OWNER : Project Name: DESIGNER :
COATING & WRAPPING OF
UNDERGROUND PIPING
Doc. No.:SEC-PJ-000-SPC-PI-008
SABZ
ENGINEERING
COMPANY
PROJ. NO. : PJ-
CONSTRUCTION
STANDARD SPECIFICATION
COATING & WRAPPING OF
UNDERGROUND PIPING
DOCUMENT NO :SEC-PJ-000-SPC-PI-008
TOTAL PAGES : 8
Page 2 of 8
OWNER : Project Name: DESIGNER :
COATING & WRAPPING OF
UNDERGROUND PIPING
Doc. No.:SEC-PJ-000-SPC-PI-008
SABZ
ENGINEERING
COMPANY
PROJ. NO. : PJ-
CONTENTS
1. SCOPE
2. DEFINITION
3. CODES AND STANDARDS
4. MATERIALS
Page 3 of 8
OWNER : Project Name: DESIGNER :
COATING & WRAPPING OF
UNDERGROUND PIPING
Doc. No.:SEC-PJ-000-SPC-PI-008
SABZ
ENGINEERING
COMPANY
PROJ. NO. : PJ-
1. SCOPE
This specification describes the materials, applications, handling, installation and testing procedures
For external coating and wrapping over Carbon Steel piping to be laid under ground for protection
against corrosion.
1.1 All buried Carbon Steel and Galvanized pipes, valves, fittings etc., shall be externally double
wrapped. Double wrapping of pipe shall be achieved by overlapping the wrap by a minimum
of 55%.
1.2 All conflicts between the requirements of this standard, purchase order or data sheets shall be
referred to contractor for clarification before commencement of site operations.
2. DEFINITION
OWNER :
CONTRACTOR : SABZ Engineering Company
3. CODES AND STANDARDS
3.1 The following standard should be the latest edition.
BS 2782 Method of Testing for Plastics.
EN 12068 Cathodic protection. External organic coatings for the corrosion protection of buried.
ASTM American Society for Testing of Materials.
D-1000 Standard Specification for Method of Testing Sensitive Adhesive Coated Tapes.
D-1004 Standard Specification for Test Method for Initial Tear Resistance.
D-638 Standard Test Method for Tensile Properties of Plastics.
G-14 Test Method for Impact Resistance of Pipeline Coating.
G-8 Test Methods for Cathodic Disbonding of Pipeline Coating.
G-62 Standard Test Method for Holiday Detection in Pipeline coatings.
4. MATERIALS
Polyethylene wrapping material shall be used in cold applied tape system.
4.1 POLYETHYLENE WRAPPING MATERIAL
All materials shall be furnished from the same manufacturer and consist of the followings:
a) Laminated polyethylene (low-density), backed self-adhesive, rubberized, bitumastic compound tape.
a.1) Polyethylene inner wrap:
Thickness should be minimum 0.305 mm (0.012"), with self-adhesive compound thickness 0.203
mm (0.008") minimum. Interleaf in rolls supplied shall be double sided release coated paper or
polymer preferably with extra width for roll protection. Final thickness should be defined as
per vendor data.
Page 4 of 8
OWNER : Project Name: DESIGNER :
COATING & WRAPPING OF
UNDERGROUND PIPING
Doc. No.:SEC-PJ-000-SPC-PI-008
SABZ
ENGINEERING
COMPANY
PROJ. NO. : PJ-
Characteristics of tape:
- Elongation : 250%
- Tensile strength : 7 N/mm2
- Tear resistance : 8 kg/cm
- Dielectric strength : 40 Kvolt/mm
6
- Insulation strength : 1 x 10 Ohm/mm
- Impact resistance : 3.2 Joules
- Adhesion to steel (With primer) : 2.6 N/mm
- Adhesion to self : 0.5 N/mm
- Temperature range : -5~ C to 90~ C
a.2) Polyethylene outer wrap :
Thickness should be minimum 0.229 mm (0.009") with 0.102 mm (0.004") self-adhesive
compound. Polyethylene to be White or Silver-Grey light reflecting. Final thickness should
be defined as per vendor data.
Characteristics of tape:
- Elongation : Min 200%
- Dielectric strength : Min. 10 KVolt
12
- Insulation resistance : 1x10 Ohm/in
b) Bitumen solution type primer, fast drying (3 to 10 minutes).
c) Molding Putty
A compatible molding putty to the supplied tape shall be provided for applying around fittings and
flanges, etc., supplied in packs as per manufacturers standard.
4.2 STORAGE
a) All materials shall be stored in a covered warehouse in a location as cool as possible and protected
from the ingress of dirt, dust, moisture, etc.
b) Any coating materials show evidence of deterioration due to weathering or damage due
to mishandling while are in the custody contractor, shall be replaced by the contractor at
his expense.
c) Any materials, which have been rejected for any reason, shall be removed from the site.
4.3 SURFACE PREPARATION
4.3.1 Surface shall be completely free from rust, mill scale, grease, weld spatter, weld slag, dirt, dust, oil
and any other foreign matter and to be dry at time of application.
4.3.2 Oil and grease shall be removed using an approved solvent. White spirit and paint thinners
are suitable solvents. Kerosene shall not be used.
Page 5 of 8
OWNER : Project Name: DESIGNER :
COATING & WRAPPING OF
UNDERGROUND PIPING
SABZ
ENGINEERING
COMPANY
PROJ. NO. : PJ-
Doc. No.:SEC-PJ-000-SPC-PI-008
4.3.3 Blast cleaning shall not be conducted when the temperature of the surfaces is less than 3~ C
above dew point of the surrounding air or when the relative humidity of the air is greater
than 85%.
