SlideShare a Scribd company logo
1 of 17
9/14/2015 September 2015, p.1Supply Chain Insights Global Summit #ImagineSC
Supply Chain Optimization
Kehat Shahar
Vice President, Supply Chain Planning
SanDisk Corporation
9/14/2015 September 2015, p.2Supply Chain Insights Global Summit #ImagineSC
Forward Looking Statements
During our meeting today, we may make forward-looking statements.
Any statement that refers to expectations, projections or other characterizations of future
events or circumstances is a forward-looking statement, including those relating to
market position, market growth, product sales, industry trends, supply chain, future
memory technology, production capacity, production costs, technology transitions,
construction schedules, production starts, and future products. This presentation
contains information from third parties, which reflect their projections as of the date of
issuance. Actual results may differ materially from those expressed in these forward-
looking statements due to factors detailed under the caption “Risk Factors” and
elsewhere in the documents we file from time to time with the SEC, including our annual
and quarterly reports. We undertake no obligation to update these forward-looking
statements, which speak only as of the date hereof or the date of issuance by a third
party, as the case may be.
9/14/2015 September 2015, p.3Supply Chain Insights Global Summit #ImagineSC
Agenda
 SanDisk Overview
 Supply Chain Optimization
- Supply Chain Segmentation & Policy
 Q & A
9/14/2015 September 2015, p.4Supply Chain Insights Global Summit #ImagineSC
We Enable Innovation in Four Mega Markets
Mobile and
Connected
Devices
ConsumerData Center
Client
Computing
9/14/2015 September 2015, p.5Supply Chain Insights Global Summit #ImagineSC
Financial Strength
Trailing 4 Quarter Financials*
• $6.1B Revenue
• 61% commercial; 39% retail
• $1.5B Net Cash
• $.9B R&D Investment
 Fortune 500
5
* Financials as of Q2’15. Net Cash = (Cash + cash equivalents + short-term and
long-term marketable securities) less (debt at maturity value) as of end of Q2’15
9/14/2015 September 2015, p.6Supply Chain Insights Global Summit #ImagineSC
Supply Chain Footprint
SanDisk with Mfg
partner Toshiba
Silicon Suppliers
SanDisk Storage Shanghai Factory
SanDisk Storage Malaysia Factory (Target production in 1H-2015)
Contract Manufacturers (CM)
CM CM
SanDisk
Retail
Fulfillment
Regional
Fulfillment
Local
Warehouse
VMI Hub
300,000+
Store Fronts
Distributors
System
Integrators
Wafer Memory Packaging & Test Card and Solid State Drive
Assembly & Test
Vertically Integrated, scale and flexible supply chain
Shipping almost 2 million units daily
Packaging and
Fulfillment
Channel
CM CM
9/14/2015 September 2015, p.7Supply Chain Insights Global Summit #ImagineSC
DP
DM
SCP
FP
MEIOSAP
Agile BI
Tablea
u
Advanced Planning Systems
GATP
Advanced Planning Solutions
L1
Independent
Forecasting
L2 - Consensus
Forecasting
L3 Supply
Planning
L4 Adjust
Demand
&Supply Plan
L5 Distribute
Sup Plan
Week/Monthly
Process
Daily/Weekly
Process
S&OP Process
Analytics
Simu
latio
n
Optimi
zation
Analytics COE
Supply Chain
R&D
SC Policy
Inv. Models
Fcst Algorithm
…
Plan
Recommendation
Decisions
9/14/2015 September 2015, p.8Supply Chain Insights Global Summit #ImagineSC
Supply Chain Optimization
9/14/2015 September 2015, p.9Supply Chain Insights Global Summit #ImagineSC
Postpone Inventory while meeting customer service level requirements
Delay Product Differentiation without adding significant cycle time or cost
Understand/Measure · Buffer · Reduce Variability
σ
SKUWafer
Memory
Package
Card and
Drive
Mem Pkg
Test
Supply Chain Policy to Maximize $/GB & effectively balance Service level & Inventory
Reduce Cycle Time without compromising on flexibility
Supply Chain Optimization
9/14/2015 September 2015, p.10Supply Chain Insights Global Summit #ImagineSC
Supply Chain Segmentation
(Postpone inventory while meeting
customer service level requirements)
9/14/2015 September 2015, p.11Supply Chain Insights Global Summit #ImagineSC
Supply Chain SegmentationSupplychainsegmentation
Started with one size
fits all approach
(FY 2008 and prior)
- Build to forecast with 6-
8 weeks manufacturing
frozen fence
- Changed from Build to
forecast to Build to targets
(still one size fits all)
- Key drivers for this
change is to reverse trend
of high inventory and low
service level
Die Bank Tested
Memory Pkg
Tested Card
or Drive
Generic Card
or Drive
SKU
