SlideShare a Scribd company logo
1 of 7
Download to read offline
Rework-Seating Operations
Core Manufacturing Process Standard
Proprietary and Confidential AECS-MOS-ST-11-E Rev 1.0 Page 1 of 7
Master files are stored electronically and are available to all team members.
Printed copies of the master files are for reference only.
Revision Release Date Description of Changes
02 01-February-2016  Clarified responsibilities / process requirements (3.0, 4.0, 4.2 - 4.9 &
6.0)
 Added General section (4.1)
 Changed from CC Fasteners to CC Subsystems (4.4 & 4.5)
1.0 01-April-2017  Adient release
 Clarified process responsibilities (3.0, 4.1.1, 4.1.2 & 4.13)
Prepared Approved Released
Process Leader Subject Matter Expert Process Champion BOS Team
Brian Jacobs Chris Parker Scott Foster
Approval records maintained by BOS Team
1.0 Purpose
This standard defines the requirements for seat rework.
2.0 Scope
This standard applies to the following Adient Complete Seat locations:
Plant
Tech
Center
Adient owned operations Yes No
Adient majority-owned subsidiaries Yes No
Consolidated joint ventures and affiliates Yes* No
Unconsolidated joint ventures and affiliates * No
* Required in accordance with JV business agreement
3.0 Responsibility
The Advanced Manufacturing Engineer / Plant Manufacturing Engineer (AME/PltME) is responsible for
applying the contents of this standard and consulting with the proper Subject Matter Manufacturing Experts
(SMME) for any support required when applying this standard.
The Regional Director of Advanced Manufacturing Engineering and the Business Unit / Regional
Manufacturing Engineering Leads are responsible for communicating the contents of this standard to the
AME/PltME.
The Regional Lead for Subject Matter Manufacturing Experts is responsible for training the contents of this
standard to the AME/PltME.
The Plant Manager is responsible for ensuring implementation and compliance with rework requirements.
The regional Vice President of Quality and Vice President of Manufacturing Operations are responsible for
approving any exception to the rework requirements.
The Quality Engineer and/or Manufacturing Engineer is responsible for creating / posting Visual aids
identifying seat safety critical subsystems.
The Production Operator is responsible for identifying a nonconforming seat (seat fails to achieve an OK
from the standard process controls and/or appearance standards).
Rework-Seating Operations
Core Manufacturing Process Standard
Proprietary and Confidential AECS-MOS-ST-11-E Rev 1.0 Page 2 of 7
The Supervisor is responsible for identifying the failure mode of the nonconforming seat and bypassing the
seat from the station to the Rework Area.
The Certified Rework operator is responsible for executing the rework or teardown process and recording
on a Rework / Teardown log and executing / verifying End-of-Line (EoL) Testing and occupant
classification system confirmation after any rework.
The Production Supervisor or Quality Engineer is responsible for verifying rework completion and signing
the Rework / Teardown Log before the seat is released.
The Final Inspection operator is responsible for completing final inspection (manual system) and
evaluating and verification failures.
The Shift Superintendent is responsible for releasing nonconforming seats from Shipping Verification
System (SVS).
4.0 Process
4.1 General: The standard for seat rework is that no item identified as safety critical (CC) in the PFMEA
or Control Plan shall be reworked without the required process controls as defined in the Control
Plan.
The standard method of rework for a safety critical (CC) seat subsystem failure is to build a new
replacement seat. The nonconforming seat must be torn down, the conforming components
returned to stock and the non-conforming parts must be placed in a clearly-marked nonconforming
material container. This is required for simplicity and minimal coordination requirements.
Rework of any seat or component must include a complete End-of-line (EoL) Electrical test and, if
required, occupant classification system confirmation.
The Plant Manager must ensure implementation and compliance with rework requirements.
4.1.1 Application: The Advanced Manufacturing Engineer / Plant Manufacturing Engineer
(AME/PltME) applies the contents of this standard and consults with the proper Subject Matter
Manufacturing Experts (SMME) for any support required when applying this standard.
4.1.2 Communication: The Regional Director of Advanced Manufacturing Engineering and the
Business Unit / Regional Manufacturing Engineering Leads ensure that the contents of this
standard are communicated to the AME/PltMEs.
4.1.3 Training: The Regional Subject Matter Manufacturing Experts (SMME) ensure that training of
the contents of this standard is provided to the AME/PltMEs.
The Certified Rework Operator must be trained to the following in accordance with the
Manufacturing Plant Employee Training and Development procedure:
 Nonconforming Material procedure
 Safety Critical Threaded Fastener Installation standard
 Rework-Seating Operations Core Manufacturing Process standard
The Operations Manager ensures:
 Training is documented, annual refresher retraining is conducted and training records are
retained by Human Resources.
 Adequate alternate operators designated and trained to support absences, vacations,
etc...
Rework-Seating Operations
Core Manufacturing Process Standard
Proprietary and Confidential AECS-MOS-ST-11-E Rev 1.0 Page 3 of 7
4.1.4 Exceptions: Any exceptions to these requirements must be approved by the regional Vice
President of Quality and regional Vice President of Manufacturing Operations or someone
designated in writing by these individuals, prior to implementation. Exception approval must be
retained by the Quality Manager.
Exceptions to this standard may be needed due to production constraints, such as customer
broadcast data availability, outgoing buffer deficiency, and failure rate and/or quality issues.
Exceptions are business case specific and require a full set of process documents, consisting
of: process flow, PFMEA, ODS, Control Plan and a training plan for certified rework
operators, as detailed above. Any exception must include full process documentation and
customer approval.
Examples of alternate processes may include, but are not limited to:
 Teardown of the seat to the point of failure and re-introduction to the build process
 A Kanban of sub-assemblies or seats that can re-introduced to the build process
 An offline process that duplicates all online process controls
Rework-Seating Operations
Core Manufacturing Process Standard
Proprietary and Confidential AECS-MOS-ST-11-E Rev 1.0 Page 4 of 7
