)
MECHANICAL ENGINEERING WORKS (ME)
CIVIL ENGINEERING (CE)
DEFINITION BASIC WORKS TYPES EXAMPLES
Construction Works primarily concerned with materials such
as steel, concrete, earth & rock & their application in the
development, extension, installation, maintenance, removal,
renovation, alteration, or dismantling of building and
engineering infrastructure
Water, sewerage, roads, railways,
harbours and transport, urban
development & municipal services
• Structures such as cooling tower, bridge, culvert, dam, grand stand,
road, railway, reservoir, runway, swimming pool, silo or tunnel.
• The results of operations such as dredging, earthworks and
geotechnical processes.
• Township services, water treatment and supply, sewerage works,
sanitation, soil conservation works, irrigation works, storm-water and
drainage works, coastal works, ports, harbours, airports and pipelines
Construction Works that are primarily concerned with the
installation, extension, modification or repair of electrical
installations in or on any premises used for the transmission
of electricity from a point of control to a point of
consumption, including any article forming part of such an
installation
All electrical equipment forming an integral
and permanent part of buildings and/or
structures, including any wiring, cable
jointing and laying and electrical overhead
line construction
• Electrical installations in buildings
• Electrical reticulations within a plot of land (erf) or building site
• Standby plant and uninterrupted power supply
• Verification and certification of electrical installations on premises
Construction Works that are primarily concerned with
development, extension, installation, removal, renovation,
alteration or dismantling of engineering infrastructure:
a) relating to the generation, transmission and distribution
of electricity; or
b) Which cannot be classified as EB
Electrical power generation, transmission,
control and distribution equipment &
systems
• Power generation
• Street & area lighting
• Substations & protection systems
• Township reticulations
• Transmission lines
Construction Works that:
a) are primarily concerned with the development, extension,
installation, renewal, renovation, alteration, or dismantling
of a permanent shelter for its occupants or contents; or
b) cannot be categorised in terms of the definitions provided
for civil engineering works, electrical engineering works,
mechanical engineering works, or specialist works
Building & ancillary works other than those
categorised as:
• civil engineering works
• electrical engineering works
• mechanical engineering works
• specialist works
• Buildings for domestic, industrial, institutional or commercial
occupancies
• Car ports
• Masonry (brick, block or stone) and lightly reinforced or
unreinforced cast in-situ concrete walls and timber fences
• Stores
• Walls
Construction Works that are primarily concerned with the
development, extension, installation, removal, alteration,
renewal of engineering infrastructure for gas transmission
and distribution, solid waste disposal, heating, ventilation
and cooling, chemical works, metallurgical works,
manufacturing, food processing and materials handling
• Machine systems including those relating
to the environment of building interiors
• Gas transmission and distribution systems
• Pipelines
• Materials handling, lifting machinery,
heating, ventilation and cooling, pumps
• Continuous process systems, chemical
works, metallurgical works, manufacturing,
food processing such as that in
concentrator machinery and apparatus, oil
and gas wells, smelters, cyanide plants,
acid plants, metallurgical machinery,
equipment and apparatus, and works
necessary for the beneficiation of metals,
minerals, rocks, petroleum and organic
substances or other chemical processes
• Air-conditioning & mechanical ventilation
• Boiler installations & steam distribution
• Central heating
• Centralised hot water generation
• Compressed air, gas & vacuum installations
• Conveyor & materials handling installations
• Continuous process systems involving chemical works,
metallurgical works, oil and gas wells, acid plants, metallurgical
machinery, equipment and apparatus, and works necessary for the
beneficiation of metals, minerals, rocks, petroleum and organic
substance and other chemical processes
• Dust and sawdust extraction
• Kitchen equipment
• Laundry equipment
• Refrigeration & cold rooms
• Waste handling systems (including compactors)
3
CAN A CONTRACTOR BE REGISTERED IN DIFFERENT GRADES?
A contractor may apply to be graded in one or several grades. However a contractor can only be registered in 1 grade per class of works.
PROVIDING SUFFICIENT EVIDENCE TO SUPPORT YOUR APPLICATION
The cidb evaluates applications for grading and registration based on evidence of works and financial capability provided by the
contractor. Evidence is then used to determine which grade and class of works a company qualifies for. Once a grade has been
determined and approved by the Board a contractor is then able to tender for construction contracts within the approved grade. Should
a contractor fail to provide sufficient evidence to support the grade applied for the cidb will determine an appropriate grade based on
the information at its disposal.
A contractor has the right to appeal the decision of the cidb.
To determine grading the cidb evaluates a contractor’s financial and works capability.
FINANCIAL CAPABILITY REQUIREMENTS:
To determine financial capability the cidb takes into consideration:
1. The best annual turnover over the two financial years immediately preceding the application and available capital.
2. Available capital. The cidb calculates available capital by adding any financial sponsorship to the sum of the net asset value of a
contractor as indicated in the most recent financial statements. Net Asset Value is the difference between the total assets and total
liabilities of a company as reflected in the company's most recent financial statements.
3. Financial sponsorship. Financial sponsorship must be a collectable financial guarantee by one person (a sponsor) to another, (the
beneficiary). Financial sponsorship must be:
• A determined amount to support operations of the contractor concerned in order to complete projects. Any sponsorship from another
company other than a financial institution may not exceed 15% of the sponsor's net asset value;
• Available to the beneficiary as and when required;
• If applicable, it must be available to a third person, such as a bank, to advance funds or such as a supplier, to advance a line of credit;
• If applicable, it must be in a form acceptable to any financial institution in South Africa as defined in the Financial Services Board Act,
97 of 1990; and
Please note that:
a) where the sponsor is a registered contractor or owns 50 percent or more of the applicant contractor, sponsorship may constitute
up to 100 percent of the total required available capital;
b) where the sponsor is not a registered contractor and owns 25 percent or more of the applicant contractor, sponsorship may not
exceed 75 percent of the total required available capital; and
c) where the contractor is not a registered contractor and the sponsor owns less than 25 percent of the applicant contractor,
sponsorship may not exceed 50 percent of the total required available capital.
WORKS CAPABILITY REQUIREMENTS EXPLAINED:
Works capability is determined by:
• The largest contract undertaken and completed in the relevant class of construction works within the 5 years immediately preceding
the application;
• The total number of full time registered professionals employed (See Table 3 and 4)
• The fulfillment of relevant statutory requirements.
TYPES OF GRADING METHODS USED:
There are two methods that a contractors grade may be assessed on (see Table 2 below):
Method A is based on financial capacity and works capability and is applicable to all grades.
Method B is based on available capital and the number of registered professionals employed and is only applicable for grades 5 - 9.
(There are no turnover and track record requirements for Method B). The requirement for available capital and registered professionals
for Method B is higher than the requirement for Method A.
Works Capability
TABLE 2: FINANCIAL & WORKS CAPABILITY REQUIREMENTS FOR METHOD A AND METHOD B
