Many projects fail or become impaired, but what is the cause? Software development is one of the most complicated
endeavours mankind has ever undertaken, but after 70 years of progress, huge investment in tools & methodologies,
and constant research on the causes of failure, many projects still fail or materially underperform.
In this short presentation, we take a high-level look at some error-creating tendencies in project team focus that I’ve
observed over many projects, both using waterfall and agile approaches. These observations are qualitative and
generalised, and relate to no specific organisation or project. I make no claim on causation, these are external
observations of tendencies that exist in projects that had delivery problems.
For whatever reason, teams create problems by investing more time in aspects of software development practice that
have a smaller impact on project overall success, and accordingly invest less time in areas that have a larger impact.
These observations are not saying that teams “do all of one thing and none of that”. They are saying “projects with
errors tend to focus more on ‘this’ and less on ‘that’, but ‘that’ is where bigger impact errors likely arise”.
These observations are aimed to make us think about what we are doing, and to shape behaviour to focus on those
areas that give a more productive and less error prone project execution. We need to understand the causes this type
of misalignment, and to find some answers on how prevent it, or having found it, re-align focus for success.
I think the answer is not in more tools, methodologies and process. The answer is a principle-based approach to how
teams delivery software projects. From principles we can make objective behaviour assessments that drive a simpler
approach based on reality, not desire: we look at things the way they are, not the way we hope or want that they are.
http://adamonprojects.com
Date
title
Page
5 Common Areas of Misfocus
2/12/2015
Team Focus & Project Success
3
1. App Functional Focus
2. Needs Analysis Focus
3. Lifecycle Stage Focus
4. Practice Focus
5. Experience Focus
http://adamonprojects.com
App function
Focus
ChapterNo.
More focus on application components
than the interfaces between them,
when interfaces often cause the most
problems.
Date
title
Page
App function bias vs interface
2/12/2015
Team Focus & Project Success
5
• Open source and componentised architectures allow architects and
developers to easily focus on development of a system’s core
functions. A plethora of interface ‘standards’ make it easy assume that
interface development will be simple and therefore this implementation
can be done later, or will require less time.
• But “standards-based” components can often be standard in name
only, and can result in unexpected errors and gaps.
• Even without component defects, developing interfaces have more
overheads and problems than application components.
• And the problems tend to arise later in projects, and are harder to
debug and fix.
http://adamonprojects.com
Date
title
Page
Component Focus
Focus on app components over interfaces
App
App server
App
App server
Most of the
attention
goes here
Most of the attention
goes here
Most of the problems occur here
internet
Most of the problems occur here
Upstream
System
Client
System
2/12/2015
Team Focus & Project Success
6
http://adamonprojects.com
Needs Analysis
Focus
ChapterNo.
Focus on functional needs over quality,
UX or performance needs when missed
non-functional needs can cause problems
that are harder to diagnose and fix.
Date
title
Page
Needs Analysis
2/12/2015
Team Focus & Project Success
8
• Whether using traditional Requirements Analysis or User Stories, teams in
impaired projects tend to focus more heavily on statements of “functional” need,
& less on quality, performance or other “non-functional” needs.
• In extreme situations, non-functional requirements (NFR’s) get only cursory
analysis, or the risk responsibilities are artificially transferred to other teams.
• And yet NFR’s missed or in defined in error tend to have far more impact on the
project, and can be much harder to fix, than missed or incorrect functional
requirements.
• Achieving an unexpected service level metric can often impact core
architectural decisions made early in the project, which are very costly to
rework late in a project.
http://adamonprojects.com
Date
title
Page
→ It shall ......
→ It shall .....
→ It will .....
→ It must .....
Most of the attention
goes here
Most of the problems
occur here
Functional Requirements Non-functional Requirements
→ Responsiveness
→ Throughput
→ Usability
→ Security
→ Accessibility
→ Reliability
“Traditional” Requirements Specification
most time spent on functional requirements
2/12/2015
Team Focus & Project Success
9
http://adamonprojects.com
Date
title
Page
Agile Needs Analysis:
User Stories tend to emphasise “I want”
As a ..................... , I want ...................... , So that......................
Most of the attention goes here
Most of the problems occur hereproblems occur here too
2/12/2015
Team Focus & Project Success
10
http://adamonprojects.com
Lifecycle
Stage Focus
ChapterNo.
More focus on the build, test, deploy
back-end stage of the project lifecycle
than the scoping and inception stages.
Date
title
Page
Project Lifecycle
2/12/2015
Team Focus & Project Success
12
• The back-end of a project (code build, test, deployment) is usually far
more organised and focused than the front-end (customer needs
analysis, scoping, architecture).