Process Document Resource Comments
Rework Station
Required
Complete
Rework Station
Setup
Failure
Related To CC
Subsystem?
No
Yes
Complete
Rework
Complete
EoL Electrical
Testing
EoL Testing
Passed?
No
Yes
CC
Subsystem
Removal
Required?
No
Yes
Send Seat To
Shipping
System
Conforming Seat
Nonconforming Seat
(Teardown Only)
Nonconforming
Seat?
Yes
No
Visual Aids
(w/ CC symbols)
Bypass Log
Rework /
Teardown Log
ODS
ODS
ODS
Quality Engineer /
Manufacturing
Engineer
Operator /
Supervisor
Certified Rework
Operator
Certified Rework
Operator
Certified Rework
Operator /
Production
Supervisor /
Quality Engineer
Certified Rework
Operator
Certified Rework
Operator
Final Inspection
Operator
 Safety Critical Threaded Fastener
Installation Standard – Core
Manufacturing Process: AE-MOS-
ST-08-E
 Section: 4.3. 8
 Refer to the Nonconforming
Material procedure and Material
Handing, Identification and
Traceability procedure
 Refer to the End-of-Line Electrical
Tester Core Equipment standard
 Enter at Last Chance Induct / Ship
Verification System
Rework-Seating Operations
Core Manufacturing Process Standard
Proprietary and Confidential AECS-MOS-ST-11-E Rev 1.0 Page 5 of 7
4.2 Complete Rework Station Setup
4.2.1 The Quality Engineer or Manufacturing Engineer creates and posts the visual aids (with CC
symbols) identifying seat safety critical subsystems.
4.2.2 Rework / Teardown Criteria:
 Safety critical (CC) components may be restocked after a teardown, with the exception of
fasteners, if the component was not the reason for the teardown.
 If a safety critical (CC) process fails to achieve an OK result in the production station, the
seat must be bypassed and released to the rework area for teardown.
 All torque equipment in the rework area must only operate in reverse.
4.3 Nonconforming seat identified? The Production Operator identifies a nonconforming seat (seat fails
to achieve an OK from the standard process controls and/or appearance standards). The supervisor
/ production operator identifies the failure mode via the electronic or paper system (Bypass Log) and,
bypasses the seat from the station and routes it to the rework area.
Rework-Seating Operations
Core Manufacturing Process Standard
Proprietary and Confidential AECS-MOS-ST-11-E Rev 1.0 Page 6 of 7
4.4 Failure related to CC subsystem? The Certified Rework Operator determines whether the failure is
related to a safety critical subsystem and the seat must be torn down.
4.5 CC subsystem removal required? The Certified Rework Operator determines whether the rework of
the seat requires the removal of a safety critical subsystem and the seat must be torn down.
4.6 Complete Rework: The Certified Rework Operator executes the rework or teardown process.
4.6.1 If the rework does not affect a safety critical (CC) subsystem, the seat is reworked in the
rework area.
4.6.2 Any rework or teardown of the seat must be recorded by the Certified Rework Operator in a
Rework / Teardown Log or electronic equivalent. Records must specify seat sequence
number, the defect, and final disposition (specific rework performed or teardown).
4.6.3 If the seat is torn down, the conforming components are returned to stock and the
nonconforming parts must be placed in a clearly marked nonconforming material container
and handled in accordance with the Nonconforming Material procedure. Traceability of parts
must be done in accordance with plant traceability instructions and the Material Handling,
Identification and Traceability procedure.
4.7 Complete EoL Electrical Testing: The Certified Rework Operator will execute EoL testing and
occupant classification system confirmation after any rework in accordance with the EoL Electrical
Tester Core Equipment standard.
4.8 EoL Testing Passed? The Certified Rework Operator confirms the seat passes EoL testing.
4.8.1 If the seat passes EoL testing, the Certified Rework Operator directs the seat to continue
through final inspection, bagging (if required) and labeling as specified on the ODS.
4.8.2 If the seat fails EoL testing, the Certified Rework Operator tags the part as nonconforming
material and the teardown process is initiated.
4.8.3 After Rework the Production Supervisor or Quality Engineer must verify rework completion
and sign the Rework / Teardown Log before the seat is released.
4.9 Send Seat to Shipping System
4.9.1 Last Chance Induct (LCI): The Iast designated point in the ship system that is designed to
accept seats.
4.9.2 Shipping Verification System: After all line processes and rework (if applicable) are completed,
the seat proceeds to the Shipping Verification System (SVS) where EoL testing and Serial
Data Trace information (Airbag, pre-tensioner and PODs/IEE Mat) are verified ‘good’
electronically by the system. If the system is not equipped to do this, a manual verification
must be defined in the ODS at final inspection and completed by the Final Inspection
Operator.
Note: SVS is a system, electronic or manual, that confirms all electrical testing and traceability
data for the seat at the point of shipment.
4.9.3 Verification Failure: If the SVS / manual verification indicates any failures the seat must be
thoroughly evaluated by the Final Inspection Operator to identify the failure. Once the failure
is identified and resolved, intervention / release of the seat must be authorized (via card key or
password) by a Shift Superintendent or higher level operations management.
Rework-Seating Operations
Core Manufacturing Process Standard
Proprietary and Confidential AECS-MOS-ST-11-E Rev 1.0 Page 7 of 7
5.0 Records/Logs
5.1 Approvals for deviations to this standard, as well as Rework / Teardown Logs with required
approvals, and Bypass Logs are stored by the Quality Manager.
Rework Station Compliance Audit results are stored by the Plant Manager.
Certified Rework Operator training records are stored by Human Resources Manager.
5.2 Retention: Records must be retained in accordance with the Control of Documents, Data and
Records procedure, Record Retention policy and Record Retention Schedule standard.
6.0 References
Bypass Log (Local)
Control of Documents, Data and Records procedure (AE-LOS-PR-13)
End-of-Line Electrical Tester Core Equipment standard (AECS-MOS-ST-12)
Layered Process Audit work instruction (AE-LOS-WI-75)
Layered Process Audit Workbook (AE-LOS-CL-14)
Manufacturing Plant Employee Training and Development procedure (AE-MOS-PR-15)
Material Handling, Identification and Traceability procedure (AE-MOS-PR-10)
Nonconforming Material procedure (AE-MOS-PR-12)
Record Retention policy (AE-LOS-PY-02)
Record Retention Schedule standard (AE-LOS-ST-39)
Rework / Teardown Log (Local)
Safety Critical Threaded Fastener Installation standard (AECS-MOS-ST-09)