4
The minimum number of registered professionals per grade for method A and B is indicated below in Table 3 and table 4 respectively:
TABLE 3: MINIMUM NUMBER OF REGISTERED PROFESSIONALS REQUIRED
(BASED ON METHOD A)
Available capital
(R)
Grade
2
3
4
5
6
7
8
9
Maximum tender
value (R)
650 000
2 000 000
4 000 000
6 500 000
13 000 000
40 000 000
130 000 000
No limit
Best Annual turnover
(R) over 2 years
immediately
preceding application
0
1 000 000
2 000 000
3 250 000
7 800 000
24 000 000
90 000 000
270 000 000
Available capital
(R)
0
OR 100 000
OR 200 000
650 000
1 300 000
4 000 000
13 000 000
40 000 000
Largest contract (R)
over 5 years
immediately
preceding application
150 000
500 000
1 000 000
1 600 000
3 250 000
10 000 000
32 500 000
100 000 000
Method BMethod A
N/A
N/A
N/A
1 300 000
2 600 000
8 000 000
26 000 000
80 000 000
6
7
8
9
13 000 000
40 000 000
130 000 000
No Limit
R
R
R
N/A
1
2
3
N/A
1
2
3
1
2
3
4
1
2
3
4
1
2
3
4
Designation Maximum Value of
Contract that a
contractor is
considered capable
of performing
General Building
(GB)
Civil
Engineering
(CE)
Electrical
Engineering
(EB & EP)
Mechanical
Engineering
(ME)
Specialist Works
Minimum Number of Full-Time Equivalent Registered Professional(s) Required for
Registration in a Class of Construction Works
5
6
7
8
9
6 500 000
13 000 000
40 000 000
130 000 000
No Limit
R
R
R
R
1
2
4
6
8
1
2
4
6
8
1
2
4
6
8
1
2
4
6
8
1
2
4
6
8
Works Capability
Designation Maximum Value of
Contract that a
contractor is
considered capable
of performing
General Building
(GB)
Civil
Engineering
(CE)
Electrical
Engineering
(EB & EP)
Mechanical
Engineering
(ME)
Specialist Works
Minimum Number of Full-Time Equivalent Registered Professional(s) Required for
Registration in a Class of Construction Works
TABLE 4: MINIMUM NUMBER OF REGISTERED PROFESSIONALS REQUIRED
(BASED ON METHOD B)
5
• The contractor must employ the minimum number of registered professionals permanently (full time) or the equivalent number of
persons on a part time basis (totalling 40 hours a week).
• The "full-time equivalent" means that, for example, two part time engineers, each working 20 hours a week, would equal one
full-time engineer.
• A registered professional is recognised by virtue of his or her training and experience as having the necessary qualifications to undertake
construction works in a specific class. All registered professionals (e.g. architects, quantity surveyors, etc.) employed by a contractor are
required to be registered with relevant built environment councils:
The following classes of construction works require professionals who are registered in accordance with the following councils:
Civil Engineering, Electrical Engineering and Mechanical Engineering
• Engineering Profession Act 46 of 2000 (Council: ECSA) or
• Project and Construction Management Professions Act 48 of 2000 (Council: SACPCMP)
General Building and Specialist Works
• Project and Construction Management Professions Act 48 of 2000 (Council: SACPCMP) or
• Engineering Profession Act 46 of 2000 (Council: ECSA) or
• Architectural Profession Act 44 of 2000 (Council: SACAP) or
• Quantity Surveying Profession Act 49 of 2000 (Council: SACQSP) or
• Landscape Architectural Profession Act 45 of 2000 (Council: SACLAP)
ELECTRICAL ENGINEERING
All contractors applying for the EB class of works must provide the cidb with an originally certified copy of their Electrical contractor's
certificate, issued by the Electrical Contractor’s Board.
It is important that the Electrical contractors' certificate is in the name of the company applying and it must still be valid at the time of
registration. A valid, originally certified copy of the Electrical contractors' certificate must be provided to the cidb annually.
SUPPORTING DOCUMENTS
Please note that:
• All financial statements for a private company must be audited. The cidb may, for other forms of company where the financial statements
are not audited, request supporting evidence of that contractor's turnover. Such evidence would be in the form of the South African
Revenue Services Form VAT 201 (return for value added tax) and proof of payment of that value added tax;
• A contractor's records may be transferable from one enterprise to the other where the same entity either: a) Changes name, b) converts
to a close corporation, c) amalgamates with another company, d) is taken over by another company or e) changes membership or
member's interest of a close corporation
• An original tax clearance certificate is a compulsory requirement for all applications. If a foreign enterprise has not yet performed
contracts in South Africa but wants to register it must provide proof that it has paid all taxes due to the government of its origin.
6
JOINT VENTURES
A joint venture is a grouping of two or more contractors who jointly and severally undertake to perform a construction works contract.
Once-off joint ventures do not have to register. However, each partner of the joint venture must be registered separately and the leading
partner must have a contractor grading designation in the relevant class of construction works.
The cidb has developed a calculator to enable assessment of joint ventures. This calculator is available on the cidb website at
www.cidb.org.za.
POTENTIALLY EMERGING ENTERPRISES
Contractors may also apply to be recognized as Potentially Emerging (PE) contractors. "Emerging enterprise" means an enterprise which
is owned, managed and controlled by previously disadvantaged persons and which is overcoming business impediments arising from the
legacy of apartheid. A registered, potentially emerging contractor may be awarded a contract at one level higher than the enterprise's
registered contractor grading designation, if the client or employer:
• is satisfied that such a contractor has the potential to develop and qualify to be registered in that higher grade; and
• ensures that financial, management or other support is provided - in the context of a targeted development programme to enable the
contractor to successfully execute that contract.
HOW TO APPLY:
All applications must be submitted on an approved registration form, which may be collected at any of our nationwide Construction
Contact Centres, or downloaded from our website at www.cidb.org.za
• Contractors applying for Grade 2 - 9 must use the application form CRS F006.
• Contractors applying for Grade 1 must use the application form CRS F007.
Contractors who submit incomplete applications have a 60 day grace period from the date of application in which to submit
outstanding information and supporting documents. Failure to comply will result in cancellation of the application. Administration fees are
non-refundable.
Registration is valid for a three year period, subject to payment of an annual fee and subject to compliance with the code of conduct for
contractors as published by the cidb in the Government Gazette no. 25656 of 2003. To prevent fraud the cidb no longer prints contractor
registration certificates. Clients and other stakeholders must consult the cidb website www.cidb.org.za to verify a contractor's grade.
Please ensure that your application meets all cidb requirements together with the relevant documentary evidence for the grades
applied for. For comprehensive requirements to apply in each grade please consult the cidb Checklist for Contractor Registration included
in this guideline.
7
TABLE 5: REGISTRATION FEES
2
3
4
5
6
7
8
9
650 000
2 000 000
4 000 000
6 500 000
13 000 000
40 000 000
130 000 000
No Limit
R
R
R
R
R
R
R
450
750
750
750
750
750
750
750
R
R
R
R
R
R
R
R
250
350
900
1 750
3 500
9 000
29 000
55 000
R
R
R
R
R
R
R
R
Contractor Grading
Designation
Upper limit of
Tender Value Range
Designation
Administration / Renewal Fee
in respect of each
Grade applied for
Annual Fees Payable in respect
of the Highest Contractor
Grading Designation
Note:
Please use your enterprise name as the reference when making payment.
Contractors already registered with the cidb, should please use their cidb registration number (CRS number) as the reference.
Please note that the cidb does not accept cash payments and cheques over the counter.
APPLYING FOR GRADE 1
Grade 1 contractors can register over the counter at any of the provincial Construction Contact Centers. It takes 48 hours for a Grade 1
