SlideShare a Scribd company logo
1 of 4
Download to read offline
Ashwani kumar shukla
Mob: +91-7503-882-010, +91-8800-306-579
Email: ashwanishukla46@gmail.com, shukla.ashwani@rocketmail.com
11B, Block-3, LIG Flat, Near- The Shri Ram Millennium School, Sector-135,
Noida, (U.P.)
To work as an electrical engineer in an esteemed growth oriented organization where I can utilize my
professional experience and technical skills to attain organization goals.
Professional Synopsis & Job Description :
 An astute professional with more than 15 years of experience in Project Execution,
Construction Management and Electrical Engineering.
 Currently working as a Sr. Engineer – MEP – JMC Projects (I) Ltd. at Jaypee Greens, Wish
Township, Noida. (Residential High Rise Building Project Cost (52.5 + 389) Cr.).
 Earlier have experience in Thermal Power Plant & Oil-Gas Refinery Projects and Maintenance
work.
Educational Qualification:
 Diploma in Electrical Engineering from Maharaja Sayajirao University of Baroda, Gujarat. in
the year 2001.
 Intermediate from Gujarat Secondary Education Board in the year 1998.
PROFESSIONAL STRENGTH:
 Implement policies, standards and procedures for the MEP related works.
 Follow-up with design consultant for release of engineering drawings for computation of scope
of work and work fronts to be activated.
 Review all services drawings and provide information on any shortfalls or improvement
required.
 Initiation of material indents as per specification and BOQ and follow up for procurement.
 Reconciliation of material issued for the execution.
 Implement all quality related issues as per manual.
 Supervise all commissioning activities and prepare acceptance report.
 Control all installation of services.
 Provide all technical inputs to executing agencies for supply and installation / commissioning
of the services.
 Control and supervise all day to day activities related to installation / testing / commissioning of
services at site.
 Review project plans and specifications, before construction and during construction and get
them corrected with proper approval.
 Coordinate day to day working of various MEP agencies employed at the worksite.
 Checking of all MEP related bills.
Working Experience:
1. Sr. Engineer – MEP, JMC Projects (I) Ltd., (Dec 2012 to till date)
Kasa Isles, Jaypee Greens, Wish Township, Noida (High Rise Residential Building Project).
Kasa Isles is the Residential Building project which consist 15 high rise (29 floors,1926 units ) towers
with 1 substations 2 pump rooms along with external area development.
 MEP Services Monitoring.(Electrical, Plumbing, Fire Fighting and Fire Alarm system)
 Electrical Installation which includes cable tray fixing, conduit laying (slab/wall), wiring, light
fixture installation, cable laying, gland termination, LT panel installation testing and
commissioning, system earthing.
 Review and verification of Services drawing.
 Monitoring regular work progress with reports towards meeting the project deliverables
 Monitoring project resource and manpower requirements and organizing weekly review
meetings with follow up MOM (Minutes of Meeting) reports
 Verification of bill of materials as per drawing/contract.
 Supervision & execution of work of Erection Contracts and regular follow up.
 Keep track of all MEP related issues, root causes, and corrective actions recommended /
taken to ensure closure in a timely manner
 Co-ordination with all the vendors for material quality and on time delivery.
 Planning and scheduling project timelines in close coordination with the PMC and vendors
 Ensuring the project implementation is as per the requirements and GFC (Good For
Construction) drawings
 Presenting reports defining project progress, discussions with vendors and seniors for problem
resolutions.
 Review and approve the monthly bills of the contractors.