More Related Content

Similar to Rework-Seating Operations.pdf

CCIE Real LAB TS 1.2 CCIEREALLABWORKBOOK.COM
CCIE Real LAB TS 1.2 CCIEREALLABWORKBOOK.COMCCIE Real LAB TS 1.2 CCIEREALLABWORKBOOK.COM
CCIE Real LAB TS 1.2 CCIEREALLABWORKBOOK.COMcciereallabworkbooks
 
CCIE Real LAB TS 1.3 CCIEREALLABWORKBOOK.COM
CCIE Real LAB TS 1.3 CCIEREALLABWORKBOOK.COMCCIE Real LAB TS 1.3 CCIEREALLABWORKBOOK.COM
CCIE Real LAB TS 1.3 CCIEREALLABWORKBOOK.COMcciereallabworkbooks
 
ASQ RD Webinar: Design for reliability a roadmap for design robustness
ASQ RD Webinar: Design for reliability   a roadmap for design robustnessASQ RD Webinar: Design for reliability   a roadmap for design robustness
ASQ RD Webinar: Design for reliability a roadmap for design robustnessASQ Reliability Division
 
Capability initial flow control
Capability   initial flow controlCapability   initial flow control
Capability initial flow controlhqdan
 
Performance Quality Review Standards
Performance Quality Review StandardsPerformance Quality Review Standards
Performance Quality Review StandardsElizabeth Prunk
 
Adil Field Instrument without apprentice Cv
Adil Field Instrument  without apprentice CvAdil Field Instrument  without apprentice Cv
Adil Field Instrument without apprentice CvMuhammad Adil
 
Aktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocess
Aktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocessAktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocess
Aktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocessInboundLabs (ex mon.ki inc)
 
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_29-09-2022_Mo...
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_29-09-2022_Mo...FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_29-09-2022_Mo...
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_29-09-2022_Mo...JothiSankar7
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programshossam hassanein
 
Business Process Modeling rendition_V0
Business Process Modeling rendition_V0Business Process Modeling rendition_V0
Business Process Modeling rendition_V0Jaswin Sood
 