registration to be approved by the cidb, and to become visible on our website under the approved contractors listing. Registration is valid
for a period of three years and there are no annual fees payable. Grade 1 contractors are not required to submit proof of financial
capability or track record of projects previously completed.
REQUIRED DOCUMENTATION FOR GRADE 1 APPLICATIONS
• Application form.
• Proof of Payment.
• Company Registration documentation.
• Identity Documents for a maximum of 20 principals.
• Tax Clearance certificate.
• Electrical Contractors License (for EB class of works only).
Note that the payment for grade 1 class of works is R450 per class of works, valid for 3 years. (For example, an application for
1CE = R450.00 whereas an application for both 1CE and 1ME = R900.00)
APPLYING FOR GRADES 2 - 9
Applications for registration in grades 2 - 9 are assessed in terms of both financial and works capability requirements.
REQUIRED DOCUMENTATION FOR GRADE 2 - 9 APPLICATIONS
All required documents for Grade 1 PLUS
• Financial statement for the two years immediately preceeding the application. (used to determine the financial capability)
• Track Record documents (used to determine the works capability)
• Letter of Award
• Certificate of Completion
• Final / latest payment certificate
• Registered Professionals certificate(s) with a relevant built environment council (used to determine the works capability). See table 3 & 4
on page 4.
Consult the checklist on page 10 for a comprehensive list of registration requirements.
REGISTRATION FEES (FOR GRADE 2 - 9 APPLICATIONS ONLY)
Registration fees are mandatory, and required for all initial application, as well as amendments to existing registrations. Registrations are
valid for a 3 year period, whereafter a re-application for registration is required.
A payment is made up of two parts,
• An admin payment which is payable for each class of works applied for.
• An annual payment which is payable in advance for the highest class of works applied for, and required as an annual obligation.
Payment should be made to the cidb in the following instances.
1. Initial registration with the cidb
a. Admin fees for each class of works applied for.
b. Annual fees only for the highest grade applied for.
2. Annual update
a. Annual fees only for the highest grade.
3. 3 Year renewal
a. Admin fees for each class of works applied for.
b. Annual fees only for the highest grade applied for.
4. Upgrade
a. Admin fees for each class of works to be upgraded.
b. The difference in the Annual fees from the highest grade currently registered in and the highest grade applied for (pro-rata for
the remainder of the annual period).
5. Additional class of works.
a. Admin fees for each class of works to be added.
b. The difference in the Annual fees from the highest grade currently registered in and the highest grade applied for (if the additional
class of works is a higher grade), pro-rata for the remainder of the annual period.
8
CONDITIONS OF REGISTRATION
The contractor must:
• confirm particulars provided on his application form annually on or before the anniversary date of his registration;
• pay the relevant administration fee(s), as well as the stipulated annual fee;
• notify the cidb of any change of particulars relating to an existing registration;
• be free from any restrictions to tender;
• comply with the Code of Conduct for All Parties Engaged in Construction Procurement, as published by the cidb in the Government
Gazette no. 25656 of 2003. (Also available at: www.cidb.org.za)
• annually provide a valid, original tax clearance certificate, upon expiry of the previous certificate; and
• renew registration every three years for requalification of grades.
Please note that false information provided or a false declaration is a punishable offence in terms of the cidb ACT, Construction Industry
Development Regulations and other applicable laws.
WHO IS THE cidb?
The cidb has been established in terms of the Construction Industry Development Board Act 38 of 2000. It has the mandate to lead the
construction industry stakeholders in construction development and to facilitate regulation and development of the construction industry.
The cidb is required in terms of the Construction Industry Development Board Act to establish the Register of Contractors. The Register
grades and categorises contractors according to their capability to carry out construction projects. All contractors seeking to participate in
public sector infrastructure delivery must be registered on the cidb Register of Contractors.
9
10
CHECKLIST
SECTION B (i): Enterprise Particulars
Close Corporation (latest CK1 / CK2) Company:
• Certificate of Incorporation (CM1)
• List of all active directors (CM29)
• Share certificates
• All name change certificates (CM9) (if applicable)
Partnership (partnership agreement)
Trust ( a copy of the trust deed or JM21)
Other:
SECTION B (ii): Principals and Ownership / Interest
Attach originally certified copies of Identity Documents (for a maximum of 20 principals)
SECTION D (i): Annual Best Turnover
Attach a complete set of financial statements (compliant with GAAP or IFRS) for the 2 financial years immediately preceding the application:
• Public / Private company - Audited
• Trust - Audited
• Close Corporation - compiled by an accounting officer
• Partnership - compiled by an accounting officer
• Sole Traders - compiled by a bookkeeper / accounting officer
SECTION D (ii): Available Capital
Description and proof of financial sponsorship(s)
• Financial institution sponsorship
OR
• Letter of sponsorship undertaking in the form of a members resolution from a CC and a board resolution from a Company
• If sponsor is not a financial institution please attach the sponsors latest set of financial statements (compliant with GAAP or IFRS)
SECTION E: Track Record
For each class of works applied for, attach copies of:
• Letter of award; and
• Certificate of completion; and
• Final payment certificate indicating the contract value.
Maintenance contractors may provide client payment certificate indicating the value of work done to date;
• Joint Venture agreement (if applicable);
• Sub-contract agreement and corresponding bank statements (if applicable).
SECTION E (iv): Transfer of Track Record
Attach particulars of changes in name or company type
OR
Auditors letter confirming changes in company structure
SECTION F (i): Registered Professional(s)
Certificate of registration with the relevant built environment council / Ensure that the declaration is signed and ensure that the registered professionals sign
SECTION F (ii): Requirements for Registration in Electrical Engineering for EB class of works
Attach originally certified copy of the enterprise's valid Electrical Contractor's certificate / Ensure that the declaration is signed and ensure that the
registered professionals sign
SECTION H: Payment of Fees
Attach proof of Payment
(please use your company name or CRS number as the reference number when making payment).
SECTION I: Declaration
Attach valid, original Tax Clearance Certificate and;
Attach signed declaration of the contractor and;
Attach signed declaration of the registered professional(s) (if applicable).
cidb HELP LINE: 0860 103 353
cidb FRAUD HOTLINE: 0800 112 432
cidb CONSTRUCTION CONTACT CENTRES (CCC's):
Eastern Cape
Department of Public Works
Qhasana Building
Independence Avenue
Bisho
Tel: 0861 222 327
Fax: 086 674 2908
Free State
Medford Building
St. Andrews Street
Ground Floor
Bloemfontein
Tel: 0861 377 222
Fax: 086 552 8692
Gauteng
Blocks N & R
SABS Campus
2 Dr Lategan Road
Groenkloof, Pretoria
Tel: 0861 428 222
Fax: 086 680 8569
North West
Department of Public Works
Old Parliament Building
Modiri Molema Road
Gate House
Mmabatho
Tel: (018) 387 2150 / 2435
Fax: 086 743 3193
Northern Cape
Regional Department of Transport,
Roads and Public Works
45 Schmidtdrift Road
Kimberley
Tel: 0861 222 627
Fax: 086 690 6295
Western Cape
140 Long Street
Cnr Long & Dorp Street
Cape Town
Tel: 0861 927 222
Fax: 086 674 0293
KwaZulu Natal
Department of Public Works
428 Blink Bonnie Road
Mayville, Durban
Tel: 0861 596 222
Fax: 086 856 6024
Limpopo
Department of Public Works
1st Floor, Works Tower Building
43 Church Street
Polokwane
Tel: 0861 222 765
Fax: 086 678 9184
Mpumalanga
Nelcity Building
Office No. G15
Cnr Samora Machel &
Paul Kruger Street
Nelspruit
Tel: 0861 678 222
Fax: 086 685 6733

