SlideShare a Scribd company logo
1 of 3
MANOJ KUMAR MANDAL
Address:-flat no. 4531
Alok vihar 1,sec-50
Noida-201301
Mob. No .07827194970
email:-manojraj48@gmail.com
OBJECTIVE:-
To excel in my chosen field of Electrical Engineering and to be a part of an organization which believes
in growth through on effective employee contribution sharing of knowledge and responsibility with exposure to
cutting edge technology.
EXPERIENCE: - [5] Years [6] Months.
ELECTRICAL ENGINEER:-
 From Jun-2016 to till Date in Civitech Developers pvt ltd., Noida
 Project:- Civitech Stadia, Sector – 79, Noida
 Project Cost: - 60 Crores (Approx).
 Civitech Stadia consists of Six Towers (2B+G+25) each; Civitech Stadia project have
substation of 11KV. All internal and external electrification such as Transformer, LT Panel,
Feeder Pillars, Rising Mains, Cables, Earthing, Street Lights, AC System etc.
JOB RESPONSIBILITIES
 Supervision of all electrical works on project site including substations and external works.
 Monitoring quality of work with regard to project and contract specification.
 Monitoring progress of work with regard to project completion schedule and mile stone
dates.
 Monitoring Interface between all MEP services including raising RFIs with design
consultants.
 Coordinating with in-house design engineer to resolve construction drawing issues.
 Final completion of works and handing over to client/customer to their satisfaction.
 Any other responsibility that may be assigned by Reporting Manager or his designate.
 Preparation of bills of material by every month.
PROJECT ENGINEER:-
 From Jun-2011 to May-2016 in Kataria Electricals., Faridabad
 Project:- Jai Prakash Associates Ltd., Noida
 Project Cost: - 30 Crores (Approx).
 Kallisto Tower consists of Ten Towers (3B+G+25) each; Town Homes consist of 168 nos. of
Villas with B+G+2 each. Both of the project have separate substation of 11KV. All internal and
external electrification such as Transformer, LT Panel, Feeder Pillars, Rising Mains, Cables,
Earthing, Street Lights,point wiring ,floor DB, Sub DB,BMS, Fire Alarm System, PA System,Cable
tray, etc.
JOB RESPONSIBILITIES
 Making Schedule for daily work.
 Site Supervision & Execution as per drawings and BOQ.
 Billing includes Checking of Sub Contractor’s Bills
 Daily Report to project head.
 Attending weakly meeting with architect and consultants.
 Supervision of all electrical works on project site including substations and external works.
 Monitoring quality of work with regard to project and contract specification.
 Monitoring progress of work with regard to project completion schedule and mile stone
dates.
 Coordinating with in-house design engineer to resolve construction drawing issues.
 Any other responsibility that may be assigned by Reporting Manager or his designate.
 Preparation of bills of material by every month.
PROFESSIONAL QUALIFICATION:-
 Degree in Electrical Engineering in 2011 with 67% from PTU Jalandhar.
EDUCATIONAL QUALIFICATION:-
 Intermediate from B.I.E.C, Patna.
 Matriculation from B.S.E.B, Patna.
COMPUTER SKILLS:-
 Microsoft Office: - MS-Word, MS-Excel.
PERSONAL INFORMATION:-
Date of Birth : 12th
Dec.1985
Gender : Male
Marital Status : Unmarried
Nationality : Indian
Date:
Place: Noida
(MANOJ KR.MANDAL)

More Related Content

What's hot

What's hot (13)

CHAITANYA PS
CHAITANYA PSCHAITANYA PS
CHAITANYA PS
 
cv avik
cv avikcv avik
cv avik
 
Amarnath RESUME
Amarnath RESUMEAmarnath RESUME
Amarnath RESUME
 
CV Up Dated 15 Pic
CV Up Dated 15 PicCV Up Dated 15 Pic
CV Up Dated 15 Pic
 
june'15
june'15june'15
june'15
 
Abu bakr cv 2015.2
Abu bakr cv 2015.2Abu bakr cv 2015.2
Abu bakr cv 2015.2
 
site manager /construction manager
site manager /construction managersite manager /construction manager
site manager /construction manager
 
CV
CVCV
CV
 
Francisco Javier Samaniego RESUME2
Francisco Javier Samaniego RESUME2Francisco Javier Samaniego RESUME2
Francisco Javier Samaniego RESUME2
 
