Mobile1:	+974	33717339	
Email:	fawzy_eg2001@hotmail.com	
PERSONAL INFORMATION
Nationality: Egyptian
Birth Date: 6 Oct, 1979
Gender: Male
Marital Status:
Religion:
:
Married
Muslim
GRADUATION
May 2003: Zagazig University, Egypt.
Faculty of Engineering, Civil Engineering Department
Graduation Project: Harbor Engineering.
Project Degree : Excellent.
LANGUAGES
1-PMP (Project Management Professional) Preparation Course.
2-Professional Program in Project Management in
* Project Planning &Control Techniques
* Management of Project Resources
* Projects Bids &Contract
* Project Budgeting & Financial Control
3- AutoCAD (2D).
4- Microsoft office 2010 (word-excel-power point)
Mohamed Ahmed Fawzy
Doha-Qatar
Language Level Years practiced
Arabic Expert Mother Tongue
English Very Good More than 30 years
Courses
PROFESSIONAL EXPERIENCE
Sep. 2015 – Present
Sep. 2015 – Present
Lusail Infrastructure (CP-07B)
Concept Designer:          Worley‐Parsons 
PMCM:                              Parsons 
Consultant:                      Dorsch 
Location:                           Lusail City     
Budget :                             5 billion QR 
Project Description
1. D&B Tunnel along Road A1 (Two Levels)
2. D&B Combined LRT Station Structural and Civil Works
3. D&B Multi-Story Underground Car Park
4. D&B Bridge at Junction No. 19
5. D&B Six 11KV Substations:
a. 3 Substations recently relocated outside the limit of
the Project
b. 3 Substations inside the Car Park
6. Infrastructure Utilities (Integration of the remaining
networks including Electrical, Mechanical, Sewage,
Irrigation, Storm and Tunnel Drain Network)
7. Construction of Landscape and Public Realm Features
QD-SBG.(Qatar)
Construction manager.
 In charge of the project budget for materials and manpower &
maintaining accurate billing records.
 Obtain all necessary permits and licenses.
 Daily management of project staff and multiple sub-contractors.
 Ensuring that all quality control, environmental and health and safety
requirements are met.
 Formulated policies, managed daily operations, and planned the use of
materials and human resources.
 Planning site activities in detail, setting targets and accurately forecasting
completion dates.
 Accurately estimate material, construction and labor costs as well as
project timescales.
 Directing and supervising workers.
Saudi Arabia (KSA)
Dec 2013 – Aug 2015 :
April 2010 – AUG. 2015
1-King Fahd Quran Printing House
2-KAP1 (High Way Security Forced Building)
SAUDI OGER LTD.
Construction manager.
 In charge of the project budget for materials and manpower &
maintaining accurate billing records.
 Obtain all necessary permits and licenses.
 Daily management of project staff and multiple sub-contractors.
 Ensuring that all quality control, environmental and health and safety
requirements are met.
 Formulated policies, managed daily operations, and planned the use of
materials and human resources.
 Planning site activities in detail, setting targets and accurately forecasting
completion dates.
 Accurately estimate material, construction and labor costs as well as
project timescales.
 Directing and supervising workers.
April 2012 – Dec 2013
April 2010 – Aug.2015
King Abdullah Waqf Project
(It is a five hotels front of Masjid Alnabwi Alshreef with budget 2.5 billion SAR.)
SAUDI OGER LTD.
Senior Site Engineer
 Analyses drawings and prepares planning schedule for the execution of
site activities.
 Identifies quantities of materials and verifies the locally source materials
available.
 Coordinates with sub-contractors for the work activities schedule and
sequence.
 Prepares and brings needed materials on site prior to start of work
activities by sub-contractors.
 Organizes site meetings with sub-contractors for discussing obstacles and
progress of work.
 Visits site to monitor progress of work executed by sub-contractors and to
resolve any problem.