ITIL Implemetation in Telecom
 ITIL Implemetation in Telecom ITIL Implemetation in Telecom
ITIL Implemetation in TelecomUtkarsh Verma
 
resume Jennifer Hall 01-2017a
resume Jennifer Hall 01-2017aresume Jennifer Hall 01-2017a
resume Jennifer Hall 01-2017aJennifer Hall
 
Brian Scott Resume
Brian Scott ResumeBrian Scott Resume
Brian Scott ResumeBrian Scott
 
jmeyercons10112016
jmeyercons10112016jmeyercons10112016
jmeyercons10112016John Meyer
 

Similar to Rework-Seating Operations.pdf (20)

CCIE Real LAB TS 1.2 CCIEREALLABWORKBOOK.COM
CCIE Real LAB TS 1.2 CCIEREALLABWORKBOOK.COMCCIE Real LAB TS 1.2 CCIEREALLABWORKBOOK.COM
CCIE Real LAB TS 1.2 CCIEREALLABWORKBOOK.COM
 
00 AM Step 4 Overview V1.pptx
00 AM Step 4 Overview V1.pptx00 AM Step 4 Overview V1.pptx
00 AM Step 4 Overview V1.pptx
 
CCIE Real LAB TS 1.3 CCIEREALLABWORKBOOK.COM
CCIE Real LAB TS 1.3 CCIEREALLABWORKBOOK.COMCCIE Real LAB TS 1.3 CCIEREALLABWORKBOOK.COM
CCIE Real LAB TS 1.3 CCIEREALLABWORKBOOK.COM
 
ASQ RD Webinar: Design for reliability a roadmap for design robustness
ASQ RD Webinar: Design for reliability   a roadmap for design robustnessASQ RD Webinar: Design for reliability   a roadmap for design robustness
ASQ RD Webinar: Design for reliability a roadmap for design robustness
 
Capability initial flow control
Capability   initial flow controlCapability   initial flow control
Capability initial flow control
 
Performance Quality Review Standards
Performance Quality Review StandardsPerformance Quality Review Standards
Performance Quality Review Standards
 
Smed smpl 1
Smed smpl 1Smed smpl 1
Smed smpl 1
 
Smed smpl 1
Smed smpl 1Smed smpl 1
Smed smpl 1
 
LaFataResume16ddd
LaFataResume16dddLaFataResume16ddd
LaFataResume16ddd
 
johncv
johncvjohncv
johncv
 
Adil Field Instrument without apprentice Cv
Adil Field Instrument  without apprentice CvAdil Field Instrument  without apprentice Cv
Adil Field Instrument without apprentice Cv
 
Aktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocess
Aktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocessAktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocess
Aktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocess
 
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_29-09-2022_Mo...
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_29-09-2022_Mo...FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_29-09-2022_Mo...
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_29-09-2022_Mo...
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programs
 
Business Process Modeling rendition_V0
Business Process Modeling rendition_V0Business Process Modeling rendition_V0
Business Process Modeling rendition_V0
 
Presentation of Engineering Services
Presentation of Engineering ServicesPresentation of Engineering Services
Presentation of Engineering Services
 
ITIL Implemetation in Telecom
 ITIL Implemetation in Telecom ITIL Implemetation in Telecom
ITIL Implemetation in Telecom
 
resume Jennifer Hall 01-2017a
resume Jennifer Hall 01-2017aresume Jennifer Hall 01-2017a
resume Jennifer Hall 01-2017a
 
Brian Scott Resume
Brian Scott ResumeBrian Scott Resume
Brian Scott Resume
 
jmeyercons10112016
jmeyercons10112016jmeyercons10112016
jmeyercons10112016
 

Recently uploaded

Auto Glass Repair in Redwood City What to Do When Disaster Strikes.pdf
Auto Glass Repair in Redwood City What to Do When Disaster Strikes.pdfAuto Glass Repair in Redwood City What to Do When Disaster Strikes.pdf
Auto Glass Repair in Redwood City What to Do When Disaster Strikes.pdfDuran's Auto Glass
 
Things that make the new Nissan Z unique
Things that make the new Nissan Z uniqueThings that make the new Nissan Z unique
Things that make the new Nissan Z uniquejennifermiller8137
 
What Causes The BMW X7 Power Supply Warning To Illuminate
What Causes The BMW X7 Power Supply Warning To IlluminateWhat Causes The BMW X7 Power Supply Warning To Illuminate
What Causes The BMW X7 Power Supply Warning To IlluminateMedway Imports
 
Access to Rural Charging by David Skakel
Access to Rural Charging by David SkakelAccess to Rural Charging by David Skakel
Access to Rural Charging by David SkakelForth
 
Why Won't My Mercedes Key Fob Function After A Battery Swap
Why Won't My Mercedes Key Fob Function After A Battery SwapWhy Won't My Mercedes Key Fob Function After A Battery Swap
Why Won't My Mercedes Key Fob Function After A Battery SwapDreamcars Auto Repair
 
