SAP ECC HANA EHP 6 TO EHP7 Technical Up gradation
I have recently completed upgrade of Enhancement Pack 7 for one of our esteemed client. Initially it looks like
normal SP upgrade, but when getting deeper into it appeared as huge package of addition to the existing
system at software component level. Enhancement of component cause impact on overall performance of the
system. If you are planning to upgrade your systemto EHP7 (Which is also latest patch provided by SAP), then
it would be useful for you to go though below post.
This post will help you to prepare plan for upgrading your system.
Insights of Enhancement Pack 7
What is Enhancement Pack:
Enhancement packages are provided by SAP for their customer to manage and deploy new software
functionality introduced by SAP. A set of new integrated/individual functionalities can be deployed by
implementing enhancement packs. Best part is customers can select new/enhanced functionalities out f the
delivered software innovations by SAP and activate as per business needs. This is the simplest online solution
to introduce new functionalities into the systemwithout impacting ongoing business in faster way.
Enhancement packages are cumulative. Thus, enhancement package 7 contains all the previously delivered
enhancements as well as the new ones. Enhancement packages can be downloaded from SAP service using
SAP Solution Manager.
Enhancement Package 7 for SAP ERP 6.0
SAP has introduced more than 100 new functions in Enhancement package 7 for SAP ERP 6.0 and is the first
EHP to be optimized for both the SAP HANA database and the traditional certified databases.
Since enhancement package 5 for SAP ERP 6.0, customers have had the option of deactivating certain business
functions that were previously activated. SAP enhancement package 7 also includes numerous new functions
for financial accounting, logistics, human resources, and quality management, as well as cross-application
functions and improvements for SAP Master Data Governance and manager self-service (MSS).
Key features with EHP 7
 SAP Fiori – There are collection of 25 role-based productivity applications in SAP Fiori which will help
end users to complete their daily tasks with enhanced speed and efficiency on handhold devices like
smartphone and tablet along with notebook or PCs.
 Faster MRP runs – As EHP7 is optimized for SAP HANA database, it provides the option to use SAP
HANA Live to check on material availability and inventory days of supply in real time at exploded-view
level. All features of SAP HANA can be utilized to speed up complex MRP runs and capacity planning.
 Data aging – The use of data in-memory platform of SAP HANA can be used for implement a data aging
strategy efficiently. This can provide near real-time data to end user for day-to-day operations such as
the financial results for the last two years.
SAP Upgrade from ECC 6.0 EHP4 toECC 6.0 EHP7:
Pre-upgrade Activities must be done on the existing level of software to understand impact on the basic
software level. Another installation check should be done to identify any critical issues that could lead to
additional risks or work on total number of custom objects /customizing to identify the impact of EHP7
enhancements on the existing custom transactions/reports
Study of Software components versions:
The component versions can be generated by Solution Manager System which gives the overall components
needs to be upgraded from EHP4 to EHP7 SPS3. This can be done by SAP basis consultant using SAP Solution
Manager. A list of all the new versions of software components can be seen and selected before upgrading to
EHP7. Find below sample screenshots which show the components selected that will be upgraded with new
version.
Installation Check:
Installation check is the activity to must be done to understand if there are any critical issues that could lead to
additional risks or work when compared with the average SAP EHP installation project.
This check can be done by development team or SAP support can be taken to study and report the impact on
the existing set of processes in the ERP SAP system. SAP charges separately for doing such studies.
The objective of the SAP EHP Installation Check is to identify the most significant risk and effort drivers for
your planned project. For this purpose, it collects technical information in your current production systemand
evaluates it based on general experience obtained.
The table below shows the most critical risk and outlay drivers for any software change project grouped by key
focus areas. An explanation of the key focus areas can be found in the upgrade white paper of the SAP
standards for solution operations.
An action plan for the activities can be prepared based on the priorities on identified risk and precautions
before upgrade initiation.
Installation check will be baseline for estimations of the efforts required for adjustment during upgrade of
enhancement package.
Security Authorization Check
Enhancement package impact on the security and authorization objects of the end users. Once development
upgrade is done in the landscape, a detail check of modifies authorization object must be done by SAP security
consultant/team. This activity will mitigate further risk of authorization issues after production upgrade.
The transports of the security adjustment must be transported just after upgrading quality or production
system.
Test Factory for SIT:
Test factory must be involved for SIT in project planning to avoid re-planning or any impact the go-live date.
Test factory do not always have all the domain knowledge to be able to execute a full SIT. If test scripts are not
ready or up-to-date, it could cause adverse impact on the project timelines.
Its is highly recommended to execute knowledge transfer to test factory for the areas where they are
currently lacking the knowledge of the upgrading system. There involvement during start-up of the project will
help in the efficient project planning. Test Factory can execute Regression Testing on the upgrading system as
a part of regular monthly release.
SAP Max Attention Support:
SAP Quality manager must be involved right from kick-off of the upgrade. SAP quality manager can arrange
support from SAP to expedite resolutions from SAP. This is a paid service of SAP and must be arrange in
