Progress continues despite this late posting of month number three of TechTown’s 1st Floor Renovation Project. Every month I track and post the construction progress of this project. My firm Centric Design Studio designed this space for Detroit based TechTown. You can view the previous two slide share months of progress (starting in May 2013) to see how far we’ve come. Come back next month and see the progress. Thanks for viewing.
Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31
1. Slide Show of Construction Progress at TechTown - Detroit
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
2. Mail Boxes Progress
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
3. Plumbing Work at Food Prep Room
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
4. View of Future Event Space
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
5. Future Event Space Progress
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
6. Corridor 2 + Future Meeting Rooms
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
7. Future Co-Working Area Facing Burroughs St.
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
8. Concrete Repair (Before)
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
9. Concrete Repair (After)
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
10. Fire Extinguisher (Future Location)
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
11. Overhead Door Structural Steel (at Event Space 1)
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
12. Overhead Door Structural Steel (at Event Spaces 1 & 2)
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
13. Overhead Door Structural Steel (at Event Spaces 1 & 2)
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
14. Structural Steel for Operable Partition (at Event Spaces 1 & 2)
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
15. Structural Steel for Operable Partition (at Event Spaces 1 & 2)
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
16. Soffit Enclosure of Structural Steel (at Event Spaces 1 & 2)
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
17. Soffit Enclosure of Structural Steel (at Event Spaces 1 & 2)
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
18. Enclosure of Overhead Structural Steel (at Event Space 1)
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
19. Co-Working Space - Polished Concrete Floor Mock-Up - 1
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
20. Co-Working Space - Polished Concrete Floor Mock-Up - 2
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
21. Painting Begins (at Conference Room 5)
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
22. Existing Lighting (Retrofitted) Mock-Up
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
23. Future Co-Working Area (Looking West)
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
24. Exterior View of Future Co-Working Area (From Burroughs St.)
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
25. More Construction Progress Photos Will Be Posted Next Month
TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com