SlideShare a Scribd company logo
1 of 6
KEY PERSONNEL RESUME
Name: Mohamed Aly ElSharkawy Proposed Position: Site Manager
Discipline: Electronic & Communication Engineering
Minimum Qualification: BE Electronic & Communication
English Speaking Capability: Excellent
Career Objective
• Seeking a position as a valued member that leverages my achievements,
skills, energy and talent for identifying superior job candidates.
CAPABILITIES AND PERSONAL TRAITS
 Work together with other engineers and working level staff to solve and
define the developmental problems.
 Provide technical assistance and solution to the team.
 Intelligence, Honesty, Professionalism.
 Innovation, Ingenuity, Dedication to work.
 Prompt decision-making.
 Meeting challenges keeping project on schedule & within budget.
 Team leader and a team player with motivational skills.
 Flexibility and adaptability.
 Able to work independently in the area of authority.
Work Experience:
Period: Jan 2015 –Present
Company: SSEM
Project: PS1 SWCC Ras-Al-Khair WTS Project
Position: Station Manager
• Monitoring and controlling remaining construction activities and taking
corrective actions.
• Implements systems to comply with Health & Safety Regulations and
ensure accident free sites.
• Take the work permits from SWCC, and coordination with Power Plant
Contractor for Underground cables, MV System and other concern
departments.
• Arrange all Material, Equipment, Manpower etc
• Following up with supplier.
• Following up for the closing of TOD punch list & walk through punch list.
• Following up with Head Office.
• Good communication skills with client SWCC/Consultant.
Period: Apr 2011 – Dec. 2014
Company: SSEM
Project: PS1 SWCC Ras-Al-Khair WTS Project
Position: Senior Electrical Site Engineer
Responsibility:
• MV/LV system (supervision / supplier coordination)
• MV Cable laying:
• Preparation of BOQ (review the cable route drawing, estimation of cable
length and required accessories )
• Preparation of the cable trench as per the approved norms.
• Cable laying of MV cable (13.8kv, 1Cx 630 mm2, XLPE ) , preparation for
the requirement cable pulling machine , rollers & required manpower.
• Supervision for cable jointing as per the standard. Mugger test 5KV DC Hi-
pot test. Cable termination and torque test.
• Cooling water system. ( installation / commissioning )
• UPS system. ( installation / commissioning )
• Air compressor system. ( installation / commissioning )
• Fire alarm system. ( installation / commissioning )
• HVAC system. ( installation / commissioning )
• Lighting system. ( installation / commissioning )
• Cathodic protection system. ( installation / commissioning )
• Emergency generator system. ( installation / commissioning )
• Firefighting system. ( installation / commissioning )
• Installation for control panels ( installation / commissioning / ABB
coordination )
Period: Jan 2008 – Sept. 2010
Company: SSEM
Project: SWCC Shoaiba WTS WTS Project
Position: Site Electrical Engineer
Responsibility:
Lighting System:
• Planning site schedule, task schedule, leading with the engineer and
technicians.
• Installed and wired light fixtures in a new building such as looping,
emergency, UPS and exit lights.
• Installed new lights in a high-base hangar.
• Erection and wired the incomer for the lighting panels according to the lay
out drawings and wiring schematic.
• Commissioning for the system and testing for the CT (current transformer)
equipment using ISA T 100 device.
• Installation for street lighting poles up to energizing status.
Fire Alarm System:
• Bent and laid conduit pipes to put in a new fire alarm system.
