1. Ashwani kumar shukla
Mob: +91-7503-882-010, +91-8800-306-579
Email: ashwanishukla46@gmail.com, shukla.ashwani@rocketmail.com
11B, Block-3, LIG Flat, Near- The Shri Ram Millennium School, Sector-135,
Noida, (U.P.)
To work as an electrical engineer in an esteemed growth oriented organization where I can utilize my
professional experience and technical skills to attain organization goals.
Professional Synopsis & Job Description :
An astute professional with more than 15 years of experience in Project Execution,
Construction Management and Electrical Engineering.
Currently working as a Sr. Engineer – MEP – JMC Projects (I) Ltd. at Jaypee Greens, Wish
Township, Noida. (Residential High Rise Building Project Cost (52.5 + 389) Cr.).
Earlier have experience in Thermal Power Plant & Oil-Gas Refinery Projects and Maintenance
work.
Educational Qualification:
Diploma in Electrical Engineering from Maharaja Sayajirao University of Baroda, Gujarat. in
the year 2001.
Intermediate from Gujarat Secondary Education Board in the year 1998.
PROFESSIONAL STRENGTH:
Implement policies, standards and procedures for the MEP related works.
Follow-up with design consultant for release of engineering drawings for computation of scope
of work and work fronts to be activated.
Review all services drawings and provide information on any shortfalls or improvement
required.
Initiation of material indents as per specification and BOQ and follow up for procurement.
Reconciliation of material issued for the execution.
Implement all quality related issues as per manual.
Supervise all commissioning activities and prepare acceptance report.
Control all installation of services.
Provide all technical inputs to executing agencies for supply and installation / commissioning
of the services.
Control and supervise all day to day activities related to installation / testing / commissioning of
services at site.
Review project plans and specifications, before construction and during construction and get
them corrected with proper approval.
Coordinate day to day working of various MEP agencies employed at the worksite.
Checking of all MEP related bills.
Working Experience:
1. Sr. Engineer – MEP, JMC Projects (I) Ltd., (Dec 2012 to till date)
Kasa Isles, Jaypee Greens, Wish Township, Noida (High Rise Residential Building Project).
2. Kasa Isles is the Residential Building project which consist 15 high rise (29 floors,1926 units ) towers
with 1 substations 2 pump rooms along with external area development.
MEP Services Monitoring.(Electrical, Plumbing, Fire Fighting and Fire Alarm system)
Electrical Installation which includes cable tray fixing, conduit laying (slab/wall), wiring, light
fixture installation, cable laying, gland termination, LT panel installation testing and
commissioning, system earthing.
Review and verification of Services drawing.
Monitoring regular work progress with reports towards meeting the project deliverables
Monitoring project resource and manpower requirements and organizing weekly review
meetings with follow up MOM (Minutes of Meeting) reports
Verification of bill of materials as per drawing/contract.
Supervision & execution of work of Erection Contracts and regular follow up.
Keep track of all MEP related issues, root causes, and corrective actions recommended /
taken to ensure closure in a timely manner
Co-ordination with all the vendors for material quality and on time delivery.
Planning and scheduling project timelines in close coordination with the PMC and vendors
Ensuring the project implementation is as per the requirements and GFC (Good For
Construction) drawings
Presenting reports defining project progress, discussions with vendors and seniors for problem
resolutions.
Review and approve the monthly bills of the contractors.
Monitoring and guiding contractors at site for smooth work progress.
2. Field Engineer - Electrical, Gannon Dunkerely & Co. Ltd., (Nov. 2006 to Nov. 2012)
Talwandi Sabo Power Plant – Mansa, Panjab & Indira Gandhi Power Plant, Jhajjar, Haryana.
Talwandi Sabo Power Limited is consist of 3*660 MW Super Critical Thermal Power Plant is situated
at Banawali, Dist. Mansa, Punjab. And Indira Gandhi Power Plant is consist of 2*660 MW Super
Critical Thermal Power Plant is Situated at near Jharli Railway Station, Dist. – Jhajjar, Haryana. With
Construction Network Power Supply and Preventive Maintenance works.
Supervise and monitor the contractors and Sub-Contractors on site.
Co-ordination with all system wide contractors which includes Electrical along with Civil
contractors.
Power system installation testing and commissioning which includes Switchyards, TG,
Transfer Tower, CHP, Fabrication Yard, RMC Plant and cooling towers.
Ventilation system installation testing and commissioning.
Executing all external works which includes Street lighting and Area Lighting.
Organizing meetings with Upper Management and Contractors on weekly basis for reviewing
progress and setting targets for the next week.
Review and approve the monthly bills of the contractors.
Review variation request and coordinate with the procurement department for necessary
action.
Seek and review the following document to be generated by the contractor: Shop Drawing,
Material Submittals and Method Statements.
Conducting snag identification activities with contractors and preparing plans for timely
handover of the project on time.
3. Asst. Engineer - Electrical, Bhupendra and Brothers, (July 2004 to June 2006)
Jamnagar Export Refinery Projects, Moti Khawdi, Jamnagar, Gujarat.
3. Actively contributing to activities on site & Overall responsible for:
LT electrical distribution network installation, testing and commissioning.
Electrical Installation which includes cable tray fixing, conduit laying, wiring, light fixture
installation, cable laying, gland termination, LT panel installation testing and commissioning,
system earthing.
Earthing & lightening protection system installation.
Commissioning the same above given responsibilities.
Co-ordination with contractor and Client.
Monitoring and Supervising Contractors and Sub-contractors.
Preparing and submitting daily reports to Site-in-Charge and attending weekly meeting by
client.
4. Site Engineer - Electrical, Konstlec Engineers Pvt. Ltd., (Aug. 2001 to June 2004)
Reliance Petroleum Limited, Moti Khawdi, Jamnagar, Gujarat.
Actively contributing to activities on site & Overall responsible for:
LT electrical distribution network installation, testing and commissioning.
Electrical Installation which includes cable tray fixing, conduit laying, wiring, light fixture
installation, cable laying, gland termination, LT panel installation testing and commissioning,
system earthing.
Earthing & lightening protection system installation.
Commissioning the same above given responsibilities.
Co-ordination with contractor and Client.
Monitoring and Supervising Contractors and Sub-contractors.
Preparing and submitting daily reports to Site-in-Charge and attending weekly meeting by
client.
. Personal Snippets:
Total Experience : 15 years
Current CTC : 6.15 Lac
Notice Period : 1 Month
Date of Birth: : 18th
July 1981
Marital Status: : Married
Nationality: : Indian
Languages: : English, Hindi & Gujarati.
Permanent Address: Village. - Shuklpura, P/o - Bhaidwa, Distt. - Deoria, (U.P.), India.
PASSPORT DETAILS: -
Passport No. : G-0972670
Date of Issue: 13/12/2006
Date of Expiry: 12/12/2016
Place of Issue: Ahmedabad, India
DECLARATION: -
I hereby declare that the above-furnished details are true and best of my knowledge and belief.
Date
Place
Ashwani Kumar Shukla