 Prepares and initiates site inspections with consultant in accordance with
QC
April 2010 – April 2012:
April 2010 – Aug.2015
PNU (Princess Nora Bent Abdurrahman University for Woman)
The project beside Riyadh Airport on 8’000’000 SQM area with budget 30 billion SAR, our(
Company package is 12 billion SAR, the project is an university for women including colleges,
hospital, Playgrounds, library, villas for staff & monorail for transport inside the university
My package is the colleges with estimated budget 3 billion SAR)
SAUDI OGER LTD.
Senior Site Engineer
 Analyses drawings and prepares planning schedule for the execution of
site activities.
 Identifies quantities of materials and verifies the locally source materials
available.
 Coordinates with sub-contractors for the work activities schedule and
sequence.
 Prepares and brings needed materials on site prior to start of work
activities by sub-contractors.
 Organizes site meetings with sub-contractors for discussing obstacles
and progress of work.
 Visits site to monitor progress of work executed by sub-contractors and
to resolve any problem.
 Prepares and initiates site inspections with consultant in accordance
with QC.
 Prepares site work orders for extra works done by sub-contractors,
which is not included in contract
United Arab Emirates (UAE)
Dec 2008 – March 2010:
Dec 2008 - March 2010
Palm Gebel Ali (crescent A)
This is an infrastructure project (sewage, irrigation, district cooling, water supply, gas pipe
and communication rooms
o Budget of the project is 950,000,000 AED
o Owner: Nakheel
o Consultant: Hyder
Al-Rajhi Construction L.L.C (U.A.E)
Project Engineer
 Lead and management for the site engineer
 Review the shop drawings
 Prepare daily, weekly, monthly report
June 2007 – Dec 2008: Al Esaa tower (B+Gf+8 p+H.C+2 s+28 typ+2 H.P)
o Budget of the project is 112000000 AED
o Owner: Mr. Mohamed Hamad Elshamsy
o Consultant: Dimensions Engineering Consultant
Sharjah Towers General Contracting Company:
Sharjah U.A.E
Project Engineer
 Lead and management for the site engineer
 Review the shop drawings
 Prepare daily, weekly, monthly report
.
September 2005 – June 2007
October 2003 – September 2005
1-Grading Works and Construction Major and Local Roads on
Madinaty City.
o Fill Works 300,0000 M3.
o Cut Works 60,0000 M3.
o Construction the North Road on this City.
o Budget of the project is 25,000,000 L.E.
o Owner: Talat Mustafa Group.
2-Contraction of local roads on Helwan Fertilizer Company.
o Owner: Helwan fertilizer Budget of the project is 7,000,000 L.E.
o Owner: Helwan fertilizer company
3-Contraction of local roads on Egyptian cements company.
o Budget of the project is 7,000,000 L.E.
o Owner: Helwan fertilizer company
4- Construction and Upgrade of U-Turns of (sueze - Cairo) Road.
Orascom of Roads Construction (EGYPT)
Site Engineer:
 Controlling all equipment for sub-grade, base coarse and for asphalt
pavement (supervising the equipment and making sure the quality
according to the specifications).
 Checking plans, drawings and quantities for accuracy of calculations.
 Overseeing quality control, health and safety matters on site.
 Review and check all new drawings, instructions & documentation
received from either the client or authorities
WASFYAA HIGHT BRIDGE
o 2 Km, Length. &Width 18m
o Budget of the project is 45,000,000 L.E
o Owner: General Authority for Roads and Bridges
General Nile Company for Roads & Bridges(EGYPT)
Site Engineer:
 Controlling all equipment for sub-grade, base coarse and for asphalt
pavement (supervising the equipment and making sure the quality
according to the specifications).
 Checking plans, drawings and quantities for accuracy of calculations.
 Overseeing quality control, health and safety matters on site.
 Review and check all new drawings, instructions & documentation
received from either the client or authorities