4.3.4 The coat of primer shall be given as soon as practicable and before detrimental corrosion
or recontamination occurs. The cleaned surface shall never be left unprotected over night.
Mechanical cleaning machines shall not employ knives or other tools, which may produce
notches or gauges on the pipe surface.
4.3.5 Blast cleaning machines shall be maintained in correct adjustment and replacement tools shall
be available throughout the cleaning process.
4.3.6 The cleaning method employed shall not result in thinning of the pipe wall beyond the limits of
the pipe specification. Wire brush (surface according to ST2) is accepted.
4.3.7 Cleaning shall be carried out immediately before application of the priming coat and shall be to
the satisfaction of OWNER. If the outside of the pipe becomes contaminated with any
foreign matter, OWNER shall have the right to call for relearning before the priming
coat is applied.
4.4 APPLICATION OF PRIMER
4.4.1 The clean and dry prepared surface shall be primed with one thin continuous coat of the primer
and allowed to dry completely.
4.4.2 Coating and wrapping shall not be started until that section of line has been tested and accepted.
4.4.3 The primer shall be suitable for brush or spray application and still form at thin uniform
coating with an approximate 40 micrometer dry film thickness according to vendor’s instruction.
4.5 APPLICATION OF WRAPPING
4.5.1 Clean and dry primed surface shall be shaped up at pipe fittings and flanges, using the cold
applied bitumen based molding putty packed into crevices around bolts, etc., to provide an
even contour suitable for wrapping. Unequal tees shall receive a 45~ fillet at the branch
inter section.
4.5.2 The total, clean, dry prepared surface shall be spirally wrapped with the laminated tape with 55%
overlap using sufficient tension to ensure complete conformability. Any bulges formed at
covers may be removed by splicing the tape in site and repress ring.
4.5.3 End laps between adjoining rolls of the wrap or between pipe sections shall be a minimum of
150 cm.
4.5.4 When the wrapping shall be performed "AT SHOP" or "AT SITE" (when it is necessary to
stock the wrapped pipes), an outer wrap shall be spirally wound over a clean dry inner wrap
with a 55% or 50 mm minimum overlap using sufficient tension to ensure complete conformity.
No bulges shall be permitted.
Page 6 of 8
OWNER : Project Name: DESIGNER :
COATING & WRAPPING OF
UNDERGROUND PIPING
SABZ
ENGINEERING
COMPANY
PROJ. NO. : PJ-
Doc. No.:SEC-PJ-000-SPC-PI-008
4.5.5 Roll widths of wrapping tapes to be used shall be conform to the table below:
TAPE WIDTH
(MM)
PIPES BENDS TEES FLANGES
150 Up to 3" Up to 8" Up to 12" All
100 4" to 8" 10" to 24" 14" and above -
150 10" to 16" 28" and above - -
225 18" and above - - -
a) Flanges and tees shall receive molding putty as per 3.5.1; Cross bandaging technique shall
be used in accordance with manufacturer’s instruction.
b) Tees shall be machine-wrap only, otherwise 150 mm tape shall be used.
4.5.6 At the wind and weather line (pipe risers), Pipe wrap shall be applied with 55% overlap
completely.
4.6 WRAPPING OF BURIED FLANGES, VALVES AND OTHER FITTINGS
4.6.1 The approved tape shall protect buried flanges, valves and fittings, plus primer and putty
supplied by the tape manufacturer.
4.6.2 All exposed metal surfaces of the object to be protected and existing protective coating at each
extremity to be cleaned by blasting or wire brushing as appropriate so that the metal surfaces are
free of all rust, weld spatter, mill scale, dirt, dust, lime wash and other deleterious matter.
4.6.3 The clean, dry prepared surface to be brush primed with one thin continuous coat of quick drying
primer and allowed to dry completely.
4.6.4 Where necessary the dry cleaned, primed surfaces to be shaped up using cold-applied molding putty
supplied by the tape manufacturer packed into crevices, around bolts etc. to provide an even
contour suitable for wrapping.
4.7 HANDLING OF COATED PIPE
4.7.1 All coated pipes shall be handled in such a way that the coating does not suffer damage.
Coated pipe shall be handled at all times with wide non-abrading slings or belts, or other equipment
designed to prevent damage to the coating. All skids used to support coated pipe shall be padded.
4.7.2 If the pipeline protective coating suffers damage between the coating and laying operations, the
Contractor shall replace or repair the coating to the satisfaction of the OWNER
4.7.3 Coating materials shall be handled in such a way that the materials do not suffer damage.
4.7.4 Pipe shall normally be lowered into the trench immediately after the coating and wrapping has been
approved. Where coated and wrapped pipe is supported on padded skids, their number shall be
sufficient to ensure that no damage will be caused to the coating and wrapping.
Page 7 of 8
OWNER : Project Name: DESIGNER :
COATING & WRAPPING OF
UNDERGROUND PIPING
SABZ