 Monitoring and guiding contractors at site for smooth work progress.
2. Field Engineer - Electrical, Gannon Dunkerely & Co. Ltd., (Nov. 2006 to Nov. 2012)
Talwandi Sabo Power Plant – Mansa, Panjab & Indira Gandhi Power Plant, Jhajjar, Haryana.
Talwandi Sabo Power Limited is consist of 3*660 MW Super Critical Thermal Power Plant is situated
at Banawali, Dist. Mansa, Punjab. And Indira Gandhi Power Plant is consist of 2*660 MW Super
Critical Thermal Power Plant is Situated at near Jharli Railway Station, Dist. – Jhajjar, Haryana. With
Construction Network Power Supply and Preventive Maintenance works.
 Supervise and monitor the contractors and Sub-Contractors on site.
 Co-ordination with all system wide contractors which includes Electrical along with Civil
contractors.
 Power system installation testing and commissioning which includes Switchyards, TG,
Transfer Tower, CHP, Fabrication Yard, RMC Plant and cooling towers.
 Ventilation system installation testing and commissioning.
 Executing all external works which includes Street lighting and Area Lighting.
 Organizing meetings with Upper Management and Contractors on weekly basis for reviewing
progress and setting targets for the next week.
 Review and approve the monthly bills of the contractors.
 Review variation request and coordinate with the procurement department for necessary
action.
 Seek and review the following document to be generated by the contractor: Shop Drawing,
Material Submittals and Method Statements.
 Conducting snag identification activities with contractors and preparing plans for timely
handover of the project on time.
3. Asst. Engineer - Electrical, Bhupendra and Brothers, (July 2004 to June 2006)
Jamnagar Export Refinery Projects, Moti Khawdi, Jamnagar, Gujarat.
Actively contributing to activities on site & Overall responsible for:
 LT electrical distribution network installation, testing and commissioning.
 Electrical Installation which includes cable tray fixing, conduit laying, wiring, light fixture
installation, cable laying, gland termination, LT panel installation testing and commissioning,
system earthing.
 Earthing & lightening protection system installation.
 Commissioning the same above given responsibilities.
 Co-ordination with contractor and Client.
 Monitoring and Supervising Contractors and Sub-contractors.
 Preparing and submitting daily reports to Site-in-Charge and attending weekly meeting by
client.
4. Site Engineer - Electrical, Konstlec Engineers Pvt. Ltd., (Aug. 2001 to June 2004)
Reliance Petroleum Limited, Moti Khawdi, Jamnagar, Gujarat.
Actively contributing to activities on site & Overall responsible for:
 LT electrical distribution network installation, testing and commissioning.
 Electrical Installation which includes cable tray fixing, conduit laying, wiring, light fixture
installation, cable laying, gland termination, LT panel installation testing and commissioning,
system earthing.
 Earthing & lightening protection system installation.
 Commissioning the same above given responsibilities.
 Co-ordination with contractor and Client.
 Monitoring and Supervising Contractors and Sub-contractors.
 Preparing and submitting daily reports to Site-in-Charge and attending weekly meeting by
client.
. Personal Snippets:
 Total Experience : 15 years
 Current CTC : 6.15 Lac
 Notice Period : 1 Month
 Date of Birth: : 18th
July 1981
 Marital Status: : Married
 Nationality: : Indian
 Languages: : English, Hindi & Gujarati.
 Permanent Address: Village. - Shuklpura, P/o - Bhaidwa, Distt. - Deoria, (U.P.), India.
PASSPORT DETAILS: -
Passport No. : G-0972670
Date of Issue: 13/12/2006
Date of Expiry: 12/12/2016
Place of Issue: Ahmedabad, India
DECLARATION: -
I hereby declare that the above-furnished details are true and best of my knowledge and belief.
Date
Place
Ashwani Kumar Shukla
ashwani shukla