Factory/Contract Manufacturer Fulfillment
Build To Forecast Order
Build To Targets Order
High Margin
Builds
Excess
Build PlanKey changes
• Multi stage inventory
• Reduce frozen fence (from weeks to days) to
increase response to demand changes
• Demand priority visibility and actions across
supply chain
Implementation approach
• Top management buy in
• Think tank team of functional expert is set up to
architect solution
• Think tank team led change management
Build To Targets
9/14/2015 September 2015, p.12Supply Chain Insights Global Summit #ImagineSC
BTT
Supply chain segmentationSupplychainsegmentation
Supply chain
segmentation by
customer and
product
Retail
- Build to targets (BTT)
- CPFR customers
- Emerging markets
- eTail customers
(enhanced BTT model
with integrated
information and physical
flow)
Die Bank Tested
Memory Pkg
Tested Card
or Drive
Generic Card
or Drive
SKU
Factory/Contract Manufacturer Fulfillment
Build To Targets OrderBuild To Targets
CPFRCustomer
Targets (SS)
Order
Targets (SS)
Commits
Driver: CPFR team request to meet CPFR customer requirements
Key changes: Provide commits to CPFR customers accurately and consistently
meet commits
SKU
Whse
Emerging
Markets
Build To Targets Build To Targets Targets
Driver: Retail BU focus on strategic growth in emerging markets
Key changes: same day pick up, regional whse, value stream map & improvements
9/14/2015 September 2015, p.13Supply Chain Insights Global Summit #ImagineSC
Supply chain segmentationSupplychainsegmentation
Supply chain
segmentation by
customer and
product
OEM
- Build to forecast
- Build to targets
- Build to order
- Virtual hub
- VMI/Customer hubs
Die Bank Tested
Memory Pkg
Tested Card
or Drive
SKU SKU
Factory/Contract Manufacturer VMI Hub
Build To Forecast Order
Build To Targets Order
BTO
Build To Order
Driver: Excess inventory of custom products
Key changes: improving end to end cycle time, material and capacity planning
VHub
Build To Commits & Days of Inv Virtual Hub Pulls
Driver: stg customer request to set up hub for all mfg locations around the world
Key changes: Factory as hub, Expanded CPFR commits process for OEM customer
VM
I
Build To Commits & Days of Inv Pulls
Driver: Customer request
9/14/2015 September 2015, p.15Supply Chain Insights Global Summit #ImagineSC
Supply Chain Segmentation and Next StepsSupplychainsegmentation
Started with One size
fits all supply chain
Proactively
understanding key
customer and product
needs and segment
supply chain
Achieve effective
trade off between
• Customer service lvl
• Inventory/cost
• Replenish’t lead
time
Delayproduct
differentiation
Generic products delay
differentiation
Custom products delay
differentiation (common
platform)
Design for delay
product differentiation
Configure to order
Costtoserve
Trade-offs – Cost, Repln
LT, Service level
Cost to serve for on
boarding new customers
Provide ongoing visibility
to BU and sales (in
progress)
Tracking supply chain
operating cost by segment
(in progress)
Valueaddedservice
Identify value added
service opportunities
through competitive
analysis
Capturing value to price
ratio by segment (in
progress)
Integrate in cost to serve
model (in progress)
9/14/2015 September 2015, p.16Supply Chain Insights Global Summit #ImagineSC
Key lessons
Think tank team of functional leads helps in architecting solution and managing change
Internal sales and customer collaboration teams are good source of customer requirements and
competitive landscape information
Advanced planning systems is key enabler of segmentation
Take incremental re-engineering as opposed to big bang approach to segmentation
Increased effort in re-design existing products for delay differentiation
Getting management buy-in for cost-to-serve is easy, implementation is complex
9/14/2015 September 2015, p.17Supply Chain Insights Global Summit #ImagineSC
Q & A
9/14/2015 September 2015, p.18Supply Chain Insights Global Summit #ImagineSC
Postpone Inventory while meeting customer service level requirements
Delay Product Differentiation without adding significant cycle time or cost
Understand/Measure · Buffer · Reduce Variability
σ
SKUWafer
Memory
Package
Card and
Drive
Mem Pkg
Test
Advance Planning
System Architecture
System recommends
User review and
update plan
System respect user
updates and re-plan
Supply Chain Policy to Maximize $/GB and effectively balance Service level & Inventory
Reduce Cycle Time without compromising on flexibility
Supply Chain Optimization Recap and Q &A