• Teams in impaired projects tend to focus more on this back-end as
the “real” project and where the “real” work gets done.
• But the work up-front is at least an order of magnitude more influential
to project success than back-end work.
• Think of Boehm’s “Cost of Change” curve, where lost time and its
impacts are considered as defects.
• Even just the failure to prosecute the project rapidly can cause errors.
http://adamonprojects.com
Date
title
Page
Elapsed Time
Scoping Requirements
Solution
Design
Design and
Build
Integration
and Test
Deployment
Most of the attention
goes here
Most of the problems
occur here
Customer
Problem
Aligned to Deterministic Planned Lifecycle (e.g. PMBOK-based or PRINCE)
Project Lifecycle (Waterfall)
Back end dev is emphasised over upfront initiation
2/12/2015
Team Focus & Project Success
13
http://adamonprojects.com
Date
title
Page
Elapsed Time
Business Scoping Solutioning Inception
Construction
Iterations
Transition /
Release
Integration
Most of the attention
goes here
Most of the problems
occur here
Customer
Problem
Aligned to agile lifecycle e.g. Scrum
Generic Agile Project Lifecycle
Back end development is emphasised over initiation.
Operations
2/12/2015
Team Focus & Project Success
14
http://adamonprojects.com
Practice Focus
ChapterNo.
More focus on Development practices
(the realisation of the solution) than
the User Experience practices.
Date
title
Page
Practices Focus
2/12/2015
Team Focus & Project Success
16
• Development practices of code build, test, deployment are usually far
more organised and focused than the front-end practices of customer
needs analysis, scoping, and architecture.
• User Experience practises produce output that is at least an order of
magnitude more influential to project success than development, but
nett effective input can get crowded out by development practise
timelines
• User Experience tends to focus on visual style practises rather than
more enabling interaction modeling and information architecture
practises
http://adamonprojects.com
Date
title
Page
Most of the
attention goes
here Most of the
problems
occur here
User Experience vs Application Development
An emphasis on functionality over User Design / UX
2/12/2015
Team Focus & Project Success
17
http://adamonprojects.com
UX Practices
Dev Practices
Date
title
Page
Most of the
attention goes
here
Fonts, designs, colors
Information Architecture,
Workflow, User journey
User Experience
Visual "Look and Feel" emphasised over Information Architecture
Most of the
problems occur
here
2/12/2015
Team Focus & Project Success
18
http://adamonprojects.com
Resource
Focus
ChapterNo.
Its common to underestimate the
expertise required to realise any given
solution – easy to focus on the available
resources rather than what we need
Date
title
Page
Skills & Experience
2/12/2015
Team Focus & Project Success
20
• Organisations rarely decide to forego a project if there is doubt about whether
a person or a team has the right skills – unless it is a landmark project.
• There is a common tendency to underestimate the level of skill and experience
required to implement any given project.
• Organisation will frequently decide to manage the situation with existing
personnel, even in some “hybrid” mode with a more experienced person
supporting a more junior person.
• Budgetary constraints and company pay-bands or rate limits can cut-off
access to the experience actually required because these are optimised to the
most likely level required, and as we often see (see over), this is often too low
to attract the right people.
http://adamonprojects.com
Date
title
Page
Operating basic
processes and being
‘driven by their
projects’ rather than
the opposit
Managing to just stay
on top of their projects,
but working long hours
and stressed.
8-12 Years
Were happier and
more in control of their
projects, which were
larger but performing
better
3-5 Years < 3 years (Avg 1.4)
PMs that thrive have much more experience
From a large enterprise PMO, we assessed who was
“thriving” in the enterprise environment and who was
struggling, and compared to the criteria for which we
were hiring. The single biggest discriminator was years
of PM experience, almost exclusively. We were hiring
for about 5 years experience, but the folks who thrived
had around 10 years experience.
PM Experience Distribution
212/12/2015
Team Focus & Project Success
This is what
we were
hiring for: 3-5
Years
These are the
folks who
were “thriving”
http://adamonprojects.com
Date
title
Page
Conclusion
 This list of observations is by no means definitive, but it does address a number
of areas that have high leverage during project execution.
 There are probably dozens of practices within the field of software development
projects that can have an effect on project impairment if not balanced correctly.
 Only the project team can decide whether they are doing to much or too little of
some particular practice: I am not mandating any particular change in a general
presentation such as this.
 But from my experience the ones I’ve listed here are very well worth a look: to
take some investment of time to review whether you are seeing symptoms that
could be caused by mis-focus in these areas.
 Another way to look at this is to think of the relative focus of your project team
as your “perspective” on the project delivery. If you get your “perspective” right
then you’ll deliver well.
http://adamonprojects.com
“What a team focuses on
predicts project success”
Find out more on
http://adamonprojects.com
2/12/20
15
Team Focus &
Project Success23