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样AS
 
John Deere 990 Compact Utility Tractor Shop Manual.pdf
John Deere 990 Compact Utility Tractor Shop Manual.pdfJohn Deere 990 Compact Utility Tractor Shop Manual.pdf
John Deere 990 Compact Utility Tractor Shop Manual.pdfExcavator
 
EV Charging Resources and Technical Assistance for Rural Communities and Trib...
EV Charging Resources and Technical Assistance for Rural Communities and Trib...EV Charging Resources and Technical Assistance for Rural Communities and Trib...
EV Charging Resources and Technical Assistance for Rural Communities and Trib...Forth
 
一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书
一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书
一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书AD
 
Why Is The Glow Plug Light Flashing In My VW & What Does It Indicate
Why Is The Glow Plug Light Flashing In My VW & What Does It IndicateWhy Is The Glow Plug Light Flashing In My VW & What Does It Indicate
Why Is The Glow Plug Light Flashing In My VW & What Does It IndicateWoodinville Sports Cars
 
Exploring the Heart of Alberta: A Journey from Calgary to Edmonton
Exploring the Heart of Alberta: A Journey from Calgary to EdmontonExploring the Heart of Alberta: A Journey from Calgary to Edmonton
Exploring the Heart of Alberta: A Journey from Calgary to EdmontonTheCanada BUS
 
一比一原版英国哈珀亚当斯大学毕业证如何办理
一比一原版英国哈珀亚当斯大学毕业证如何办理一比一原版英国哈珀亚当斯大学毕业证如何办理
一比一原版英国哈珀亚当斯大学毕业证如何办理AS
 
快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样
快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样
快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样kthcah
 
Benefits of Load Planning in Fleet Management
Benefits of Load Planning in Fleet ManagementBenefits of Load Planning in Fleet Management
Benefits of Load Planning in Fleet Managementjennifermiller8137
 
What Might Be Behind Your Mercedes' Inoperative Cruise Control
What Might Be Behind Your Mercedes' Inoperative Cruise ControlWhat Might Be Behind Your Mercedes' Inoperative Cruise Control
What Might Be Behind Your Mercedes' Inoperative Cruise ControlM Service Inc
 
Preparing for Transportation Electrification: The Electric Coop Perspective
Preparing for Transportation Electrification: The Electric Coop PerspectivePreparing for Transportation Electrification: The Electric Coop Perspective
Preparing for Transportation Electrification: The Electric Coop PerspectiveForth
 
Toyota Yaris service manual Free.pdf Toyota Yaris Service manual
Toyota Yaris service manual Free.pdf  Toyota Yaris Service manualToyota Yaris service manual Free.pdf  Toyota Yaris Service manual
Toyota Yaris service manual Free.pdf Toyota Yaris Service manualAutocarmanuals.com
 
Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...
Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...
Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...Forth
 
What Could Cause Your Audi To Keep Cutting Out
What Could Cause Your Audi To Keep Cutting OutWhat Could Cause Your Audi To Keep Cutting Out
What Could Cause Your Audi To Keep Cutting OutEuroautomotive
 

Recently uploaded (20)

Auto Glass Repair in Redwood City What to Do When Disaster Strikes.pdf
Auto Glass Repair in Redwood City What to Do When Disaster Strikes.pdfAuto Glass Repair in Redwood City What to Do When Disaster Strikes.pdf
Auto Glass Repair in Redwood City What to Do When Disaster Strikes.pdf
 
Things that make the new Nissan Z unique
Things that make the new Nissan Z uniqueThings that make the new Nissan Z unique
Things that make the new Nissan Z unique
 
What Causes The BMW X7 Power Supply Warning To Illuminate
What Causes The BMW X7 Power Supply Warning To IlluminateWhat Causes The BMW X7 Power Supply Warning To Illuminate
What Causes The BMW X7 Power Supply Warning To Illuminate
 
Access to Rural Charging by David Skakel
Access to Rural Charging by David SkakelAccess to Rural Charging by David Skakel
Access to Rural Charging by David Skakel
 
Why Won't My Mercedes Key Fob Function After A Battery Swap
Why Won't My Mercedes Key Fob Function After A Battery SwapWhy Won't My Mercedes Key Fob Function After A Battery Swap
Why Won't My Mercedes Key Fob Function After A Battery Swap
 
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
 
John Deere 990 Compact Utility Tractor Shop Manual.pdf
John Deere 990 Compact Utility Tractor Shop Manual.pdfJohn Deere 990 Compact Utility Tractor Shop Manual.pdf
John Deere 990 Compact Utility Tractor Shop Manual.pdf
 
EV Charging Resources and Technical Assistance for Rural Communities and Trib...
EV Charging Resources and Technical Assistance for Rural Communities and Trib...EV Charging Resources and Technical Assistance for Rural Communities and Trib...
EV Charging Resources and Technical Assistance for Rural Communities and Trib...
 
