W07|Tracking Time and Costs on Work Orders
MC University
Agenda
Labor Report
Costs Tab Defined
Estimated vs. Actual Labor
Estimated vs. Actual Materials
Other Costs and Tools
Converting Estimates to Actuals
MC University
Labor Report
Labor Report Overview
Labor Report Complete / Close
MC University
Labor Report Overview
Record notes and activity on Work Order
Ongoing note (continuous)
Often completed during Complete / Close
MC University
Labor Report Overview (cont’d)
Add / edit Labor Report options from Tasks
tab:
• Type directly into field
• Edit button
• Actions Lookup for consistency
Failure Analysis and Follow-up Work data also
available
MC University
Labor Report Complete / Close
Complete / Close process typically requires
Technician to fill in Labor Report
Functionality is similar
MC University
Costs Tab Defined
What are Work Order Costs?
Estimates vs. Actuals Overview
MC University
What are Work Order Costs?
Costs can be associated with Labor, Materials,
and Other Costs
Costs added from:
• Procedure (Estimates)
• Manual (Costs tab)
• Manual (Complete / Close)
MC University
Estimates vs. Actuals Overview
Estimates are pre-determined:
• Not completed or used
• Can be turned into Actuals
Actuals have already occurred or been used:
• Real cost of Work and Materials
MC University
Estimated vs. Actual Labor
Labor Fields and Columns
Viewing Labor
MC University
Labor Fields and Columns
Estimated Labor fields and columns:
• Selection Checkbox for removing entries
• Labor description field (Craft or Labor Name)
MC University
Labor Fields and Columns (cont’d)
• Estimated hours (estimated work to complete)
• Cost based on estimated hours and Labor rate
MC University
Labor Fields and Columns (cont’d)
• Charge rate defined for individual or craft
(subject to designated markup)
MC University
Labor Fields and Columns (cont’d)
Actual Labor fields and columns:
• Selection Checkbox for removing entries
• Labor description field (Craft or Labor Name)
• Reg, OT, and Other Hours expended by Labor
MC University
Labor Fields and Columns (cont’d)
• Work Date when work was completed
• Cost based on actual hours and Labor rate
• Charge rate defined for individual or craft
(subject to designated markup)
MC University
Labor Fields and Columns (cont’d)
Last row of Estimated and Actual Labor
includes:
• Total Hours
• Total Costs
• Total Charges
MC University
Adding Labor
Actual Labor must be manually created (or
converted from estimate)
Use Add button to open Labor Module
Lookup
Craft, Employee or Contractor selections
MC University
Adding Labor (cont’d)
Labor Actuals fields:
• Reg, OT or Other Hours
• Date
• Time In and Time Out
• Assignments for this Labor complete
• Comments
MC University
Adding Labor (cont’d)
Labor Estimates and Actual Fields:
• Account and Category
• Auto-Calc Cost? and Auto-Calc Charge?
MC University
Adding Labor (cont’d)
Example of Estimated Labor:
MC University
Adding Labor (cont’d)
Example of Actual Labor:
MC University
Estimated vs. Actual Materials
Materials Overview
Adding Materials
MC University
Materials Overview
Estimated Materials:
• Typically populated from Procedure
• Creates a “reserve” quantity
Two types of items for estimated material
costs:
• Stocked
• Direct Issue
MC University
Materials Overview (cont’d)
Actual Materials:
• Adjustments are made to Inventory levels
• Can be used to “rotate” Assets
• If estimates are defined, actual cost records will
be created
MC University
Materials Overview (cont’d)
Three types of items for actual material costs:
• Stocked
• Direct Issue
• Out of Pocket
MC University
Adding Materials
Inventory Module lookup is utilized to select
Material
Filters available to specify what type of Item
for selection
MC University
Adding Materials (cont’d)
Inventory Items Popup:
• Actual Qty
• Account and Category
• Other Cost, Cost, and Charge
• Auto-Calc Cost and Charge
MC University
Adding Materials (cont’d)
Rotating Assets:
• Last 5 fields of Inventory Popup
• Business process specific!
MC University
Adding Materials (cont’d)
Estimated Example:
MC University
Adding Materials (cont’d)
Actual Example:
MC University
Other Costs and Tools
Other Costs Overview
Tools Overview
MC University
Other Costs Overview
All costs that are considered miscellaneous /
not associated with Inventory
Estimates can be converted (same as Labor
and Materials)
MC University
Other Costs Overview (cont’d)
Estimate Example:
MC University
Other Costs Overview (cont’d)
Actuals Example:
MC University
Tools Overview
Tools that are needed to complete the set of
tasks (Procedure)
Borrowed not purchased
MC University
Tools Overview (cont’d)
Example of adding Estimates:
MC University
Converting Estimates to Actuals
Complete / Close Dialog Options
Convert Labor and Material Estimates
MC University
Complete / Close Dialog Options
Convert estimates to actuals via the Complete
/ Close Dialog
Allows Techs to track actual costs and update
inventory levels
MC University
Complete / Close Dialog Options (cont’d)
Complete / Close Dialog includes section to
enter additional Labor, Materials, and Other
Costs
MC University
Convert Labor and Material Estimates
Quick mechanism to convert existing
Estimates or Assignments to Actuals
Resets records created on the Actuals page
and creates new records
MC University
Adding and Converting Labor: Example
Now let’s take a look at adding Estimated
Labor and Materials to a Work Order, and
converting to an Actual Labor record!
Thank You for
Watching!

More Related Content

What's hot

PPP03 | Complex Preventative Maintenance Procedures (MCUI)
PPP03 | Complex Preventative Maintenance Procedures (MCUI)PPP03 | Complex Preventative Maintenance Procedures (MCUI)
PPP03 | Complex Preventative Maintenance Procedures (MCUI)Maintenance Connection
 
Test construction (for content staff) eg feb08 erp
Test construction (for content staff) eg feb08 erpTest construction (for content staff) eg feb08 erp
Test construction (for content staff) eg feb08 erpWilliam Kapambwe
 
W09 | Work Order Management Tools (MCUI)
W09 | Work Order Management Tools  (MCUI)W09 | Work Order Management Tools  (MCUI)
W09 | Work Order Management Tools (MCUI)Maintenance Connection
 
Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02hlksd
 
cost estimation techniques
cost estimation techniquescost estimation techniques
cost estimation techniquesabid khaliq
 
R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)
R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)
R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)Maintenance Connection
 