ENGINEERING
COMPANY
PROJ. NO. : PJ-
Doc. No.:SEC-PJ-000-SPC-PI-008
4.7.5 All coated and wrapped pipes which have been supported in any manner on padded skids,
or lowering devices, shall be subjected to closed inspection to see that the coating is undamaged
before the pipe reaches the bottom of the trench. Backfilling shall be carried out immediately after
the pipeline is lowered into the trench but Contractor shall first obtain the approval by OWNER. If
any backfilling is carried out without this approval, OWNER will have the right to require the
Contractor to remove the backfill for examination of the coating and wrapping.
4.8 TESTS ON NEW MATERIALS
Manufacturers shall conform to the following tests or OWNER approved equivalent tests, in
writing. OWNER reserves the right to have any production sample tested subsequently to ensure
that the material conforms to these specifications.
4.8.1 Tensile strength and elongation at break tests shall be carried out according to BS 2782 ,D638
or EN12068.
4.8.2 Tear resistance test shall be carried out according ASTM D1004. Laboratory conditions may
alternatively be 20~C ± 2~C and 65 ± 2% relative humidity.
4.8.3 Adhesion testing shall be carried out according to ASTM D 1000 or EN 12068.
4.8.4 Impact resistance tests shall be carried out according to ASTM G-14.
4.8.5 Dielectric strength test shall be carried out according to BS 2782 or ASTM D1000.
4.8.6 Cathodic disbonding test shall be carried out according to ASTM G-8 or EN12068.
4.9 INSPECTION AND TESTING OF COMPLETED WORK
4.9.1 All coating shall be subjected to 100% visual inspection and 100% inspection with an electrical
holiday detector according to ASTM G62 before being lowered into the trench.
4.9.2 Prior to back filling, all wrapped pipe shall be holiday tested using an approved holiday tester set
at 5KV per mm of tape thickness to a maximum of 15KV.
4.9.3 Visual inspection shall ensure that the coating is continuous, that the overlap is correctly maintained
and that there are no wrinkles in the tape.
4.9.4 The holiday detector shall be used to check that there is a continuous coating over the pipe surface,
particular attention being given to bends and to areas where the tape has been spliced or repaired.
NOTE: It is not intended that the holiday detector should be used to reveal pin holes and minor faults in
the inner tape wrap. Such defects would not normally show up on the holiday detector with the
specified coating system, unless the voltage was set at a level, so high, that it would be likely to
damage the coating.
4.9.5 The holiday detector shall be of an approved type and the operating voltage and setting shall be
determined by a method approved by OWNER.
Page 8 of 8
OWNER : Project Name: DESIGNER :
COATING & WRAPPING OF
UNDERGROUND PIPING
SABZ
ENGINEERING
COMPANY
PROJ. NO. : PJ-
Doc. No.:SEC-PJ-000-SPC-PI-008
4.9.6 The holiday detector settings shall be checked at least twice per day, while it is in use.
4.9.7 The holiday detector shall be operated strictly in accordance with the manufacturer's instructions at
all times.
4.9.8 At no time, shall the holiday detector be permitted to remain stationary around a coated pipeline
with the operating voltage switched on.
4.9.9 All defects, whether discovered visually or by means of the holiday detector, shall be clearly and
indelibly marked.
4.9.10 To ensure continuity between the brushes or rings, a short circuit test shall be carried out at regular
intervals to determine the efficiency. If brushes are used, these must be cleaned every day.
4.10 REPAIRS OF COATINGS
4.10.1 All defects in the coating shall be made good immediately after their detection.
4.10.2 The Contractor shall be responsible for the complete cost, including cost of materials, of making
good all defects caused by incorrect storage, handling, application, erection and testing of the
protective coating or caused by incorrect construction of the pipeline.
4.10.3 In the event of numerous defects in the coating, OWNER shall have the right to order the whole
coating to be stripped, the pipe cleaned and another coating provided, applied and tested in
accordance with this specification at the Contractor's expense.
4.10.4 Holiday or localized defects in the inner tape wrap shall be repaired by the following procedure:
a) Strip off outer wrap from affected area, after ensuring that completed coating on either side is
properly secured to prevent the outer wrap from unraveling.
b) Strip off inner wrap and primer from the affected area and thoroughly clean the pipe surface.
c) Reprime in accordance with this specification.
d) Apply patch of inner wrap not smaller than 150 mm x 150 mm (6" x 6").
e) Test for continuity of repaired inner wrap with holiday detector before replacing outer wrap.
f) Replace outer wrap and secure firmly.
4.10.5 Tears, abrasion or other coating defects shall be repaired as directed by contractor.