More Related Content

What's hot

Cv SF van Zyl - December 2015
Cv SF van Zyl - December 2015Cv SF van Zyl - December 2015
Cv SF van Zyl - December 2015Frans Van Zyl
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015naiyar yazdani
 
Graded unit Civil engineering Presentation
Graded unit Civil engineering PresentationGraded unit Civil engineering Presentation
Graded unit Civil engineering PresentationTehmas Saeed
 
What is ASHRAE 90.1?
What is ASHRAE 90.1?What is ASHRAE 90.1?
What is ASHRAE 90.1?CannonDesign
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)Mohamed Ahmed
 
EN16309 - methodology social performance assessment (comprehensive presentation)
EN16309 - methodology social performance assessment (comprehensive presentation)EN16309 - methodology social performance assessment (comprehensive presentation)
EN16309 - methodology social performance assessment (comprehensive presentation)Chris Hamans
 
Project mechanical engineer c.v
Project mechanical engineer c.vProject mechanical engineer c.v
Project mechanical engineer c.vali ibrahim
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian Akl
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typChristian Akl
 
CEN TC350 prEN16309: methodology for the social performance assessment of bui...
CEN TC350 prEN16309: methodology for the social performance assessment of bui...CEN TC350 prEN16309: methodology for the social performance assessment of bui...
CEN TC350 prEN16309: methodology for the social performance assessment of bui...Chris Hamans
 
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........yogeshpokharkar
 
Electrical_Designer_10_11_2015
Electrical_Designer_10_11_2015Electrical_Designer_10_11_2015
Electrical_Designer_10_11_2015Thomas Rallis
 
Jose Ruiz resume
Jose Ruiz resumeJose Ruiz resume
Jose Ruiz resumeJosé Ruiz
 

What's hot (19)

Cv SF van Zyl - December 2015
Cv SF van Zyl - December 2015Cv SF van Zyl - December 2015
Cv SF van Zyl - December 2015
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015
 
HVAC Design Course Content For Regular & Weekend Batch
HVAC Design Course Content For Regular & Weekend BatchHVAC Design Course Content For Regular & Weekend Batch
HVAC Design Course Content For Regular & Weekend Batch
 
Graded unit Civil engineering Presentation
Graded unit Civil engineering PresentationGraded unit Civil engineering Presentation
Graded unit Civil engineering Presentation
 
What is ASHRAE 90.1?
What is ASHRAE 90.1?What is ASHRAE 90.1?
What is ASHRAE 90.1?
 
RESUME JULY 2016
RESUME JULY 2016RESUME JULY 2016
RESUME JULY 2016
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)
 
EN16309 - methodology social performance assessment (comprehensive presentation)
EN16309 - methodology social performance assessment (comprehensive presentation)EN16309 - methodology social performance assessment (comprehensive presentation)
EN16309 - methodology social performance assessment (comprehensive presentation)
 
PORTFOLIO-DCASSIANO
PORTFOLIO-DCASSIANOPORTFOLIO-DCASSIANO
PORTFOLIO-DCASSIANO
 
Project mechanical engineer c.v
Project mechanical engineer c.vProject mechanical engineer c.v
Project mechanical engineer c.v
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOC
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
 
CEN TC350 prEN16309: methodology for the social performance assessment of bui...
CEN TC350 prEN16309: methodology for the social performance assessment of bui...CEN TC350 prEN16309: methodology for the social performance assessment of bui...
CEN TC350 prEN16309: methodology for the social performance assessment of bui...
 
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........
 
ENG SAID C.V...
ENG SAID   C.V...ENG SAID   C.V...
ENG SAID C.V...
 
Emma McMullan CV 2
Emma McMullan CV 2Emma McMullan CV 2
Emma McMullan CV 2
 
Electrical_Designer_10_11_2015
Electrical_Designer_10_11_2015Electrical_Designer_10_11_2015
Electrical_Designer_10_11_2015
 
STEVEN J
STEVEN JSTEVEN J
STEVEN J
 
Jose Ruiz resume
Jose Ruiz resumeJose Ruiz resume
Jose Ruiz resume
 

Similar to Brochure contractor registration_guidelines

No 1 Licensed structural auditor in Mumbai CSR consultant and associates
No 1 Licensed structural auditor in Mumbai CSR consultant and associatesNo 1 Licensed structural auditor in Mumbai CSR consultant and associates
No 1 Licensed structural auditor in Mumbai CSR consultant and associatesCSR Consultant and Associates
 
New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105Safe Rise
 
Building permit 2
Building permit 2Building permit 2
Building permit 2Lumbad 1989
 
Greener Greater Building Plan Overview
Greener Greater Building Plan Overview Greener Greater Building Plan Overview
Greener Greater Building Plan Overview REBNY
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-Stevie Nimmo
 
BUTLAS Consulting Engineers - Profile
BUTLAS Consulting Engineers - ProfileBUTLAS Consulting Engineers - Profile
BUTLAS Consulting Engineers - ProfileSreenivas Butla
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentationAKASHGARG131
 
SCS -SOQ January 2015 II
SCS -SOQ January 2015 IISCS -SOQ January 2015 II
SCS -SOQ January 2015 IIHal Forsyth
 
Surtreat Construction Services -SOQ January 2015
Surtreat Construction Services -SOQ January 2015Surtreat Construction Services -SOQ January 2015
Surtreat Construction Services -SOQ January 2015Hal Forsyth
 