PPP05 | Creating Preventative Maintenance Schedules (MCUI)
PPP05 | Creating Preventative Maintenance Schedules (MCUI)PPP05 | Creating Preventative Maintenance Schedules (MCUI)
PPP05 | Creating Preventative Maintenance Schedules (MCUI)Maintenance Connection
 
ASC Model: A Process Model for the Evaluation of Simulated Field Exercises in...
ASC Model: A Process Model for the Evaluation of Simulated Field Exercises in...ASC Model: A Process Model for the Evaluation of Simulated Field Exercises in...
ASC Model: A Process Model for the Evaluation of Simulated Field Exercises in...streamspotter
 
Advanced mechanical design and materials material selection and finite elemen...
Advanced mechanical design and materials material selection and finite elemen...Advanced mechanical design and materials material selection and finite elemen...
Advanced mechanical design and materials material selection and finite elemen...TOPENGINEERINGSOLUTIONS
 

What's hot (12)

PPP03 | Complex Preventative Maintenance Procedures (MCUI)
PPP03 | Complex Preventative Maintenance Procedures (MCUI)PPP03 | Complex Preventative Maintenance Procedures (MCUI)
PPP03 | Complex Preventative Maintenance Procedures (MCUI)
 
P01 | Master Parts List Configuration
P01 | Master Parts List ConfigurationP01 | Master Parts List Configuration
P01 | Master Parts List Configuration
 
Test construction (for content staff) eg feb08 erp
Test construction (for content staff) eg feb08 erpTest construction (for content staff) eg feb08 erp
Test construction (for content staff) eg feb08 erp
 
W09 | Work Order Management Tools (MCUI)
W09 | Work Order Management Tools  (MCUI)W09 | Work Order Management Tools  (MCUI)
W09 | Work Order Management Tools (MCUI)
 
Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02
 
cost estimation techniques
cost estimation techniquescost estimation techniques
cost estimation techniques
 
R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)
R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)
R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)
 
PPP05 | Creating Preventative Maintenance Schedules (MCUI)
PPP05 | Creating Preventative Maintenance Schedules (MCUI)PPP05 | Creating Preventative Maintenance Schedules (MCUI)
PPP05 | Creating Preventative Maintenance Schedules (MCUI)
 
ASC Model: A Process Model for the Evaluation of Simulated Field Exercises in...
ASC Model: A Process Model for the Evaluation of Simulated Field Exercises in...ASC Model: A Process Model for the Evaluation of Simulated Field Exercises in...
ASC Model: A Process Model for the Evaluation of Simulated Field Exercises in...
 
Lecture 7
Lecture 7Lecture 7
Lecture 7
 
Advanced mechanical design and materials material selection and finite elemen...
Advanced mechanical design and materials material selection and finite elemen...Advanced mechanical design and materials material selection and finite elemen...
Advanced mechanical design and materials material selection and finite elemen...
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 

Viewers also liked

284029657-Stronger-Together-Paper-FINAL
284029657-Stronger-Together-Paper-FINAL284029657-Stronger-Together-Paper-FINAL
284029657-Stronger-Together-Paper-FINALEvan Butcher
 
Эффективная реклама: реальность или миф?
Эффективная реклама: реальность или миф?Эффективная реклама: реальность или миф?
Эффективная реклама: реальность или миф?Медиацентр BMG
 
Taller práctico 10 analisis
Taller práctico 10  analisisTaller práctico 10  analisis
Taller práctico 10 analisisangel paodi
 
International Management Report
International Management Report International Management Report
International Management Report Conor Fitzgibbon
 
Estudio de alternativas de accesos rodados al barrio de Nuevo Roces
Estudio de alternativas de accesos rodados al barrio de Nuevo RocesEstudio de alternativas de accesos rodados al barrio de Nuevo Roces
Estudio de alternativas de accesos rodados al barrio de Nuevo Rocesavnuevoroces
 
Informe reunión Concejal Obras Públicas Ayuntamiento Gijón
Informe reunión Concejal Obras Públicas  Ayuntamiento GijónInforme reunión Concejal Obras Públicas  Ayuntamiento Gijón
Informe reunión Concejal Obras Públicas Ayuntamiento Gijónavnuevoroces
 
Credence 15 Years Updated Jan 18 AB
Credence 15 Years Updated Jan 18 ABCredence 15 Years Updated Jan 18 AB
Credence 15 Years Updated Jan 18 ABAman Bandvi
 
CAU TRUC VON CAC DOANH NGHIEP NGAN THEP VN
CAU TRUC VON CAC DOANH NGHIEP NGAN THEP VNCAU TRUC VON CAC DOANH NGHIEP NGAN THEP VN
CAU TRUC VON CAC DOANH NGHIEP NGAN THEP VNQuan Trường
 
Персонал как барьер для прибыли
Персонал как барьер для прибылиПерсонал как барьер для прибыли
Персонал как барьер для прибылиМедиацентр BMG
 

Viewers also liked (15)

284029657-Stronger-Together-Paper-FINAL
284029657-Stronger-Together-Paper-FINAL284029657-Stronger-Together-Paper-FINAL
284029657-Stronger-Together-Paper-FINAL
 
Este centro es una ruina
Este centro es una ruinaEste centro es una ruina
Este centro es una ruina
 
Ebenezer Resume
Ebenezer ResumeEbenezer Resume
Ebenezer Resume
 
Cvp
CvpCvp
Cvp
 
Kumbara
KumbaraKumbara
Kumbara
 
Эффективная реклама: реальность или миф?
Эффективная реклама: реальность или миф?Эффективная реклама: реальность или миф?
Эффективная реклама: реальность или миф?
 
