SlideShare a Scribd company logo
1 of 2
Date Filming
Location
Actors needed Equipment and
props needed
Scenes filmed? Any
problems?
How we solved
the problems?
6th
December
2012
Erica’s house Cherry Whipp
Nai’lahFirdaws
Camera
Tripod
Memory card
Book
Newspaper
DVD
n/a -Problems
setting up
camera and
tripod
-Problems
with natural
lighting (by
the time we
set up it was
dark outside)
Unable to
resolve the
problem as we
could not use
artificial
lighting
therefore, we
cancelled the
filming session
21st
December
2012
Erica’s house Cherry Whipp
Nai’lahFirdaws
Camera
Tripod
Memory card
Book
Newspaper
DVD
Opening scene -No problems
encountered
Saturday 8th
February
2013
Cemetery and
Mile end
Cherry Whipp Camera
Tripod
Memory card
Walking to the
Cemetery scene
and some scenes
at the cemetery
-No problems
encountered
Saturday
19th
February
2013
Cemetery Cherry Whipp
Abdullah Al-
Maruf
Afsana Ahmed
Camera
Tripod
Memory card
Torches
Gloves with
wiring
Scenes outside
and at the
Cemetery with
all actors
-Problem
with the
weather- was
a cold and
rainy day
-Waited for it
to stop raining
and carried on
with the
filming
Friday 12th
February
2013
Cemetery
(FINAL DAY)
Cherry Whipp Camera
Tripod
Memory card
Black bin bag
Torch
Fake blood
Final scenes at
the cemetery
No problems
encountered

More Related Content

Viewers also liked

Craig Ellis MBA Dissertation
Craig Ellis MBA DissertationCraig Ellis MBA Dissertation
Craig Ellis MBA DissertationCraig Ellis
 
Programa VI setmana cultural
Programa VI setmana culturalPrograma VI setmana cultural
Programa VI setmana culturalEscolaLaBobila
 
Abolition peine de mort
Abolition peine de mortAbolition peine de mort
Abolition peine de mortJamaity
 
3 asiaa ravintolalle
3 asiaa ravintolalle3 asiaa ravintolalle
3 asiaa ravintolalleRoyal Events
 
LIGA OUTDOOR | ARWC PANTANAL
LIGA OUTDOOR | ARWC PANTANALLIGA OUTDOOR | ARWC PANTANAL
LIGA OUTDOOR | ARWC PANTANALMeu Estúdio
 
Advanced motion controls dq111se15a40ldc h
Advanced motion controls dq111se15a40ldc hAdvanced motion controls dq111se15a40ldc h
Advanced motion controls dq111se15a40ldc hElectromate
 
Question 2
Question 2Question 2
Question 2jessheap
 

Viewers also liked (10)

Craig Ellis MBA Dissertation
Craig Ellis MBA DissertationCraig Ellis MBA Dissertation
Craig Ellis MBA Dissertation
 
2
22
2
 
Programa VI setmana cultural
Programa VI setmana culturalPrograma VI setmana cultural
Programa VI setmana cultural
 
Abolition peine de mort
Abolition peine de mortAbolition peine de mort
Abolition peine de mort
 
Definición de cuenta contable
Definición de cuenta contableDefinición de cuenta contable
Definición de cuenta contable
 
3 asiaa ravintolalle
3 asiaa ravintolalle3 asiaa ravintolalle
3 asiaa ravintolalle
 
LIGA OUTDOOR | ARWC PANTANAL
LIGA OUTDOOR | ARWC PANTANALLIGA OUTDOOR | ARWC PANTANAL
LIGA OUTDOOR | ARWC PANTANAL
 
Budget
Budget Budget
Budget
 
Advanced motion controls dq111se15a40ldc h
Advanced motion controls dq111se15a40ldc hAdvanced motion controls dq111se15a40ldc h
Advanced motion controls dq111se15a40ldc h
 
