Foreign investors are presented with many projects in the areas of beef and prepared meats, wood production, agricultural greenhouses, and tourism centers.
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
East Kazakhstan Investment Projects
1. On the following investment projects, the following can be contacted:
Bauyrzhan Kudebayev, Director, Kudebay Invest and Trade LLC, +7 7172
48 67 93, kudebay@mail.ru
Nurgali Arystanov, Counselor, Embassy of Kazakhstan,
nurgali@kazakhembus.com
Kaisar Kopish, Economic Officer, Embassy of Kazakhstan,
kaisar@kazakhembus.com
Construction of plant for deep processing of meat and the creation of an
irrigation system in the area of 700 hectares
Applicant: LLC «Shalabai»
The purpose and concept of the project are:
Production modernization, creation of a stable food
supply for the cattle breeding and production of
competitive meat products.
Period of realization: 2016-2020
Place of realization: EKR, Zharma rayon, Shalabai village.
Current state: For irrigating 700 hectares of arable land on the river
Kyzyl-Su is built reservoir capacity of 650-700tys.m3.
project documentation for the construction of plant for
meat processing is developed.
Total cost of project: 5 500 million tenge
Required investments: 5 500 million tenge (15.1 million USD)
Government support: 1. Subsidies of interest rates on loans, and leasing of
technological equipment and agricultural machinery;
2. Subsidies to implement irrigation system;
3. Subsidies for feed production (seeds, fuels and
lubricants, herbicides, fertilizers), and the delivery of
water;
4. Subsidies for meat production.
Expected Result: Production of 200 tons per year of premium beef and
2. canned meat products
Workplaces 30 persons
Construction of oil processing of oilseeds crops
Applicant: LLC «EastAroKholding»
The purpose and concept of the project are:
production and sale of its oil in the region
Period of realization: 2016-2020 years
Place of realization: EKR, Ust-Kamenogorsk city
Current state There is an engineering infrastructure, where develop
design documentation.
Total cost of project: 900 million tenge
Required investments: 600 million tenge (163k USD)
Government support Subsidized of interest rates on loans, and leasing of
technological equipment and agricultural machinery;
Expected Result: Production annual 16,900 tons of sunflower oil, 15
600 tonnes of sunflower meal.
Workplaces 47 persons
3. Growing and processing of artichoke to produce granular concentrated feed,
bioethanol and monosugars
Applicant: LCC «Zelenstroi KZ»
The purpose and concept of the project are:
creation of a modern agricultural holding for
breeding and deep processing of complex technical
and forage crops
Period of realization: 2016 2018 years
Place of realization: EKR, Ust-Kamenogorsk
Current state There are 1600 hectares of land. Also all the
necessary engineering and transport communications
are available. Business plan.
Total cost of project: 400 million tenge
Required investments: 320 million tenge (876k USD)
Government support subsidies for feed production (seeds, fuels and
lubricants, herbicides, fertilizers).
Expected Result: The annual production of up to 37,000 granulated
concentrated feed, bioethanol and monosugars.
Workplaces: 220 persons
4. Construction corn-treacle factory
Applicant: «Bota» farm
The purpose and concept of the project are:
processing of corn starch release and other
products for sale on the territory of the region and
outside.
Period of realization: 2016 2018 years
Place of realization EKR, Zaisan
Current state: There are 1500 hectares of land. Develop a
business plan, feasibility study for the project.
Total cost of project: 2 500 million tenge
Required investments: 1 800 million tenge (4.9 million USD)
Government support 1. Subsidized of interest rates on loans, and
leasing of technological equipment and
agricultural machinery;
2. Subsidies for crop production (seeds, fuels and
lubricants, herbicides, fertilizers).
Expected Result: Production per day 70 tons of starch.
Workplaces: 60 persons
5. Construction of plant for packing the honey
Applicant: CH "Paseka"
The purpose and concept of the project:
Increasing production and sales volumes in the
region and the Republic of honey products.
Period of realization: 2016
Project location: East Kazakhstan region, Ust-
Kamenogorsk city, Menovnoe village
Current Status: The construction of the plant and are maintained
interior finishing work. It is considering the
issue of the supply of equipment to suppliers.
Total project cost: 360 million tenge
Required investments: 140 million tenge for the purchase of
equipment. (838k USD)
Government support: Subsidizing interest rates on loans, and leasing
of technological equipment and agricultural
machinery.
Expected Result: The annual production of up to 1,000 ton of
honey products.
Job Creation: 15 persons
6. Construction of ethno-ecological agricultural tourism and recreation сentre
Applicant: SP "Kanapyanov"
The purpose and concept of the project: the
development of agricultural tourism
Period of realization: 2016-2017 years
Project location: East Kazakhstan region, Ulan
district, Kobayashi Utepov village
Current status: Available land of 580 hectares. The project is
under development
Total project cost: 370 million tenge
Required investments: 300 million tenge for the construction of the base,
a cafe, stables (821k USD)
Expected Result: restoration of the destroyed ethno-village of
Kush-Birlik with a single capacity of 60 persons
Job Creation: 11 persons
7. Construction of a hothouse complex
Applicant: LLP "Alzhan AGROTRADE"
The purpose and concept of the project:
Growing vegetable crops using advanced
technologies.
Period of realization: 2016-2017 years
Project location: East Kazakhstan region,
Ust-Kamenogorsk city
Current status: There is a 2.2 hectare plot of land in the area of
New Sogra. The necessary infrastructure is
lacking. PSD does not. There is a business plan.
The total cost of the project: 1 350 mln. tenge
Required investments: 1 350 mln. tenge (3.7 million USD)
State support: 1. Wrap the missing infrastructure on the
program "Business Road Map-2020";
2. Subsidize interest rates on loans, and leasing
of technological equipment and agricultural
machinery;
3. Investment subsidies for the construction and
expansion of the greenhouse complex.
Output expected: Annual production of
vegetables and 550 tons of cucumbers and 450
tons of tomatoes.
Job Creation: 40 persons
Organization of the production of wood products
8. Applicant: "Tsykunov AA" IB
The purpose and concept of the project:
Procurement of raw materials for the wood
production and the further processing.
Implementation period: 2016-2017
Project location: EKR, Ridder city
Current status: - At the design stage
Total project cost: 750.0 million tenge
Required investments: 720.0 million tenge
(1.9 million USD)
The State Support
Expected result
1. Summing missing infrastructure by the program
"Business Road Map-2020";
2. Preferences in according by the Law of the
Republic of Kazakhstan "On Investments";
3. Different measures of financial and nonfinancial
state support and business development services,
business support for the "Road Map of Business-
2020".
The final product (the number of ton per year):
- Cutting board - 10,000 m3
; - Dry timber - 1350 m3
;
- Laminated veneer lumber for housing - 1200m3
; -
glulam for manufacturing euro windows - 1200m3
; -
Round logs for log cabins - 10000m3
; - wooden
doors
Creating jobs 60 persons
###