2. OUTLINE
Brief Introduction
Vision and Mission
Main Objectives
Products/Services
Marketing and Sales
SWOT Analysis
PESTL Analysis
Human Resource Management
Financial Highlights
3. INTRODUCTION
The world has started utilizing the renewable
energy sources to save depleting gas, oil and coal
reserves.
There are more than 7 billion people in this world.
Most of them have been trying to disturb the natural
cycle every day.
As a result, natural sources have become limited,
clean water has disappeared, land has become
barren and air has become polluted.
That is why, world is moving towards renewable
and sustainable energy sources.
4. VISION AND MISSION
MICRO-Energy Solution has the vision to bring
green revolution in Pakistan by providing cost-
effective energy solutions to the masses.
Our mission is to eradicate the energy crises from
Pakistan and to improve the life style of the public
for the progress of Pakistan giving environment
friendly, easy-to-use & innovative products for the
current energy demand.
5. COMPANY VALUES
The company is strongly committed to work with
honesty without any compromise on the Total Quality
Management (TQM).
With Customer Experience Management (CEM), we
strive best for customer care for their satisfaction in
order to build trust and long term relationships with
them.
An environment of innovation & uniqueness has been
developed throughout the company. For the fast
services, we utilize Time Compression Management
(TCM).
7. BIO GAS PLANTS
Pakistan has low forest cover
About 4% of total area is covered by forest
90% of country’s wood production is used as fuel
About 7000 ha of land is reforested in Pakistan
every year
To control reforestation adoption of biogas is a
best technology
Beneficial to the human health also have positive
impact on the environment
Better crops can be grown while using the existing
resources at lower cost
9. USAGES OF BIOGAS
For cooking and heating food
For playing fan in summer
For lighting
Organic manure is its bye product
10. SELECTION CRITERIA
The plant will be allotted to individual household.
Land for construction of bio-gas plant should be
available free of cost.
Enough water should be available for feeding
purposes.
The individual household should have two
buffaloes, preferably.
Direct sunshine should be there throughout the
day time on the proposed site.
From environmental point of view, the plant should
be out side of the boundary wall of the house.
Plant should away 50 feet from kitchen.
11. REQUIRED MANURE
One buffalo can produce about 20 to 22 kg manure per
day. Average 4 cows or 2 buffalos will produce about 45
kg manure per day .05 cubic meter.
The ratio of manure and water is 1: 1
45 kg manure + 45 kg water = 90kg
Total input per day = 90 kg
Input for 5 weeks = 90 kg X 35 days = 3150 kg
1000kg = 1 cubic meter
3150 kg =3.1 cubic meters
So for a single household of average 7 people living
single plant of 3-cubic meter is recommended
Temperature: Normally required temperature will be
20o c to 35 o c
12. CONSTRUCTION MATERIALS
(For 3-Cubic-Meter Digester)
Bricks approximately 2700
Cement, 11 bags.
Sand, 74 cft.
Crush 9 cft.
Steel sheet for gas cap 20’x4’ of 16 gauge.
RCC pipe of 6 inch diameter,12 feet.
Angle iron 2 inch,10 feet.
Mild steel rods, approximately 18 feet (for bracing)
GI pipe ½ inch dia, and fitting as per requirement.
Plastic pipe ½ inch dia, as per requirement.
Stove 1 No.
Waterproof coating (paint, tar, asphalt, etc.), 4 liters (for
gas cap)
15. SOLAR ENERGY PANEL
Replacement of UPS/ generators
Use of Solar Panel
According to Need and demand
Supplies will be imported
Sealed gel batteries will be used
5-years battery warranty
Can provide energy continuously
DC using appliances
19. MARKETING PLAN
Local Cable Operators
Local Circulations
Hoardings and banners
Pamphlets and Brochures
Conducting Seminars
Door to door Marketing
E- Marketing
e.g. (Online Sources)
Target Market Area:
Islamabad and Rawalpindi
Lahore (Future)
20. MAJOR COMPETITORS
PAK-Energy Solutions, Lahore
Synercon: Solution to Energy Saving, Johar Town,
Lahore
Akhter Solar Limited, Blue Area, Islamabad
Clean Power (Pvt.) Ltd, I-8, Islamabad
Electro Control Industries (Pvt) Ltd, I-8/4, Isb
Socio-Engineering Consultants, F-7/4, Islamabad
Trillium Pakistan (Pvt) Ltd, 5-The Mall, Rawalpindi
21. SELLING PROCEDURE
Site/ location visit
Estimation of the requirements
Preparation of proposal/ quotations
Signing of Agreement
50% Payment at the time of agreement
Execution of contract
Feedback
After sale services
22. SWOT ANALYSIS
Strengths
Our Team
Our Products
Environment Friendly
Weaknesses
New Business
Limited Resources
Lake of Experience
Lake of Awareness
Opportunities
Huge Market Exist
Current Energy Crisis
Rural and Agri based Economy
Threats
Existing Competitors
Political Issues
Law and Order Situation
Future Legislation
23. PESTL ANALYSIS
Political
Economical
Social
Technological
Legal
24. ORGANIZATIONAL HIERARCHY
Top BOD
Middle Operations Technical
Lower Accounts/Finance Marketing Lower Staff
26. FINANCIAL HIGHLIGHTS
Initial Investments
Rs. 1000,000
Debt/Equity Ratio
40:60
ROE
25%
ROI
18%
ROA
15%
Pay Back Period
One Year
*(All figures are expected estimates)
27. FINANCIAL HIGHLIGHTS…. CONT’D
EBIT
Rs. 0.5 Million
GP Ratio
25%
NI Ratio
15%
Gross Revenue
Rs. 0.7 Million
Assets Turnover
5 times