Taller práctico 10 analisis
Taller práctico 10  analisisTaller práctico 10  analisis
Taller práctico 10 analisis
 
International Management Report
International Management Report International Management Report
International Management Report
 
Estudio de alternativas de accesos rodados al barrio de Nuevo Roces
Estudio de alternativas de accesos rodados al barrio de Nuevo RocesEstudio de alternativas de accesos rodados al barrio de Nuevo Roces
Estudio de alternativas de accesos rodados al barrio de Nuevo Roces
 
Informe reunión Concejal Obras Públicas Ayuntamiento Gijón
Informe reunión Concejal Obras Públicas  Ayuntamiento GijónInforme reunión Concejal Obras Públicas  Ayuntamiento Gijón
Informe reunión Concejal Obras Públicas Ayuntamiento Gijón
 
Credence 15 Years Updated Jan 18 AB
Credence 15 Years Updated Jan 18 ABCredence 15 Years Updated Jan 18 AB
Credence 15 Years Updated Jan 18 AB
 
CAU TRUC VON CAC DOANH NGHIEP NGAN THEP VN
CAU TRUC VON CAC DOANH NGHIEP NGAN THEP VNCAU TRUC VON CAC DOANH NGHIEP NGAN THEP VN
CAU TRUC VON CAC DOANH NGHIEP NGAN THEP VN
 
Персонал как барьер для прибыли
Персонал как барьер для прибылиПерсонал как барьер для прибыли
Персонал как барьер для прибыли
 
Updated cv RAMZAN
Updated cv RAMZANUpdated cv RAMZAN
Updated cv RAMZAN
 
La vida lenguaje. 3
La vida lenguaje. 3La vida lenguaje. 3
La vida lenguaje. 3
 

Similar to W07 - Tracking Time and Costs on Work Orders (MCU)

W07 - Tracking Time and Costs on Work Orders
W07 - Tracking Time and Costs on Work Orders W07 - Tracking Time and Costs on Work Orders
W07 - Tracking Time and Costs on Work Orders Maintenance Connection
 
P03 - Inventory Management Tools (MCU)
P03 - Inventory Management Tools (MCU)P03 - Inventory Management Tools (MCU)
P03 - Inventory Management Tools (MCU)Maintenance Connection
 
EX03 - Work Management Through MC Express
EX03 - Work Management Through MC Express EX03 - Work Management Through MC Express
EX03 - Work Management Through MC Express Maintenance Connection
 
W09 - Work Order Management Tools (MCU)
W09 - Work Order Management Tools (MCU)W09 - Work Order Management Tools (MCU)
W09 - Work Order Management Tools (MCU)Maintenance Connection
 
R05 - Intermediate Reporting Report Configuration (MCU)
R05 - Intermediate Reporting Report Configuration (MCU)R05 - Intermediate Reporting Report Configuration (MCU)
R05 - Intermediate Reporting Report Configuration (MCU)Maintenance Connection
 
P03 - Inventory Management Tools (MCU)
P03 - Inventory Management Tools (MCU) P03 - Inventory Management Tools (MCU)
P03 - Inventory Management Tools (MCU) Maintenance Connection
 
EX04 - Parts Management Through MC Express
EX04 - Parts Management Through MC Express EX04 - Parts Management Through MC Express
EX04 - Parts Management Through MC Express Maintenance Connection
 
R05 | Intermediate Reporting - Report Configuration (MCI)
R05 | Intermediate Reporting - Report Configuration (MCI)R05 | Intermediate Reporting - Report Configuration (MCI)
R05 | Intermediate Reporting - Report Configuration (MCI)Maintenance Connection
 
V7.0-06 - Asset and PM Management with MC v7.0
V7.0-06 - Asset and PM Management with MC v7.0 V7.0-06 - Asset and PM Management with MC v7.0
V7.0-06 - Asset and PM Management with MC v7.0 Maintenance Connection
 
Govology Webinar: Detailed Preparation of the ICP Part I: General & Job Cost ...
Govology Webinar: Detailed Preparation of the ICP Part I: General & Job Cost ...Govology Webinar: Detailed Preparation of the ICP Part I: General & Job Cost ...
Govology Webinar: Detailed Preparation of the ICP Part I: General & Job Cost ...Robert E Jones
 
Ex03 | Work Order Management Through MC Express (MCUI)
Ex03 | Work Order Management Through MC Express (MCUI)Ex03 | Work Order Management Through MC Express (MCUI)
Ex03 | Work Order Management Through MC Express (MCUI)Maintenance Connection
 
R05 - Intermediate Reporting: Report Configuration (MCU)
R05 - Intermediate Reporting: Report Configuration (MCU)R05 - Intermediate Reporting: Report Configuration (MCU)
R05 - Intermediate Reporting: Report Configuration (MCU)Maintenance Connection
 
P06 - Purchase Order Receiving and Invoicing (MCU)
P06 - Purchase Order Receiving and Invoicing (MCU)P06 - Purchase Order Receiving and Invoicing (MCU)
P06 - Purchase Order Receiving and Invoicing (MCU)Maintenance Connection
 
W06 - Standard / Enhanced Complete Close Setup (MCU)
W06 - Standard / Enhanced Complete Close Setup (MCU)W06 - Standard / Enhanced Complete Close Setup (MCU)
W06 - Standard / Enhanced Complete Close Setup (MCU)Maintenance Connection
 
PPP04 - Setting Up Assets and PM Schedules (MCU)
PPP04 - Setting Up Assets and PM Schedules (MCU)PPP04 - Setting Up Assets and PM Schedules (MCU)
PPP04 - Setting Up Assets and PM Schedules (MCU)Maintenance Connection
 
Ex04 | Parts Management Through MC Express
Ex04 | Parts Management Through MC ExpressEx04 | Parts Management Through MC Express
Ex04 | Parts Management Through MC ExpressMaintenance Connection
 

Similar to W07 - Tracking Time and Costs on Work Orders (MCU) (20)

W07 - Tracking Time and Costs on Work Orders
W07 - Tracking Time and Costs on Work Orders W07 - Tracking Time and Costs on Work Orders
W07 - Tracking Time and Costs on Work Orders
 
P03 - Inventory Management Tools (MCU)
P03 - Inventory Management Tools (MCU)P03 - Inventory Management Tools (MCU)
P03 - Inventory Management Tools (MCU)
 
EX03 - Work Management Through MC Express
EX03 - Work Management Through MC Express EX03 - Work Management Through MC Express
EX03 - Work Management Through MC Express
 
W09 - Work Order Management Tools (MCU)
W09 - Work Order Management Tools (MCU)W09 - Work Order Management Tools (MCU)
W09 - Work Order Management Tools (MCU)
 
P04 | Vendor Management Tool
P04 | Vendor Management ToolP04 | Vendor Management Tool
P04 | Vendor Management Tool
 
R05 - Intermediate Reporting Report Configuration (MCU)
R05 - Intermediate Reporting Report Configuration (MCU)R05 - Intermediate Reporting Report Configuration (MCU)
R05 - Intermediate Reporting Report Configuration (MCU)
 
P03 - Inventory Management Tools (MCU)
P03 - Inventory Management Tools (MCU) P03 - Inventory Management Tools (MCU)
P03 - Inventory Management Tools (MCU)
 