• Installed and wired detectors like smoke, heat & flame (ultra violet)
detectors.
• Giving the accurate addressing for the detectors through the rotary
switches according to the guide drawings.
• Installation and wiring for the manual call point (M.C.P),FCM , FMM , ISO
and strope sounder modules.
• Installation for main frame control panel & cable termination for feeder
cables.
• Commissioning the system for checking the reliability and the performance
in case.
Fiber Optic Cable System:
• Laying cables for long distance or internally between buildings or panels.
• Splicing for the fiber cores using mechanical splicing or arc fusion splicing.
• Locating the fault location for any cutting in the fiber by using OTDR
instrument and re-splice it into splicing closure box.
Telephone System:
• Erection for local central inside the stations
• Weather proof telephone sets, desk, desk/wall erection & cable termination.
• PAPX panel installation and laying cables up to it and finalized the wiring
addressing termination inside the panel.
• Installation digital telephone sets for the building which feeding with
telephone junction box that having fiber optic cable (MM) feeding from
server panels.
Fire fighting System:
• Installation for EMT pipes for cable pulling
• Fixing the modules and wiring devices which clearly approved from the
client 7&mentioned in the specification by following the AFC drawings.
• Installing the control panel & accomplished the wiring termination task.
• Finalizing the interface between the electrical & mechanical equipment to
control the deluge valves by solenoids and to be monitor by pressure
switching refereeing to the main control panel.
• Dealing with FM200 SYSTEM ,Either water sprinkling SYSTEM.
• Finalize the system with commissioning & to be interfaced with the DCS.
Summary Of Skills And Abilities
1. Languages:
• Fluent English. (Reading, Writing, Speaking)
• Fluent Arabic. (Reading, Writing, Speaking)
2. IT skills:
• Microsoft Word.
• Microsoft Excel.
• Microsoft Access.
• Microsoft Power Point
3. General:
• Analytical & conceptual thinking.
• Problem solving & management.
• Leadership qualities.
• Interpersonal skills.
• Good communication skills.
• Ability to work unsupervised or in a team
environment.
• High performance under pressure.
Education
2002-2007 Arab Academy for Science and Technology.
Alexandria, Egypt.
I achieved a Bachelor degree in the Electronics and
Communications Engineering Department.
My GPA is 2.91 / 4 " very good"
I scored a 91% in my graduation project, “An Intelligent
Autonomous Vehicle.”
Previous course
Sept 2007 New Horizons, Egypt Alexandria branch.
I attended the CCNA “Cisco Certified Network
Administration” course.
Sept 2011 Haward Technology Middle East, Abu Dhabi,UAE.
I attended the CFOP “ Certified Fiber Optic Professional”
course.
Personal
Date of Birth: 01-10-1984
Gender: Male
Nationality: Egyptian
Military status: None
Contact Details:
Al Jubail, KSA
966-501-923-386,Saudi Arabia
M.sherkawi@ssem.com.sa
References
A list of references is available on request
My GPA is 2.91 / 4 " very good"
I scored a 91% in my graduation project, “An Intelligent
Autonomous Vehicle.”
Previous course
Sept 2007 New Horizons, Egypt Alexandria branch.
I attended the CCNA “Cisco Certified Network
Administration” course.
Sept 2011 Haward Technology Middle East, Abu Dhabi,UAE.
I attended the CFOP “ Certified Fiber Optic Professional”
course.
Personal
Date of Birth: 01-10-1984
Gender: Male
Nationality: Egyptian
Military status: None
Contact Details:
Al Jubail, KSA
966-501-923-386,Saudi Arabia
M.sherkawi@ssem.com.sa
References
A list of references is available on request