More Related Content

What's hot

Amit Kumar_CV_100_MW
Amit Kumar_CV_100_MWAmit Kumar_CV_100_MW
Amit Kumar_CV_100_MWAmit Kumar
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gasvineeth ravi
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionvineeth ravi
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer ResumeBokam Divakar
 
ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdAritra Ghosh
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electricianjesegbue
 
GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM Gowthaman V
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedSANDEEP KUMAR
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGpappu kumar
 
Laxmi narayan's resume
Laxmi narayan's resumeLaxmi narayan's resume
Laxmi narayan's resumeLaxmi Narayan
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 

What's hot (20)

Amit Kumar_CV_100_MW
Amit Kumar_CV_100_MWAmit Kumar_CV_100_MW
Amit Kumar_CV_100_MW
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
 
RESUME Kashyap
RESUME KashyapRESUME Kashyap
RESUME Kashyap
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
 
Ravishankar-CV
Ravishankar-CVRavishankar-CV
Ravishankar-CV
 
ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_Updtd
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electrician
 
GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
 
Laxmi narayan's resume
Laxmi narayan's resumeLaxmi narayan's resume
Laxmi narayan's resume
 
Resume of Dileep K 2017
Resume of Dileep K 2017Resume of Dileep K 2017
Resume of Dileep K 2017
 
pecaaa
pecaaapecaaa
pecaaa
 
Navaneeth New CV
Navaneeth New CVNavaneeth New CV
Navaneeth New CV
 
MUHAMMAD IQBAL
MUHAMMAD IQBALMUHAMMAD IQBAL
MUHAMMAD IQBAL
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 

Viewers also liked

CHELSEA CONCRETE Brief Introduction
CHELSEA CONCRETE Brief IntroductionCHELSEA CONCRETE Brief Introduction
CHELSEA CONCRETE Brief IntroductionChelsea Group
 
Karaoke elsa laurapadróntrejo.
Karaoke elsa laurapadróntrejo.Karaoke elsa laurapadróntrejo.
Karaoke elsa laurapadróntrejo.Elsa Laura Padrón
 
resume-Sept 2016 Mazlan Alias
resume-Sept 2016 Mazlan Aliasresume-Sept 2016 Mazlan Alias
resume-Sept 2016 Mazlan AliasMazlan Alias
 
Alcatel-Lucent LAA25
Alcatel-Lucent LAA25Alcatel-Lucent LAA25
Alcatel-Lucent LAA25savomir
 
Diapositivas humberto mendoza
Diapositivas humberto mendozaDiapositivas humberto mendoza
Diapositivas humberto mendozaHumberto Mendoza
 
Web protocols for java developers
Web protocols for java developersWeb protocols for java developers
Web protocols for java developersPavel Bucek
 
Pemex Energy Gurgaon : Next Steps for the Successful and Sustainable Developm...
Pemex Energy Gurgaon : Next Steps for the Successful and Sustainable Developm...Pemex Energy Gurgaon : Next Steps for the Successful and Sustainable Developm...
Pemex Energy Gurgaon : Next Steps for the Successful and Sustainable Developm...Ravi Khanna
 
Abhishek Jana_SIP Report
Abhishek Jana_SIP ReportAbhishek Jana_SIP Report
Abhishek Jana_SIP ReportAbhishek Jana
 
Introducción a internet y sus servicios
Introducción a internet y sus serviciosIntroducción a internet y sus servicios
Introducción a internet y sus serviciosCarlos Tkm
 
QNBFS Daily Technical Trader - Qatar September 26, 2016
QNBFS Daily Technical Trader - Qatar September 26, 2016QNBFS Daily Technical Trader - Qatar September 26, 2016
QNBFS Daily Technical Trader - Qatar September 26, 2016QNB Group
 

Viewers also liked (13)

CHELSEA CONCRETE Brief Introduction
CHELSEA CONCRETE Brief IntroductionCHELSEA CONCRETE Brief Introduction
CHELSEA CONCRETE Brief Introduction
 
Karaoke elsa laurapadróntrejo.
Karaoke elsa laurapadróntrejo.Karaoke elsa laurapadróntrejo.
Karaoke elsa laurapadróntrejo.
 
Waterguard a
Waterguard aWaterguard a
Waterguard a
 
resume-Sept 2016 Mazlan Alias
resume-Sept 2016 Mazlan Aliasresume-Sept 2016 Mazlan Alias
resume-Sept 2016 Mazlan Alias
 
Alcatel-Lucent LAA25
Alcatel-Lucent LAA25Alcatel-Lucent LAA25
Alcatel-Lucent LAA25
 
Diapositivas humberto mendoza
Diapositivas humberto mendozaDiapositivas humberto mendoza
Diapositivas humberto mendoza
 
Moe putehestvie po_permskomu_krau
Moe putehestvie po_permskomu_krauMoe putehestvie po_permskomu_krau
Moe putehestvie po_permskomu_krau
 
Web protocols for java developers
Web protocols for java developersWeb protocols for java developers
Web protocols for java developers
 
Pemex Energy Gurgaon : Next Steps for the Successful and Sustainable Developm...
Pemex Energy Gurgaon : Next Steps for the Successful and Sustainable Developm...Pemex Energy Gurgaon : Next Steps for the Successful and Sustainable Developm...
Pemex Energy Gurgaon : Next Steps for the Successful and Sustainable Developm...
 