More Related Content

What's hot

The 8 Worst Managed Projects of All Time
The 8 Worst Managed Projects of All TimeThe 8 Worst Managed Projects of All Time
The 8 Worst Managed Projects of All TimeWorkfront
 
Todd williams
Todd williamsTodd williams
Todd williamsNASAPMC
 
The Process of Communication, A Practical Guide for Project Managers
The Process of Communication, A Practical Guide for Project ManagersThe Process of Communication, A Practical Guide for Project Managers
The Process of Communication, A Practical Guide for Project ManagersHarvard Web Working Group
 
Top Ten Obstacles To Project Success
Top Ten Obstacles To Project SuccessTop Ten Obstacles To Project Success
Top Ten Obstacles To Project SuccessLou Gasco
 
Applying agile and lean principles to the governance of software and systems ...
Applying agile and lean principles to the governance of software and systems ...Applying agile and lean principles to the governance of software and systems ...
Applying agile and lean principles to the governance of software and systems ...IBM Rational software
 
Project communications presentations
Project communications presentationsProject communications presentations
Project communications presentationsDow Publishing LLC
 
Project management chapter_04 for MSBTE
Project management chapter_04 for MSBTEProject management chapter_04 for MSBTE
Project management chapter_04 for MSBTEKalyan Ingole
 
Common causes of cost overruns in construction projects
Common causes of cost overruns in construction projectsCommon causes of cost overruns in construction projects
Common causes of cost overruns in construction projectsSANJEEV Wazir
 
Program Management Playbook
Program Management PlaybookProgram Management Playbook
Program Management PlaybookLenovo
 
Project Management - Part 2
Project Management - Part 2 Project Management - Part 2
Project Management - Part 2 Shorebird RPO
 
The Project Management Process - Week 3
The Project Management Process - Week 3The Project Management Process - Week 3
The Project Management Process - Week 3Craig Brown
 
Portal Deployment Best Practices | IBM Portal Excellence Conference 2009
Portal Deployment Best Practices | IBM Portal Excellence Conference 2009Portal Deployment Best Practices | IBM Portal Excellence Conference 2009
Portal Deployment Best Practices | IBM Portal Excellence Conference 2009Perficient, Inc.
 