Final Year Review
Final Year ReviewFinal Year Review
Final Year Review
 
cv islam
cv islamcv islam
cv islam
 
Hossam salah-cv
Hossam salah-cvHossam salah-cv
Hossam salah-cv
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems Projects
 

Viewers also liked

Registros en la producción pecuaria
Registros en la producción pecuariaRegistros en la producción pecuaria
Registros en la producción pecuariaeduardo gonzalez
 
PO 375 Third Parties
PO 375 Third Parties PO 375 Third Parties
PO 375 Third Parties atrantham
 
Make Your Data Come Alive: Visual Design's Role in Creating Compelling Visual...
Make Your Data Come Alive: Visual Design's Role in Creating Compelling Visual...Make Your Data Come Alive: Visual Design's Role in Creating Compelling Visual...
Make Your Data Come Alive: Visual Design's Role in Creating Compelling Visual...Allison Bloodworth
 
2016 English catalog
2016 English catalog2016 English catalog
2016 English catalogIsabella Chan
 
研發能力(Keynot)
研發能力(Keynot)研發能力(Keynot)
研發能力(Keynot)治維 黃
 
Scheduling SLEX (FS)-InitialCPM
Scheduling SLEX (FS)-InitialCPMScheduling SLEX (FS)-InitialCPM
Scheduling SLEX (FS)-InitialCPMAllan Leyte
 
Enc times october 08,2016
Enc times october 08,2016Enc times october 08,2016
Enc times october 08,2016ENC
 
Urogenital masculino
Urogenital masculinoUrogenital masculino
Urogenital masculinoGALOMAR
 
MC Minh Tâm, MC event chuyên nghiệp tại Tp.HCM
MC Minh Tâm, MC event chuyên nghiệp tại Tp.HCMMC Minh Tâm, MC event chuyên nghiệp tại Tp.HCM
MC Minh Tâm, MC event chuyên nghiệp tại Tp.HCMHoàng Tuấn
 

Viewers also liked (14)

Roles con fechas
Roles con fechasRoles con fechas
Roles con fechas
 
Registros en la producción pecuaria
Registros en la producción pecuariaRegistros en la producción pecuaria
Registros en la producción pecuaria
 
PO 375 Third Parties
PO 375 Third Parties PO 375 Third Parties
PO 375 Third Parties
 
EB_media kit_2016_digital
EB_media kit_2016_digitalEB_media kit_2016_digital
EB_media kit_2016_digital
 
Make Your Data Come Alive: Visual Design's Role in Creating Compelling Visual...
Make Your Data Come Alive: Visual Design's Role in Creating Compelling Visual...Make Your Data Come Alive: Visual Design's Role in Creating Compelling Visual...
Make Your Data Come Alive: Visual Design's Role in Creating Compelling Visual...
 
2016 English catalog
2016 English catalog2016 English catalog
2016 English catalog
 
研發能力(Keynot)
研發能力(Keynot)研發能力(Keynot)
研發能力(Keynot)
 
Scheduling SLEX (FS)-InitialCPM
Scheduling SLEX (FS)-InitialCPMScheduling SLEX (FS)-InitialCPM
Scheduling SLEX (FS)-InitialCPM
 
Todo o nada sobre io t
Todo o nada sobre io tTodo o nada sobre io t
Todo o nada sobre io t
 
Enc times october 08,2016
Enc times october 08,2016Enc times october 08,2016
Enc times october 08,2016
 
новый мп
новый мпновый мп
новый мп
 
El asesor psicopedagogico
El asesor psicopedagogicoEl asesor psicopedagogico
El asesor psicopedagogico
 
Urogenital masculino
Urogenital masculinoUrogenital masculino
Urogenital masculino
 
MC Minh Tâm, MC event chuyên nghiệp tại Tp.HCM
MC Minh Tâm, MC event chuyên nghiệp tại Tp.HCMMC Minh Tâm, MC event chuyên nghiệp tại Tp.HCM
MC Minh Tâm, MC event chuyên nghiệp tại Tp.HCM
 

Similar to mandal (20)

Resume (Sunil Kumar)
Resume (Sunil Kumar)Resume (Sunil Kumar)
Resume (Sunil Kumar)
 
Ramendu cv - for Bd
Ramendu cv - for BdRamendu cv - for Bd
Ramendu cv - for Bd
 
project electrical engineer
project electrical engineerproject electrical engineer
project electrical engineer
 