EX04 - Parts Management Through MC Express
EX04 - Parts Management Through MC Express EX04 - Parts Management Through MC Express
EX04 - Parts Management Through MC Express
 
R05 | Intermediate Reporting - Report Configuration (MCI)
R05 | Intermediate Reporting - Report Configuration (MCI)R05 | Intermediate Reporting - Report Configuration (MCI)
R05 | Intermediate Reporting - Report Configuration (MCI)
 
V7.0-06 - Asset and PM Management with MC v7.0
V7.0-06 - Asset and PM Management with MC v7.0 V7.0-06 - Asset and PM Management with MC v7.0
V7.0-06 - Asset and PM Management with MC v7.0
 
R11 - Pivot Reports (MCU)
R11 - Pivot Reports (MCU)R11 - Pivot Reports (MCU)
R11 - Pivot Reports (MCU)
 
Govology Webinar: Detailed Preparation of the ICP Part I: General & Job Cost ...
Govology Webinar: Detailed Preparation of the ICP Part I: General & Job Cost ...Govology Webinar: Detailed Preparation of the ICP Part I: General & Job Cost ...
Govology Webinar: Detailed Preparation of the ICP Part I: General & Job Cost ...
 
Ex03 | Work Order Management Through MC Express (MCUI)
Ex03 | Work Order Management Through MC Express (MCUI)Ex03 | Work Order Management Through MC Express (MCUI)
Ex03 | Work Order Management Through MC Express (MCUI)
 
R05 - Intermediate Reporting: Report Configuration (MCU)
R05 - Intermediate Reporting: Report Configuration (MCU)R05 - Intermediate Reporting: Report Configuration (MCU)
R05 - Intermediate Reporting: Report Configuration (MCU)
 
P06 - Purchase Order Receiving and Invoicing (MCU)
P06 - Purchase Order Receiving and Invoicing (MCU)P06 - Purchase Order Receiving and Invoicing (MCU)
P06 - Purchase Order Receiving and Invoicing (MCU)
 
W06 - Standard / Enhanced Complete Close Setup (MCU)
W06 - Standard / Enhanced Complete Close Setup (MCU)W06 - Standard / Enhanced Complete Close Setup (MCU)
W06 - Standard / Enhanced Complete Close Setup (MCU)
 
W09 - Work Order Management Tools
W09 - Work Order Management ToolsW09 - Work Order Management Tools
W09 - Work Order Management Tools
 
PPP04 - Setting Up Assets and PM Schedules (MCU)
PPP04 - Setting Up Assets and PM Schedules (MCU)PPP04 - Setting Up Assets and PM Schedules (MCU)
PPP04 - Setting Up Assets and PM Schedules (MCU)
 
W10 - Work Order Preferences (MCU)
W10 - Work Order Preferences (MCU)W10 - Work Order Preferences (MCU)
W10 - Work Order Preferences (MCU)
 
Ex04 | Parts Management Through MC Express
Ex04 | Parts Management Through MC ExpressEx04 | Parts Management Through MC Express
Ex04 | Parts Management Through MC Express
 

More from Maintenance Connection

Three Easy Ways to Radically Improve Your Manufacturing Asset Management Process
Three Easy Ways to Radically Improve Your Manufacturing Asset Management ProcessThree Easy Ways to Radically Improve Your Manufacturing Asset Management Process
Three Easy Ways to Radically Improve Your Manufacturing Asset Management ProcessMaintenance Connection
 
3 inventory strategies to maximize your CMMS profitability
3 inventory strategies to maximize your CMMS profitability3 inventory strategies to maximize your CMMS profitability
3 inventory strategies to maximize your CMMS profitabilityMaintenance Connection
 
3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization
3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization
3 Ways a Mobile CMMS Strategy Can Revolutionize Your OrganizationMaintenance Connection
 
How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...
How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...
How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...Maintenance Connection
 
Manufacturers: What's next in the ever-evolving industry?
Manufacturers: What's next in the ever-evolving industry?Manufacturers: What's next in the ever-evolving industry?
Manufacturers: What's next in the ever-evolving industry?Maintenance Connection
 
V7.0-02 - System Administration with MC v7.0 (MCUIE)
V7.0-02 - System Administration with MC v7.0 (MCUIE)V7.0-02 - System Administration with MC v7.0 (MCUIE)
V7.0-02 - System Administration with MC v7.0 (MCUIE)Maintenance Connection
 
W08 | Rules Manager Notifications and Alerts (MCUI)
W08 | Rules Manager Notifications and Alerts (MCUI)W08 | Rules Manager Notifications and Alerts (MCUI)
W08 | Rules Manager Notifications and Alerts (MCUI)Maintenance Connection
 
SA07 | Rules Manager and Events Notifications (MCUI)
SA07 | Rules Manager and Events Notifications  (MCUI)SA07 | Rules Manager and Events Notifications  (MCUI)
SA07 | Rules Manager and Events Notifications (MCUI)Maintenance Connection
 
SA06 | Human Resource Management (MCUI)
SA06 | Human Resource Management  (MCUI)SA06 | Human Resource Management  (MCUI)
SA06 | Human Resource Management (MCUI)Maintenance Connection
 
SA05 | Customizing the User Interface (MCUI)
SA05 | Customizing the User Interface  (MCUI)SA05 | Customizing the User Interface  (MCUI)
SA05 | Customizing the User Interface (MCUI)Maintenance Connection
 
SA04 | Managing KPI's and Dashboards (MCUI)
SA04 | Managing KPI's and Dashboards  (MCUI)SA04 | Managing KPI's and Dashboards  (MCUI)
SA04 | Managing KPI's and Dashboards (MCUI)Maintenance Connection
 
Sa03 | Overview of Access Groups (MCUI)
Sa03 | Overview of Access Groups  (MCUI)Sa03 | Overview of Access Groups  (MCUI)
Sa03 | Overview of Access Groups (MCUI)Maintenance Connection
 
SA02 | User and Password Management Techniques (MCUI)
SA02 | User and Password Management Techniques  (MCUI)SA02 | User and Password Management Techniques  (MCUI)
SA02 | User and Password Management Techniques (MCUI)Maintenance Connection
 
R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)
R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)
R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)Maintenance Connection
 
R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)
R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)
R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)Maintenance Connection
 
