2. TEAM DETAILS
Facilitator- Mr. Rana Sanjeev Singh
Team Members:
1. Bipin Sinha(Team Leader)
2. Krishna Raj Shail
3. Ramesh Chaudhary
4. Rahul Kurmi
5. Gurpreet Singh
6. Abhinandan Rathore
3. Problem Identification
Sl No Problems Weightage Category
A B C
1 Problem in manual / automatic operation of flap gate 7 X
2 Ring hammer breaking in both Ring Granulators 6 X
3 Dislodging of liner plates from chutes surfaces 4 X
4
Frequent Bearing failure & Cracking of support beam as well as side
wall in VGF 5 X
5 High Vibration in Conv. 8A & 8B drive 4 X
6 High Vibration in Conv. 10 A head end drive 8 X
7 Spillage of coal in feeding zone in conv. 4AB 4 X
Category A: MINIMUM INVOLVEMENT OF OTHER DEPT. IN SOLVING THEM
Category B: INVOLVEMENT OF OTHER DEPT. IS NECESSARY
Category C: MANAGEMENT SANCTION MAY BE NEEDED IN IMPLEMENTING THE SOLUTION
.
4. Problem Identification
Sl No Problems
Weightage
Category
A B C
8 Slippage of RBF 1/2 belting during high feeding 4 X
9 Spillage of dust coal from VGF discharge 4 X
10 Slippage of boom conveyor belt 3 X
11 Damaging of return idler at bend pulley area in conv. 4AB, 5AB, 8AB 5 X
12 Regular damaging of skirt rubber in conv. 4A 6 X
13 Chute jamming in Crusher House, TP 5/6/7 and Tripper Chute 5 X
14 Failure of PLC communication in Stacker Reclaimer 4 X
15 Frequent Damage of skirt rubber 5 X
5. Problem Identification
Sl No Problems Weightage
Category
A B C
16 Removal of iron particle in conv. 3C and 10 A 4 X
17
Coal spillage in conv. 3C 5
X
18 Coal fine dust on all conv. head end
5
X
19
Vibration in Conv. 5A
8
X
20 Vibration in Conv. 9B
8
X
WEIGHTAGE IS ALLOTTED ON THE FREQUENCY OF OCCURRENCE IN PAST THREE
MONTHS. WEIGHTAGE DECREASES IF THE SOLUTION OF THE PROBLEM IS PROVIDED
FOR NOW