Abhishek Jana_SIP Report
Abhishek Jana_SIP ReportAbhishek Jana_SIP Report
Abhishek Jana_SIP Report
 
Introducción a internet y sus servicios
Introducción a internet y sus serviciosIntroducción a internet y sus servicios
Introducción a internet y sus servicios
 
QNBFS Daily Technical Trader - Qatar September 26, 2016
QNBFS Daily Technical Trader - Qatar September 26, 2016QNBFS Daily Technical Trader - Qatar September 26, 2016
QNBFS Daily Technical Trader - Qatar September 26, 2016
 
Practical legal research
Practical legal researchPractical legal research
Practical legal research
 

Similar to ashwani shukla

Similar to ashwani shukla (20)

Sankar_ Vaid
Sankar_ VaidSankar_ Vaid
Sankar_ Vaid
 
RESUME
RESUMERESUME
RESUME
 
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CVDGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
 
Rama Rao MW CV
Rama Rao  MW CVRama Rao  MW CV
Rama Rao MW CV
 
Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
VK-Resume
VK-ResumeVK-Resume
VK-Resume
 
Final CV3 -
Final CV3 -Final CV3 -
Final CV3 -
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
 
Shameem Ahamed - Electrical Engineer
Shameem Ahamed - Electrical EngineerShameem Ahamed - Electrical Engineer
Shameem Ahamed - Electrical Engineer
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
Engr iqbal resume ,
Engr  iqbal  resume ,Engr  iqbal  resume ,
Engr iqbal resume ,
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
CV_Mahesh Prajapati
CV_Mahesh PrajapatiCV_Mahesh Prajapati
CV_Mahesh Prajapati
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
syed Raza _CV
syed Raza _CVsyed Raza _CV
syed Raza _CV
 