More Related Content

What's hot

Quicki branch joint - 25mm to 16mm
Quicki branch joint - 25mm to 16mmQuicki branch joint - 25mm to 16mm
Quicki branch joint - 25mm to 16mmCable Glands UK Ltd
 
Weld Purging 2011 Best Practices
Weld Purging 2011 Best PracticesWeld Purging 2011 Best Practices
Weld Purging 2011 Best PracticesRon Sewell
 
Hazardous Substance Cabinets Brochure
Hazardous Substance Cabinets BrochureHazardous Substance Cabinets Brochure
Hazardous Substance Cabinets BrochureFPD Group Ltd
 
IRJET- Controlling the Formation of Rust in the Rocker Panel using Cavity...
IRJET-  	  Controlling the Formation of Rust in the Rocker Panel using Cavity...IRJET-  	  Controlling the Formation of Rust in the Rocker Panel using Cavity...
IRJET- Controlling the Formation of Rust in the Rocker Panel using Cavity...IRJET Journal
 
Korolozyon Kontrol Teknolojileri
Korolozyon Kontrol TeknolojileriKorolozyon Kontrol Teknolojileri
Korolozyon Kontrol Teknolojilerivizyonendustriyel1
 
New Safety Gloves In U.S
New Safety Gloves In U.SNew Safety Gloves In U.S
New Safety Gloves In U.SMichael Cash
 
Klubertop tp-46-111 Mr Tùng - 0987 988 407 | www.khodaumo.com
Klubertop tp-46-111 Mr Tùng - 0987 988 407 | www.khodaumo.comKlubertop tp-46-111 Mr Tùng - 0987 988 407 | www.khodaumo.com
Klubertop tp-46-111 Mr Tùng - 0987 988 407 | www.khodaumo.comĐỗ Bá Tùng
 
Lab procedures for cast partial dentures. /certified fixed orthodontic cours...
Lab procedures for cast partial dentures.  /certified fixed orthodontic cours...Lab procedures for cast partial dentures.  /certified fixed orthodontic cours...
Lab procedures for cast partial dentures. /certified fixed orthodontic cours...Indian dental academy
 
Storage Cabinets Brochure
Storage Cabinets BrochureStorage Cabinets Brochure
Storage Cabinets BrochureFPD Group Ltd
 
Tornado 602 self cleaning filter datasheet
Tornado 602 self cleaning filter datasheetTornado 602 self cleaning filter datasheet
Tornado 602 self cleaning filter datasheeta1-cbiss
 
Obturation of Root canal systems or Root canal obturation
Obturation of Root canal systems or Root canal obturation Obturation of Root canal systems or Root canal obturation
Obturation of Root canal systems or Root canal obturation surabhisoumya1
 
Techsil OverTEC 5FR
Techsil OverTEC 5FRTechsil OverTEC 5FR
Techsil OverTEC 5FRTechsil Ltd
 

What's hot (19)

Quicki branch joint - 25mm to 16mm
Quicki branch joint - 25mm to 16mmQuicki branch joint - 25mm to 16mm
Quicki branch joint - 25mm to 16mm
 
A guide to weld purging
A guide to weld purging A guide to weld purging
A guide to weld purging
 
Flexsil - AMETEK FPP
Flexsil - AMETEK FPPFlexsil - AMETEK FPP
Flexsil - AMETEK FPP
 
Weld Purging 2011 Best Practices
Weld Purging 2011 Best PracticesWeld Purging 2011 Best Practices
Weld Purging 2011 Best Practices
 
12777 coastal single pages part18
12777  coastal single pages part1812777  coastal single pages part18
12777 coastal single pages part18
 
Obturation
ObturationObturation
Obturation
 
Hazardous Substance Cabinets Brochure
Hazardous Substance Cabinets BrochureHazardous Substance Cabinets Brochure
Hazardous Substance Cabinets Brochure
 
IRJET- Controlling the Formation of Rust in the Rocker Panel using Cavity...
IRJET-  	  Controlling the Formation of Rust in the Rocker Panel using Cavity...IRJET-  	  Controlling the Formation of Rust in the Rocker Panel using Cavity...
IRJET- Controlling the Formation of Rust in the Rocker Panel using Cavity...
 