INTODUCTION TO CIVIL ENGINEERING
INTODUCTION TO CIVIL ENGINEERINGINTODUCTION TO CIVIL ENGINEERING
INTODUCTION TO CIVIL ENGINEERINGHafiz JUNAID
 
What are Highways Works, Street works, Road works and Diversionary Works
What are Highways Works, Street works, Road works and Diversionary WorksWhat are Highways Works, Street works, Road works and Diversionary Works
What are Highways Works, Street works, Road works and Diversionary WorksCarlo Gabriele Borri MACostE AMICE
 

Similar to Brochure contractor registration_guidelines (20)

wsa
wsawsa
wsa
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
No 1 Licensed structural auditor in Mumbai CSR consultant and associates
No 1 Licensed structural auditor in Mumbai CSR consultant and associatesNo 1 Licensed structural auditor in Mumbai CSR consultant and associates
No 1 Licensed structural auditor in Mumbai CSR consultant and associates
 
Transmission line Project
Transmission line ProjectTransmission line Project
Transmission line Project
 
New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105
 
Building permit 2
Building permit 2Building permit 2
Building permit 2
 
Greener Greater Building Plan Overview
Greener Greater Building Plan Overview Greener Greater Building Plan Overview
Greener Greater Building Plan Overview
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-
 
BUTLAS Consulting Engineers - Profile
BUTLAS Consulting Engineers - ProfileBUTLAS Consulting Engineers - Profile
BUTLAS Consulting Engineers - Profile
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
M.Salah cv1
M.Salah cv1M.Salah cv1
M.Salah cv1
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentation
 
SCS -SOQ January 2015 II
SCS -SOQ January 2015 IISCS -SOQ January 2015 II
SCS -SOQ January 2015 II
 
ckreddycv (1)
ckreddycv (1)ckreddycv (1)
ckreddycv (1)
 
Resume
ResumeResume
Resume
 
Surtreat Construction Services -SOQ January 2015
Surtreat Construction Services -SOQ January 2015Surtreat Construction Services -SOQ January 2015
Surtreat Construction Services -SOQ January 2015
 
INTODUCTION TO CIVIL ENGINEERING
INTODUCTION TO CIVIL ENGINEERINGINTODUCTION TO CIVIL ENGINEERING
INTODUCTION TO CIVIL ENGINEERING
 
What are Highways Works, Street works, Road works and Diversionary Works
What are Highways Works, Street works, Road works and Diversionary WorksWhat are Highways Works, Street works, Road works and Diversionary Works
What are Highways Works, Street works, Road works and Diversionary Works
 

Recently uploaded

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 

Recently uploaded (20)