Question 2
Question 2Question 2
Question 2
 

More from Anikachy

7 questions 3
7 questions 37 questions 3
7 questions 3Anikachy
 
Poster analysis
Poster analysisPoster analysis
Poster analysisAnikachy
 
Script for Radio Trailer
Script for Radio TrailerScript for Radio Trailer
Script for Radio TrailerAnikachy
 
Radio Trailer Script
Radio Trailer ScriptRadio Trailer Script
Radio Trailer ScriptAnikachy
 
Location agreement between Pandora Pictures and The Cemetery Park
Location agreement between Pandora Pictures and The Cemetery ParkLocation agreement between Pandora Pictures and The Cemetery Park
Location agreement between Pandora Pictures and The Cemetery ParkAnikachy
 
Actors contract
Actors contract Actors contract
Actors contract Anikachy
 
Actors contract new
Actors contract newActors contract new
Actors contract newAnikachy
 
Audience profiling
Audience profilingAudience profiling
Audience profilingAnikachy
 
A Clockwork Orange
A Clockwork OrangeA Clockwork Orange
A Clockwork OrangeAnikachy
 
7 questions Powerpoint
7 questions Powerpoint 7 questions Powerpoint
7 questions Powerpoint Anikachy
 
7 questions
7 questions7 questions
7 questionsAnikachy
 
7 questions
7 questions7 questions
7 questionsAnikachy
 

More from Anikachy (13)

7 questions 3
7 questions 37 questions 3
7 questions 3
 
Poster analysis
Poster analysisPoster analysis
Poster analysis
 
Script for Radio Trailer
Script for Radio TrailerScript for Radio Trailer
Script for Radio Trailer
 
Ra
RaRa
Ra
 
Radio Trailer Script
Radio Trailer ScriptRadio Trailer Script
Radio Trailer Script
 
Location agreement between Pandora Pictures and The Cemetery Park
Location agreement between Pandora Pictures and The Cemetery ParkLocation agreement between Pandora Pictures and The Cemetery Park
Location agreement between Pandora Pictures and The Cemetery Park
 
Actors contract
Actors contract Actors contract
Actors contract
 
Actors contract new
Actors contract newActors contract new
Actors contract new
 
Audience profiling
Audience profilingAudience profiling
Audience profiling
 
A Clockwork Orange
A Clockwork OrangeA Clockwork Orange
A Clockwork Orange
 
7 questions Powerpoint
7 questions Powerpoint 7 questions Powerpoint
7 questions Powerpoint
 
7 questions
7 questions7 questions
7 questions
 
7 questions
7 questions7 questions
7 questions
 

Filming Schedule

  • 1. Date Filming Location Actors needed Equipment and props needed Scenes filmed? Any problems? How we solved the problems? 6th December 2012 Erica’s house Cherry Whipp Nai’lahFirdaws Camera Tripod Memory card Book Newspaper DVD n/a -Problems setting up camera and tripod -Problems with natural lighting (by the time we set up it was dark outside) Unable to resolve the problem as we could not use artificial lighting therefore, we cancelled the filming session 21st December 2012 Erica’s house Cherry Whipp Nai’lahFirdaws Camera Tripod Memory card Book Newspaper DVD Opening scene -No problems encountered Saturday 8th February 2013 Cemetery and Mile end Cherry Whipp Camera Tripod Memory card Walking to the Cemetery scene and some scenes at the cemetery -No problems encountered
  • 2. Saturday 19th February 2013 Cemetery Cherry Whipp Abdullah Al- Maruf Afsana Ahmed Camera Tripod Memory card Torches Gloves with wiring Scenes outside and at the Cemetery with all actors -Problem with the weather- was a cold and rainy day -Waited for it to stop raining and carried on with the filming Friday 12th February 2013 Cemetery (FINAL DAY) Cherry Whipp Camera Tripod Memory card Black bin bag Torch Fake blood Final scenes at the cemetery No problems encountered