1. Production Schedule
Date What needs to be done Location By Who Equipment Needed
10th
December
2015
Pre-production: Health
and safety risk
assessments of filming
locations
Ringwood School Matt Holley Pen and Risk Assessment forms
20th
December
2015
Production: Filming of
Scene 1 shots 1-3 (Internal
room shots)
Bransgore- Oscar’s
house
Camera, sound and actors: Oscar Camera, SD card and Tripod
21st
December
2015
Production: Filming
Scene 2
Shots 4-11 (External date
shots, on the swings)
Bransgore- The
swings
Camera, sound and actors/Actresses:
Oscar and Georgia
Camera, SD card and Tripod
23rd
December
2015
Production: Filming
Scene 3
Shots 12-14 (Internal shots
of Karl waking up)
Bransgore- Oscar’s
house
Camera, sound and actors: Oscar
Camera, SD card and Tripod
3rd
January
2016
Production: Filming scene
4 shots 14-21 (Kitchen
scene with his mum)
Bransgore- Oscar’s
house
Camera, sound and actors/Actresses:
Oscar and Mabel
Camera, SD card and Tripod
4th January
2016
Production: Extra footage
that requires filming
Bransgore Full cast and crew to make sure that
nothing is missing
Camera, SD card and Tripod
7th
January
2016
EDITING A PC, Adobe Premiere Pro CS5 and
an SD card with all of the footage on it
8th
January
2016
EDITING A PC, Adobe Premiere Pro CS5 and
an SD card with all of the footage on it
14th
January
2016
EDITING A PC, Adobe Premiere Pro CS5 and
an SD card with all of the footage on it