More Related Content

Viewers also liked

Continuous replenishment and vendor managed inventory
Continuous replenishment and vendor managed inventoryContinuous replenishment and vendor managed inventory
Continuous replenishment and vendor managed inventory
Dr. Tapish Panwar
 
Final ppt of offshorebanking
Final ppt of offshorebankingFinal ppt of offshorebanking
Final ppt of offshorebanking
JW Marriott
 

Viewers also liked (20)

Redefining Contract Manufacturing Through the Use of Robotics
Redefining Contract Manufacturing Through the Use of RoboticsRedefining Contract Manufacturing Through the Use of Robotics
Redefining Contract Manufacturing Through the Use of Robotics
 
Insights - Supply Chain Infographics Slide Deck from the Supply Chain Insight...
Insights - Supply Chain Infographics Slide Deck from the Supply Chain Insight...Insights - Supply Chain Infographics Slide Deck from the Supply Chain Insight...
Insights - Supply Chain Infographics Slide Deck from the Supply Chain Insight...
 
The Eastman Chemical Journey to Be a Supply Chains to Admire Winner for 2014 ...
The Eastman Chemical Journey to Be a Supply Chains to Admire Winner for 2014 ...The Eastman Chemical Journey to Be a Supply Chains to Admire Winner for 2014 ...
The Eastman Chemical Journey to Be a Supply Chains to Admire Winner for 2014 ...
 
Where Are We on the Evolution of Supply Chain Planning?
Where Are We on the Evolution of Supply Chain Planning?Where Are We on the Evolution of Supply Chain Planning?
Where Are We on the Evolution of Supply Chain Planning?
 
There Is Always Time for Trivia - Supply Chain Trivia Slide Deck from the Sup...
There Is Always Time for Trivia - Supply Chain Trivia Slide Deck from the Sup...There Is Always Time for Trivia - Supply Chain Trivia Slide Deck from the Sup...
There Is Always Time for Trivia - Supply Chain Trivia Slide Deck from the Sup...
 
Building New Business Models: Green Eileen
Building New Business Models: Green EileenBuilding New Business Models: Green Eileen
Building New Business Models: Green Eileen
 
The General Mills Journey to Be a Supply Chains to Admire Winner for 2014 and...
The General Mills Journey to Be a Supply Chains to Admire Winner for 2014 and...The General Mills Journey to Be a Supply Chains to Admire Winner for 2014 and...
The General Mills Journey to Be a Supply Chains to Admire Winner for 2014 and...
 
Imagine the Supply Chain of the Future
Imagine the Supply Chain of the FutureImagine the Supply Chain of the Future
Imagine the Supply Chain of the Future
 
KEYNOTE ADDRESS: Embracing the Autonomous Supply Chain and Rethinking Innovation
KEYNOTE ADDRESS: Embracing the Autonomous Supply Chain and Rethinking InnovationKEYNOTE ADDRESS: Embracing the Autonomous Supply Chain and Rethinking Innovation
KEYNOTE ADDRESS: Embracing the Autonomous Supply Chain and Rethinking Innovation
 
Opening: Imagining the Supply Chain of 2030. Where Are We Now? What Is Possible?
Opening: Imagining the Supply Chain of 2030. Where Are We Now? What Is Possible?Opening: Imagining the Supply Chain of 2030. Where Are We Now? What Is Possible?
Opening: Imagining the Supply Chain of 2030. Where Are We Now? What Is Possible?
 