advance to avoid unexpected delays in project timelines due to software issues during upgrade.
Challenges andRisk:
Challenges
 Enhancement pack 7 is the latest pack provided by SAP. Even SAP doesn’t have complete knowledge
bank on the issues occurred. In our case customer specific SAP notes had developed by SAP to resolve
issues in SAP standard code during technical upgrade.
 Coordination with vendors for SAP security, Basis, EAI, Portals and SAP for respective activities in
different time zones.
 Stringent timelines due to other projects based on business priorities.
 Governance of emergency changes and fixes.
Risks
 Issues encountered during upgrade and testing in (DEV/QUA) which might need structural fix
 Delayed response from SAP in providing required solution since issues are not in knowlege bank of SAP
 Upgrading CTP to EHP7 brings additional risk due to older versions of other systems in the landscape.
 Existing projects, new projects and project aftercare issues can be impacted during upgrade activities
of productive system
 UAT issues/fixes of the ongoing projects can be impacted during upgrade activities.
Communication Protocol:
Communication plan must be prepared and approved before actual execution of the projects from IT and
business.
Daily call – There must be daily call on every working day with the project team along with client IT team.
Use Run book to review the status on a daily basis. Meeting was chaired by the onsite/offshore PM.
Governance Board call – It must be a bi-weekly call. All stakeholders must be invited to join this meeting. It
should always starts with a brief status update on upgrade project. The objective of call should be to check
and approve/reject the high priority transports of operations or project that need to move through the
landscape during the freeze (e.g. severity 1 production issues or project after care issues). A tracker would
help to track these changes along with transport list.
Lessons learned call – At the end of each major project stage, a lessons learned call must be scheduled to
capture the lessons learned in the lessons learned log.
Ad-hoc call – Calls when important decisions need to take place e.g. Go/No Go and Changes to the project
plan / freeze periods. All stakeholders of the project were invited to join the meeting
Governance Board:
Governance Model Execution:
During the freeze period of upgrading SAP systems, there are two kind of situations which can occur:
1. Aftercare issues ongoing projects
2. Production issues in operations
Governance board will work for smooth execution of these issues:
1. Aftercare issues:
• Project Manager of the respective project must approach business, Tech Lead/BA of that project an
operations lead in case of Change required and get the approval ready.
• Then formal approval in Governance board meeting.
• Project Manager of the respective project to connect with Release Manager and QA officer for transporting
changes/fix
approved.
2. Production Issues:
• Raise an incident in the ticket handling tool.
• Corrective change/fix must be checked and Incident Manager/Service Lead must approach Business and
operational lead for approval.
• Then formal approval in Governance board.
• Service Lead/IM to connect with Release Manager for transporting changes/fix if approved.
Lesson Learned and Recommendations:
Project Plan and Run book preparation:
All the stakeholders and involved parties must be involved while preparing project plan. Most important
activity is to gather run book from all vendors supporting upgrade activity and merge into master run book
and project plan. Get POC from each of the vendors for interchanging information and involve in meetings.
Following contributors must involve for their respective responsibilities:
• Basis will be doing technical upgrade of the system. Involve POC right from project kick-off and planning
project activities.
• Security and Authorization team must take care of arranging user access for Basis and other dialog and
non-dialog users (system users, batch users, etc.).
• Business must be involve to make sure availability of users for UAT.
• Test Factory must be involve for regression testing
• SAP Functional team must be involve for unit testing and functional testing
• SAP technical team must be involve to implement SAP notes, SPAU/SPDD activities, bug fixing in functional
testing/UAT/aftercare
• Release Manager is an important participant to adjust systemupgrade of each system in continuation with
regular/monthly activities
Prerequisites of EHP7:
SAP systemmust be well equipped before go-live. EHP7 brings loads of additional functionalities to the
existing SAP system. It creates considerable reduction in the system response and generally contribute to
system performance. Make sure SAP system will be at latest software component level. Go through the note
mentioned below for further details.
There are several SAP notes available providing information about EHP7 package. Find below one of the note
which is providing related information about support packs.
1737650 – EHP7 for SAP ERP 6.0 SP Stacks – Release & Information Note
Test script and Test users:
Make sure test scripts must be updated with the latest approved testing process and test users must be
having similar role as that of the business users executing certain business processes . Make sure Test factory
testing script are updated.
Security and Authorizations:
EHP7 modifies authorization objects at some extent. Involve security and authorizations team in planning
study of changes in authorizations and roles of users. There is a separate exercise must be done after
implementing EHP7 in DEV system to find change s in the authorizations. A separate run book must be
prepared for S&A activity and merge in master run book and project plan
SAP involvement:
OSS messages raised due to various issues during upgrade of DEV or QUA takes time since SAP do not allow to
keep priority High/Very High for non-production system. Involvement of POC from SAP helps is arranging
appropriate in-time support during non-production system upgrades.
Other third party interfaces or applications POCs must be involve during testing of interfaces/portals
etc. Project managers of the
other ongoing projects will help in prioritize activities.
------X-----