More Related Content

What's hot (18)

Michael CV
Michael CVMichael CV
Michael CV
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
 
NegarSheiktaheri_Resume_2015
NegarSheiktaheri_Resume_2015NegarSheiktaheri_Resume_2015
NegarSheiktaheri_Resume_2015
 
James_resume
James_resumeJames_resume
James_resume
 
Obaidullah_CV
Obaidullah_CVObaidullah_CV
Obaidullah_CV
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
CV
CVCV
CV
 
SAHEEM CV
SAHEEM CVSAHEEM CV
SAHEEM CV
 
ThomasLitewski_Electronics 2015 Dec
ThomasLitewski_Electronics 2015 DecThomasLitewski_Electronics 2015 Dec
ThomasLitewski_Electronics 2015 Dec
 
2015.Nov.Resume Eric Kaplun
2015.Nov.Resume Eric Kaplun2015.Nov.Resume Eric Kaplun
2015.Nov.Resume Eric Kaplun
 
Jon_MacInnis_Electrical
Jon_MacInnis_ElectricalJon_MacInnis_Electrical
Jon_MacInnis_Electrical
 
JUAN CAREER OBJECTIVE 2016
JUAN CAREER OBJECTIVE 2016JUAN CAREER OBJECTIVE 2016
JUAN CAREER OBJECTIVE 2016
 
CV CPP Wynand de Wit - updated 02.04.15
CV CPP Wynand de Wit - updated 02.04.15CV CPP Wynand de Wit - updated 02.04.15
CV CPP Wynand de Wit - updated 02.04.15
 
Charles jost resume
Charles jost resumeCharles jost resume
Charles jost resume
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
 
Austin James Elite Candidate 2
Austin James Elite Candidate 2Austin James Elite Candidate 2
Austin James Elite Candidate 2
 
Sanjeet_CV
Sanjeet_CVSanjeet_CV
Sanjeet_CV
 
syed jaffer aafaq Resume
syed jaffer aafaq Resumesyed jaffer aafaq Resume
syed jaffer aafaq Resume
 

Viewers also liked

Presentacion informatica
Presentacion informaticaPresentacion informatica
Presentacion informaticaanggie1003
 
Capa de Enlace - Redes de Computadoras
Capa de Enlace - Redes de ComputadorasCapa de Enlace - Redes de Computadoras
Capa de Enlace - Redes de ComputadorasJesus Jimenez
 
Riesgos de la información electrónica
Riesgos de la información electrónicaRiesgos de la información electrónica
Riesgos de la información electrónicaEdgar Rojas
 
Migración plataformas
Migración plataformasMigración plataformas
Migración plataformasmoika_usagi
 
International Telecommunications Society Conference - Dr. Andy Banerjee
International Telecommunications Society Conference - Dr. Andy BanerjeeInternational Telecommunications Society Conference - Dr. Andy Banerjee
International Telecommunications Society Conference - Dr. Andy BanerjeeSSRS Market Research
 
Teaching Holocaust and Genocide: An Interdisciplinary Approach
Teaching Holocaust and Genocide: An Interdisciplinary ApproachTeaching Holocaust and Genocide: An Interdisciplinary Approach
Teaching Holocaust and Genocide: An Interdisciplinary Approachtimothyhensley
 
Indian patent act 1970
Indian patent act 1970Indian patent act 1970
Indian patent act 1970Akashwani
 
Watson and Analytics
Watson and AnalyticsWatson and Analytics
Watson and AnalyticsJorge W. Hago
 
IBM Watson Analytics - Sales Prediction
IBM Watson Analytics - Sales Prediction IBM Watson Analytics - Sales Prediction
IBM Watson Analytics - Sales Prediction Pragyan Sharma
 
Hakikat Hak Dan Kewajiban Warga Negara
Hakikat Hak Dan Kewajiban Warga NegaraHakikat Hak Dan Kewajiban Warga Negara
Hakikat Hak Dan Kewajiban Warga NegaraR HF Fakhirin
 

Viewers also liked (16)

Presentacion informatica
Presentacion informaticaPresentacion informatica
Presentacion informatica
 
Cinco de May 2016
Cinco de May 2016Cinco de May 2016
Cinco de May 2016
 
Johnson Trotter Algorithm(Permutation)
Johnson Trotter Algorithm(Permutation)Johnson Trotter Algorithm(Permutation)
Johnson Trotter Algorithm(Permutation)
 
Game of Thrones
Game of ThronesGame of Thrones
Game of Thrones
 
Capa de Enlace - Redes de Computadoras
Capa de Enlace - Redes de ComputadorasCapa de Enlace - Redes de Computadoras
Capa de Enlace - Redes de Computadoras
 
National Karaoke Week
National Karaoke WeekNational Karaoke Week
National Karaoke Week
 