Putting Yeast to Work: Reducing Supply Chain Volatility
Putting Yeast to Work: Reducing Supply Chain VolatilityPutting Yeast to Work: Reducing Supply Chain Volatility
Putting Yeast to Work: Reducing Supply Chain Volatility
 
The Internet of Things: Driving Automated Replenishment
The Internet of Things: Driving Automated ReplenishmentThe Internet of Things: Driving Automated Replenishment
The Internet of Things: Driving Automated Replenishment
 
Driving Supply Chain Improvements Using a Tailored Supply Chain Strategy
Driving Supply Chain Improvements Using a Tailored Supply Chain StrategyDriving Supply Chain Improvements Using a Tailored Supply Chain Strategy
Driving Supply Chain Improvements Using a Tailored Supply Chain Strategy
 
Building the Data-Driven Organization
Building the Data-Driven OrganizationBuilding the Data-Driven Organization
Building the Data-Driven Organization
 
vendor managed inventory
vendor managed inventoryvendor managed inventory
vendor managed inventory
 
Vendor Managed Inventory with Acorn (VMI)
Vendor Managed Inventory with Acorn (VMI)Vendor Managed Inventory with Acorn (VMI)
Vendor Managed Inventory with Acorn (VMI)
 
Continuous replenishment and vendor managed inventory
Continuous replenishment and vendor managed inventoryContinuous replenishment and vendor managed inventory
Continuous replenishment and vendor managed inventory
 
Vendor managed inventory
Vendor managed inventoryVendor managed inventory
Vendor managed inventory
 
Final ppt of offshorebanking
Final ppt of offshorebankingFinal ppt of offshorebanking
Final ppt of offshorebanking
 
Offshore banking units
Offshore banking unitsOffshore banking units
Offshore banking units
 

Similar to Driving Improvements Through Supply Chain Optimization.

Supply Chain Visibility via Cargo Tracking and Monitoring
Supply Chain Visibility via Cargo Tracking and MonitoringSupply Chain Visibility via Cargo Tracking and Monitoring
Supply Chain Visibility via Cargo Tracking and Monitoring
Inspiricon AG
 
Vp sales business plan ver1.1
Vp sales business plan ver1.1Vp sales business plan ver1.1
Vp sales business plan ver1.1
Umesh Jamwal
 
Vinay_Patange_StanChart_Cannes_2010_Ver2
Vinay_Patange_StanChart_Cannes_2010_Ver2Vinay_Patange_StanChart_Cannes_2010_Ver2
Vinay_Patange_StanChart_Cannes_2010_Ver2
Vinay Patange
 

Similar to Driving Improvements Through Supply Chain Optimization. (20)

رضا مصطفوی طباطبایی
رضا مصطفوی طباطباییرضا مصطفوی طباطبایی
رضا مصطفوی طباطبایی
 
Ignite 2015 NA - Paul Lord - "Insights on Supply Chain for the Chemical Indus...
Ignite 2015 NA - Paul Lord - "Insights on Supply Chain for the Chemical Indus...Ignite 2015 NA - Paul Lord - "Insights on Supply Chain for the Chemical Indus...
Ignite 2015 NA - Paul Lord - "Insights on Supply Chain for the Chemical Indus...
 
Supply Chain Visibility via Cargo Tracking and Monitoring
Supply Chain Visibility via Cargo Tracking and MonitoringSupply Chain Visibility via Cargo Tracking and Monitoring
Supply Chain Visibility via Cargo Tracking and Monitoring
 
Lean forward case study at Cisco
Lean forward case study at CiscoLean forward case study at Cisco
Lean forward case study at Cisco
 
Vp sales business plan ver1.1
Vp sales business plan ver1.1Vp sales business plan ver1.1
Vp sales business plan ver1.1
 
Vinay_Patange_StanChart_Cannes_2010_Ver2
Vinay_Patange_StanChart_Cannes_2010_Ver2Vinay_Patange_StanChart_Cannes_2010_Ver2
Vinay_Patange_StanChart_Cannes_2010_Ver2
 
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...
 