More Related Content

What's hot

“Migration to Suite of HANA”
“Migration to Suite of HANA”“Migration to Suite of HANA”
“Migration to Suite of HANA”Wise Men
 
Sap S/4 HANA New Implementation
Sap S/4 HANA New ImplementationSap S/4 HANA New Implementation
Sap S/4 HANA New ImplementationSoumya De
 
SAP HANA System Replication (HSR) versus SAP Replication Server (SRS)
SAP HANA System Replication (HSR) versus SAP Replication Server (SRS)SAP HANA System Replication (HSR) versus SAP Replication Server (SRS)
SAP HANA System Replication (HSR) versus SAP Replication Server (SRS)Gary Jackson MBCS
 
Sap Study Materials and certification exam dump
Sap Study Materials and certification exam dumpSap Study Materials and certification exam dump
Sap Study Materials and certification exam dumpERP Training
 
T codes sap-basis-training
T codes sap-basis-trainingT codes sap-basis-training
T codes sap-basis-trainingmunnasap007
 
SAP S/4HANA Migration Cockpit
SAP S/4HANA Migration CockpitSAP S/4HANA Migration Cockpit
SAP S/4HANA Migration CockpitEdwin Weijers
 
Sap Upgrade Project Brief
Sap Upgrade Project BriefSap Upgrade Project Brief
Sap Upgrade Project Briefvpallapothu
 
Best Practices to Administer, Operate, and Monitor an SAP HANA System
Best Practices to Administer, Operate, and Monitor an SAP HANA SystemBest Practices to Administer, Operate, and Monitor an SAP HANA System
Best Practices to Administer, Operate, and Monitor an SAP HANA SystemSAPinsider Events
 
Delta scope sap ehp8 for SAP ERP 6.0 (Technical View)
Delta scope sap ehp8 for SAP ERP 6.0 (Technical View)Delta scope sap ehp8 for SAP ERP 6.0 (Technical View)
Delta scope sap ehp8 for SAP ERP 6.0 (Technical View)Pierluigi Demaria
 
Change Control Management in SAP Solution Manager 7.2
Change Control Management in SAP Solution Manager 7.2Change Control Management in SAP Solution Manager 7.2
Change Control Management in SAP Solution Manager 7.2Techedge Group
 
Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....
Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....
Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....Yevilina Rizka
 
Sap S4 HANA Everything You Need To Know
Sap S4 HANA Everything You Need To Know Sap S4 HANA Everything You Need To Know
Sap S4 HANA Everything You Need To Know Soumya De
 
SAP Fiori Mobility Applications
SAP  Fiori Mobility ApplicationsSAP  Fiori Mobility Applications
SAP Fiori Mobility ApplicationsWise Men
 
Accelerate your journey to SAP S/4HANA with SAP’s Business Technology Platform
Accelerate your journey to SAP S/4HANA with SAP’s Business Technology PlatformAccelerate your journey to SAP S/4HANA with SAP’s Business Technology Platform
Accelerate your journey to SAP S/4HANA with SAP’s Business Technology PlatformSAP Technology
 
17398351 sap-system-copy-homcopyv1
17398351 sap-system-copy-homcopyv117398351 sap-system-copy-homcopyv1
17398351 sap-system-copy-homcopyv1Mmusi Dithotse
 

What's hot (20)

Moving to SAP S/4HANA
Moving to SAP S/4HANAMoving to SAP S/4HANA
Moving to SAP S/4HANA
 
Sap system copy procedure
Sap system copy procedureSap system copy procedure
Sap system copy procedure
 
“Migration to Suite of HANA”
“Migration to Suite of HANA”“Migration to Suite of HANA”
“Migration to Suite of HANA”
 
Sap S/4 HANA New Implementation
Sap S/4 HANA New ImplementationSap S/4 HANA New Implementation
Sap S/4 HANA New Implementation
 
SAP S/4 HANA Technical assessment before migration
SAP S/4 HANA Technical assessment before migrationSAP S/4 HANA Technical assessment before migration
SAP S/4 HANA Technical assessment before migration
 
SAP HANA System Replication (HSR) versus SAP Replication Server (SRS)
SAP HANA System Replication (HSR) versus SAP Replication Server (SRS)SAP HANA System Replication (HSR) versus SAP Replication Server (SRS)
SAP HANA System Replication (HSR) versus SAP Replication Server (SRS)
 
Sap Study Materials and certification exam dump
Sap Study Materials and certification exam dumpSap Study Materials and certification exam dump
Sap Study Materials and certification exam dump
 
SAP ECC to S/4HANA Move
SAP ECC to S/4HANA MoveSAP ECC to S/4HANA Move
SAP ECC to S/4HANA Move
 
T codes sap-basis-training
T codes sap-basis-trainingT codes sap-basis-training
T codes sap-basis-training
 
SAP S/4HANA Migration Cockpit
SAP S/4HANA Migration CockpitSAP S/4HANA Migration Cockpit
SAP S/4HANA Migration Cockpit
 
Sap Upgrade Project Brief
Sap Upgrade Project BriefSap Upgrade Project Brief
Sap Upgrade Project Brief
 
Best Practices to Administer, Operate, and Monitor an SAP HANA System
Best Practices to Administer, Operate, and Monitor an SAP HANA SystemBest Practices to Administer, Operate, and Monitor an SAP HANA System
Best Practices to Administer, Operate, and Monitor an SAP HANA System
 
Delta scope sap ehp8 for SAP ERP 6.0 (Technical View)
Delta scope sap ehp8 for SAP ERP 6.0 (Technical View)Delta scope sap ehp8 for SAP ERP 6.0 (Technical View)
Delta scope sap ehp8 for SAP ERP 6.0 (Technical View)
 
Change Control Management in SAP Solution Manager 7.2
Change Control Management in SAP Solution Manager 7.2Change Control Management in SAP Solution Manager 7.2
Change Control Management in SAP Solution Manager 7.2
 
Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....
Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....
Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....
 