Top 10 Microsoft Project Problems
Top 10 Microsoft Project ProblemsTop 10 Microsoft Project Problems
Top 10 Microsoft Project ProblemsMark Corker
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software EngineeringFáber D. Giraldo
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Managementcwarren
 
Ieee sw small_projects
Ieee sw small_projectsIeee sw small_projects
Ieee sw small_projectsmanoharbalu
 
Project Management
Project ManagementProject Management
Project ManagementRami Issa
 
Project Management Methodologies Orangescrum Tutorial
Project Management Methodologies Orangescrum TutorialProject Management Methodologies Orangescrum Tutorial
Project Management Methodologies Orangescrum TutorialOrangescrum
 
Common Problems of Software Development
Common Problems of Software DevelopmentCommon Problems of Software Development
Common Problems of Software DevelopmentAleksejs Truhans
 
Lect-2: Overview and Traditional SPM, Classic mistakes
Lect-2: Overview and Traditional SPM, Classic mistakesLect-2: Overview and Traditional SPM, Classic mistakes
Lect-2: Overview and Traditional SPM, Classic mistakesMubashir Ali
 

What's hot (20)

The 8 Worst Managed Projects of All Time
The 8 Worst Managed Projects of All TimeThe 8 Worst Managed Projects of All Time
The 8 Worst Managed Projects of All Time
 
Todd williams
Todd williamsTodd williams
Todd williams
 
The Process of Communication, A Practical Guide for Project Managers
The Process of Communication, A Practical Guide for Project ManagersThe Process of Communication, A Practical Guide for Project Managers
The Process of Communication, A Practical Guide for Project Managers
 
Top Ten Obstacles To Project Success
Top Ten Obstacles To Project SuccessTop Ten Obstacles To Project Success
Top Ten Obstacles To Project Success
 
Applying agile and lean principles to the governance of software and systems ...
Applying agile and lean principles to the governance of software and systems ...Applying agile and lean principles to the governance of software and systems ...
Applying agile and lean principles to the governance of software and systems ...
 
Project communications presentations
Project communications presentationsProject communications presentations
Project communications presentations
 
Project management chapter_04 for MSBTE
Project management chapter_04 for MSBTEProject management chapter_04 for MSBTE
Project management chapter_04 for MSBTE
 
Common causes of cost overruns in construction projects
Common causes of cost overruns in construction projectsCommon causes of cost overruns in construction projects
Common causes of cost overruns in construction projects
 
Program Management Playbook
Program Management PlaybookProgram Management Playbook
Program Management Playbook
 
Project Management - Part 2
Project Management - Part 2 Project Management - Part 2
Project Management - Part 2
 
The Project Management Process - Week 3
The Project Management Process - Week 3The Project Management Process - Week 3
The Project Management Process - Week 3
 
Portal Deployment Best Practices | IBM Portal Excellence Conference 2009
Portal Deployment Best Practices | IBM Portal Excellence Conference 2009Portal Deployment Best Practices | IBM Portal Excellence Conference 2009
Portal Deployment Best Practices | IBM Portal Excellence Conference 2009
 
Top 10 Microsoft Project Problems
Top 10 Microsoft Project ProblemsTop 10 Microsoft Project Problems
Top 10 Microsoft Project Problems
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software Engineering
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Ieee sw small_projects
Ieee sw small_projectsIeee sw small_projects
Ieee sw small_projects
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management Methodologies Orangescrum Tutorial
Project Management Methodologies Orangescrum TutorialProject Management Methodologies Orangescrum Tutorial
Project Management Methodologies Orangescrum Tutorial
 
Common Problems of Software Development
Common Problems of Software DevelopmentCommon Problems of Software Development
Common Problems of Software Development
 
Lect-2: Overview and Traditional SPM, Classic mistakes
Lect-2: Overview and Traditional SPM, Classic mistakesLect-2: Overview and Traditional SPM, Classic mistakes
Lect-2: Overview and Traditional SPM, Classic mistakes
 

Viewers also liked

Case study 1 (zaileha,suryani,anis,ilyana)
Case study 1 (zaileha,suryani,anis,ilyana)Case study 1 (zaileha,suryani,anis,ilyana)
Case study 1 (zaileha,suryani,anis,ilyana)ilyanaismarau90
 
Top 9 Reasons Construction Projects Fail
Top 9 Reasons Construction Projects FailTop 9 Reasons Construction Projects Fail
Top 9 Reasons Construction Projects FailBuildrite Construction
 