More Related Content

What's hot

Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)ahmed elazazy
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -maen KHODR
 
Maged George Kamel C.V
Maged George Kamel C.VMaged George Kamel C.V
Maged George Kamel C.VMaged George
 
mohamed_mahmoud_atia - Planning & Cost Control Engineer
mohamed_mahmoud_atia - Planning & Cost Control Engineermohamed_mahmoud_atia - Planning & Cost Control Engineer
mohamed_mahmoud_atia - Planning & Cost Control Engineermohamed atia
 
MOHAMED CV - Civil Engineer
MOHAMED CV - Civil EngineerMOHAMED CV - Civil Engineer
MOHAMED CV - Civil EngineerMohamed ASalem
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASULAkhtar Rasul
 
CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.zaid Abbas
 
C.V (MOHAMED MOHEB )
C.V (MOHAMED MOHEB )C.V (MOHAMED MOHEB )
C.V (MOHAMED MOHEB )Mohamed Moheb
 
Abanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning EngineerAbanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning EngineerAbanoubGhobrial1
 
Mina Naiem CV (Civil Engineer)
Mina Naiem CV (Civil Engineer)Mina Naiem CV (Civil Engineer)
Mina Naiem CV (Civil Engineer)mina naiem
 
Rakhib Abdullah Civil Engineer
Rakhib Abdullah   Civil EngineerRakhib Abdullah   Civil Engineer
Rakhib Abdullah Civil EngineerRAKHIBABDULLAH
 

What's hot (20)

Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
Maged George Kamel C.V
Maged George Kamel C.VMaged George Kamel C.V
Maged George Kamel C.V
 
mohamed_mahmoud_atia - Planning & Cost Control Engineer
mohamed_mahmoud_atia - Planning & Cost Control Engineermohamed_mahmoud_atia - Planning & Cost Control Engineer
mohamed_mahmoud_atia - Planning & Cost Control Engineer
 
cv 8-8-2016
cv 8-8-2016cv 8-8-2016
cv 8-8-2016
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
MOHAMED CV - Civil Engineer
MOHAMED CV - Civil EngineerMOHAMED CV - Civil Engineer
MOHAMED CV - Civil Engineer
 
Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
george nasralla CV
george nasralla CVgeorge nasralla CV
george nasralla CV
 
Tarek CV 2015 planning
Tarek CV 2015 planningTarek CV 2015 planning
Tarek CV 2015 planning
 
Engr. Khalid Ghazi C.V
Engr. Khalid Ghazi C.V Engr. Khalid Ghazi C.V
Engr. Khalid Ghazi C.V
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.
 
C.V (MOHAMED MOHEB )
C.V (MOHAMED MOHEB )C.V (MOHAMED MOHEB )
C.V (MOHAMED MOHEB )
 
Abanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning EngineerAbanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning Engineer
 
Mina Naiem CV (Civil Engineer)
Mina Naiem CV (Civil Engineer)Mina Naiem CV (Civil Engineer)
Mina Naiem CV (Civil Engineer)
 
Rakhib Abdullah Civil Engineer
Rakhib Abdullah   Civil EngineerRakhib Abdullah   Civil Engineer
Rakhib Abdullah Civil Engineer
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 

Viewers also liked

Programa metodologia científica Agenor Florêncio
Programa metodologia científica Agenor FlorêncioPrograma metodologia científica Agenor Florêncio
Programa metodologia científica Agenor Florêncioagenor costa
 
強國人 玩壞花蓮 手法大公開
強國人 玩壞花蓮 手法大公開強國人 玩壞花蓮 手法大公開
強國人 玩壞花蓮 手法大公開watchinese
 
Manaul de serviço cbx150 aero (1988) mskw1881 p contracapa
Manaul de serviço cbx150 aero (1988)   mskw1881 p contracapaManaul de serviço cbx150 aero (1988)   mskw1881 p contracapa
Manaul de serviço cbx150 aero (1988) mskw1881 p contracapaThiago Huari
 
Rondônia: Casamento Igualitário
Rondônia: Casamento IgualitárioRondônia: Casamento Igualitário
Rondônia: Casamento IgualitárioGrupo Dignidade
 