Techniques of Root Canal Obturation
Techniques of Root Canal ObturationTechniques of Root Canal Obturation
Techniques of Root Canal Obturation
 
Korolozyon Kontrol Teknolojileri
Korolozyon Kontrol TeknolojileriKorolozyon Kontrol Teknolojileri
Korolozyon Kontrol Teknolojileri
 
Sae hydraulic hose
Sae hydraulic hoseSae hydraulic hose
Sae hydraulic hose
 
New Safety Gloves In U.S
New Safety Gloves In U.SNew Safety Gloves In U.S
New Safety Gloves In U.S
 
Klubertop tp-46-111 Mr Tùng - 0987 988 407 | www.khodaumo.com
Klubertop tp-46-111 Mr Tùng - 0987 988 407 | www.khodaumo.comKlubertop tp-46-111 Mr Tùng - 0987 988 407 | www.khodaumo.com
Klubertop tp-46-111 Mr Tùng - 0987 988 407 | www.khodaumo.com
 
Obturation
ObturationObturation
Obturation
 
Lab procedures for cast partial dentures. /certified fixed orthodontic cours...
Lab procedures for cast partial dentures.  /certified fixed orthodontic cours...Lab procedures for cast partial dentures.  /certified fixed orthodontic cours...
Lab procedures for cast partial dentures. /certified fixed orthodontic cours...
 
Storage Cabinets Brochure
Storage Cabinets BrochureStorage Cabinets Brochure
Storage Cabinets Brochure
 
Tornado 602 self cleaning filter datasheet
Tornado 602 self cleaning filter datasheetTornado 602 self cleaning filter datasheet
Tornado 602 self cleaning filter datasheet
 
Obturation of Root canal systems or Root canal obturation
Obturation of Root canal systems or Root canal obturation Obturation of Root canal systems or Root canal obturation
Obturation of Root canal systems or Root canal obturation
 
Techsil OverTEC 5FR
Techsil OverTEC 5FRTechsil OverTEC 5FR
Techsil OverTEC 5FR
 

Similar to Coating

Corrocoat Composite Nozzle Insert
Corrocoat Composite Nozzle InsertCorrocoat Composite Nozzle Insert
Corrocoat Composite Nozzle Insert3M
 
Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)ghani386
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestationYousef Riad
 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Pratap Biswas
 
Method statement for expansion joint
Method statement for expansion jointMethod statement for expansion joint
Method statement for expansion jointakash yadav
 
MIL-PRF-131 Materials & Performance Specifications
MIL-PRF-131 Materials & Performance SpecificationsMIL-PRF-131 Materials & Performance Specifications
MIL-PRF-131 Materials & Performance SpecificationsThan Nguyen
 
Vf19 plusspc rev3(3)
Vf19 plusspc rev3(3)Vf19 plusspc rev3(3)
Vf19 plusspc rev3(3)Tim Yao
 
WPM 002 Australian version
WPM 002 Australian versionWPM 002 Australian version
WPM 002 Australian versionnandu_raga
 
Fire Coating Korea - Fireproofing Spray | Fireproofing Steel in Korea
Fire Coating Korea - Fireproofing Spray | Fireproofing Steel in KoreaFire Coating Korea - Fireproofing Spray | Fireproofing Steel in Korea
Fire Coating Korea - Fireproofing Spray | Fireproofing Steel in KoreaFire Security System
 
Tarkett Clean Air Room System
Tarkett Clean Air Room SystemTarkett Clean Air Room System
Tarkett Clean Air Room Systemcuttingcorners
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDFWorldofAllLyrics
 
General Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space ApplicationsGeneral Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space ApplicationsBelilove Company-Engineers
 

Similar to Coating (20)

Hdpe sealing sheet specification
Hdpe sealing sheet specificationHdpe sealing sheet specification
Hdpe sealing sheet specification
 
Corrocoat Composite Nozzle Insert
Corrocoat Composite Nozzle InsertCorrocoat Composite Nozzle Insert
Corrocoat Composite Nozzle Insert
 
Section 500
Section 500Section 500
Section 500
 
ioc_2
ioc_2ioc_2
ioc_2
 
A027556
A027556A027556
A027556
 
Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestation
 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------
 
Method statement for expansion joint
Method statement for expansion jointMethod statement for expansion joint
Method statement for expansion joint
 
MIL-PRF-131 Materials & Performance Specifications
MIL-PRF-131 Materials & Performance SpecificationsMIL-PRF-131 Materials & Performance Specifications
MIL-PRF-131 Materials & Performance Specifications
 
Vf19 plusspc rev3(3)
Vf19 plusspc rev3(3)Vf19 plusspc rev3(3)
Vf19 plusspc rev3(3)
 
Introduction to linings
Introduction to liningsIntroduction to linings
Introduction to linings
 
WPM 002 Australian version
WPM 002 Australian versionWPM 002 Australian version
WPM 002 Australian version
 
4990
49904990
4990
 
Fire Coating Korea - Fireproofing Spray | Fireproofing Steel in Korea
Fire Coating Korea - Fireproofing Spray | Fireproofing Steel in KoreaFire Coating Korea - Fireproofing Spray | Fireproofing Steel in Korea
Fire Coating Korea - Fireproofing Spray | Fireproofing Steel in Korea
 
Cable coating application manual
Cable coating application manualCable coating application manual
Cable coating application manual
 
Cable coating application manual
Cable coating application manualCable coating application manual
Cable coating application manual
 
Tarkett Clean Air Room System
Tarkett Clean Air Room SystemTarkett Clean Air Room System
Tarkett Clean Air Room System
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF
 
General Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space ApplicationsGeneral Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space Applications
 

Recently uploaded

High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 

Recently uploaded (20)

High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 

Coating

  • 1. Page 1 of 8 OWNER : Project Name: DESIGNER : COATING & WRAPPING OF UNDERGROUND PIPING Doc. No.:SEC-PJ-000-SPC-PI-008 SABZ ENGINEERING COMPANY PROJ. NO. : PJ- CONSTRUCTION STANDARD SPECIFICATION COATING & WRAPPING OF UNDERGROUND PIPING DOCUMENT NO :SEC-PJ-000-SPC-PI-008 TOTAL PAGES : 8
  • 2. Page 2 of 8 OWNER : Project Name: DESIGNER : COATING & WRAPPING OF UNDERGROUND PIPING Doc. No.:SEC-PJ-000-SPC-PI-008 SABZ ENGINEERING COMPANY PROJ. NO. : PJ- CONTENTS 1. SCOPE 2. DEFINITION 3. CODES AND STANDARDS 4. MATERIALS
  • 3. Page 3 of 8 OWNER : Project Name: DESIGNER : COATING & WRAPPING OF UNDERGROUND PIPING Doc. No.:SEC-PJ-000-SPC-PI-008 SABZ ENGINEERING COMPANY PROJ. NO. : PJ- 1. SCOPE This specification describes the materials, applications, handling, installation and testing procedures For external coating and wrapping over Carbon Steel piping to be laid under ground for protection against corrosion. 1.1 All buried Carbon Steel and Galvanized pipes, valves, fittings etc., shall be externally double wrapped. Double wrapping of pipe shall be achieved by overlapping the wrap by a minimum of 55%. 1.2 All conflicts between the requirements of this standard, purchase order or data sheets shall be referred to contractor for clarification before commencement of site operations. 2. DEFINITION OWNER : CONTRACTOR : SABZ Engineering Company 3. CODES AND STANDARDS 3.1 The following standard should be the latest edition. BS 2782 Method of Testing for Plastics. EN 12068 Cathodic protection. External organic coatings for the corrosion protection of buried. ASTM American Society for Testing of Materials. D-1000 Standard Specification for Method of Testing Sensitive Adhesive Coated Tapes. D-1004 Standard Specification for Test Method for Initial Tear Resistance. D-638 Standard Test Method for Tensile Properties of Plastics. G-14 Test Method for Impact Resistance of Pipeline Coating. G-8 Test Methods for Cathodic Disbonding of Pipeline Coating. G-62 Standard Test Method for Holiday Detection in Pipeline coatings. 4. MATERIALS Polyethylene wrapping material shall be used in cold applied tape system. 4.1 POLYETHYLENE WRAPPING MATERIAL All materials shall be furnished from the same manufacturer and consist of the followings: a) Laminated polyethylene (low-density), backed self-adhesive, rubberized, bitumastic compound tape. a.1) Polyethylene inner wrap: Thickness should be minimum 0.305 mm (0.012"), with self-adhesive compound thickness 0.203 mm (0.008") minimum. Interleaf in rolls supplied shall be double sided release coated paper or polymer preferably with extra width for roll protection. Final thickness should be defined as per vendor data.
  • 4. Page 4 of 8 OWNER : Project Name: DESIGNER : COATING & WRAPPING OF UNDERGROUND PIPING Doc. No.:SEC-PJ-000-SPC-PI-008 SABZ ENGINEERING COMPANY PROJ. NO. : PJ- Characteristics of tape: - Elongation : 250% - Tensile strength : 7 N/mm2 - Tear resistance : 8 kg/cm - Dielectric strength : 40 Kvolt/mm 6 - Insulation strength : 1 x 10 Ohm/mm - Impact resistance : 3.2 Joules - Adhesion to steel (With primer) : 2.6 N/mm - Adhesion to self : 0.5 N/mm - Temperature range : -5~ C to 90~ C a.2) Polyethylene outer wrap : Thickness should be minimum 0.229 mm (0.009") with 0.102 mm (0.004") self-adhesive compound. Polyethylene to be White or Silver-Grey light reflecting. Final thickness should be defined as per vendor data. Characteristics of tape: - Elongation : Min 200% - Dielectric strength : Min. 10 KVolt 12 - Insulation resistance : 1x10 Ohm/in b) Bitumen solution type primer, fast drying (3 to 10 minutes). c) Molding Putty A compatible molding putty to the supplied tape shall be provided for applying around fittings and flanges, etc., supplied in packs as per manufacturers standard. 4.2 STORAGE a) All materials shall be stored in a covered warehouse in a location as cool as possible and protected from the ingress of dirt, dust, moisture, etc. b) Any coating materials show evidence of deterioration due to weathering or damage due to mishandling while are in the custody contractor, shall be replaced by the contractor at his expense. c) Any materials, which have been rejected for any reason, shall be removed from the site. 4.3 SURFACE PREPARATION 4.3.1 Surface shall be completely free from rust, mill scale, grease, weld spatter, weld slag, dirt, dust, oil and any other foreign matter and to be dry at time of application. 4.3.2 Oil and grease shall be removed using an approved solvent. White spirit and paint thinners are suitable solvents. Kerosene shall not be used.