Deliver a Successful ECM Project
Deliver a Successful ECM ProjectDeliver a Successful ECM Project
Deliver a Successful ECM ProjectNuxeo
 
Why test automation projects are failing
Why test automation projects are failingWhy test automation projects are failing
Why test automation projects are failingIgor Khrol
 
Perfecting the Product Launch
Perfecting the Product LaunchPerfecting the Product Launch
Perfecting the Product LaunchSteven Haines
 
Important keys to success
Important keys to successImportant keys to success
Important keys to successmirza ibraheem
 
Small Business Critical Success Factors
Small Business Critical Success FactorsSmall Business Critical Success Factors
Small Business Critical Success FactorsVenture Advisors
 
10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoidMarianna Semenova
 
Why Most Startups Fail and How to Avoid the Same Fate
Why Most Startups Fail and How to Avoid the Same FateWhy Most Startups Fail and How to Avoid the Same Fate
Why Most Startups Fail and How to Avoid the Same FateBrian Honigman
 

Viewers also liked (10)

Case study 1 (zaileha,suryani,anis,ilyana)
Case study 1 (zaileha,suryani,anis,ilyana)Case study 1 (zaileha,suryani,anis,ilyana)
Case study 1 (zaileha,suryani,anis,ilyana)
 
Top 9 Reasons Construction Projects Fail
Top 9 Reasons Construction Projects FailTop 9 Reasons Construction Projects Fail
Top 9 Reasons Construction Projects Fail
 
Deliver a Successful ECM Project
Deliver a Successful ECM ProjectDeliver a Successful ECM Project
Deliver a Successful ECM Project
 
Why test automation projects are failing
Why test automation projects are failingWhy test automation projects are failing
Why test automation projects are failing
 
Perfecting the Product Launch
Perfecting the Product LaunchPerfecting the Product Launch
Perfecting the Product Launch
 
Important keys to success
Important keys to successImportant keys to success
Important keys to success
 
Small Business Critical Success Factors
Small Business Critical Success FactorsSmall Business Critical Success Factors
Small Business Critical Success Factors
 
10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid
 
Why Most Startups Fail and How to Avoid the Same Fate
Why Most Startups Fail and How to Avoid the Same FateWhy Most Startups Fail and How to Avoid the Same Fate
Why Most Startups Fail and How to Avoid the Same Fate
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 

Similar to Misfocus-caused error in software projects

importance of resources allocation in formal method of software engineering ...
 importance of resources allocation in formal method of software engineering ... importance of resources allocation in formal method of software engineering ...
importance of resources allocation in formal method of software engineering ...Abdul Naqashbandi
 
9 Common Challenges in the Software Development Process
9 Common Challenges in the Software Development Process9 Common Challenges in the Software Development Process
9 Common Challenges in the Software Development ProcessSattrix Software Solutions
 
Breaking the Project Failure Cycle
Breaking the Project Failure CycleBreaking the Project Failure Cycle
Breaking the Project Failure CycleGlen Alleman
 
Robert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls AgileRobert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls AgileRobert McGeachy
 
Preempting ERP Project Failure
Preempting ERP Project FailurePreempting ERP Project Failure
Preempting ERP Project FailureRob Prinzo
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overviewcford1973
 
Project Planning And Controlling
Project Planning And ControllingProject Planning And Controlling
Project Planning And ControllingGiancarlo Berner
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleKate Pynn
 
Major Project Management Challenges and The Way Forward.pptx
Major Project Management Challenges and The Way Forward.pptxMajor Project Management Challenges and The Way Forward.pptx
Major Project Management Challenges and The Way Forward.pptxMd. Masudur Rahman, PMP
 
Software Outsourcing: Pitfalls and Best Practices
Software Outsourcing: Pitfalls and Best PracticesSoftware Outsourcing: Pitfalls and Best Practices
Software Outsourcing: Pitfalls and Best PracticesSitrusLLC
 
20100310 liwen-waterfall (1)
20100310 liwen-waterfall (1)20100310 liwen-waterfall (1)
20100310 liwen-waterfall (1)Jyothi Vbs
 