Regulatory Requirements, Leveraging Regulatory Opportunities
Regulatory Requirements, Leveraging Regulatory Opportunities Regulatory Requirements, Leveraging Regulatory Opportunities
Regulatory Requirements, Leveraging Regulatory Opportunities The Risk Institute
 
Maquinas Automatas
Maquinas AutomatasMaquinas Automatas
Maquinas AutomatasJohanna Diaz
 
Agile, Automated, Aware: How to Model for Success
Agile, Automated, Aware: How to Model for SuccessAgile, Automated, Aware: How to Model for Success
Agile, Automated, Aware: How to Model for SuccessInside Analysis
 
CV Gabriel Garcia 08.2016
CV Gabriel Garcia 08.2016 CV Gabriel Garcia 08.2016
CV Gabriel Garcia 08.2016 Gabriel Garcia
 
Ahmed M. Elwan, PMP
Ahmed M. Elwan, PMPAhmed M. Elwan, PMP
Ahmed M. Elwan, PMPahmed Elwan
 

Viewers also liked (15)

Programa metodologia científica Agenor Florêncio
Programa metodologia científica Agenor FlorêncioPrograma metodologia científica Agenor Florêncio
Programa metodologia científica Agenor Florêncio
 
強國人 玩壞花蓮 手法大公開
強國人 玩壞花蓮 手法大公開強國人 玩壞花蓮 手法大公開
強國人 玩壞花蓮 手法大公開
 
Manaul de serviço cbx150 aero (1988) mskw1881 p contracapa
Manaul de serviço cbx150 aero (1988)   mskw1881 p contracapaManaul de serviço cbx150 aero (1988)   mskw1881 p contracapa
Manaul de serviço cbx150 aero (1988) mskw1881 p contracapa
 
Rondônia: Casamento Igualitário
Rondônia: Casamento IgualitárioRondônia: Casamento Igualitário
Rondônia: Casamento Igualitário
 
Sampada_Joshi
Sampada_JoshiSampada_Joshi
Sampada_Joshi
 
Regulatory Requirements, Leveraging Regulatory Opportunities
Regulatory Requirements, Leveraging Regulatory Opportunities Regulatory Requirements, Leveraging Regulatory Opportunities
Regulatory Requirements, Leveraging Regulatory Opportunities
 
Maquinas Automatas
Maquinas AutomatasMaquinas Automatas
Maquinas Automatas
 
Agile, Automated, Aware: How to Model for Success
Agile, Automated, Aware: How to Model for SuccessAgile, Automated, Aware: How to Model for Success
Agile, Automated, Aware: How to Model for Success
 
CV Gabriel Garcia 08.2016
CV Gabriel Garcia 08.2016 CV Gabriel Garcia 08.2016
CV Gabriel Garcia 08.2016
 
Catalog KLASS PRODEXPORT
Catalog KLASS PRODEXPORTCatalog KLASS PRODEXPORT
Catalog KLASS PRODEXPORT
 
Ahmed M. Elwan, PMP
Ahmed M. Elwan, PMPAhmed M. Elwan, PMP
Ahmed M. Elwan, PMP
 
Arch.Msaeed 2017
Arch.Msaeed 2017Arch.Msaeed 2017
Arch.Msaeed 2017
 
Financial Manager
Financial ManagerFinancial Manager
Financial Manager
 
mohamed abdel atye (3) (1)
mohamed abdel atye (3) (1)mohamed abdel atye (3) (1)
mohamed abdel atye (3) (1)
 
Tarek Kotb CV
Tarek Kotb CVTarek Kotb CV
Tarek Kotb CV
 

Similar to cm cv

TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -linkTahrer Abu Yousef
 
CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida finalAhmad Eida
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastMohamed Sayed
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNshaat Hafez
 
Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016Diaa Anwar
 
Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016Diaa Anwar
 
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCECV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCEAbdoo Sowar
 
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWaell Azmy
 

Similar to cm cv (20)

hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
Survey Engr
Survey EngrSurvey Engr
Survey Engr
 
TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -link
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida final
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
 
Ehab Radwan
Ehab RadwanEhab Radwan
Ehab Radwan
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016
 
Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016
 
AYMAN HELMY_CV
AYMAN HELMY_CVAYMAN HELMY_CV
AYMAN HELMY_CV
 
السي في
السي فيالسي في
السي في
 
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCECV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
 
Hafez CV
Hafez CVHafez CV
Hafez CV
 
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp Letters
 
Resume_Sherif El-Sherif
Resume_Sherif El-SherifResume_Sherif El-Sherif
Resume_Sherif El-Sherif
 
mohammad fathi cv2017
mohammad fathi cv2017mohammad fathi cv2017
mohammad fathi cv2017
 

cm cv

  • 1. Mobile1: +974 33717339 Email: fawzy_eg2001@hotmail.com PERSONAL INFORMATION Nationality: Egyptian Birth Date: 6 Oct, 1979 Gender: Male Marital Status: Religion: : Married Muslim GRADUATION May 2003: Zagazig University, Egypt. Faculty of Engineering, Civil Engineering Department Graduation Project: Harbor Engineering. Project Degree : Excellent. LANGUAGES 1-PMP (Project Management Professional) Preparation Course. 2-Professional Program in Project Management in * Project Planning &Control Techniques * Management of Project Resources * Projects Bids &Contract * Project Budgeting & Financial Control 3- AutoCAD (2D). 4- Microsoft office 2010 (word-excel-power point) Mohamed Ahmed Fawzy Doha-Qatar Language Level Years practiced Arabic Expert Mother Tongue English Very Good More than 30 years Courses
  • 2. PROFESSIONAL EXPERIENCE Sep. 2015 – Present Sep. 2015 – Present Lusail Infrastructure (CP-07B) Concept Designer:          Worley‐Parsons  PMCM:                              Parsons  Consultant:                      Dorsch  Location:                           Lusail City      Budget :                             5 billion QR  Project Description 1. D&B Tunnel along Road A1 (Two Levels) 2. D&B Combined LRT Station Structural and Civil Works 3. D&B Multi-Story Underground Car Park 4. D&B Bridge at Junction No. 19 5. D&B Six 11KV Substations: a. 3 Substations recently relocated outside the limit of the Project b. 3 Substations inside the Car Park 6. Infrastructure Utilities (Integration of the remaining networks including Electrical, Mechanical, Sewage, Irrigation, Storm and Tunnel Drain Network) 7. Construction of Landscape and Public Realm Features QD-SBG.(Qatar) Construction manager.  In charge of the project budget for materials and manpower & maintaining accurate billing records.  Obtain all necessary permits and licenses.  Daily management of project staff and multiple sub-contractors.  Ensuring that all quality control, environmental and health and safety requirements are met.  Formulated policies, managed daily operations, and planned the use of materials and human resources.  Planning site activities in detail, setting targets and accurately forecasting completion dates.  Accurately estimate material, construction and labor costs as well as project timescales.  Directing and supervising workers.
  • 3. Saudi Arabia (KSA) Dec 2013 – Aug 2015 : April 2010 – AUG. 2015 1-King Fahd Quran Printing House 2-KAP1 (High Way Security Forced Building) SAUDI OGER LTD. Construction manager.  In charge of the project budget for materials and manpower & maintaining accurate billing records.  Obtain all necessary permits and licenses.  Daily management of project staff and multiple sub-contractors.  Ensuring that all quality control, environmental and health and safety requirements are met.  Formulated policies, managed daily operations, and planned the use of materials and human resources.  Planning site activities in detail, setting targets and accurately forecasting completion dates.  Accurately estimate material, construction and labor costs as well as project timescales.  Directing and supervising workers. April 2012 – Dec 2013 April 2010 – Aug.2015 King Abdullah Waqf Project (It is a five hotels front of Masjid Alnabwi Alshreef with budget 2.5 billion SAR.) SAUDI OGER LTD. Senior Site Engineer  Analyses drawings and prepares planning schedule for the execution of site activities.  Identifies quantities of materials and verifies the locally source materials available.  Coordinates with sub-contractors for the work activities schedule and sequence.  Prepares and brings needed materials on site prior to start of work activities by sub-contractors.  Organizes site meetings with sub-contractors for discussing obstacles and progress of work.