Sap S4 HANA Everything You Need To Know
Sap S4 HANA Everything You Need To Know Sap S4 HANA Everything You Need To Know
Sap S4 HANA Everything You Need To Know
 
SAP Fiori Mobility Applications
SAP  Fiori Mobility ApplicationsSAP  Fiori Mobility Applications
SAP Fiori Mobility Applications
 
Accelerate your journey to SAP S/4HANA with SAP’s Business Technology Platform
Accelerate your journey to SAP S/4HANA with SAP’s Business Technology PlatformAccelerate your journey to SAP S/4HANA with SAP’s Business Technology Platform
Accelerate your journey to SAP S/4HANA with SAP’s Business Technology Platform
 
Migration to sap s4 hana
Migration to sap s4 hanaMigration to sap s4 hana
Migration to sap s4 hana
 
17398351 sap-system-copy-homcopyv1
17398351 sap-system-copy-homcopyv117398351 sap-system-copy-homcopyv1
17398351 sap-system-copy-homcopyv1
 

Similar to Sap ehp6 to ehp7 upgradation projects

Velocity enhanced support- SAP
Velocity enhanced support- SAPVelocity enhanced support- SAP
Velocity enhanced support- SAPDeepa Nair
 
Solman Technosoft
Solman TechnosoftSolman Technosoft
Solman Technosoftr_shanki
 
ASAP Methodology Roadmaps and Phases.pdf
ASAP Methodology Roadmaps and Phases.pdfASAP Methodology Roadmaps and Phases.pdf
ASAP Methodology Roadmaps and Phases.pdfmail2cnivas1
 
Enhancement packages for sap erp what's new in logistics and operations
Enhancement packages for sap erp what's new in logistics and operationsEnhancement packages for sap erp what's new in logistics and operations
Enhancement packages for sap erp what's new in logistics and operationsaminab
 
11 mistakes to_avoid_when_upgrading_sap
11 mistakes to_avoid_when_upgrading_sap11 mistakes to_avoid_when_upgrading_sap
11 mistakes to_avoid_when_upgrading_sapVasudev Reddy
 
Eduardo Garcia IV - CV 07202016
Eduardo Garcia IV - CV 07202016Eduardo Garcia IV - CV 07202016
Eduardo Garcia IV - CV 07202016Eduardo Garcia IV
 
Asap methodology 1st phase- project preparation
Asap methodology  1st phase- project preparationAsap methodology  1st phase- project preparation
Asap methodology 1st phase- project preparationRangabashyam S
 
SAP Platform & S/4 HANA - Support for Innovation
SAP Platform & S/4 HANA - Support for InnovationSAP Platform & S/4 HANA - Support for Innovation
SAP Platform & S/4 HANA - Support for InnovationBernhard Luecke
 
Operations Control Center (OCC)
Operations Control Center (OCC)Operations Control Center (OCC)
Operations Control Center (OCC)Andreas Born
 
Adeyinka Olurin - Goal 3 - Change Request Management
Adeyinka Olurin - Goal 3 - Change Request ManagementAdeyinka Olurin - Goal 3 - Change Request Management
Adeyinka Olurin - Goal 3 - Change Request ManagementAdeyinka Olurin
 
Asap implementation methodology (2)
Asap implementation methodology (2)Asap implementation methodology (2)
Asap implementation methodology (2)Pradipta Mallick
 
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_content
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_contentSaphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_content
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_contentSanthoshakumar Chelliah
 
Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9Hari Krishna
 
Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9Hari Krishna
 
SAP_Technical_Architect_JSwetha_Resume
SAP_Technical_Architect_JSwetha_ResumeSAP_Technical_Architect_JSwetha_Resume
SAP_Technical_Architect_JSwetha_ResumeSwetha J
 

Similar to Sap ehp6 to ehp7 upgradation projects (20)

Velocity enhanced support- SAP
Velocity enhanced support- SAPVelocity enhanced support- SAP
Velocity enhanced support- SAP
 
Solman Technosoft
Solman TechnosoftSolman Technosoft
Solman Technosoft
 
ASAP Methodology Roadmaps and Phases.pdf
ASAP Methodology Roadmaps and Phases.pdfASAP Methodology Roadmaps and Phases.pdf
ASAP Methodology Roadmaps and Phases.pdf
 
sum-week1.pdf
sum-week1.pdfsum-week1.pdf
sum-week1.pdf
 
Enhancement packages for sap erp what's new in logistics and operations
Enhancement packages for sap erp what's new in logistics and operationsEnhancement packages for sap erp what's new in logistics and operations
Enhancement packages for sap erp what's new in logistics and operations
 