★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 

Brochure contractor registration_guidelines

  • 1. development through partnership GUIDELINES FOR CONTRACTOR REGISTRATION Thank you for your interest in being registered as a contractor on the cidb Register of Contractors. To ensure successful registration and avoid delays please ensure that you furnish the cidb with all the necessary information and supporting documents when you apply. The Construction Industry Development Board V-2 : 2011
  • 2. Grade 1 2 3 4 5 6 7 8 9 Tender value less than or equal to (R) 200 000 650 000 2 000 000 4 000 000 6 500 000 13 000 000 40 000 000 130 000 000 No limit The extension, installation, repair, maintenance or renewal, or removal of asphalt The development, extension, installation, removal and dismantling, as relevant, associated with building excavations, shaft sinking and lateral earth support The development, extension, installation, repair, renewal, removal or alteration of corrosion protection systems (cathodic, anodic and electrolytic) Demolition of buildings and engineering infrastructure and blasting The development, extension, installation, renewal, removal, renovation, alteration or dismantling of fire prevention and protection infrastructure (drencher and sprinkler systems and fire installation) The development, extension, installation, renewal, removal, renovation, alteration or dismantling of glazing, curtain walls and shop fronts The development, extension, installation, maintenance, renewal, removal, alteration or dismantling, as relevant, of landscaping, irrigation and horticultural works The development, extension, installation, repair, maintenance, renewal, removal, renovation, alteration or dismantling of lifts, escalators, travellators and hoisting machinery The development, installation, removal, or dismantling, as relevant, of piles and other specialised foundations for buildings and structures The installation, renewal, removal, alteration or dismantling, as relevant, road markings and signage The development, extension, installation, renewal, removal, renovation, alteration or dismantling of structural steelwork and scaffolding Timber buildings & structures The extension, installation, repair, maintenance, renewal, removal, renovation or alteration, as relevant, of the waterproofing of basements, roofs and walls using specialist systems The development, extension, installation, renewal, removal, alteration, or dismantling or demolition of water installations and soil and waste water drainage associated with buildings (wet services and plumbing) The development, extension, installation, repair, removal, alteration, dismantling or demolition of precast concrete, security fencing or steel security fencing TYPES OF WORKS THAT CONTRACTORS CAN REGISTER FOR: SPECIALIST WORKS Works identified and defined by the Board that involve specialist capabilities for their execution SB SC SD SE SF SG SH SI SJ SK SL SM SN SO SQ Application Received Compliant? Application Registered within 21 Working Days Annual Confirmation Received? Registration Updated 3 Year Renewal Received Registration Renewed Non-Compliant Letter sent allowing 60 days before Cancellation Registration suspended after three months grace period Registration removed from the register on the date of expiry WHO MUST APPLY? All contractors seeking to participate in public sector infrastructure delivery must be registered on the cidb Register of Contractors. Contractors who are exempted from registration are: • Home builders, unless they also wish to tender for other kinds of public sector construction work. • Those who undertake contracts consisting substantially of the provision of labour. • Those who undertake contracts consisting substantially of the provision of supplies. WHY REGISTER? According to the CIDB Act 38 of 2000 no public sector client may award construction contracts to a contractor who is not registered.The Register grades and categorises contractors according to their capability to carry out construction projects. There are 9 different grading levels according to which contractors can be registered. A grade determines the maximum Rand value of a project as well as the type of construction works a contractor is capable to perform. TABLE 1(A): TENDER VALUE RANGES 1
  • 3. 2 TABLE 1(B): MORE CLASSES OF CONSTRUCTION WORKS (Schedule 3 of the regulations) ELECTRICAL ENGINEERING WORKS - BUILDING (EB) - Electrical certificate Required ELECTRICAL ENGINEERING WORKS - INFRASTRUCTURE (EP) GENERAL BUILDING WORKS (GB) MECHANICAL ENGINEERING WORKS (ME) CIVIL ENGINEERING (CE) DEFINITION BASIC WORKS TYPES EXAMPLES Construction Works primarily concerned with materials such as steel, concrete, earth & rock & their application in the development, extension, installation, maintenance, removal, renovation, alteration, or dismantling of building and engineering infrastructure Water, sewerage, roads, railways, harbours and transport, urban development & municipal services • Structures such as cooling tower, bridge, culvert, dam, grand stand, road, railway, reservoir, runway, swimming pool, silo or tunnel. • The results of operations such as dredging, earthworks and geotechnical processes. • Township services, water treatment and supply, sewerage works, sanitation, soil conservation works, irrigation works, storm-water and drainage works, coastal works, ports, harbours, airports and pipelines Construction Works that are primarily concerned with the installation, extension, modification or repair of electrical installations in or on any premises used for the transmission of electricity from a point of control to a point of consumption, including any article forming part of such an installation All electrical equipment forming an integral and permanent part of buildings and/or structures, including any wiring, cable jointing and laying and electrical overhead line construction • Electrical installations in buildings • Electrical reticulations within a plot of land (erf) or building site • Standby plant and uninterrupted power supply • Verification and certification of electrical installations on premises Construction Works that are primarily concerned with development, extension, installation, removal, renovation, alteration or dismantling of engineering infrastructure: a) relating to the generation, transmission and distribution of electricity; or b) Which cannot be classified as EB Electrical power generation, transmission, control and distribution equipment & systems • Power generation • Street & area lighting • Substations & protection systems • Township reticulations • Transmission lines Construction Works that: a) are primarily concerned with the development, extension, installation, renewal, renovation, alteration, or dismantling of a permanent shelter for its occupants or contents; or b) cannot be categorised in terms of the definitions provided for civil engineering works, electrical engineering works, mechanical engineering works, or specialist works Building & ancillary works other than those categorised as: • civil engineering works • electrical engineering works • mechanical engineering works • specialist works • Buildings for domestic, industrial, institutional or commercial occupancies • Car ports • Masonry (brick, block or stone) and lightly reinforced or unreinforced cast in-situ concrete walls and timber fences • Stores • Walls Construction Works that are primarily concerned with the development, extension, installation, removal, alteration, renewal of engineering infrastructure for gas transmission and distribution, solid waste disposal, heating, ventilation and cooling, chemical works, metallurgical works, manufacturing, food processing and materials handling • Machine systems including those relating to the environment of building interiors • Gas transmission and distribution systems • Pipelines • Materials handling, lifting machinery, heating, ventilation and cooling, pumps • Continuous process systems, chemical works, metallurgical works, manufacturing, food processing such as that in concentrator machinery and apparatus, oil and gas wells, smelters, cyanide plants, acid plants, metallurgical machinery, equipment and apparatus, and works necessary for the beneficiation of metals, minerals, rocks, petroleum and organic substances or other chemical processes • Air-conditioning & mechanical ventilation • Boiler installations & steam distribution • Central heating • Centralised hot water generation • Compressed air, gas & vacuum installations • Conveyor & materials handling installations • Continuous process systems involving chemical works, metallurgical works, oil and gas wells, acid plants, metallurgical machinery, equipment and apparatus, and works necessary for the beneficiation of metals, minerals, rocks, petroleum and organic substance and other chemical processes • Dust and sawdust extraction • Kitchen equipment • Laundry equipment • Refrigeration & cold rooms • Waste handling systems (including compactors)