  • 4.  Visits site to monitor progress of work executed by sub-contractors and to resolve any problem.  Prepares and initiates site inspections with consultant in accordance with QC April 2010 – April 2012: April 2010 – Aug.2015 PNU (Princess Nora Bent Abdurrahman University for Woman) The project beside Riyadh Airport on 8’000’000 SQM area with budget 30 billion SAR, our( Company package is 12 billion SAR, the project is an university for women including colleges, hospital, Playgrounds, library, villas for staff & monorail for transport inside the university My package is the colleges with estimated budget 3 billion SAR) SAUDI OGER LTD. Senior Site Engineer  Analyses drawings and prepares planning schedule for the execution of site activities.  Identifies quantities of materials and verifies the locally source materials available.  Coordinates with sub-contractors for the work activities schedule and sequence.  Prepares and brings needed materials on site prior to start of work activities by sub-contractors.  Organizes site meetings with sub-contractors for discussing obstacles and progress of work.  Visits site to monitor progress of work executed by sub-contractors and to resolve any problem.  Prepares and initiates site inspections with consultant in accordance with QC.  Prepares site work orders for extra works done by sub-contractors, which is not included in contract
  • 5. United Arab Emirates (UAE) Dec 2008 – March 2010: Dec 2008 - March 2010 Palm Gebel Ali (crescent A) This is an infrastructure project (sewage, irrigation, district cooling, water supply, gas pipe and communication rooms o Budget of the project is 950,000,000 AED o Owner: Nakheel o Consultant: Hyder Al-Rajhi Construction L.L.C (U.A.E) Project Engineer  Lead and management for the site engineer  Review the shop drawings  Prepare daily, weekly, monthly report June 2007 – Dec 2008: Al Esaa tower (B+Gf+8 p+H.C+2 s+28 typ+2 H.P) o Budget of the project is 112000000 AED o Owner: Mr. Mohamed Hamad Elshamsy o Consultant: Dimensions Engineering Consultant Sharjah Towers General Contracting Company: Sharjah U.A.E Project Engineer  Lead and management for the site engineer  Review the shop drawings  Prepare daily, weekly, monthly report .
  • 6. September 2005 – June 2007 October 2003 – September 2005 1-Grading Works and Construction Major and Local Roads on Madinaty City. o Fill Works 300,0000 M3. o Cut Works 60,0000 M3. o Construction the North Road on this City. o Budget of the project is 25,000,000 L.E. o Owner: Talat Mustafa Group. 2-Contraction of local roads on Helwan Fertilizer Company. o Owner: Helwan fertilizer Budget of the project is 7,000,000 L.E. o Owner: Helwan fertilizer company 3-Contraction of local roads on Egyptian cements company. o Budget of the project is 7,000,000 L.E. o Owner: Helwan fertilizer company 4- Construction and Upgrade of U-Turns of (sueze - Cairo) Road. Orascom of Roads Construction (EGYPT) Site Engineer:  Controlling all equipment for sub-grade, base coarse and for asphalt pavement (supervising the equipment and making sure the quality according to the specifications).  Checking plans, drawings and quantities for accuracy of calculations.  Overseeing quality control, health and safety matters on site.  Review and check all new drawings, instructions & documentation received from either the client or authorities WASFYAA HIGHT BRIDGE o 2 Km, Length. &Width 18m o Budget of the project is 45,000,000 L.E o Owner: General Authority for Roads and Bridges General Nile Company for Roads & Bridges(EGYPT) Site Engineer:  Controlling all equipment for sub-grade, base coarse and for asphalt pavement (supervising the equipment and making sure the quality according to the specifications).  Checking plans, drawings and quantities for accuracy of calculations.  Overseeing quality control, health and safety matters on site.  Review and check all new drawings, instructions & documentation received from either the client or authorities