R07 | Intermediate Reporting - Smart Reports (MCUI)
R07 | Intermediate Reporting - Smart Reports (MCUI)R07 | Intermediate Reporting - Smart Reports (MCUI)
R07 | Intermediate Reporting - Smart Reports (MCUI)Maintenance Connection
 
R06 | Intermediate Reporting - Conditional Formatting (MCUI)
R06 | Intermediate Reporting - Conditional Formatting (MCUI)R06 | Intermediate Reporting - Conditional Formatting (MCUI)
R06 | Intermediate Reporting - Conditional Formatting (MCUI)Maintenance Connection
 
V7.0-04 - Parts and Purchasing with MC v7.0
V7.0-04 - Parts and Purchasing with MC v7.0 V7.0-04 - Parts and Purchasing with MC v7.0
V7.0-04 - Parts and Purchasing with MC v7.0 Maintenance Connection
 

More from Maintenance Connection (20)

Three Easy Ways to Radically Improve Your Manufacturing Asset Management Process
Three Easy Ways to Radically Improve Your Manufacturing Asset Management ProcessThree Easy Ways to Radically Improve Your Manufacturing Asset Management Process
Three Easy Ways to Radically Improve Your Manufacturing Asset Management Process
 
3 inventory strategies to maximize your CMMS profitability
3 inventory strategies to maximize your CMMS profitability3 inventory strategies to maximize your CMMS profitability
3 inventory strategies to maximize your CMMS profitability
 
3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization
3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization
3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization
 
How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...
How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...
How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...
 
Manufacturers: What's next in the ever-evolving industry?
Manufacturers: What's next in the ever-evolving industry?Manufacturers: What's next in the ever-evolving industry?
Manufacturers: What's next in the ever-evolving industry?
 
V7.0-02 - System Administration with MC v7.0 (MCUIE)
V7.0-02 - System Administration with MC v7.0 (MCUIE)V7.0-02 - System Administration with MC v7.0 (MCUIE)
V7.0-02 - System Administration with MC v7.0 (MCUIE)
 
W10 | Work Order Preferences (MCUI)
W10 | Work Order Preferences  (MCUI)W10 | Work Order Preferences  (MCUI)
W10 | Work Order Preferences (MCUI)
 
W08 | Rules Manager Notifications and Alerts (MCUI)
W08 | Rules Manager Notifications and Alerts (MCUI)W08 | Rules Manager Notifications and Alerts (MCUI)
W08 | Rules Manager Notifications and Alerts (MCUI)
 
SA07 | Rules Manager and Events Notifications (MCUI)
SA07 | Rules Manager and Events Notifications  (MCUI)SA07 | Rules Manager and Events Notifications  (MCUI)
SA07 | Rules Manager and Events Notifications (MCUI)
 
SA06 | Human Resource Management (MCUI)
SA06 | Human Resource Management  (MCUI)SA06 | Human Resource Management  (MCUI)
SA06 | Human Resource Management (MCUI)
 
SA05 | Customizing the User Interface (MCUI)
SA05 | Customizing the User Interface  (MCUI)SA05 | Customizing the User Interface  (MCUI)
SA05 | Customizing the User Interface (MCUI)
 
SA04 | Managing KPI's and Dashboards (MCUI)
SA04 | Managing KPI's and Dashboards  (MCUI)SA04 | Managing KPI's and Dashboards  (MCUI)
SA04 | Managing KPI's and Dashboards (MCUI)
 
Sa03 | Overview of Access Groups (MCUI)
Sa03 | Overview of Access Groups  (MCUI)Sa03 | Overview of Access Groups  (MCUI)
Sa03 | Overview of Access Groups (MCUI)
 
SA02 | User and Password Management Techniques (MCUI)
SA02 | User and Password Management Techniques  (MCUI)SA02 | User and Password Management Techniques  (MCUI)
SA02 | User and Password Management Techniques (MCUI)
 
R11 | Pivot Reports (MCUI)
R11 | Pivot Reports (MCUI)R11 | Pivot Reports (MCUI)
R11 | Pivot Reports (MCUI)
 
R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)
R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)
R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)
 
R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)
R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)
R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)
 
R07 | Intermediate Reporting - Smart Reports (MCUI)
R07 | Intermediate Reporting - Smart Reports (MCUI)R07 | Intermediate Reporting - Smart Reports (MCUI)
R07 | Intermediate Reporting - Smart Reports (MCUI)
 
R06 | Intermediate Reporting - Conditional Formatting (MCUI)
R06 | Intermediate Reporting - Conditional Formatting (MCUI)R06 | Intermediate Reporting - Conditional Formatting (MCUI)
R06 | Intermediate Reporting - Conditional Formatting (MCUI)
 
V7.0-04 - Parts and Purchasing with MC v7.0
V7.0-04 - Parts and Purchasing with MC v7.0 V7.0-04 - Parts and Purchasing with MC v7.0
V7.0-04 - Parts and Purchasing with MC v7.0
 

Recently uploaded

BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEOrtus Solutions, Corp
 
Intelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmIntelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmSujith Sukumaran
 
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...gurkirankumar98700
 
Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)
Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)
Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)jennyeacort
 
Unveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML DiagramsUnveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML DiagramsAhmed Mohamed
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024StefanoLambiase
 
英国UN学位证,北安普顿大学毕业证书1:1制作
英国UN学位证,北安普顿大学毕业证书1:1制作英国UN学位证,北安普顿大学毕业证书1:1制作
英国UN学位证,北安普顿大学毕业证书1:1制作qr0udbr0
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesPhilip Schwarz
 
Unveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesUnveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesŁukasz Chruściel
 
chapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptchapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptkotipi9215
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideChristina Lin
 
Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...OnePlan Solutions
 
Implementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with AzureImplementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with AzureDinusha Kumarasiri
 
Professional Resume Template for Software Developers
Professional Resume Template for Software DevelopersProfessional Resume Template for Software Developers
Professional Resume Template for Software DevelopersVinodh Ram
 
What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....kzayra69
 
React Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaReact Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaHanief Utama
 
Recruitment Management Software Benefits (Infographic)
Recruitment Management Software Benefits (Infographic)Recruitment Management Software Benefits (Infographic)
Recruitment Management Software Benefits (Infographic)Hr365.us smith
 
What is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWhat is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWave PLM
 
Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Velvetech LLC
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxTier1 app
 

Recently uploaded (20)

BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
 
Intelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmIntelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalm
 
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
 
Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)
Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)
Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)
 
Unveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML DiagramsUnveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML Diagrams
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
 
英国UN学位证,北安普顿大学毕业证书1:1制作
英国UN学位证,北安普顿大学毕业证书1:1制作英国UN学位证,北安普顿大学毕业证书1:1制作
英国UN学位证,北安普顿大学毕业证书1:1制作
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a series
 
Unveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesUnveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New Features
 
chapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptchapter--4-software-project-planning.ppt
chapter--4-software-project-planning.ppt
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
 
Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...
 
Implementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with AzureImplementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with Azure
 
Professional Resume Template for Software Developers
Professional Resume Template for Software DevelopersProfessional Resume Template for Software Developers
Professional Resume Template for Software Developers
 
What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....
 
React Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaReact Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief Utama
 
Recruitment Management Software Benefits (Infographic)
Recruitment Management Software Benefits (Infographic)Recruitment Management Software Benefits (Infographic)
Recruitment Management Software Benefits (Infographic)
 
What is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWhat is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need It
 
Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
 

W07 - Tracking Time and Costs on Work Orders (MCU)

Editor's Notes

  1. Introduction: In today’s presentation we will be discussing Work Order Labor and Materials, including information on estimated and actual Labor, estimated and actual Materials, Other costs and Tools, and walking through how to convert Estimated to Actual records via the Complete / Close on the Work Order. Labor Report: How to utilize the Labor Report, it’s functionality, and where to access. Costs Tab Defined: Overview of the different types of Labor and Materials (estimates and actuals), and views of the Costs tab. Estimated vs. Actual Labor: Details of estimated and actual Labor and tools for using both. Estimated vs. Actual Materials: Details of estimated and actual Materials and tools for using both. Other Costs and Tools: Details of miscellaneous cost tracking, as well as how to add Tool estimates / utilize the Tool module for quantity updates. Converting Estimates to Actuals: How to convert estimates to Actuals.
  2. SECTION OVERVIEW
  3. Bullet 1: The Labor Report sub-tab displays the Labor Report used to record notes / activity on the Work Order. This sub-tab is accessed from the Tasks main tab of the Work Order, Labor Report sub-tab. Bullet 2: In contrast to the individual notes created on the Notes / Status History page, the Labor Report is one continuous (ongoing) note regarding activity. Bullet 3: The process of completing the notes for the Labor Report is typically done via the Complete / Close of the Work Order.
  4. Bullet 1: The Labor Report has many different options available for adding as well as editing information. Sub-Bullet 1: One way to add Labor information is to simply type directly into the Labor Report text box. Sub-Bullet 2: There is also an Edit button capability next to the “Add” button at the top right of the Labor report text box, which will open up a larger Text box to allow for easier viewing of longer paragraphs. Sub-Bullet 3: Lastly, the Actions Lookup stores commonly used actions which can be utilized for consistency as well as can be time saving for the Technician (these can also be edited to store organizational specific information, if necessary). Bullet 2: From the Labor Report sub-tab there is also access to the Failure Analysis section, as well as Follow-up Work capability (when clicking on New a follow-up Work Order is created).
  5. Bullet 1: The complete / close process of the Work Order typically will require / have the Technician fill in information to the Labor Report. This Labor Report section can be hidden / moved depending on the type of Complete / Close in place at your organization (for more information on the Complete / Close and Enhanced Complete / Close, please reference the Work Order Standard and Enhanced Complete Close Configuration presentation). Bullet 2: The Labor Report functions the same from the Complete / Close as it does from the Labor Report sub-tab, however the Technician can fill in details about many different parts of the Work Order in one easily accessible location. It is important to note that the functionality is close to the same except for the edit button and the follow-up indicator not being added to this section.
  6. SECTION OVERVIEW
  7. Bullet 1: Work Order costs can be associated with Labor, Materials, or Other Costs and are tracked against the Work Order from the Costs tab. The Costs tab is designed to track all costs associated with the Work to accurately record and report these costs. Bullet 2: Costs can be added in multiple ways: Sub-Bullet 1: A Procedure is the most common way of adding estimated costs, as estimated materials are generally used for Preventive Maintenance Work Orders. Sub-Bullet 2: However Actual costs can be added manually via the Costs tab. Sub-Bullet 3: Or Actual cost records are created from the complete / close screen by converting estimated into actuals records.
  8. Bullet 1: Estimated Costs are any costs that are being pre-determined for the Work Order. Sub-Bullet 1: Have not been completed or verified. Sub-Bullet 2: These estimated costs are designed to be, eventually, converted into Actual records (this process is explained later in this presentation). Bullet 2: Actual costs are any costs that have already occurred or been used. Sub-Bullet 1: For example, the work has already been done by the Technician and the Materials have already been used. Because of this reason, the Charge is applied and the cost of work will be noted, unlike the estimates.
  9. SECTION OVERVIEW
  10. Sub-Bullet 1: The selection Checkbox is designed to offer a selection for removing Labor entries. To select a row, click inside the checkbox. To remove a selection / check that has been made, click inside the checkbox. This column is also used when estimated labor has been added or edited, but not yet saved (revert control). Clicking that control will revert the changes / additions before saving. Sub-Bullet 2: The Labor field is the description of the Labor itself. If the Labor is a craft, the craft will be listed. If it is assigned to an individual, the individual’s name will be displayed.
  11. Sub-Bullet 3: The Estimated Hours column will only be shown for estimated Labor records. This column will show the amount of Hours that has been estimated for that particular assignment. Sub-Bullet 4: For estimated labor, the Cost is calculated by taking the estimated hours and multiplying by the Rate defined at the Labor Record level.
  12. Sub-Bullet 5: The total charge for the labor record is based on the charge rate defined for the individual or craft, or is subject to a designated markup. If there is no markup or charge rate defined for the labor resource or craft, the charge will be the same as the cost. If there is a markup defined for the labor resource or craft, the charge is calculated by determining total cost and applying the markup percent. If there is a charge rate defined for the labor resource or craft, the charge is calculated by multiplying the total hours by the charge rate (regardless of whether the hours are for regular or overtime). If there is both a charge rate and markup defined, the charge rate will be used.  Screenshots: An example of how the Charge rates function is depicted in the above screenshots. The Computer Technician II has a Regular hour rate of 100, with a Charge Rate of 30. Because there is both a Markup Percentage AND a Charge Rate in place, the Charge Rate is used. When adding the Craft of Computer Technician II to a Work Order for 1 hour of estimated work, the Cost is 100 however the actual Charge for the work will be 30 as designated on the Rate of the record.
  13. Note: Some of these fields function identical to the Estimated Labor portion, so they will only be listed here and not gone into full detail! Sub-Bullet 1: Same as Estimated Labor functionality. Sub-Bullet 2: Same as Estimated Labor functionality. Sub-Bullet 3: The Actual, Regular, Overtime, and Other Hours column show the actual hours expended by the Labor resource for the work order.  Regular hours are copied from the target hours listed in the assignment if assignments were converted to actual labor (explained in detail later in presentation).