Supply Chain Analytics for the modern enterprise
Supply Chain Analytics for the modern enterpriseSupply Chain Analytics for the modern enterprise
Supply Chain Analytics for the modern enterprise
 
Building a Roadmap to Adopt SAP Integrated Business Planning (IBP)
Building a Roadmap to Adopt SAP Integrated Business Planning (IBP)Building a Roadmap to Adopt SAP Integrated Business Planning (IBP)
Building a Roadmap to Adopt SAP Integrated Business Planning (IBP)
 
How to Get the Best User Experience for Your Customers With: CA View® / CA De...
How to Get the Best User Experience for Your Customers With: CA View® / CA De...How to Get the Best User Experience for Your Customers With: CA View® / CA De...
How to Get the Best User Experience for Your Customers With: CA View® / CA De...
 
Presentation to AMI university on Value Chain fundamentals
Presentation to AMI university on Value Chain fundamentals Presentation to AMI university on Value Chain fundamentals
Presentation to AMI university on Value Chain fundamentals
 
Cloud Expo - Designing Cloud Solutions for Customers
Cloud Expo - Designing Cloud Solutions for CustomersCloud Expo - Designing Cloud Solutions for Customers
Cloud Expo - Designing Cloud Solutions for Customers
 
Roadmap timelines and optimization.ppt
Roadmap timelines and optimization.pptRoadmap timelines and optimization.ppt
Roadmap timelines and optimization.ppt
 
Insight2014 orchestrating customer_activated_supply_chain_6913
Insight2014 orchestrating customer_activated_supply_chain_6913Insight2014 orchestrating customer_activated_supply_chain_6913
Insight2014 orchestrating customer_activated_supply_chain_6913
 
Get Smart About Technical Debt
Get Smart About Technical DebtGet Smart About Technical Debt
Get Smart About Technical Debt
 
Investor meeting june 8 2015
Investor meeting june 8 2015Investor meeting june 8 2015
Investor meeting june 8 2015
 
Q315 citi-conf-090915
Q315 citi-conf-090915Q315 citi-conf-090915
Q315 citi-conf-090915
 
Envisioning the Next Generation of Analytics
Envisioning the Next Generation of AnalyticsEnvisioning the Next Generation of Analytics
Envisioning the Next Generation of Analytics
 
Go-to-Market Business Plan Template
Go-to-Market Business Plan TemplateGo-to-Market Business Plan Template
Go-to-Market Business Plan Template
 
#bluecruxtalks crash course - Part 2 - Digital-Ready People & Organizations.pdf
#bluecruxtalks crash course - Part 2 - Digital-Ready People & Organizations.pdf#bluecruxtalks crash course - Part 2 - Digital-Ready People & Organizations.pdf
#bluecruxtalks crash course - Part 2 - Digital-Ready People & Organizations.pdf
 

More from Lora Cecere

More from Lora Cecere (20)

2023 Reset Report v3.1.pdf
2023 Reset Report v3.1.pdf2023 Reset Report v3.1.pdf
2023 Reset Report v3.1.pdf
 
Submission to Journal of Logistics
Submission to Journal of LogisticsSubmission to Journal of Logistics
Submission to Journal of Logistics
 
River of Demand - ALL RIVERS with QR.pdf
River of Demand - ALL RIVERS with QR.pdfRiver of Demand - ALL RIVERS with QR.pdf
River of Demand - ALL RIVERS with QR.pdf
 
NOW 2022 Conference Lora Cecere
NOW 2022  Conference Lora CecereNOW 2022  Conference Lora Cecere
NOW 2022 Conference Lora Cecere
 
Digital Transformation Western Digital
Digital Transformation Western DigitalDigital Transformation Western Digital
Digital Transformation Western Digital
 
Imagine 2022 Rick McDonald Content rev5.pptx
Imagine 2022 Rick McDonald Content rev5.pptxImagine 2022 Rick McDonald Content rev5.pptx
Imagine 2022 Rick McDonald Content rev5.pptx
 
Sleep Number Supply Chain's To Admire.pptx
Sleep Number Supply Chain's To Admire.pptxSleep Number Supply Chain's To Admire.pptx
Sleep Number Supply Chain's To Admire.pptx
 
Future of Healthcare--2030
Future of Healthcare--2030Future of Healthcare--2030
Future of Healthcare--2030
 