Aidah sabila
Aidah sabila Aidah sabila
Aidah sabila
 
Riesgos de la información electrónica
Riesgos de la información electrónicaRiesgos de la información electrónica
Riesgos de la información electrónica
 
Achillies Tendon Injuries
Achillies Tendon InjuriesAchillies Tendon Injuries
Achillies Tendon Injuries
 
Migración plataformas
Migración plataformasMigración plataformas
Migración plataformas
 
International Telecommunications Society Conference - Dr. Andy Banerjee
International Telecommunications Society Conference - Dr. Andy BanerjeeInternational Telecommunications Society Conference - Dr. Andy Banerjee
International Telecommunications Society Conference - Dr. Andy Banerjee
 
Teaching Holocaust and Genocide: An Interdisciplinary Approach
Teaching Holocaust and Genocide: An Interdisciplinary ApproachTeaching Holocaust and Genocide: An Interdisciplinary Approach
Teaching Holocaust and Genocide: An Interdisciplinary Approach
 
Indian patent act 1970
Indian patent act 1970Indian patent act 1970
Indian patent act 1970
 
Watson and Analytics
Watson and AnalyticsWatson and Analytics
Watson and Analytics
 
IBM Watson Analytics - Sales Prediction
IBM Watson Analytics - Sales Prediction IBM Watson Analytics - Sales Prediction
IBM Watson Analytics - Sales Prediction
 
Hakikat Hak Dan Kewajiban Warga Negara
Hakikat Hak Dan Kewajiban Warga NegaraHakikat Hak Dan Kewajiban Warga Negara
Hakikat Hak Dan Kewajiban Warga Negara
 

Similar to Site Manager - Mohamed Aly ElSharkawy

c.v. النهائي
c.v. النهائيc.v. النهائي
c.v. النهائيSila Boktor
 
Electromechanical engineer (2)
Electromechanical engineer (2)Electromechanical engineer (2)
Electromechanical engineer (2)Mohammad Zakir
 
amin resumee
amin resumeeamin resumee
amin resumeeAmin Mir
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Mohammed Fazaluddin
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Mohammed Fazaluddin
 
ATT_1419883665642_leroydouglasresume
ATT_1419883665642_leroydouglasresumeATT_1419883665642_leroydouglasresume
ATT_1419883665642_leroydouglasresumeLeroy Douglas
 
ahmed mohamed diaa_original
ahmed mohamed diaa_originalahmed mohamed diaa_original
ahmed mohamed diaa_originalAHMED DIAA
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVAjith Chandramohan
 
Engr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSAEngr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSAZeeshan khalid
 
NERM Applications & Testing (PTY) Ltd - Brochure
NERM Applications & Testing (PTY) Ltd - Brochure NERM Applications & Testing (PTY) Ltd - Brochure
NERM Applications & Testing (PTY) Ltd - Brochure Anthony Erasmus
 
m.berna.resume-draft-2.1
m.berna.resume-draft-2.1m.berna.resume-draft-2.1
m.berna.resume-draft-2.1Michael Berna
 
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2usman ahmed
 
Zahid Iqbal Resume
Zahid Iqbal ResumeZahid Iqbal Resume
Zahid Iqbal Resumezahid iqbal
 

Similar to Site Manager - Mohamed Aly ElSharkawy (20)

c.v. النهائي
c.v. النهائيc.v. النهائي
c.v. النهائي
 
Electromechanical engineer (2)
Electromechanical engineer (2)Electromechanical engineer (2)
Electromechanical engineer (2)
 
waqass cv
waqass cvwaqass cv
waqass cv
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 
C.V -updated
C.V -updatedC.V -updated
C.V -updated
 
C.V Murtaza Cheema
C.V Murtaza CheemaC.V Murtaza Cheema
C.V Murtaza Cheema
 
amin resumee
amin resumeeamin resumee
amin resumee
 
Resume_Bala
Resume_BalaResume_Bala
Resume_Bala
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
 