  • 5. Page 5 of 8 OWNER : Project Name: DESIGNER : COATING & WRAPPING OF UNDERGROUND PIPING SABZ ENGINEERING COMPANY PROJ. NO. : PJ- Doc. No.:SEC-PJ-000-SPC-PI-008 4.3.3 Blast cleaning shall not be conducted when the temperature of the surfaces is less than 3~ C above dew point of the surrounding air or when the relative humidity of the air is greater than 85%. 4.3.4 The coat of primer shall be given as soon as practicable and before detrimental corrosion or recontamination occurs. The cleaned surface shall never be left unprotected over night. Mechanical cleaning machines shall not employ knives or other tools, which may produce notches or gauges on the pipe surface. 4.3.5 Blast cleaning machines shall be maintained in correct adjustment and replacement tools shall be available throughout the cleaning process. 4.3.6 The cleaning method employed shall not result in thinning of the pipe wall beyond the limits of the pipe specification. Wire brush (surface according to ST2) is accepted. 4.3.7 Cleaning shall be carried out immediately before application of the priming coat and shall be to the satisfaction of OWNER. If the outside of the pipe becomes contaminated with any foreign matter, OWNER shall have the right to call for relearning before the priming coat is applied. 4.4 APPLICATION OF PRIMER 4.4.1 The clean and dry prepared surface shall be primed with one thin continuous coat of the primer and allowed to dry completely. 4.4.2 Coating and wrapping shall not be started until that section of line has been tested and accepted. 4.4.3 The primer shall be suitable for brush or spray application and still form at thin uniform coating with an approximate 40 micrometer dry film thickness according to vendor’s instruction. 4.5 APPLICATION OF WRAPPING 4.5.1 Clean and dry primed surface shall be shaped up at pipe fittings and flanges, using the cold applied bitumen based molding putty packed into crevices around bolts, etc., to provide an even contour suitable for wrapping. Unequal tees shall receive a 45~ fillet at the branch inter section. 4.5.2 The total, clean, dry prepared surface shall be spirally wrapped with the laminated tape with 55% overlap using sufficient tension to ensure complete conformability. Any bulges formed at covers may be removed by splicing the tape in site and repress ring. 4.5.3 End laps between adjoining rolls of the wrap or between pipe sections shall be a minimum of 150 cm. 4.5.4 When the wrapping shall be performed "AT SHOP" or "AT SITE" (when it is necessary to stock the wrapped pipes), an outer wrap shall be spirally wound over a clean dry inner wrap with a 55% or 50 mm minimum overlap using sufficient tension to ensure complete conformity. No bulges shall be permitted.
  • 6. Page 6 of 8 OWNER : Project Name: DESIGNER : COATING & WRAPPING OF UNDERGROUND PIPING SABZ ENGINEERING COMPANY PROJ. NO. : PJ- Doc. No.:SEC-PJ-000-SPC-PI-008 4.5.5 Roll widths of wrapping tapes to be used shall be conform to the table below: TAPE WIDTH (MM) PIPES BENDS TEES FLANGES 150 Up to 3" Up to 8" Up to 12" All 100 4" to 8" 10" to 24" 14" and above - 150 10" to 16" 28" and above - - 225 18" and above - - - a) Flanges and tees shall receive molding putty as per 3.5.1; Cross bandaging technique shall be used in accordance with manufacturer’s instruction. b) Tees shall be machine-wrap only, otherwise 150 mm tape shall be used. 4.5.6 At the wind and weather line (pipe risers), Pipe wrap shall be applied with 55% overlap completely. 4.6 WRAPPING OF BURIED FLANGES, VALVES AND OTHER FITTINGS 4.6.1 The approved tape shall protect buried flanges, valves and fittings, plus primer and putty supplied by the tape manufacturer. 4.6.2 All exposed metal surfaces of the object to be protected and existing protective coating at each extremity to be cleaned by blasting or wire brushing as appropriate so that the metal surfaces are free of all rust, weld spatter, mill scale, dirt, dust, lime wash and other deleterious matter. 4.6.3 The clean, dry prepared surface to be brush primed with one thin continuous coat of quick drying primer and allowed to dry completely. 4.6.4 Where necessary the dry cleaned, primed surfaces to be shaped up using cold-applied molding putty supplied by the tape manufacturer packed into crevices, around bolts etc. to provide an even contour suitable for wrapping. 4.7 HANDLING OF COATED PIPE 4.7.1 All coated pipes shall be handled in such a way that the coating does not suffer damage. Coated pipe shall be handled at all times with wide non-abrading slings or belts, or other equipment designed to prevent damage to the coating. All skids used to support coated pipe shall be padded. 4.7.2 If the pipeline protective coating suffers damage between the coating and laying operations, the Contractor shall replace or repair the coating to the satisfaction of the OWNER 4.7.3 Coating materials shall be handled in such a way that the materials do not suffer damage. 4.7.4 Pipe shall normally be lowered into the trench immediately after the coating and wrapping has been approved. Where coated and wrapped pipe is supported on padded skids, their number shall be sufficient to ensure that no damage will be caused to the coating and wrapping.