AmeriCare Royal
AmeriCare RoyalAmeriCare Royal
AmeriCare Royal
 
Supply Chains to Admire Award Winner
Supply Chains to Admire Award Winner Supply Chains to Admire Award Winner
Supply Chains to Admire Award Winner
 
Navigating the Talent Crunch
Navigating the Talent CrunchNavigating the Talent Crunch
Navigating the Talent Crunch
 
Use of Social Tokens in Supply Chain
Use of Social Tokens in Supply ChainUse of Social Tokens in Supply Chain
Use of Social Tokens in Supply Chain
 
Lora Cecere Opening Presentation Imagine 2022.pptx
Lora Cecere Opening Presentation Imagine 2022.pptxLora Cecere Opening Presentation Imagine 2022.pptx
Lora Cecere Opening Presentation Imagine 2022.pptx
 
Summary Pilot Work Project Zebra
Summary Pilot Work Project ZebraSummary Pilot Work Project Zebra
Summary Pilot Work Project Zebra
 
Rivers of Demand
Rivers of DemandRivers of Demand
Rivers of Demand
 
Building Outside-in Planning Processes
Building Outside-in Planning ProcessesBuilding Outside-in Planning Processes
Building Outside-in Planning Processes
 
Supply Chains to Admire 2022
Supply Chains to Admire 2022Supply Chains to Admire 2022
Supply Chains to Admire 2022
 
Supply Chains to Admire Analysis 2022_2022 presentation.pptx
Supply Chains to Admire Analysis 2022_2022 presentation.pptxSupply Chains to Admire Analysis 2022_2022 presentation.pptx
Supply Chains to Admire Analysis 2022_2022 presentation.pptx
 
Building Outside-in Supply Chain Processes
Building Outside-in Supply Chain ProcessesBuilding Outside-in Supply Chain Processes
Building Outside-in Supply Chain Processes
 
The Role of Analytics In Defining The Art Of The Possible
The Role of Analytics In Defining The Art Of The PossibleThe Role of Analytics In Defining The Art Of The Possible
The Role of Analytics In Defining The Art Of The Possible
 

Recently uploaded

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 

Recently uploaded (20)

Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 

Driving Improvements Through Supply Chain Optimization.