ATT_1419883665642_leroydouglasresume
ATT_1419883665642_leroydouglasresumeATT_1419883665642_leroydouglasresume
ATT_1419883665642_leroydouglasresume
 
JKY CV.
JKY CV.JKY CV.
JKY CV.
 
ahmed mohamed diaa_original
ahmed mohamed diaa_originalahmed mohamed diaa_original
ahmed mohamed diaa_original
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
Engr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSAEngr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSA
 
NERM Applications & Testing (PTY) Ltd - Brochure
NERM Applications & Testing (PTY) Ltd - Brochure NERM Applications & Testing (PTY) Ltd - Brochure
NERM Applications & Testing (PTY) Ltd - Brochure
 
idrees resume
idrees resumeidrees resume
idrees resume
 
m.berna.resume-draft-2.1
m.berna.resume-draft-2.1m.berna.resume-draft-2.1
m.berna.resume-draft-2.1
 
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2
 
Zahid Iqbal Resume
Zahid Iqbal ResumeZahid Iqbal Resume
Zahid Iqbal Resume
 

Site Manager - Mohamed Aly ElSharkawy

  • 1. KEY PERSONNEL RESUME Name: Mohamed Aly ElSharkawy Proposed Position: Site Manager Discipline: Electronic & Communication Engineering Minimum Qualification: BE Electronic & Communication English Speaking Capability: Excellent Career Objective • Seeking a position as a valued member that leverages my achievements, skills, energy and talent for identifying superior job candidates. CAPABILITIES AND PERSONAL TRAITS  Work together with other engineers and working level staff to solve and define the developmental problems.  Provide technical assistance and solution to the team.  Intelligence, Honesty, Professionalism.  Innovation, Ingenuity, Dedication to work.  Prompt decision-making.  Meeting challenges keeping project on schedule & within budget.  Team leader and a team player with motivational skills.  Flexibility and adaptability.  Able to work independently in the area of authority. Work Experience: Period: Jan 2015 –Present Company: SSEM Project: PS1 SWCC Ras-Al-Khair WTS Project Position: Station Manager • Monitoring and controlling remaining construction activities and taking corrective actions. • Implements systems to comply with Health & Safety Regulations and ensure accident free sites. • Take the work permits from SWCC, and coordination with Power Plant Contractor for Underground cables, MV System and other concern departments. • Arrange all Material, Equipment, Manpower etc • Following up with supplier. • Following up for the closing of TOD punch list & walk through punch list. • Following up with Head Office.
  • 2. • Good communication skills with client SWCC/Consultant. Period: Apr 2011 – Dec. 2014 Company: SSEM Project: PS1 SWCC Ras-Al-Khair WTS Project Position: Senior Electrical Site Engineer Responsibility: • MV/LV system (supervision / supplier coordination) • MV Cable laying: • Preparation of BOQ (review the cable route drawing, estimation of cable length and required accessories ) • Preparation of the cable trench as per the approved norms. • Cable laying of MV cable (13.8kv, 1Cx 630 mm2, XLPE ) , preparation for the requirement cable pulling machine , rollers & required manpower. • Supervision for cable jointing as per the standard. Mugger test 5KV DC Hi- pot test. Cable termination and torque test. • Cooling water system. ( installation / commissioning ) • UPS system. ( installation / commissioning ) • Air compressor system. ( installation / commissioning ) • Fire alarm system. ( installation / commissioning ) • HVAC system. ( installation / commissioning ) • Lighting system. ( installation / commissioning ) • Cathodic protection system. ( installation / commissioning ) • Emergency generator system. ( installation / commissioning ) • Firefighting system. ( installation / commissioning ) • Installation for control panels ( installation / commissioning / ABB coordination ) Period: Jan 2008 – Sept. 2010 Company: SSEM Project: SWCC Shoaiba WTS WTS Project Position: Site Electrical Engineer Responsibility: Lighting System: • Planning site schedule, task schedule, leading with the engineer and technicians.