一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书
一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书
一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书
 
Why Is The Glow Plug Light Flashing In My VW & What Does It Indicate
Why Is The Glow Plug Light Flashing In My VW & What Does It IndicateWhy Is The Glow Plug Light Flashing In My VW & What Does It Indicate
Why Is The Glow Plug Light Flashing In My VW & What Does It Indicate
 
Exploring the Heart of Alberta: A Journey from Calgary to Edmonton
Exploring the Heart of Alberta: A Journey from Calgary to EdmontonExploring the Heart of Alberta: A Journey from Calgary to Edmonton
Exploring the Heart of Alberta: A Journey from Calgary to Edmonton
 
AI for Smart Vehicles - A quick overview
AI for Smart Vehicles - A quick overviewAI for Smart Vehicles - A quick overview
AI for Smart Vehicles - A quick overview
 
一比一原版英国哈珀亚当斯大学毕业证如何办理
一比一原版英国哈珀亚当斯大学毕业证如何办理一比一原版英国哈珀亚当斯大学毕业证如何办理
一比一原版英国哈珀亚当斯大学毕业证如何办理
 
快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样
快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样
快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样
 
Benefits of Load Planning in Fleet Management
Benefits of Load Planning in Fleet ManagementBenefits of Load Planning in Fleet Management
Benefits of Load Planning in Fleet Management
 
What Might Be Behind Your Mercedes' Inoperative Cruise Control
What Might Be Behind Your Mercedes' Inoperative Cruise ControlWhat Might Be Behind Your Mercedes' Inoperative Cruise Control
What Might Be Behind Your Mercedes' Inoperative Cruise Control
 
Preparing for Transportation Electrification: The Electric Coop Perspective
Preparing for Transportation Electrification: The Electric Coop PerspectivePreparing for Transportation Electrification: The Electric Coop Perspective
Preparing for Transportation Electrification: The Electric Coop Perspective
 
Toyota Yaris service manual Free.pdf Toyota Yaris Service manual
Toyota Yaris service manual Free.pdf  Toyota Yaris Service manualToyota Yaris service manual Free.pdf  Toyota Yaris Service manual
Toyota Yaris service manual Free.pdf Toyota Yaris Service manual
 
Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...
Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...
Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...
 
What Could Cause Your Audi To Keep Cutting Out
What Could Cause Your Audi To Keep Cutting OutWhat Could Cause Your Audi To Keep Cutting Out
What Could Cause Your Audi To Keep Cutting Out
 