  14. Sub-Bullet 4: The date defined on the record is considered the Work date (copied from assignment date if assignments were converted to actual labor). This field can be back-dated if needed. Sub-Bullet 5: The total cost for the labor record, which is calculated based on the hours entered and the corresponding rates for the labor resource.
  15. Bullet 1 / Sub-Bullets: The last row of the Estimated and Actual Labor table displays the total labor hours, costs, and charges. This is a cumulative count of all rows of Labor that has been added for the particular Work Order.
  16. Bullet 1: Actual Labor records must be manually created on the Work Order, as they are intended to be used to track real Hours and Costs that have been accumulated after work being done. If estimates have been populated from a Procedure, then the option to convert the estimated Labor to Actual records is also an option – however this will be discussed in more detail later in this presentation. Bullet 2: The “Add” button is used to add additional Labor records (for both actuals and estimates). When selected, the Labor Lookup will open, allowing the Technician / User to pick their name (or another users name) from the options. Bullet 3: In the upper left hand corner of the Labor Lookup there are “Type” selections for Craft, Employee, or Contractor. By filtering through these Types, different Labor resource records will be shown to select from.
  17. Bullet 1: After selecting a Labor resource for Actual Labor, there are many different fields that can be filled in (dependent on organizational needs). Sub-Bullet 1: There are three different types of hour fields that can be utilized to accurately reflect what type of hours have been completed. Regular hours are the most common use, however Overtime (OT) and Other Hours can also be used to track specific types of hours separately. This can especially be helpful when reporting off specific types of hours (such as reporting on all Overtime hours spent). Costs and charges are automatically calculated after entering the hours, based on the rates stored for this labor resource. Sub-Bullet 2: The Date field is designed to track the specific Date the work was performed. The date field will be populated with the current date by default.  This date can be overwritten to reflect a different work date if necessary. Sub-Bullet 3: The “time in and out” fields can also be entered, allowing Technicians to track the exact times that they performed the work. The “Time In” and Time Out” fields are maintained independently of the hours fields, however, so they must be calculated by the Technician. Sub-Bullet 4: The indicator for “All assignments for this labor are complete?” is set on by default.  This control allows you to show that multiple assignments for this labor resource (associated with this work order) are all complete, without having to access each individual record.  This state of completion will be reflected on the Complete/Close Work Order Dialog. Sub-Bullet 5: The Comments field can be used to add any additional explanatory information required.
  18. Bullet 1: There are a couple of indicators that both estimated and actual Labor records will show when adding new Labor. Sub-Bullet 1: The Account and Category can be modified using the module lookup to access a list of accounts/categories stored in the respective module. There is also an option on the Work Order Complete / Close to fill in all Accounts and Categories for ALL records on the Work Order with the same Account / Category. Sub-Bullet 2: The Auto-Calc Cost? and Auto-Calc Charge? indicators are, by default, automatically selected. These Indicators control the calculation of the Cost and Charge based on the standard calculations within MC. If these are unchecked, the Technician / User can then have manual control to change the Cost / Charge free of auto-calculations.
  19. Bullet 1: After selecting a Labor resource for the work (in this example the Contractor name is American Shack), the Estimated hours must be entered. The Cost and Charge for the work will be auto-calculated based on the Labor record rates.
  20. Bullet 1: As shown in this screenshot, there are multiple different hour options to choose from – in this example, 2.5 regular hours were completed, while 1 were considered overtime hours. The work Date took place on 2/5/2014, and the Time In / Time Out have been filled in to show the exact time that the Technician was performing the work. The Cost and Charge have been auto-calculated from the Techs Labor rate, and the Tech has completed all assignments for the Work Order and filled in comments that the work has been completed.
  21. SECTION OVERVIEW
  22. Bullet 1 / Sub-Bullets: Estimated Materials are typically populated from a Procedure from a PM schedule, and alert the Technician of what Materials should be used / can be used, track the estimated costs for planning purposes, or for other organizational purposes. If there are estimated Material records created for stocked Inventory items, MC will reserve the quantity of Material designated in the Inventory Module. Similarly, as quantities are modified, MC ensures the correct estimated quantities are reserved. Bullet 2 : There are two types of items that can be added for estimated material costs – Stocked and Direct Issue. Sub-Bullet 1: Stocked items are inventory items/parts that are maintained in a stock room.   Inventory is maintained on stocked items, indicating the quantity on-hand (physically available), the quantity reserved and the quantity available (on-hand less amount reserved).  Sub-Bullet 2: Items that are being requested for purchase specifically for a Work Order are designated as “Direct Issue.”  Direct Issue items do not affect any inventory retained in a stock room. Add the item as estimated material, using the Stock Room Filter Control to specify that the item will be “Directly Issued.”  This option generates a “request” for the Direct Issue item, prompting appropriate users to create a purchase order for the item(s).  Once a purchase order has been generated (through the Order Items Feature or through the Purchase Order Module), it will be listed on the “Costs-Purchase Orders” Tab for the work order.
  23. Bullet 1: The Actuals Materials section of the Work Order Costs page lists actual material that is used for the currently displayed Work Order. Sub-Bullet 1: As actual material is recorded, appropriate adjustments are made to stock room inventory levels. Sub-Bullet 2: In addition, actual material records can be used to “rotate” assets between stock room and production nodes on the asset tree (not discussed in detail in this presentation). Sub-Bullet 3: If estimated materials were defined for the work order, actual cost records will be created. Initially, these records will only have values for estimates; the actual quantity and cost fields will remain blank until updated on this page or through the Complete/Close Process (conversion process explained in more detail later).
  24. Bullet 1 / Sub-Bullets 2 & 3: There are three types of items that can be added to the Work order for actual material costs. This includes Stocked and Direct Issue items (same as estimated Materials). Sub-Bullet 3: Items that will be purchased “out of pocket” can be added as Actual Materials.   Items that are designated as “out of pocket” do not affect inventory and do not initiate any purchase order activity, making it ideal for on the fly additions that do not need to be tracked via Inventory.