11 mistakes to_avoid_when_upgrading_sap
11 mistakes to_avoid_when_upgrading_sap11 mistakes to_avoid_when_upgrading_sap
11 mistakes to_avoid_when_upgrading_sap
 
Eduardo Garcia IV - CV 07202016
Eduardo Garcia IV - CV 07202016Eduardo Garcia IV - CV 07202016
Eduardo Garcia IV - CV 07202016
 
Asap methodology 1st phase- project preparation
Asap methodology  1st phase- project preparationAsap methodology  1st phase- project preparation
Asap methodology 1st phase- project preparation
 
ASAP Methodology in Implementing ERP
ASAP Methodology in Implementing ERPASAP Methodology in Implementing ERP
ASAP Methodology in Implementing ERP
 
SAP Platform & S/4 HANA - Support for Innovation
SAP Platform & S/4 HANA - Support for InnovationSAP Platform & S/4 HANA - Support for Innovation
SAP Platform & S/4 HANA - Support for Innovation
 
Operations Control Center (OCC)
Operations Control Center (OCC)Operations Control Center (OCC)
Operations Control Center (OCC)
 
Focused build overview
Focused build overviewFocused build overview
Focused build overview
 
Adeyinka Olurin - Goal 3 - Change Request Management
Adeyinka Olurin - Goal 3 - Change Request ManagementAdeyinka Olurin - Goal 3 - Change Request Management
Adeyinka Olurin - Goal 3 - Change Request Management
 
Run sap
Run sapRun sap
Run sap
 
Asap implementation methodology (2)
Asap implementation methodology (2)Asap implementation methodology (2)
Asap implementation methodology (2)
 
Sap solution manager
Sap solution managerSap solution manager
Sap solution manager
 
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_content
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_contentSaphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_content
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_content
 
Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9
 
Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9
 
SAP_Technical_Architect_JSwetha_Resume
SAP_Technical_Architect_JSwetha_ResumeSAP_Technical_Architect_JSwetha_Resume
SAP_Technical_Architect_JSwetha_Resume
 

More from Lokesh Modem

Variant configuration.docx
Variant configuration.docxVariant configuration.docx
Variant configuration.docxLokesh Modem
 
SAP S4 HANA SOURCING AND PROCUREMENT CONTENT.docx
SAP S4 HANA SOURCING AND PROCUREMENT CONTENT.docxSAP S4 HANA SOURCING AND PROCUREMENT CONTENT.docx
SAP S4 HANA SOURCING AND PROCUREMENT CONTENT.docxLokesh Modem
 
Fiori Apps Library.pdf
Fiori Apps Library.pdfFiori Apps Library.pdf
Fiori Apps Library.pdfLokesh Modem
 
Material Ledger Configuration.doc
Material Ledger Configuration.docMaterial Ledger Configuration.doc
Material Ledger Configuration.docLokesh Modem
 
What is Cost of Goods Sold.doc
What is Cost of Goods Sold.docWhat is Cost of Goods Sold.doc
What is Cost of Goods Sold.docLokesh Modem
 
FSD_Stock aging Report Based On consumption.doc
FSD_Stock aging Report Based On consumption.docFSD_Stock aging Report Based On consumption.doc
FSD_Stock aging Report Based On consumption.docLokesh Modem
 
SAP Solution Manger 7.2
SAP Solution Manger 7.2SAP Solution Manger 7.2
SAP Solution Manger 7.2Lokesh Modem
 
E invoice webinar_jan2020_v2
E invoice webinar_jan2020_v2E invoice webinar_jan2020_v2
E invoice webinar_jan2020_v2Lokesh Modem
 
Gst digital compliance roadmap jan2010 v1
Gst digital compliance roadmap jan2010 v1Gst digital compliance roadmap jan2010 v1
Gst digital compliance roadmap jan2010 v1Lokesh Modem
 
SAP MM Business Scenarios
SAP MM  Business ScenariosSAP MM  Business Scenarios
SAP MM Business ScenariosLokesh Modem
 
SAP Third party scenarios _automatives
SAP Third party scenarios _automatives SAP Third party scenarios _automatives
SAP Third party scenarios _automatives Lokesh Modem
 
Fsd for mass upload program to create and change of scheduling agreement
Fsd for mass upload program to create and change of scheduling agreementFsd for mass upload program to create and change of scheduling agreement
Fsd for mass upload program to create and change of scheduling agreementLokesh Modem
 
Pir price updation in SCHEDULLING AGREEMENT
Pir price updation in SCHEDULLING AGREEMENTPir price updation in SCHEDULLING AGREEMENT
Pir price updation in SCHEDULLING AGREEMENTLokesh Modem
 
Fsd zpriz price details from a017 & a018
Fsd zpriz price details from a017 & a018Fsd zpriz price details from a017 & a018
Fsd zpriz price details from a017 & a018Lokesh Modem
 
Fsd for upload program for delivery completion indicator of scheduling agreem...
Fsd for upload program for delivery completion indicator of scheduling agreem...Fsd for upload program for delivery completion indicator of scheduling agreem...
Fsd for upload program for delivery completion indicator of scheduling agreem...Lokesh Modem
 
Guidelines for xl_filling
Guidelines for xl_fillingGuidelines for xl_filling
Guidelines for xl_fillingLokesh Modem
 