  • 1. 9/14/2015 September 2015, p.1Supply Chain Insights Global Summit #ImagineSC Supply Chain Optimization Kehat Shahar Vice President, Supply Chain Planning SanDisk Corporation
  • 2. 9/14/2015 September 2015, p.2Supply Chain Insights Global Summit #ImagineSC Forward Looking Statements During our meeting today, we may make forward-looking statements. Any statement that refers to expectations, projections or other characterizations of future events or circumstances is a forward-looking statement, including those relating to market position, market growth, product sales, industry trends, supply chain, future memory technology, production capacity, production costs, technology transitions, construction schedules, production starts, and future products. This presentation contains information from third parties, which reflect their projections as of the date of issuance. Actual results may differ materially from those expressed in these forward- looking statements due to factors detailed under the caption “Risk Factors” and elsewhere in the documents we file from time to time with the SEC, including our annual and quarterly reports. We undertake no obligation to update these forward-looking statements, which speak only as of the date hereof or the date of issuance by a third party, as the case may be.
  • 3. 9/14/2015 September 2015, p.3Supply Chain Insights Global Summit #ImagineSC Agenda  SanDisk Overview  Supply Chain Optimization - Supply Chain Segmentation & Policy  Q & A
  • 4. 9/14/2015 September 2015, p.4Supply Chain Insights Global Summit #ImagineSC We Enable Innovation in Four Mega Markets Mobile and Connected Devices ConsumerData Center Client Computing
  • 5. 9/14/2015 September 2015, p.5Supply Chain Insights Global Summit #ImagineSC Financial Strength Trailing 4 Quarter Financials* • $6.1B Revenue • 61% commercial; 39% retail • $1.5B Net Cash • $.9B R&D Investment  Fortune 500 5 * Financials as of Q2’15. Net Cash = (Cash + cash equivalents + short-term and long-term marketable securities) less (debt at maturity value) as of end of Q2’15
  • 6. 9/14/2015 September 2015, p.6Supply Chain Insights Global Summit #ImagineSC Supply Chain Footprint SanDisk with Mfg partner Toshiba Silicon Suppliers SanDisk Storage Shanghai Factory SanDisk Storage Malaysia Factory (Target production in 1H-2015) Contract Manufacturers (CM) CM CM SanDisk Retail Fulfillment Regional Fulfillment Local Warehouse VMI Hub 300,000+ Store Fronts Distributors System Integrators Wafer Memory Packaging & Test Card and Solid State Drive Assembly & Test Vertically Integrated, scale and flexible supply chain Shipping almost 2 million units daily Packaging and Fulfillment Channel CM CM
  • 7. 9/14/2015 September 2015, p.7Supply Chain Insights Global Summit #ImagineSC DP DM SCP FP MEIOSAP Agile BI Tablea u Advanced Planning Systems GATP Advanced Planning Solutions L1 Independent Forecasting L2 - Consensus Forecasting L3 Supply Planning L4 Adjust Demand &Supply Plan L5 Distribute Sup Plan Week/Monthly Process Daily/Weekly Process S&OP Process Analytics Simu latio n Optimi zation Analytics COE Supply Chain R&D SC Policy Inv. Models Fcst Algorithm … Plan Recommendation Decisions
  • 8. 9/14/2015 September 2015, p.8Supply Chain Insights Global Summit #ImagineSC Supply Chain Optimization
  • 9. 9/14/2015 September 2015, p.9Supply Chain Insights Global Summit #ImagineSC Postpone Inventory while meeting customer service level requirements Delay Product Differentiation without adding significant cycle time or cost Understand/Measure · Buffer · Reduce Variability σ SKUWafer Memory Package Card and Drive Mem Pkg Test Supply Chain Policy to Maximize $/GB & effectively balance Service level & Inventory Reduce Cycle Time without compromising on flexibility Supply Chain Optimization
  • 10. 9/14/2015 September 2015, p.10Supply Chain Insights Global Summit #ImagineSC Supply Chain Segmentation (Postpone inventory while meeting customer service level requirements)
  • 11. 9/14/2015 September 2015, p.11Supply Chain Insights Global Summit #ImagineSC Supply Chain SegmentationSupplychainsegmentation Started with one size fits all approach (FY 2008 and prior) - Build to forecast with 6- 8 weeks manufacturing frozen fence - Changed from Build to forecast to Build to targets (still one size fits all) - Key drivers for this change is to reverse trend of high inventory and low service level Die Bank Tested Memory Pkg Tested Card or Drive Generic Card or Drive SKU Factory/Contract Manufacturer Fulfillment Build To Forecast Order Build To Targets Order High Margin Builds Excess Build PlanKey changes • Multi stage inventory • Reduce frozen fence (from weeks to days) to increase response to demand changes • Demand priority visibility and actions across supply chain Implementation approach • Top management buy in • Think tank team of functional expert is set up to architect solution • Think tank team led change management Build To Targets
  • 12. 9/14/2015 September 2015, p.12Supply Chain Insights Global Summit #ImagineSC BTT Supply chain segmentationSupplychainsegmentation Supply chain segmentation by customer and product Retail - Build to targets (BTT) - CPFR customers - Emerging markets - eTail customers (enhanced BTT model with integrated information and physical flow) Die Bank Tested Memory Pkg Tested Card or Drive Generic Card or Drive SKU Factory/Contract Manufacturer Fulfillment Build To Targets OrderBuild To Targets CPFRCustomer Targets (SS) Order Targets (SS) Commits Driver: CPFR team request to meet CPFR customer requirements Key changes: Provide commits to CPFR customers accurately and consistently meet commits SKU Whse Emerging Markets Build To Targets Build To Targets Targets Driver: Retail BU focus on strategic growth in emerging markets Key changes: same day pick up, regional whse, value stream map & improvements
  • 13. 9/14/2015 September 2015, p.13Supply Chain Insights Global Summit #ImagineSC Supply chain segmentationSupplychainsegmentation Supply chain segmentation by customer and product OEM - Build to forecast - Build to targets - Build to order - Virtual hub - VMI/Customer hubs Die Bank Tested Memory Pkg Tested Card or Drive SKU SKU Factory/Contract Manufacturer VMI Hub Build To Forecast Order Build To Targets Order BTO Build To Order Driver: Excess inventory of custom products Key changes: improving end to end cycle time, material and capacity planning VHub Build To Commits & Days of Inv Virtual Hub Pulls Driver: stg customer request to set up hub for all mfg locations around the world Key changes: Factory as hub, Expanded CPFR commits process for OEM customer VM I Build To Commits & Days of Inv Pulls Driver: Customer request
  • 14. 9/14/2015 September 2015, p.15Supply Chain Insights Global Summit #ImagineSC Supply Chain Segmentation and Next StepsSupplychainsegmentation Started with One size fits all supply chain Proactively understanding key customer and product needs and segment supply chain Achieve effective trade off between • Customer service lvl • Inventory/cost • Replenish’t lead time Delayproduct differentiation Generic products delay differentiation Custom products delay differentiation (common platform) Design for delay product differentiation Configure to order Costtoserve Trade-offs – Cost, Repln LT, Service level Cost to serve for on boarding new customers Provide ongoing visibility to BU and sales (in progress) Tracking supply chain operating cost by segment (in progress) Valueaddedservice Identify value added service opportunities through competitive analysis Capturing value to price ratio by segment (in progress) Integrate in cost to serve model (in progress)
  • 15. 9/14/2015 September 2015, p.16Supply Chain Insights Global Summit #ImagineSC Key lessons Think tank team of functional leads helps in architecting solution and managing change Internal sales and customer collaboration teams are good source of customer requirements and competitive landscape information Advanced planning systems is key enabler of segmentation Take incremental re-engineering as opposed to big bang approach to segmentation Increased effort in re-design existing products for delay differentiation Getting management buy-in for cost-to-serve is easy, implementation is complex
  • 16. 9/14/2015 September 2015, p.17Supply Chain Insights Global Summit #ImagineSC Q & A
  • 17. 9/14/2015 September 2015, p.18Supply Chain Insights Global Summit #ImagineSC Postpone Inventory while meeting customer service level requirements Delay Product Differentiation without adding significant cycle time or cost Understand/Measure · Buffer · Reduce Variability σ SKUWafer Memory Package Card and Drive Mem Pkg Test Advance Planning System Architecture System recommends User review and update plan System respect user updates and re-plan Supply Chain Policy to Maximize $/GB and effectively balance Service level & Inventory Reduce Cycle Time without compromising on flexibility Supply Chain Optimization Recap and Q &A