Rework-Seating Operations.pdf

  • 1. Rework-Seating Operations Core Manufacturing Process Standard Proprietary and Confidential AECS-MOS-ST-11-E Rev 1.0 Page 1 of 7 Master files are stored electronically and are available to all team members. Printed copies of the master files are for reference only. Revision Release Date Description of Changes 02 01-February-2016  Clarified responsibilities / process requirements (3.0, 4.0, 4.2 - 4.9 & 6.0)  Added General section (4.1)  Changed from CC Fasteners to CC Subsystems (4.4 & 4.5) 1.0 01-April-2017  Adient release  Clarified process responsibilities (3.0, 4.1.1, 4.1.2 & 4.13) Prepared Approved Released Process Leader Subject Matter Expert Process Champion BOS Team Brian Jacobs Chris Parker Scott Foster Approval records maintained by BOS Team 1.0 Purpose This standard defines the requirements for seat rework. 2.0 Scope This standard applies to the following Adient Complete Seat locations: Plant Tech Center Adient owned operations Yes No Adient majority-owned subsidiaries Yes No Consolidated joint ventures and affiliates Yes* No Unconsolidated joint ventures and affiliates * No * Required in accordance with JV business agreement 3.0 Responsibility The Advanced Manufacturing Engineer / Plant Manufacturing Engineer (AME/PltME) is responsible for applying the contents of this standard and consulting with the proper Subject Matter Manufacturing Experts (SMME) for any support required when applying this standard. The Regional Director of Advanced Manufacturing Engineering and the Business Unit / Regional Manufacturing Engineering Leads are responsible for communicating the contents of this standard to the AME/PltME. The Regional Lead for Subject Matter Manufacturing Experts is responsible for training the contents of this standard to the AME/PltME. The Plant Manager is responsible for ensuring implementation and compliance with rework requirements. The regional Vice President of Quality and Vice President of Manufacturing Operations are responsible for approving any exception to the rework requirements. The Quality Engineer and/or Manufacturing Engineer is responsible for creating / posting Visual aids identifying seat safety critical subsystems. The Production Operator is responsible for identifying a nonconforming seat (seat fails to achieve an OK from the standard process controls and/or appearance standards).
  • 2. Rework-Seating Operations Core Manufacturing Process Standard Proprietary and Confidential AECS-MOS-ST-11-E Rev 1.0 Page 2 of 7 The Supervisor is responsible for identifying the failure mode of the nonconforming seat and bypassing the seat from the station to the Rework Area. The Certified Rework operator is responsible for executing the rework or teardown process and recording on a Rework / Teardown log and executing / verifying End-of-Line (EoL) Testing and occupant classification system confirmation after any rework. The Production Supervisor or Quality Engineer is responsible for verifying rework completion and signing the Rework / Teardown Log before the seat is released. The Final Inspection operator is responsible for completing final inspection (manual system) and evaluating and verification failures. The Shift Superintendent is responsible for releasing nonconforming seats from Shipping Verification System (SVS). 4.0 Process 4.1 General: The standard for seat rework is that no item identified as safety critical (CC) in the PFMEA or Control Plan shall be reworked without the required process controls as defined in the Control Plan. The standard method of rework for a safety critical (CC) seat subsystem failure is to build a new replacement seat. The nonconforming seat must be torn down, the conforming components returned to stock and the non-conforming parts must be placed in a clearly-marked nonconforming material container. This is required for simplicity and minimal coordination requirements. Rework of any seat or component must include a complete End-of-line (EoL) Electrical test and, if required, occupant classification system confirmation. The Plant Manager must ensure implementation and compliance with rework requirements. 4.1.1 Application: The Advanced Manufacturing Engineer / Plant Manufacturing Engineer (AME/PltME) applies the contents of this standard and consults with the proper Subject Matter Manufacturing Experts (SMME) for any support required when applying this standard. 4.1.2 Communication: The Regional Director of Advanced Manufacturing Engineering and the Business Unit / Regional Manufacturing Engineering Leads ensure that the contents of this standard are communicated to the AME/PltMEs. 4.1.3 Training: The Regional Subject Matter Manufacturing Experts (SMME) ensure that training of the contents of this standard is provided to the AME/PltMEs. The Certified Rework Operator must be trained to the following in accordance with the Manufacturing Plant Employee Training and Development procedure:  Nonconforming Material procedure  Safety Critical Threaded Fastener Installation standard  Rework-Seating Operations Core Manufacturing Process standard The Operations Manager ensures:  Training is documented, annual refresher retraining is conducted and training records are retained by Human Resources.  Adequate alternate operators designated and trained to support absences, vacations, etc...
  • 3. Rework-Seating Operations Core Manufacturing Process Standard Proprietary and Confidential AECS-MOS-ST-11-E Rev 1.0 Page 3 of 7 4.1.4 Exceptions: Any exceptions to these requirements must be approved by the regional Vice President of Quality and regional Vice President of Manufacturing Operations or someone designated in writing by these individuals, prior to implementation. Exception approval must be retained by the Quality Manager. Exceptions to this standard may be needed due to production constraints, such as customer broadcast data availability, outgoing buffer deficiency, and failure rate and/or quality issues. Exceptions are business case specific and require a full set of process documents, consisting of: process flow, PFMEA, ODS, Control Plan and a training plan for certified rework operators, as detailed above. Any exception must include full process documentation and customer approval. Examples of alternate processes may include, but are not limited to:  Teardown of the seat to the point of failure and re-introduction to the build process  A Kanban of sub-assemblies or seats that can re-introduced to the build process  An offline process that duplicates all online process controls