  • 4. 3 CAN A CONTRACTOR BE REGISTERED IN DIFFERENT GRADES? A contractor may apply to be graded in one or several grades. However a contractor can only be registered in 1 grade per class of works. PROVIDING SUFFICIENT EVIDENCE TO SUPPORT YOUR APPLICATION The cidb evaluates applications for grading and registration based on evidence of works and financial capability provided by the contractor. Evidence is then used to determine which grade and class of works a company qualifies for. Once a grade has been determined and approved by the Board a contractor is then able to tender for construction contracts within the approved grade. Should a contractor fail to provide sufficient evidence to support the grade applied for the cidb will determine an appropriate grade based on the information at its disposal. A contractor has the right to appeal the decision of the cidb. To determine grading the cidb evaluates a contractor’s financial and works capability. FINANCIAL CAPABILITY REQUIREMENTS: To determine financial capability the cidb takes into consideration: 1. The best annual turnover over the two financial years immediately preceding the application and available capital. 2. Available capital. The cidb calculates available capital by adding any financial sponsorship to the sum of the net asset value of a contractor as indicated in the most recent financial statements. Net Asset Value is the difference between the total assets and total liabilities of a company as reflected in the company's most recent financial statements. 3. Financial sponsorship. Financial sponsorship must be a collectable financial guarantee by one person (a sponsor) to another, (the beneficiary). Financial sponsorship must be: • A determined amount to support operations of the contractor concerned in order to complete projects. Any sponsorship from another company other than a financial institution may not exceed 15% of the sponsor's net asset value; • Available to the beneficiary as and when required; • If applicable, it must be available to a third person, such as a bank, to advance funds or such as a supplier, to advance a line of credit; • If applicable, it must be in a form acceptable to any financial institution in South Africa as defined in the Financial Services Board Act, 97 of 1990; and Please note that: a) where the sponsor is a registered contractor or owns 50 percent or more of the applicant contractor, sponsorship may constitute up to 100 percent of the total required available capital; b) where the sponsor is not a registered contractor and owns 25 percent or more of the applicant contractor, sponsorship may not exceed 75 percent of the total required available capital; and c) where the contractor is not a registered contractor and the sponsor owns less than 25 percent of the applicant contractor, sponsorship may not exceed 50 percent of the total required available capital. WORKS CAPABILITY REQUIREMENTS EXPLAINED: Works capability is determined by: • The largest contract undertaken and completed in the relevant class of construction works within the 5 years immediately preceding the application; • The total number of full time registered professionals employed (See Table 3 and 4) • The fulfillment of relevant statutory requirements. TYPES OF GRADING METHODS USED: There are two methods that a contractors grade may be assessed on (see Table 2 below): Method A is based on financial capacity and works capability and is applicable to all grades. Method B is based on available capital and the number of registered professionals employed and is only applicable for grades 5 - 9. (There are no turnover and track record requirements for Method B). The requirement for available capital and registered professionals for Method B is higher than the requirement for Method A.
  • 5. Works Capability TABLE 2: FINANCIAL & WORKS CAPABILITY REQUIREMENTS FOR METHOD A AND METHOD B 4 The minimum number of registered professionals per grade for method A and B is indicated below in Table 3 and table 4 respectively: TABLE 3: MINIMUM NUMBER OF REGISTERED PROFESSIONALS REQUIRED (BASED ON METHOD A) Available capital (R) Grade 2 3 4 5 6 7 8 9 Maximum tender value (R) 650 000 2 000 000 4 000 000 6 500 000 13 000 000 40 000 000 130 000 000 No limit Best Annual turnover (R) over 2 years immediately preceding application 0 1 000 000 2 000 000 3 250 000 7 800 000 24 000 000 90 000 000 270 000 000 Available capital (R) 0 OR 100 000 OR 200 000 650 000 1 300 000 4 000 000 13 000 000 40 000 000 Largest contract (R) over 5 years immediately preceding application 150 000 500 000 1 000 000 1 600 000 3 250 000 10 000 000 32 500 000 100 000 000 Method BMethod A N/A N/A N/A 1 300 000 2 600 000 8 000 000 26 000 000 80 000 000 6 7 8 9 13 000 000 40 000 000 130 000 000 No Limit R R R N/A 1 2 3 N/A 1 2 3 1 2 3 4 1 2 3 4 1 2 3 4 Designation Maximum Value of Contract that a contractor is considered capable of performing General Building (GB) Civil Engineering (CE) Electrical Engineering (EB & EP) Mechanical Engineering (ME) Specialist Works Minimum Number of Full-Time Equivalent Registered Professional(s) Required for Registration in a Class of Construction Works 5 6 7 8 9 6 500 000 13 000 000 40 000 000 130 000 000 No Limit R R R R 1 2 4 6 8 1 2 4 6 8 1 2 4 6 8 1 2 4 6 8 1 2 4 6 8 Works Capability Designation Maximum Value of Contract that a contractor is considered capable of performing General Building (GB) Civil Engineering (CE) Electrical Engineering (EB & EP) Mechanical Engineering (ME) Specialist Works Minimum Number of Full-Time Equivalent Registered Professional(s) Required for Registration in a Class of Construction Works TABLE 4: MINIMUM NUMBER OF REGISTERED PROFESSIONALS REQUIRED (BASED ON METHOD B)
  • 6. 5 • The contractor must employ the minimum number of registered professionals permanently (full time) or the equivalent number of persons on a part time basis (totalling 40 hours a week). • The "full-time equivalent" means that, for example, two part time engineers, each working 20 hours a week, would equal one full-time engineer. • A registered professional is recognised by virtue of his or her training and experience as having the necessary qualifications to undertake construction works in a specific class. All registered professionals (e.g. architects, quantity surveyors, etc.) employed by a contractor are required to be registered with relevant built environment councils: The following classes of construction works require professionals who are registered in accordance with the following councils: Civil Engineering, Electrical Engineering and Mechanical Engineering • Engineering Profession Act 46 of 2000 (Council: ECSA) or • Project and Construction Management Professions Act 48 of 2000 (Council: SACPCMP) General Building and Specialist Works • Project and Construction Management Professions Act 48 of 2000 (Council: SACPCMP) or • Engineering Profession Act 46 of 2000 (Council: ECSA) or • Architectural Profession Act 44 of 2000 (Council: SACAP) or • Quantity Surveying Profession Act 49 of 2000 (Council: SACQSP) or • Landscape Architectural Profession Act 45 of 2000 (Council: SACLAP) ELECTRICAL ENGINEERING All contractors applying for the EB class of works must provide the cidb with an originally certified copy of their Electrical contractor's certificate, issued by the Electrical Contractor’s Board. It is important that the Electrical contractors' certificate is in the name of the company applying and it must still be valid at the time of registration. A valid, originally certified copy of the Electrical contractors' certificate must be provided to the cidb annually. SUPPORTING DOCUMENTS Please note that: • All financial statements for a private company must be audited. The cidb may, for other forms of company where the financial statements are not audited, request supporting evidence of that contractor's turnover. Such evidence would be in the form of the South African Revenue Services Form VAT 201 (return for value added tax) and proof of payment of that value added tax; • A contractor's records may be transferable from one enterprise to the other where the same entity either: a) Changes name, b) converts to a close corporation, c) amalgamates with another company, d) is taken over by another company or e) changes membership or member's interest of a close corporation • An original tax clearance certificate is a compulsory requirement for all applications. If a foreign enterprise has not yet performed contracts in South Africa but wants to register it must provide proof that it has paid all taxes due to the government of its origin.
  • 7. 6 JOINT VENTURES A joint venture is a grouping of two or more contractors who jointly and severally undertake to perform a construction works contract. Once-off joint ventures do not have to register. However, each partner of the joint venture must be registered separately and the leading partner must have a contractor grading designation in the relevant class of construction works. The cidb has developed a calculator to enable assessment of joint ventures. This calculator is available on the cidb website at www.cidb.org.za. POTENTIALLY EMERGING ENTERPRISES Contractors may also apply to be recognized as Potentially Emerging (PE) contractors. "Emerging enterprise" means an enterprise which is owned, managed and controlled by previously disadvantaged persons and which is overcoming business impediments arising from the legacy of apartheid. A registered, potentially emerging contractor may be awarded a contract at one level higher than the enterprise's registered contractor grading designation, if the client or employer: • is satisfied that such a contractor has the potential to develop and qualify to be registered in that higher grade; and • ensures that financial, management or other support is provided - in the context of a targeted development programme to enable the contractor to successfully execute that contract. HOW TO APPLY: All applications must be submitted on an approved registration form, which may be collected at any of our nationwide Construction Contact Centres, or downloaded from our website at www.cidb.org.za • Contractors applying for Grade 2 - 9 must use the application form CRS F006. • Contractors applying for Grade 1 must use the application form CRS F007. Contractors who submit incomplete applications have a 60 day grace period from the date of application in which to submit outstanding information and supporting documents. Failure to comply will result in cancellation of the application. Administration fees are non-refundable. Registration is valid for a three year period, subject to payment of an annual fee and subject to compliance with the code of conduct for contractors as published by the cidb in the Government Gazette no. 25656 of 2003. To prevent fraud the cidb no longer prints contractor registration certificates. Clients and other stakeholders must consult the cidb website www.cidb.org.za to verify a contractor's grade. Please ensure that your application meets all cidb requirements together with the relevant documentary evidence for the grades applied for. For comprehensive requirements to apply in each grade please consult the cidb Checklist for Contractor Registration included in this guideline.