  • 7. Page 7 of 8 OWNER : Project Name: DESIGNER : COATING & WRAPPING OF UNDERGROUND PIPING SABZ ENGINEERING COMPANY PROJ. NO. : PJ- Doc. No.:SEC-PJ-000-SPC-PI-008 4.7.5 All coated and wrapped pipes which have been supported in any manner on padded skids, or lowering devices, shall be subjected to closed inspection to see that the coating is undamaged before the pipe reaches the bottom of the trench. Backfilling shall be carried out immediately after the pipeline is lowered into the trench but Contractor shall first obtain the approval by OWNER. If any backfilling is carried out without this approval, OWNER will have the right to require the Contractor to remove the backfill for examination of the coating and wrapping. 4.8 TESTS ON NEW MATERIALS Manufacturers shall conform to the following tests or OWNER approved equivalent tests, in writing. OWNER reserves the right to have any production sample tested subsequently to ensure that the material conforms to these specifications. 4.8.1 Tensile strength and elongation at break tests shall be carried out according to BS 2782 ,D638 or EN12068. 4.8.2 Tear resistance test shall be carried out according ASTM D1004. Laboratory conditions may alternatively be 20~C ± 2~C and 65 ± 2% relative humidity. 4.8.3 Adhesion testing shall be carried out according to ASTM D 1000 or EN 12068. 4.8.4 Impact resistance tests shall be carried out according to ASTM G-14. 4.8.5 Dielectric strength test shall be carried out according to BS 2782 or ASTM D1000. 4.8.6 Cathodic disbonding test shall be carried out according to ASTM G-8 or EN12068. 4.9 INSPECTION AND TESTING OF COMPLETED WORK 4.9.1 All coating shall be subjected to 100% visual inspection and 100% inspection with an electrical holiday detector according to ASTM G62 before being lowered into the trench. 4.9.2 Prior to back filling, all wrapped pipe shall be holiday tested using an approved holiday tester set at 5KV per mm of tape thickness to a maximum of 15KV. 4.9.3 Visual inspection shall ensure that the coating is continuous, that the overlap is correctly maintained and that there are no wrinkles in the tape. 4.9.4 The holiday detector shall be used to check that there is a continuous coating over the pipe surface, particular attention being given to bends and to areas where the tape has been spliced or repaired. NOTE: It is not intended that the holiday detector should be used to reveal pin holes and minor faults in the inner tape wrap. Such defects would not normally show up on the holiday detector with the specified coating system, unless the voltage was set at a level, so high, that it would be likely to damage the coating. 4.9.5 The holiday detector shall be of an approved type and the operating voltage and setting shall be determined by a method approved by OWNER.
  • 8. Page 8 of 8 OWNER : Project Name: DESIGNER : COATING & WRAPPING OF UNDERGROUND PIPING SABZ ENGINEERING COMPANY PROJ. NO. : PJ- Doc. No.:SEC-PJ-000-SPC-PI-008 4.9.6 The holiday detector settings shall be checked at least twice per day, while it is in use. 4.9.7 The holiday detector shall be operated strictly in accordance with the manufacturer's instructions at all times. 4.9.8 At no time, shall the holiday detector be permitted to remain stationary around a coated pipeline with the operating voltage switched on. 4.9.9 All defects, whether discovered visually or by means of the holiday detector, shall be clearly and indelibly marked. 4.9.10 To ensure continuity between the brushes or rings, a short circuit test shall be carried out at regular intervals to determine the efficiency. If brushes are used, these must be cleaned every day. 4.10 REPAIRS OF COATINGS 4.10.1 All defects in the coating shall be made good immediately after their detection. 4.10.2 The Contractor shall be responsible for the complete cost, including cost of materials, of making good all defects caused by incorrect storage, handling, application, erection and testing of the protective coating or caused by incorrect construction of the pipeline. 4.10.3 In the event of numerous defects in the coating, OWNER shall have the right to order the whole coating to be stripped, the pipe cleaned and another coating provided, applied and tested in accordance with this specification at the Contractor's expense. 4.10.4 Holiday or localized defects in the inner tape wrap shall be repaired by the following procedure: a) Strip off outer wrap from affected area, after ensuring that completed coating on either side is properly secured to prevent the outer wrap from unraveling. b) Strip off inner wrap and primer from the affected area and thoroughly clean the pipe surface. c) Reprime in accordance with this specification. d) Apply patch of inner wrap not smaller than 150 mm x 150 mm (6" x 6"). e) Test for continuity of repaired inner wrap with holiday detector before replacing outer wrap. f) Replace outer wrap and secure firmly. 4.10.5 Tears, abrasion or other coating defects shall be repaired as directed by contractor.