  • 3. • Installed and wired light fixtures in a new building such as looping, emergency, UPS and exit lights. • Installed new lights in a high-base hangar. • Erection and wired the incomer for the lighting panels according to the lay out drawings and wiring schematic. • Commissioning for the system and testing for the CT (current transformer) equipment using ISA T 100 device. • Installation for street lighting poles up to energizing status. Fire Alarm System: • Bent and laid conduit pipes to put in a new fire alarm system. • Installed and wired detectors like smoke, heat & flame (ultra violet) detectors. • Giving the accurate addressing for the detectors through the rotary switches according to the guide drawings. • Installation and wiring for the manual call point (M.C.P),FCM , FMM , ISO and strope sounder modules. • Installation for main frame control panel & cable termination for feeder cables. • Commissioning the system for checking the reliability and the performance in case. Fiber Optic Cable System: • Laying cables for long distance or internally between buildings or panels. • Splicing for the fiber cores using mechanical splicing or arc fusion splicing. • Locating the fault location for any cutting in the fiber by using OTDR instrument and re-splice it into splicing closure box. Telephone System: • Erection for local central inside the stations • Weather proof telephone sets, desk, desk/wall erection & cable termination. • PAPX panel installation and laying cables up to it and finalized the wiring addressing termination inside the panel. • Installation digital telephone sets for the building which feeding with telephone junction box that having fiber optic cable (MM) feeding from server panels. Fire fighting System: • Installation for EMT pipes for cable pulling
  • 4. • Fixing the modules and wiring devices which clearly approved from the client 7&mentioned in the specification by following the AFC drawings. • Installing the control panel & accomplished the wiring termination task. • Finalizing the interface between the electrical & mechanical equipment to control the deluge valves by solenoids and to be monitor by pressure switching refereeing to the main control panel. • Dealing with FM200 SYSTEM ,Either water sprinkling SYSTEM. • Finalize the system with commissioning & to be interfaced with the DCS. Summary Of Skills And Abilities 1. Languages: • Fluent English. (Reading, Writing, Speaking) • Fluent Arabic. (Reading, Writing, Speaking) 2. IT skills: • Microsoft Word. • Microsoft Excel. • Microsoft Access. • Microsoft Power Point 3. General: • Analytical & conceptual thinking. • Problem solving & management. • Leadership qualities. • Interpersonal skills. • Good communication skills. • Ability to work unsupervised or in a team environment. • High performance under pressure. Education 2002-2007 Arab Academy for Science and Technology. Alexandria, Egypt. I achieved a Bachelor degree in the Electronics and Communications Engineering Department.
  • 5. My GPA is 2.91 / 4 " very good" I scored a 91% in my graduation project, “An Intelligent Autonomous Vehicle.” Previous course Sept 2007 New Horizons, Egypt Alexandria branch. I attended the CCNA “Cisco Certified Network Administration” course. Sept 2011 Haward Technology Middle East, Abu Dhabi,UAE. I attended the CFOP “ Certified Fiber Optic Professional” course. Personal Date of Birth: 01-10-1984 Gender: Male Nationality: Egyptian Military status: None Contact Details: Al Jubail, KSA 966-501-923-386,Saudi Arabia M.sherkawi@ssem.com.sa References A list of references is available on request
  • 6. My GPA is 2.91 / 4 " very good" I scored a 91% in my graduation project, “An Intelligent Autonomous Vehicle.” Previous course Sept 2007 New Horizons, Egypt Alexandria branch. I attended the CCNA “Cisco Certified Network Administration” course. Sept 2011 Haward Technology Middle East, Abu Dhabi,UAE. I attended the CFOP “ Certified Fiber Optic Professional” course. Personal Date of Birth: 01-10-1984 Gender: Male Nationality: Egyptian Military status: None Contact Details: Al Jubail, KSA 966-501-923-386,Saudi Arabia M.sherkawi@ssem.com.sa References A list of references is available on request