  25. Bullet 1: To access the Inventory Module lookup, simply click on the Add button under the Materials (estimates) or Materials (Actuals) section. This will open the Inventory Module lookup. Bullet 2: There are many different filters available to narrow down searches / choices. To select a specific Type of item (such as Direct Issue or Out of Pocket) use the navigation controls in the upper left hand corner of the lookup. The Indicators for “Items set as Direct Issue” or “Associated with Asset / Location” can also be helpful when narrowing down Item choices.
  26. Bullet 1: After selecting an Inventory item to add to the Work Order, the Inventory Items Popup will display – prompting the Technician / User to fill in important information. Sub-Bullet 1: The Actual Qty should be filled in with the amount of the Item that was actually used. This will auto-populate the Cost / Charge appropriately, dependent on the amount of Items. Sub-Bullet 2: The Account and Category can be filled in by using the module lookup to access the list of accounts / categories stored in the respective module. Sub-Bullet 3: The Other Cost, Cost and Charge rate can be modified as needed.  The value placed in the Other Cost field is added to the total Cost and Charge fields. Changes made will only effect this particular actual material record (will not change the rate associated with the inventory item). 
  27. Bullet 1 / Sub-Bullets: The last five fields on the Inventory Items Popup can be used to designate the rotation of assets between production and stock room nodes, or between different locations on the asset tree. This functionality is organizational specific as not every one will choose or need to use this feature. Because of the complexity and uniqueness of Rotating Assets as Inventory Items, this topic is discussed in full detail in the Parts and Purchasing Track.
  28. Bullet 1: After selecting Inventory Item # 125031 for an estimated item, the Cost and Charge for this item are auto-populated from the information stored on the Inventory record. The Account and Category can be filled in (if necessary), and any other costs associated with this Item can be added as well. The most important piece of information is the Est. Qty, as this will determine the cost / charge that is added. Also – this particular item has been selected as “Out of Pocket” which means it will not be deducted from any actual Inventory counts.
  29. Bullet 1: After selecting Inventory Item 125030 as a Direct Issued item, it is important to fill in the Actual Qty and fill in any other costs (in this example, 4.50 has been added as additional costs for this particular item). The Cost / Charge will auto-calculate based on the Inventory record, however these can be modified if necessary. No information will be filled in at the bottom of the Dialog for Rotating Asset information, as this is not required / necessary.
  30. SECTION OVERVIEW
  31. Bullet 1: The Other Costs section of the Work Order is designed to track miscellaneous costs that may come up while completing the Work Order. These costs may be outside of the estimated Labor / Materials, and needs to be tracked as such. These costs are typically not associated with an Inventory item or specific Material. Bullet 2: Estimate records created for Other Costs can be converted to Actuals the same way that Labor / Materials can – from the Complete / Close. Note: do not add manual cost records if you plan on converting estimates to actuals!
  32. Bullet 1: When adding Estimates for Other Costs there are a few key fields that can be filled in to provide detailed information about the misc. costs. The Name and Description are entered by typing in any desired value – typically the Name is shorter and more concise, while the description provides more detail as to what the cost is. The Company, Labor, account and Category field only need to be entered if necessary (not required). For example, if it is important to enter the vendor associated with the cost, a Company can be added (see screenshot). The Cost and Markup can be defined as well, which auto-calculates the Charge.
  33. Bullet 1: The Other Cost Actuals have additional field options available, however many of the fields are similar. The Name, Description, Company, Labor, Account and Category, Actual Cost, Markup, and Charge all function the same as the Estimates. However there are also fields for Invoice #, which allows the Technician to apply a specific Invoice to the record, as well as “Other 1 / 2” fields for any other information that needs to be included. The Comments section allows the Technician to include any important notes or information that pertains to the new Other Cost record.
  34. Bullet 1: Tools that are added as estimates to the Work Order are tools that are needed to complete the Work Order. These Tools are created in the Tools Module of Maintenance Connection, and are not considered Inventory Items as they typically do not come at any cost. This feature is typically only intended to be used if you have Tools listed in the Tools module – otherwise, it does not relate to anything. Bullet 2: These Tools are considered “borrowed” when they are added to a Work Order (used and returned), rather than purchased – so there is no cost record. Note: Tool quantity records will NOT update automatically and must be manually updated. For example, if a Tool is added to a Work Order, then the user must go in and manually update the Quantity on Hand to change the Available count.
  35. Bullet 1: To add a Tool to the Tools (Estimates) simply click on the “Add” button, and select the Tool from the Tool Module Lookup. Once selected, the record will be added to the Work Order. To change the Issued Quantity to the correct amount, simply go to the Tool record in the Tools Module, and select the “Locations” tab. From here, you can edit the “Issued” to reflect that one of the Tools is in use, and the Available will auto-calculate based on the data entered. The Last Counted field is also important to ensure that the counts are kept up-to-date and accurate.
  36. SECTION OVERVIEW
  37. Bullet 1: The powerful feature to convert estimates records (both Labor and Materials) is accessible from the Work Order Complete / Close Dialog. These are considered “Actions”, and the Indicators for these Actions are located under the Actions header. Bullet 2: This functionality allows Technicians to track their Actual costs and update Inventory levels quickly and efficiently – without having to create manual entries for their costs. It is important to note that this feature should only be used if the estimates are = to the actuals, otherwise the data will be incorrect.
  38. Bullet 1: The Work Order Complete / Close also has an additional section that can be shown (turn on via preferences) to add Labor, Materials, and Other Costs. This gives the Technician flexibility to add new records on the fly from the Complete / Close.
  39. Bullet 1: The option to convert estimated or assigned labor to actual labor provides a quick mechanism to convert existing estimates or assignments to actual labor, allowing you to keep track of actual labor costs. The same process takes place for setting Materials / Other Cost estimates to Actuals. Bullet 1 Note: The options for Labor are simply alternatives.  You cannot set actual labor hours to both estimated and assigned labor.  You must choose which current records (assignments or estimates) most accurately reflect the actual labor performed. Bullet 2: It is important to understand that these options reset any records created on the Actuals Page. The conversion options create new “actual cost” records based on the information stored in the estimates or assignments, resulting in the deletion of any manually entered records.  As such, to ensure that no important data is lost, you should not use these conversion options if you are using the Actuals Page to enter actual labor hours / costs or Materials actuals.