Gst e way bill solution from sap
Gst e way bill solution from sapGst e way bill solution from sap
Gst e way bill solution from sapLokesh Modem
 

More from Lokesh Modem (20)

Variant configuration.docx
Variant configuration.docxVariant configuration.docx
Variant configuration.docx
 
SAP S4 HANA SOURCING AND PROCUREMENT CONTENT.docx
SAP S4 HANA SOURCING AND PROCUREMENT CONTENT.docxSAP S4 HANA SOURCING AND PROCUREMENT CONTENT.docx
SAP S4 HANA SOURCING AND PROCUREMENT CONTENT.docx
 
Fiori Apps Library.pdf
Fiori Apps Library.pdfFiori Apps Library.pdf
Fiori Apps Library.pdf
 
Material Ledger Configuration.doc
Material Ledger Configuration.docMaterial Ledger Configuration.doc
Material Ledger Configuration.doc
 
SAP S4 HANA.docx
SAP S4 HANA.docxSAP S4 HANA.docx
SAP S4 HANA.docx
 
What is Cost of Goods Sold.doc
What is Cost of Goods Sold.docWhat is Cost of Goods Sold.doc
What is Cost of Goods Sold.doc
 
FSD_Stock aging Report Based On consumption.doc
FSD_Stock aging Report Based On consumption.docFSD_Stock aging Report Based On consumption.doc
FSD_Stock aging Report Based On consumption.doc
 
Sap pp org
Sap pp orgSap pp org
Sap pp org
 
Sap sd org
Sap sd org Sap sd org
Sap sd org
 
SAP Solution Manger 7.2
SAP Solution Manger 7.2SAP Solution Manger 7.2
SAP Solution Manger 7.2
 
E invoice webinar_jan2020_v2
E invoice webinar_jan2020_v2E invoice webinar_jan2020_v2
E invoice webinar_jan2020_v2
 
Gst digital compliance roadmap jan2010 v1
Gst digital compliance roadmap jan2010 v1Gst digital compliance roadmap jan2010 v1
Gst digital compliance roadmap jan2010 v1
 
SAP MM Business Scenarios
SAP MM  Business ScenariosSAP MM  Business Scenarios
SAP MM Business Scenarios
 
SAP Third party scenarios _automatives
SAP Third party scenarios _automatives SAP Third party scenarios _automatives
SAP Third party scenarios _automatives
 
Fsd for mass upload program to create and change of scheduling agreement
Fsd for mass upload program to create and change of scheduling agreementFsd for mass upload program to create and change of scheduling agreement
Fsd for mass upload program to create and change of scheduling agreement
 
Pir price updation in SCHEDULLING AGREEMENT
Pir price updation in SCHEDULLING AGREEMENTPir price updation in SCHEDULLING AGREEMENT
Pir price updation in SCHEDULLING AGREEMENT
 
Fsd zpriz price details from a017 & a018
Fsd zpriz price details from a017 & a018Fsd zpriz price details from a017 & a018
Fsd zpriz price details from a017 & a018
 
Fsd for upload program for delivery completion indicator of scheduling agreem...
Fsd for upload program for delivery completion indicator of scheduling agreem...Fsd for upload program for delivery completion indicator of scheduling agreem...
Fsd for upload program for delivery completion indicator of scheduling agreem...
 
Guidelines for xl_filling
Guidelines for xl_fillingGuidelines for xl_filling
Guidelines for xl_filling
 
Gst e way bill solution from sap
Gst e way bill solution from sapGst e way bill solution from sap
Gst e way bill solution from sap
 

Recently uploaded

Unveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesUnveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesŁukasz Chruściel
 
CRM Contender Series: HubSpot vs. Salesforce
CRM Contender Series: HubSpot vs. SalesforceCRM Contender Series: HubSpot vs. Salesforce
CRM Contender Series: HubSpot vs. SalesforceBrainSell Technologies
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024StefanoLambiase
 
What is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWhat is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWave PLM
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityNeo4j
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideChristina Lin
 
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanySuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanyChristoph Pohl
 
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackCloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackVICTOR MAESTRE RAMIREZ
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxTier1 app
 
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...Christina Lin
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesPhilip Schwarz
 
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...Matt Ray
 
英国UN学位证,北安普顿大学毕业证书1:1制作
英国UN学位证,北安普顿大学毕业证书1:1制作英国UN学位证,北安普顿大学毕业证书1:1制作
英国UN学位证,北安普顿大学毕业证书1:1制作qr0udbr0
 
What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....kzayra69
 
Implementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with AzureImplementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with AzureDinusha Kumarasiri
 
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEOrtus Solutions, Corp
 
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company OdishaBalasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odishasmiwainfosol
 
SpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at RuntimeSpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at Runtimeandrehoraa
 
Buds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in NoidaBuds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in Noidabntitsolutionsrishis
 

Recently uploaded (20)

Unveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesUnveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New Features
 
CRM Contender Series: HubSpot vs. Salesforce
CRM Contender Series: HubSpot vs. SalesforceCRM Contender Series: HubSpot vs. Salesforce
CRM Contender Series: HubSpot vs. Salesforce
 
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
 
What is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWhat is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need It
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered Sustainability
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
 
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanySuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
 
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackCloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStack
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
 
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a series
 
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
 
英国UN学位证,北安普顿大学毕业证书1:1制作
英国UN学位证,北安普顿大学毕业证书1:1制作英国UN学位证,北安普顿大学毕业证书1:1制作
英国UN学位证,北安普顿大学毕业证书1:1制作
 
What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....
 
Implementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with AzureImplementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with Azure
 
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
 
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company OdishaBalasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
 
SpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at RuntimeSpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at Runtime
 
Buds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in NoidaBuds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in Noida
 

Sap ehp6 to ehp7 upgradation projects

  • 1. SAP ECC HANA EHP 6 TO EHP7 Technical Up gradation I have recently completed upgrade of Enhancement Pack 7 for one of our esteemed client. Initially it looks like normal SP upgrade, but when getting deeper into it appeared as huge package of addition to the existing system at software component level. Enhancement of component cause impact on overall performance of the system. If you are planning to upgrade your systemto EHP7 (Which is also latest patch provided by SAP), then it would be useful for you to go though below post. This post will help you to prepare plan for upgrading your system. Insights of Enhancement Pack 7 What is Enhancement Pack: Enhancement packages are provided by SAP for their customer to manage and deploy new software functionality introduced by SAP. A set of new integrated/individual functionalities can be deployed by implementing enhancement packs. Best part is customers can select new/enhanced functionalities out f the delivered software innovations by SAP and activate as per business needs. This is the simplest online solution to introduce new functionalities into the systemwithout impacting ongoing business in faster way. Enhancement packages are cumulative. Thus, enhancement package 7 contains all the previously delivered enhancements as well as the new ones. Enhancement packages can be downloaded from SAP service using SAP Solution Manager. Enhancement Package 7 for SAP ERP 6.0 SAP has introduced more than 100 new functions in Enhancement package 7 for SAP ERP 6.0 and is the first EHP to be optimized for both the SAP HANA database and the traditional certified databases. Since enhancement package 5 for SAP ERP 6.0, customers have had the option of deactivating certain business functions that were previously activated. SAP enhancement package 7 also includes numerous new functions for financial accounting, logistics, human resources, and quality management, as well as cross-application functions and improvements for SAP Master Data Governance and manager self-service (MSS). Key features with EHP 7  SAP Fiori – There are collection of 25 role-based productivity applications in SAP Fiori which will help end users to complete their daily tasks with enhanced speed and efficiency on handhold devices like smartphone and tablet along with notebook or PCs.  Faster MRP runs – As EHP7 is optimized for SAP HANA database, it provides the option to use SAP HANA Live to check on material availability and inventory days of supply in real time at exploded-view level. All features of SAP HANA can be utilized to speed up complex MRP runs and capacity planning.  Data aging – The use of data in-memory platform of SAP HANA can be used for implement a data aging strategy efficiently. This can provide near real-time data to end user for day-to-day operations such as the financial results for the last two years. SAP Upgrade from ECC 6.0 EHP4 toECC 6.0 EHP7: Pre-upgrade Activities must be done on the existing level of software to understand impact on the basic software level. Another installation check should be done to identify any critical issues that could lead to additional risks or work on total number of custom objects /customizing to identify the impact of EHP7 enhancements on the existing custom transactions/reports Study of Software components versions:
  • 2. The component versions can be generated by Solution Manager System which gives the overall components needs to be upgraded from EHP4 to EHP7 SPS3. This can be done by SAP basis consultant using SAP Solution Manager. A list of all the new versions of software components can be seen and selected before upgrading to EHP7. Find below sample screenshots which show the components selected that will be upgraded with new version. Installation Check: Installation check is the activity to must be done to understand if there are any critical issues that could lead to additional risks or work when compared with the average SAP EHP installation project. This check can be done by development team or SAP support can be taken to study and report the impact on the existing set of processes in the ERP SAP system. SAP charges separately for doing such studies. The objective of the SAP EHP Installation Check is to identify the most significant risk and effort drivers for your planned project. For this purpose, it collects technical information in your current production systemand evaluates it based on general experience obtained.
  • 3. The table below shows the most critical risk and outlay drivers for any software change project grouped by key focus areas. An explanation of the key focus areas can be found in the upgrade white paper of the SAP standards for solution operations. An action plan for the activities can be prepared based on the priorities on identified risk and precautions before upgrade initiation. Installation check will be baseline for estimations of the efforts required for adjustment during upgrade of enhancement package. Security Authorization Check Enhancement package impact on the security and authorization objects of the end users. Once development upgrade is done in the landscape, a detail check of modifies authorization object must be done by SAP security consultant/team. This activity will mitigate further risk of authorization issues after production upgrade. The transports of the security adjustment must be transported just after upgrading quality or production system. Test Factory for SIT: Test factory must be involved for SIT in project planning to avoid re-planning or any impact the go-live date. Test factory do not always have all the domain knowledge to be able to execute a full SIT. If test scripts are not ready or up-to-date, it could cause adverse impact on the project timelines. Its is highly recommended to execute knowledge transfer to test factory for the areas where they are currently lacking the knowledge of the upgrading system. There involvement during start-up of the project will help in the efficient project planning. Test Factory can execute Regression Testing on the upgrading system as a part of regular monthly release. SAP Max Attention Support: SAP Quality manager must be involved right from kick-off of the upgrade. SAP quality manager can arrange support from SAP to expedite resolutions from SAP. This is a paid service of SAP and must be arrange in advance to avoid unexpected delays in project timelines due to software issues during upgrade. Challenges andRisk: Challenges  Enhancement pack 7 is the latest pack provided by SAP. Even SAP doesn’t have complete knowledge bank on the issues occurred. In our case customer specific SAP notes had developed by SAP to resolve issues in SAP standard code during technical upgrade.  Coordination with vendors for SAP security, Basis, EAI, Portals and SAP for respective activities in different time zones.  Stringent timelines due to other projects based on business priorities.  Governance of emergency changes and fixes. Risks