Resume updated
Resume updatedResume updated
Resume updated
 
Rajbir Singh-2
Rajbir Singh-2Rajbir Singh-2
Rajbir Singh-2
 
Ganesan resume
Ganesan resumeGanesan resume
Ganesan resume
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
ashwani shukla
ashwani shuklaashwani shukla
ashwani shukla
 
aldarat
aldarataldarat
aldarat
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
 
NIRMAL_MECH ENGINEER
NIRMAL_MECH ENGINEERNIRMAL_MECH ENGINEER
NIRMAL_MECH ENGINEER
 
nabi
nabinabi
nabi
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1
 
DESTECH - COMPANY PROFILE
DESTECH - COMPANY PROFILEDESTECH - COMPANY PROFILE
DESTECH - COMPANY PROFILE
 
Arun C.V (Civil) (1)
Arun C.V (Civil) (1)Arun C.V (Civil) (1)
Arun C.V (Civil) (1)
 
Arun C.V (Civil) (1)
Arun C.V (Civil) (1)Arun C.V (Civil) (1)
Arun C.V (Civil) (1)
 
guptapranay20072016
guptapranay20072016guptapranay20072016
guptapranay20072016
 
Resume
ResumeResume
Resume
 
RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016
 
Company profile
Company profileCompany profile
Company profile
 

mandal

  • 1. MANOJ KUMAR MANDAL Address:-flat no. 4531 Alok vihar 1,sec-50 Noida-201301 Mob. No .07827194970 email:-manojraj48@gmail.com OBJECTIVE:- To excel in my chosen field of Electrical Engineering and to be a part of an organization which believes in growth through on effective employee contribution sharing of knowledge and responsibility with exposure to cutting edge technology. EXPERIENCE: - [5] Years [6] Months. ELECTRICAL ENGINEER:-  From Jun-2016 to till Date in Civitech Developers pvt ltd., Noida  Project:- Civitech Stadia, Sector – 79, Noida  Project Cost: - 60 Crores (Approx).  Civitech Stadia consists of Six Towers (2B+G+25) each; Civitech Stadia project have substation of 11KV. All internal and external electrification such as Transformer, LT Panel, Feeder Pillars, Rising Mains, Cables, Earthing, Street Lights, AC System etc. JOB RESPONSIBILITIES  Supervision of all electrical works on project site including substations and external works.  Monitoring quality of work with regard to project and contract specification.  Monitoring progress of work with regard to project completion schedule and mile stone dates.  Monitoring Interface between all MEP services including raising RFIs with design consultants.  Coordinating with in-house design engineer to resolve construction drawing issues.  Final completion of works and handing over to client/customer to their satisfaction.  Any other responsibility that may be assigned by Reporting Manager or his designate.  Preparation of bills of material by every month. PROJECT ENGINEER:-
  • 2.  From Jun-2011 to May-2016 in Kataria Electricals., Faridabad  Project:- Jai Prakash Associates Ltd., Noida  Project Cost: - 30 Crores (Approx).  Kallisto Tower consists of Ten Towers (3B+G+25) each; Town Homes consist of 168 nos. of Villas with B+G+2 each. Both of the project have separate substation of 11KV. All internal and external electrification such as Transformer, LT Panel, Feeder Pillars, Rising Mains, Cables, Earthing, Street Lights,point wiring ,floor DB, Sub DB,BMS, Fire Alarm System, PA System,Cable tray, etc. JOB RESPONSIBILITIES  Making Schedule for daily work.  Site Supervision & Execution as per drawings and BOQ.  Billing includes Checking of Sub Contractor’s Bills  Daily Report to project head.  Attending weakly meeting with architect and consultants.  Supervision of all electrical works on project site including substations and external works.  Monitoring quality of work with regard to project and contract specification.  Monitoring progress of work with regard to project completion schedule and mile stone dates.  Coordinating with in-house design engineer to resolve construction drawing issues.  Any other responsibility that may be assigned by Reporting Manager or his designate.  Preparation of bills of material by every month. PROFESSIONAL QUALIFICATION:-  Degree in Electrical Engineering in 2011 with 67% from PTU Jalandhar. EDUCATIONAL QUALIFICATION:-  Intermediate from B.I.E.C, Patna.  Matriculation from B.S.E.B, Patna. COMPUTER SKILLS:-  Microsoft Office: - MS-Word, MS-Excel. PERSONAL INFORMATION:- Date of Birth : 12th Dec.1985 Gender : Male Marital Status : Unmarried Nationality : Indian