  • 4. Rework-Seating Operations Core Manufacturing Process Standard Proprietary and Confidential AECS-MOS-ST-11-E Rev 1.0 Page 4 of 7 Process Document Resource Comments Rework Station Required Complete Rework Station Setup Failure Related To CC Subsystem? No Yes Complete Rework Complete EoL Electrical Testing EoL Testing Passed? No Yes CC Subsystem Removal Required? No Yes Send Seat To Shipping System Conforming Seat Nonconforming Seat (Teardown Only) Nonconforming Seat? Yes No Visual Aids (w/ CC symbols) Bypass Log Rework / Teardown Log ODS ODS ODS Quality Engineer / Manufacturing Engineer Operator / Supervisor Certified Rework Operator Certified Rework Operator Certified Rework Operator / Production Supervisor / Quality Engineer Certified Rework Operator Certified Rework Operator Final Inspection Operator  Safety Critical Threaded Fastener Installation Standard – Core Manufacturing Process: AE-MOS- ST-08-E  Section: 4.3. 8  Refer to the Nonconforming Material procedure and Material Handing, Identification and Traceability procedure  Refer to the End-of-Line Electrical Tester Core Equipment standard  Enter at Last Chance Induct / Ship Verification System
  • 5. Rework-Seating Operations Core Manufacturing Process Standard Proprietary and Confidential AECS-MOS-ST-11-E Rev 1.0 Page 5 of 7 4.2 Complete Rework Station Setup 4.2.1 The Quality Engineer or Manufacturing Engineer creates and posts the visual aids (with CC symbols) identifying seat safety critical subsystems. 4.2.2 Rework / Teardown Criteria:  Safety critical (CC) components may be restocked after a teardown, with the exception of fasteners, if the component was not the reason for the teardown.  If a safety critical (CC) process fails to achieve an OK result in the production station, the seat must be bypassed and released to the rework area for teardown.  All torque equipment in the rework area must only operate in reverse. 4.3 Nonconforming seat identified? The Production Operator identifies a nonconforming seat (seat fails to achieve an OK from the standard process controls and/or appearance standards). The supervisor / production operator identifies the failure mode via the electronic or paper system (Bypass Log) and, bypasses the seat from the station and routes it to the rework area.
  • 6. Rework-Seating Operations Core Manufacturing Process Standard Proprietary and Confidential AECS-MOS-ST-11-E Rev 1.0 Page 6 of 7 4.4 Failure related to CC subsystem? The Certified Rework Operator determines whether the failure is related to a safety critical subsystem and the seat must be torn down. 4.5 CC subsystem removal required? The Certified Rework Operator determines whether the rework of the seat requires the removal of a safety critical subsystem and the seat must be torn down. 4.6 Complete Rework: The Certified Rework Operator executes the rework or teardown process. 4.6.1 If the rework does not affect a safety critical (CC) subsystem, the seat is reworked in the rework area. 4.6.2 Any rework or teardown of the seat must be recorded by the Certified Rework Operator in a Rework / Teardown Log or electronic equivalent. Records must specify seat sequence number, the defect, and final disposition (specific rework performed or teardown). 4.6.3 If the seat is torn down, the conforming components are returned to stock and the nonconforming parts must be placed in a clearly marked nonconforming material container and handled in accordance with the Nonconforming Material procedure. Traceability of parts must be done in accordance with plant traceability instructions and the Material Handling, Identification and Traceability procedure. 4.7 Complete EoL Electrical Testing: The Certified Rework Operator will execute EoL testing and occupant classification system confirmation after any rework in accordance with the EoL Electrical Tester Core Equipment standard. 4.8 EoL Testing Passed? The Certified Rework Operator confirms the seat passes EoL testing. 4.8.1 If the seat passes EoL testing, the Certified Rework Operator directs the seat to continue through final inspection, bagging (if required) and labeling as specified on the ODS. 4.8.2 If the seat fails EoL testing, the Certified Rework Operator tags the part as nonconforming material and the teardown process is initiated. 4.8.3 After Rework the Production Supervisor or Quality Engineer must verify rework completion and sign the Rework / Teardown Log before the seat is released. 4.9 Send Seat to Shipping System 4.9.1 Last Chance Induct (LCI): The Iast designated point in the ship system that is designed to accept seats. 4.9.2 Shipping Verification System: After all line processes and rework (if applicable) are completed, the seat proceeds to the Shipping Verification System (SVS) where EoL testing and Serial Data Trace information (Airbag, pre-tensioner and PODs/IEE Mat) are verified ‘good’ electronically by the system. If the system is not equipped to do this, a manual verification must be defined in the ODS at final inspection and completed by the Final Inspection Operator. Note: SVS is a system, electronic or manual, that confirms all electrical testing and traceability data for the seat at the point of shipment. 4.9.3 Verification Failure: If the SVS / manual verification indicates any failures the seat must be thoroughly evaluated by the Final Inspection Operator to identify the failure. Once the failure is identified and resolved, intervention / release of the seat must be authorized (via card key or password) by a Shift Superintendent or higher level operations management.
  • 7. Rework-Seating Operations Core Manufacturing Process Standard Proprietary and Confidential AECS-MOS-ST-11-E Rev 1.0 Page 7 of 7 5.0 Records/Logs 5.1 Approvals for deviations to this standard, as well as Rework / Teardown Logs with required approvals, and Bypass Logs are stored by the Quality Manager. Rework Station Compliance Audit results are stored by the Plant Manager. Certified Rework Operator training records are stored by Human Resources Manager. 5.2 Retention: Records must be retained in accordance with the Control of Documents, Data and Records procedure, Record Retention policy and Record Retention Schedule standard. 6.0 References Bypass Log (Local) Control of Documents, Data and Records procedure (AE-LOS-PR-13) End-of-Line Electrical Tester Core Equipment standard (AECS-MOS-ST-12) Layered Process Audit work instruction (AE-LOS-WI-75) Layered Process Audit Workbook (AE-LOS-CL-14) Manufacturing Plant Employee Training and Development procedure (AE-MOS-PR-15) Material Handling, Identification and Traceability procedure (AE-MOS-PR-10) Nonconforming Material procedure (AE-MOS-PR-12) Record Retention policy (AE-LOS-PY-02) Record Retention Schedule standard (AE-LOS-ST-39) Rework / Teardown Log (Local) Safety Critical Threaded Fastener Installation standard (AECS-MOS-ST-09)