Project management paradigm
Project management paradigmProject management paradigm
Project management paradigmGlen Alleman
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
A Basic Introduction to Creating a Software Requirements Specification
A Basic Introduction to Creating a Software Requirements SpecificationA Basic Introduction to Creating a Software Requirements Specification
A Basic Introduction to Creating a Software Requirements SpecificationQuekelsBaro
 
Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Phil Comelio
 

Similar to Misfocus-caused error in software projects (20)

importance of resources allocation in formal method of software engineering ...
 importance of resources allocation in formal method of software engineering ... importance of resources allocation in formal method of software engineering ...
importance of resources allocation in formal method of software engineering ...
 
9 Common Challenges in the Software Development Process
9 Common Challenges in the Software Development Process9 Common Challenges in the Software Development Process
9 Common Challenges in the Software Development Process
 
Breaking the Project Failure Cycle
Breaking the Project Failure CycleBreaking the Project Failure Cycle
Breaking the Project Failure Cycle
 
Robert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls AgileRobert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls Agile
 
Preempting ERP Project Failure
Preempting ERP Project FailurePreempting ERP Project Failure
Preempting ERP Project Failure
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
Project Estimating....The Squeeze is On
Project Estimating....The Squeeze is OnProject Estimating....The Squeeze is On
Project Estimating....The Squeeze is On
 
Project Planning And Controlling
Project Planning And ControllingProject Planning And Controlling
Project Planning And Controlling
 
Poor Man's Kanban
Poor Man's KanbanPoor Man's Kanban
Poor Man's Kanban
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training Example
 
Major Project Management Challenges and The Way Forward.pptx
Major Project Management Challenges and The Way Forward.pptxMajor Project Management Challenges and The Way Forward.pptx
Major Project Management Challenges and The Way Forward.pptx
 
Software Outsourcing: Pitfalls and Best Practices
Software Outsourcing: Pitfalls and Best PracticesSoftware Outsourcing: Pitfalls and Best Practices
Software Outsourcing: Pitfalls and Best Practices
 
20100310 liwen-waterfall (1)
20100310 liwen-waterfall (1)20100310 liwen-waterfall (1)
20100310 liwen-waterfall (1)
 
system level requirements gathering and analysis
system level requirements gathering and analysissystem level requirements gathering and analysis
system level requirements gathering and analysis
 
Waterfall model
Waterfall modelWaterfall model
Waterfall model
 
Project management paradigm
Project management paradigmProject management paradigm
Project management paradigm
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
A Basic Introduction to Creating a Software Requirements Specification
A Basic Introduction to Creating a Software Requirements SpecificationA Basic Introduction to Creating a Software Requirements Specification
A Basic Introduction to Creating a Software Requirements Specification
 
Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?
 
Evolve methodology
Evolve methodologyEvolve methodology
Evolve methodology
 

Recently uploaded

Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 

Recently uploaded (13)

Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 

Misfocus-caused error in software projects

  • 1. Project Team Focus & Project Success Focus Created Error in Software Development Projects By Adam Russell, 2nd December 2015, v1.0 http://adamonprojects.com
  • 2. Date title Page Introduction 2/12/2015 Team Focus & Project Success 2 Many projects fail or become impaired, but what is the cause? Software development is one of the most complicated endeavours mankind has ever undertaken, but after 70 years of progress, huge investment in tools & methodologies, and constant research on the causes of failure, many projects still fail or materially underperform. In this short presentation, we take a high-level look at some error-creating tendencies in project team focus that I’ve observed over many projects, both using waterfall and agile approaches. These observations are qualitative and generalised, and relate to no specific organisation or project. I make no claim on causation, these are external observations of tendencies that exist in projects that had delivery problems. For whatever reason, teams create problems by investing more time in aspects of software development practice that have a smaller impact on project overall success, and accordingly invest less time in areas that have a larger impact. These observations are not saying that teams “do all of one thing and none of that”. They are saying “projects with errors tend to focus more on ‘this’ and less on ‘that’, but ‘that’ is where bigger impact errors likely arise”. These observations are aimed to make us think about what we are doing, and to shape behaviour to focus on those areas that give a more productive and less error prone project execution. We need to understand the causes this type of misalignment, and to find some answers on how prevent it, or having found it, re-align focus for success. I think the answer is not in more tools, methodologies and process. The answer is a principle-based approach to how teams delivery software projects. From principles we can make objective behaviour assessments that drive a simpler approach based on reality, not desire: we look at things the way they are, not the way we hope or want that they are. http://adamonprojects.com
  • 3. Date title Page 5 Common Areas of Misfocus 2/12/2015 Team Focus & Project Success 3 1. App Functional Focus 2. Needs Analysis Focus 3. Lifecycle Stage Focus 4. Practice Focus 5. Experience Focus http://adamonprojects.com
  • 4. App function Focus ChapterNo. More focus on application components than the interfaces between them, when interfaces often cause the most problems.
  • 5. Date title Page App function bias vs interface 2/12/2015 Team Focus & Project Success 5 • Open source and componentised architectures allow architects and developers to easily focus on development of a system’s core functions. A plethora of interface ‘standards’ make it easy assume that interface development will be simple and therefore this implementation can be done later, or will require less time. • But “standards-based” components can often be standard in name only, and can result in unexpected errors and gaps. • Even without component defects, developing interfaces have more overheads and problems than application components. • And the problems tend to arise later in projects, and are harder to debug and fix. http://adamonprojects.com
  • 6. Date title Page Component Focus Focus on app components over interfaces App App server App App server Most of the attention goes here Most of the attention goes here Most of the problems occur here internet Most of the problems occur here Upstream System Client System 2/12/2015 Team Focus & Project Success 6 http://adamonprojects.com
  • 7. Needs Analysis Focus ChapterNo. Focus on functional needs over quality, UX or performance needs when missed non-functional needs can cause problems that are harder to diagnose and fix.
  • 8. Date title Page Needs Analysis 2/12/2015 Team Focus & Project Success 8 • Whether using traditional Requirements Analysis or User Stories, teams in impaired projects tend to focus more heavily on statements of “functional” need, & less on quality, performance or other “non-functional” needs. • In extreme situations, non-functional requirements (NFR’s) get only cursory analysis, or the risk responsibilities are artificially transferred to other teams. • And yet NFR’s missed or in defined in error tend to have far more impact on the project, and can be much harder to fix, than missed or incorrect functional requirements. • Achieving an unexpected service level metric can often impact core architectural decisions made early in the project, which are very costly to rework late in a project. http://adamonprojects.com
  • 9. Date title Page → It shall ...... → It shall ..... → It will ..... → It must ..... Most of the attention goes here Most of the problems occur here Functional Requirements Non-functional Requirements → Responsiveness → Throughput → Usability → Security → Accessibility → Reliability “Traditional” Requirements Specification most time spent on functional requirements 2/12/2015 Team Focus & Project Success 9 http://adamonprojects.com
  • 10. Date title Page Agile Needs Analysis: User Stories tend to emphasise “I want” As a ..................... , I want ...................... , So that...................... Most of the attention goes here Most of the problems occur hereproblems occur here too 2/12/2015 Team Focus & Project Success 10 http://adamonprojects.com
  • 11. Lifecycle Stage Focus ChapterNo. More focus on the build, test, deploy back-end stage of the project lifecycle than the scoping and inception stages.