  • 4.  Issues encountered during upgrade and testing in (DEV/QUA) which might need structural fix  Delayed response from SAP in providing required solution since issues are not in knowlege bank of SAP  Upgrading CTP to EHP7 brings additional risk due to older versions of other systems in the landscape.  Existing projects, new projects and project aftercare issues can be impacted during upgrade activities of productive system  UAT issues/fixes of the ongoing projects can be impacted during upgrade activities. Communication Protocol: Communication plan must be prepared and approved before actual execution of the projects from IT and business. Daily call – There must be daily call on every working day with the project team along with client IT team. Use Run book to review the status on a daily basis. Meeting was chaired by the onsite/offshore PM. Governance Board call – It must be a bi-weekly call. All stakeholders must be invited to join this meeting. It should always starts with a brief status update on upgrade project. The objective of call should be to check and approve/reject the high priority transports of operations or project that need to move through the landscape during the freeze (e.g. severity 1 production issues or project after care issues). A tracker would help to track these changes along with transport list. Lessons learned call – At the end of each major project stage, a lessons learned call must be scheduled to capture the lessons learned in the lessons learned log. Ad-hoc call – Calls when important decisions need to take place e.g. Go/No Go and Changes to the project plan / freeze periods. All stakeholders of the project were invited to join the meeting Governance Board:
  • 5. Governance Model Execution: During the freeze period of upgrading SAP systems, there are two kind of situations which can occur: 1. Aftercare issues ongoing projects 2. Production issues in operations Governance board will work for smooth execution of these issues: 1. Aftercare issues: • Project Manager of the respective project must approach business, Tech Lead/BA of that project an operations lead in case of Change required and get the approval ready. • Then formal approval in Governance board meeting. • Project Manager of the respective project to connect with Release Manager and QA officer for transporting changes/fix approved. 2. Production Issues: • Raise an incident in the ticket handling tool. • Corrective change/fix must be checked and Incident Manager/Service Lead must approach Business and operational lead for approval. • Then formal approval in Governance board. • Service Lead/IM to connect with Release Manager for transporting changes/fix if approved. Lesson Learned and Recommendations: Project Plan and Run book preparation: All the stakeholders and involved parties must be involved while preparing project plan. Most important activity is to gather run book from all vendors supporting upgrade activity and merge into master run book and project plan. Get POC from each of the vendors for interchanging information and involve in meetings. Following contributors must involve for their respective responsibilities: • Basis will be doing technical upgrade of the system. Involve POC right from project kick-off and planning project activities. • Security and Authorization team must take care of arranging user access for Basis and other dialog and non-dialog users (system users, batch users, etc.). • Business must be involve to make sure availability of users for UAT. • Test Factory must be involve for regression testing • SAP Functional team must be involve for unit testing and functional testing • SAP technical team must be involve to implement SAP notes, SPAU/SPDD activities, bug fixing in functional testing/UAT/aftercare • Release Manager is an important participant to adjust systemupgrade of each system in continuation with regular/monthly activities Prerequisites of EHP7: SAP systemmust be well equipped before go-live. EHP7 brings loads of additional functionalities to the existing SAP system. It creates considerable reduction in the system response and generally contribute to system performance. Make sure SAP system will be at latest software component level. Go through the note mentioned below for further details.
  • 6. There are several SAP notes available providing information about EHP7 package. Find below one of the note which is providing related information about support packs. 1737650 – EHP7 for SAP ERP 6.0 SP Stacks – Release & Information Note Test script and Test users: Make sure test scripts must be updated with the latest approved testing process and test users must be having similar role as that of the business users executing certain business processes . Make sure Test factory testing script are updated. Security and Authorizations: EHP7 modifies authorization objects at some extent. Involve security and authorizations team in planning study of changes in authorizations and roles of users. There is a separate exercise must be done after implementing EHP7 in DEV system to find change s in the authorizations. A separate run book must be prepared for S&A activity and merge in master run book and project plan SAP involvement: OSS messages raised due to various issues during upgrade of DEV or QUA takes time since SAP do not allow to keep priority High/Very High for non-production system. Involvement of POC from SAP helps is arranging appropriate in-time support during non-production system upgrades. Other third party interfaces or applications POCs must be involve during testing of interfaces/portals etc. Project managers of the other ongoing projects will help in prioritize activities. ------X-----