Please view the latest slideshare of the 1st floor renovation project at TechTown - Detroit. There is a lot of excitement happening around TechTown now that finishes are being installed. If you view the May construction photos you will see the progress is amazing! You can view the previous three slide share months of progress (starting in May 2013) to see how far we have come. Come back next month and see the progress. Thanks for viewing.
Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30
1. Slide Show of Construction Progress at TechTown - Detroit
TechTown 1st Floor Renovation
Sept. 1 - Sept. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
2. Ceiling Cloud Progress at Future Copy Center
TechTown 1st Floor Renovation
Sept. 1 - Sept. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
19. Construction Progress at Co-Working Kitchen
TechTown 1st Floor Renovation
Sept. 1 - Sept. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
20. Cabinet Construction at Co-Working Kitchen
TechTown 1st Floor Renovation
Sept. 1 - Sept. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
21. Carpet Installation at Future Business Incubator Room
TechTown 1st Floor Renovation
Sept. 1 - Sept. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
22. Construction Progress at Corridor 3
TechTown 1st Floor Renovation
Sept. 1 - Sept. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
23. Construction Progress at Co-Working Area
TechTown 1st Floor Renovation
Sept. 1 - Sept. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
24. Exterior Evening View of Future TechTown Management Suite
TechTown 1st Floor Renovation
Sept. 1 - Sept. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
25. More Construction Progress Photos Will Be Posted Next Month
TechTown 1st Floor Renovation
Sept. 1 - Sept. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com