  • 12. Date title Page Project Lifecycle 2/12/2015 Team Focus & Project Success 12 • The back-end of a project (code build, test, deployment) is usually far more organised and focused than the front-end (customer needs analysis, scoping, architecture). • Teams in impaired projects tend to focus more on this back-end as the “real” project and where the “real” work gets done. • But the work up-front is at least an order of magnitude more influential to project success than back-end work. • Think of Boehm’s “Cost of Change” curve, where lost time and its impacts are considered as defects. • Even just the failure to prosecute the project rapidly can cause errors. http://adamonprojects.com
  • 13. Date title Page Elapsed Time Scoping Requirements Solution Design Design and Build Integration and Test Deployment Most of the attention goes here Most of the problems occur here Customer Problem Aligned to Deterministic Planned Lifecycle (e.g. PMBOK-based or PRINCE) Project Lifecycle (Waterfall) Back end dev is emphasised over upfront initiation 2/12/2015 Team Focus & Project Success 13 http://adamonprojects.com
  • 14. Date title Page Elapsed Time Business Scoping Solutioning Inception Construction Iterations Transition / Release Integration Most of the attention goes here Most of the problems occur here Customer Problem Aligned to agile lifecycle e.g. Scrum Generic Agile Project Lifecycle Back end development is emphasised over initiation. Operations 2/12/2015 Team Focus & Project Success 14 http://adamonprojects.com
  • 15. Practice Focus ChapterNo. More focus on Development practices (the realisation of the solution) than the User Experience practices.
  • 16. Date title Page Practices Focus 2/12/2015 Team Focus & Project Success 16 • Development practices of code build, test, deployment are usually far more organised and focused than the front-end practices of customer needs analysis, scoping, and architecture. • User Experience practises produce output that is at least an order of magnitude more influential to project success than development, but nett effective input can get crowded out by development practise timelines • User Experience tends to focus on visual style practises rather than more enabling interaction modeling and information architecture practises http://adamonprojects.com
  • 17. Date title Page Most of the attention goes here Most of the problems occur here User Experience vs Application Development An emphasis on functionality over User Design / UX 2/12/2015 Team Focus & Project Success 17 http://adamonprojects.com UX Practices Dev Practices
  • 18. Date title Page Most of the attention goes here Fonts, designs, colors Information Architecture, Workflow, User journey User Experience Visual "Look and Feel" emphasised over Information Architecture Most of the problems occur here 2/12/2015 Team Focus & Project Success 18 http://adamonprojects.com
  • 19. Resource Focus ChapterNo. Its common to underestimate the expertise required to realise any given solution – easy to focus on the available resources rather than what we need
  • 20. Date title Page Skills & Experience 2/12/2015 Team Focus & Project Success 20 • Organisations rarely decide to forego a project if there is doubt about whether a person or a team has the right skills – unless it is a landmark project. • There is a common tendency to underestimate the level of skill and experience required to implement any given project. • Organisation will frequently decide to manage the situation with existing personnel, even in some “hybrid” mode with a more experienced person supporting a more junior person. • Budgetary constraints and company pay-bands or rate limits can cut-off access to the experience actually required because these are optimised to the most likely level required, and as we often see (see over), this is often too low to attract the right people. http://adamonprojects.com
  • 21. Date title Page Operating basic processes and being ‘driven by their projects’ rather than the opposit Managing to just stay on top of their projects, but working long hours and stressed. 8-12 Years Were happier and more in control of their projects, which were larger but performing better 3-5 Years < 3 years (Avg 1.4) PMs that thrive have much more experience From a large enterprise PMO, we assessed who was “thriving” in the enterprise environment and who was struggling, and compared to the criteria for which we were hiring. The single biggest discriminator was years of PM experience, almost exclusively. We were hiring for about 5 years experience, but the folks who thrived had around 10 years experience. PM Experience Distribution 212/12/2015 Team Focus & Project Success This is what we were hiring for: 3-5 Years These are the folks who were “thriving” http://adamonprojects.com
  • 22. Date title Page Conclusion  This list of observations is by no means definitive, but it does address a number of areas that have high leverage during project execution.  There are probably dozens of practices within the field of software development projects that can have an effect on project impairment if not balanced correctly.  Only the project team can decide whether they are doing to much or too little of some particular practice: I am not mandating any particular change in a general presentation such as this.  But from my experience the ones I’ve listed here are very well worth a look: to take some investment of time to review whether you are seeing symptoms that could be caused by mis-focus in these areas.  Another way to look at this is to think of the relative focus of your project team as your “perspective” on the project delivery. If you get your “perspective” right then you’ll deliver well. http://adamonprojects.com
  • 23. “What a team focuses on predicts project success” Find out more on http://adamonprojects.com 2/12/20 15 Team Focus & Project Success23