  • 8. 7 TABLE 5: REGISTRATION FEES 2 3 4 5 6 7 8 9 650 000 2 000 000 4 000 000 6 500 000 13 000 000 40 000 000 130 000 000 No Limit R R R R R R R 450 750 750 750 750 750 750 750 R R R R R R R R 250 350 900 1 750 3 500 9 000 29 000 55 000 R R R R R R R R Contractor Grading Designation Upper limit of Tender Value Range Designation Administration / Renewal Fee in respect of each Grade applied for Annual Fees Payable in respect of the Highest Contractor Grading Designation Note: Please use your enterprise name as the reference when making payment. Contractors already registered with the cidb, should please use their cidb registration number (CRS number) as the reference. Please note that the cidb does not accept cash payments and cheques over the counter.
  • 9. APPLYING FOR GRADE 1 Grade 1 contractors can register over the counter at any of the provincial Construction Contact Centers. It takes 48 hours for a Grade 1 registration to be approved by the cidb, and to become visible on our website under the approved contractors listing. Registration is valid for a period of three years and there are no annual fees payable. Grade 1 contractors are not required to submit proof of financial capability or track record of projects previously completed. REQUIRED DOCUMENTATION FOR GRADE 1 APPLICATIONS • Application form. • Proof of Payment. • Company Registration documentation. • Identity Documents for a maximum of 20 principals. • Tax Clearance certificate. • Electrical Contractors License (for EB class of works only). Note that the payment for grade 1 class of works is R450 per class of works, valid for 3 years. (For example, an application for 1CE = R450.00 whereas an application for both 1CE and 1ME = R900.00) APPLYING FOR GRADES 2 - 9 Applications for registration in grades 2 - 9 are assessed in terms of both financial and works capability requirements. REQUIRED DOCUMENTATION FOR GRADE 2 - 9 APPLICATIONS All required documents for Grade 1 PLUS • Financial statement for the two years immediately preceeding the application. (used to determine the financial capability) • Track Record documents (used to determine the works capability) • Letter of Award • Certificate of Completion • Final / latest payment certificate • Registered Professionals certificate(s) with a relevant built environment council (used to determine the works capability). See table 3 & 4 on page 4. Consult the checklist on page 10 for a comprehensive list of registration requirements. REGISTRATION FEES (FOR GRADE 2 - 9 APPLICATIONS ONLY) Registration fees are mandatory, and required for all initial application, as well as amendments to existing registrations. Registrations are valid for a 3 year period, whereafter a re-application for registration is required. A payment is made up of two parts, • An admin payment which is payable for each class of works applied for. • An annual payment which is payable in advance for the highest class of works applied for, and required as an annual obligation. Payment should be made to the cidb in the following instances. 1. Initial registration with the cidb a. Admin fees for each class of works applied for. b. Annual fees only for the highest grade applied for. 2. Annual update a. Annual fees only for the highest grade. 3. 3 Year renewal a. Admin fees for each class of works applied for. b. Annual fees only for the highest grade applied for. 4. Upgrade a. Admin fees for each class of works to be upgraded. b. The difference in the Annual fees from the highest grade currently registered in and the highest grade applied for (pro-rata for the remainder of the annual period). 5. Additional class of works. a. Admin fees for each class of works to be added. b. The difference in the Annual fees from the highest grade currently registered in and the highest grade applied for (if the additional class of works is a higher grade), pro-rata for the remainder of the annual period. 8
  • 10. CONDITIONS OF REGISTRATION The contractor must: • confirm particulars provided on his application form annually on or before the anniversary date of his registration; • pay the relevant administration fee(s), as well as the stipulated annual fee; • notify the cidb of any change of particulars relating to an existing registration; • be free from any restrictions to tender; • comply with the Code of Conduct for All Parties Engaged in Construction Procurement, as published by the cidb in the Government Gazette no. 25656 of 2003. (Also available at: www.cidb.org.za) • annually provide a valid, original tax clearance certificate, upon expiry of the previous certificate; and • renew registration every three years for requalification of grades. Please note that false information provided or a false declaration is a punishable offence in terms of the cidb ACT, Construction Industry Development Regulations and other applicable laws. WHO IS THE cidb? The cidb has been established in terms of the Construction Industry Development Board Act 38 of 2000. It has the mandate to lead the construction industry stakeholders in construction development and to facilitate regulation and development of the construction industry. The cidb is required in terms of the Construction Industry Development Board Act to establish the Register of Contractors. The Register grades and categorises contractors according to their capability to carry out construction projects. All contractors seeking to participate in public sector infrastructure delivery must be registered on the cidb Register of Contractors. 9
  • 11. 10 CHECKLIST SECTION B (i): Enterprise Particulars Close Corporation (latest CK1 / CK2) Company: • Certificate of Incorporation (CM1) • List of all active directors (CM29) • Share certificates • All name change certificates (CM9) (if applicable) Partnership (partnership agreement) Trust ( a copy of the trust deed or JM21) Other: SECTION B (ii): Principals and Ownership / Interest Attach originally certified copies of Identity Documents (for a maximum of 20 principals) SECTION D (i): Annual Best Turnover Attach a complete set of financial statements (compliant with GAAP or IFRS) for the 2 financial years immediately preceding the application: • Public / Private company - Audited • Trust - Audited • Close Corporation - compiled by an accounting officer • Partnership - compiled by an accounting officer • Sole Traders - compiled by a bookkeeper / accounting officer SECTION D (ii): Available Capital Description and proof of financial sponsorship(s) • Financial institution sponsorship OR • Letter of sponsorship undertaking in the form of a members resolution from a CC and a board resolution from a Company • If sponsor is not a financial institution please attach the sponsors latest set of financial statements (compliant with GAAP or IFRS) SECTION E: Track Record For each class of works applied for, attach copies of: • Letter of award; and • Certificate of completion; and • Final payment certificate indicating the contract value. Maintenance contractors may provide client payment certificate indicating the value of work done to date; • Joint Venture agreement (if applicable); • Sub-contract agreement and corresponding bank statements (if applicable). SECTION E (iv): Transfer of Track Record Attach particulars of changes in name or company type OR Auditors letter confirming changes in company structure SECTION F (i): Registered Professional(s) Certificate of registration with the relevant built environment council / Ensure that the declaration is signed and ensure that the registered professionals sign SECTION F (ii): Requirements for Registration in Electrical Engineering for EB class of works Attach originally certified copy of the enterprise's valid Electrical Contractor's certificate / Ensure that the declaration is signed and ensure that the registered professionals sign SECTION H: Payment of Fees Attach proof of Payment (please use your company name or CRS number as the reference number when making payment). SECTION I: Declaration Attach valid, original Tax Clearance Certificate and; Attach signed declaration of the contractor and; Attach signed declaration of the registered professional(s) (if applicable).
  • 12. cidb HELP LINE: 0860 103 353 cidb FRAUD HOTLINE: 0800 112 432 cidb CONSTRUCTION CONTACT CENTRES (CCC's): Eastern Cape Department of Public Works Qhasana Building Independence Avenue Bisho Tel: 0861 222 327 Fax: 086 674 2908 Free State Medford Building St. Andrews Street Ground Floor Bloemfontein Tel: 0861 377 222 Fax: 086 552 8692 Gauteng Blocks N & R SABS Campus 2 Dr Lategan Road Groenkloof, Pretoria Tel: 0861 428 222 Fax: 086 680 8569 North West Department of Public Works Old Parliament Building Modiri Molema Road Gate House Mmabatho Tel: (018) 387 2150 / 2435 Fax: 086 743 3193 Northern Cape Regional Department of Transport, Roads and Public Works 45 Schmidtdrift Road Kimberley Tel: 0861 222 627 Fax: 086 690 6295 Western Cape 140 Long Street Cnr Long & Dorp Street Cape Town Tel: 0861 927 222 Fax: 086 674 0293 KwaZulu Natal Department of Public Works 428 Blink Bonnie Road Mayville, Durban Tel: 0861 596 222 Fax: 086 856 6024 Limpopo Department of Public Works 1st Floor, Works Tower Building 43 Church Street Polokwane Tel: 0861 222 765 Fax: 086 678 9184 Mpumalanga Nelcity Building Office No. G15 Cnr Samora Machel & Paul Kruger Street Nelspruit Tel: 0861 678 222 Fax: 086 685 6733