ashwani shukla

  • 1. Ashwani kumar shukla Mob: +91-7503-882-010, +91-8800-306-579 Email: ashwanishukla46@gmail.com, shukla.ashwani@rocketmail.com 11B, Block-3, LIG Flat, Near- The Shri Ram Millennium School, Sector-135, Noida, (U.P.) To work as an electrical engineer in an esteemed growth oriented organization where I can utilize my professional experience and technical skills to attain organization goals. Professional Synopsis & Job Description :  An astute professional with more than 15 years of experience in Project Execution, Construction Management and Electrical Engineering.  Currently working as a Sr. Engineer – MEP – JMC Projects (I) Ltd. at Jaypee Greens, Wish Township, Noida. (Residential High Rise Building Project Cost (52.5 + 389) Cr.).  Earlier have experience in Thermal Power Plant & Oil-Gas Refinery Projects and Maintenance work. Educational Qualification:  Diploma in Electrical Engineering from Maharaja Sayajirao University of Baroda, Gujarat. in the year 2001.  Intermediate from Gujarat Secondary Education Board in the year 1998. PROFESSIONAL STRENGTH:  Implement policies, standards and procedures for the MEP related works.  Follow-up with design consultant for release of engineering drawings for computation of scope of work and work fronts to be activated.  Review all services drawings and provide information on any shortfalls or improvement required.  Initiation of material indents as per specification and BOQ and follow up for procurement.  Reconciliation of material issued for the execution.  Implement all quality related issues as per manual.  Supervise all commissioning activities and prepare acceptance report.  Control all installation of services.  Provide all technical inputs to executing agencies for supply and installation / commissioning of the services.  Control and supervise all day to day activities related to installation / testing / commissioning of services at site.  Review project plans and specifications, before construction and during construction and get them corrected with proper approval.  Coordinate day to day working of various MEP agencies employed at the worksite.  Checking of all MEP related bills. Working Experience: 1. Sr. Engineer – MEP, JMC Projects (I) Ltd., (Dec 2012 to till date) Kasa Isles, Jaypee Greens, Wish Township, Noida (High Rise Residential Building Project).
  • 2. Kasa Isles is the Residential Building project which consist 15 high rise (29 floors,1926 units ) towers with 1 substations 2 pump rooms along with external area development.  MEP Services Monitoring.(Electrical, Plumbing, Fire Fighting and Fire Alarm system)  Electrical Installation which includes cable tray fixing, conduit laying (slab/wall), wiring, light fixture installation, cable laying, gland termination, LT panel installation testing and commissioning, system earthing.  Review and verification of Services drawing.  Monitoring regular work progress with reports towards meeting the project deliverables  Monitoring project resource and manpower requirements and organizing weekly review meetings with follow up MOM (Minutes of Meeting) reports  Verification of bill of materials as per drawing/contract.  Supervision & execution of work of Erection Contracts and regular follow up.  Keep track of all MEP related issues, root causes, and corrective actions recommended / taken to ensure closure in a timely manner  Co-ordination with all the vendors for material quality and on time delivery.  Planning and scheduling project timelines in close coordination with the PMC and vendors  Ensuring the project implementation is as per the requirements and GFC (Good For Construction) drawings  Presenting reports defining project progress, discussions with vendors and seniors for problem resolutions.  Review and approve the monthly bills of the contractors.  Monitoring and guiding contractors at site for smooth work progress. 2. Field Engineer - Electrical, Gannon Dunkerely & Co. Ltd., (Nov. 2006 to Nov. 2012) Talwandi Sabo Power Plant – Mansa, Panjab & Indira Gandhi Power Plant, Jhajjar, Haryana. Talwandi Sabo Power Limited is consist of 3*660 MW Super Critical Thermal Power Plant is situated at Banawali, Dist. Mansa, Punjab. And Indira Gandhi Power Plant is consist of 2*660 MW Super Critical Thermal Power Plant is Situated at near Jharli Railway Station, Dist. – Jhajjar, Haryana. With Construction Network Power Supply and Preventive Maintenance works.  Supervise and monitor the contractors and Sub-Contractors on site.  Co-ordination with all system wide contractors which includes Electrical along with Civil contractors.  Power system installation testing and commissioning which includes Switchyards, TG, Transfer Tower, CHP, Fabrication Yard, RMC Plant and cooling towers.  Ventilation system installation testing and commissioning.  Executing all external works which includes Street lighting and Area Lighting.  Organizing meetings with Upper Management and Contractors on weekly basis for reviewing progress and setting targets for the next week.  Review and approve the monthly bills of the contractors.  Review variation request and coordinate with the procurement department for necessary action.  Seek and review the following document to be generated by the contractor: Shop Drawing, Material Submittals and Method Statements.  Conducting snag identification activities with contractors and preparing plans for timely handover of the project on time. 3. Asst. Engineer - Electrical, Bhupendra and Brothers, (July 2004 to June 2006) Jamnagar Export Refinery Projects, Moti Khawdi, Jamnagar, Gujarat.
  • 3. Actively contributing to activities on site & Overall responsible for:  LT electrical distribution network installation, testing and commissioning.  Electrical Installation which includes cable tray fixing, conduit laying, wiring, light fixture installation, cable laying, gland termination, LT panel installation testing and commissioning, system earthing.  Earthing & lightening protection system installation.  Commissioning the same above given responsibilities.  Co-ordination with contractor and Client.  Monitoring and Supervising Contractors and Sub-contractors.  Preparing and submitting daily reports to Site-in-Charge and attending weekly meeting by client. 4. Site Engineer - Electrical, Konstlec Engineers Pvt. Ltd., (Aug. 2001 to June 2004) Reliance Petroleum Limited, Moti Khawdi, Jamnagar, Gujarat. Actively contributing to activities on site & Overall responsible for:  LT electrical distribution network installation, testing and commissioning.  Electrical Installation which includes cable tray fixing, conduit laying, wiring, light fixture installation, cable laying, gland termination, LT panel installation testing and commissioning, system earthing.  Earthing & lightening protection system installation.  Commissioning the same above given responsibilities.  Co-ordination with contractor and Client.  Monitoring and Supervising Contractors and Sub-contractors.  Preparing and submitting daily reports to Site-in-Charge and attending weekly meeting by client. . Personal Snippets:  Total Experience : 15 years  Current CTC : 6.15 Lac  Notice Period : 1 Month  Date of Birth: : 18th July 1981  Marital Status: : Married  Nationality: : Indian  Languages: : English, Hindi & Gujarati.  Permanent Address: Village. - Shuklpura, P/o - Bhaidwa, Distt. - Deoria, (U.P.), India. PASSPORT DETAILS: - Passport No. : G-0972670 Date of Issue: 13/12/2006 Date of Expiry: 12/12/2016 Place of Issue: Ahmedabad, India DECLARATION: - I hereby declare that the above-furnished details are true and best of my knowledge and belief. Date Place Ashwani Kumar Shukla