Editor's Notes

  1. Speakers note: this oral statement to be read before each presentation. But, instead of reading the entire content on this slide, the speaker may recite the following statement: “Today's presentation includes forward-looking statements concerning future events, trends and projections. Actual results may materially differ from these forward-looking statements. We refer you to our most recent forms 10-K and 10-Q, filed with the SEC, for a discussion of factors that could cause our results to differ.”
  2. We essentially serve four very large markets and customer segments. Data centers, from enterprises to government to cloud service providers, are using flash to get more value out of their infrastructure and create new services. Manufacturers of servers, desktop and laptops, who are all turning to flash to increase performance and save energy. Manufacturers of mobile and connected devices. The Internet of Things will be propelled by flash. Consumers. These markets are also increasingly interrelated. A large number of consumer and commercial devices will be continually linked to the cloud. Your car navigation system will deliver traffic and accident information in real time, for example, or tell you about available parking spaces. The demands of users will up the bar for data centers and in turn the new level of performance will lead to new services. Flash is only technology that can deliver the performance necessary for this to happen. Analysts expect that this broad-based demand will cause flash bit shipments to grow at approximately 35% per year.
  3. Explain our supply chain footprint – many are not familiar with Semi Conductor supply chain
  4. Talk about analytics and systems strongly embedded into our planning processes
  5. Talk about the principles of how we manage our supply chain and what we try to drive, top to bottom My presentation will focus on the postponement inventory model and our supply chain policies
  6. This slide focuses on the move from BTF to BTT
  7. While previous slide was one fits all, this slide is about how we segmented our supply chain to different needs and fine tuned our supply chain models
  8. In This slide talk about some of the other things we implemented to further balance between supply chain excellence and cost and value