CH- 4 DRAINAGE AND
MAINTENANCE OF ROAD
1
 Highway drainage is a process of removing and
controlling excess surface and sub-soil water
within the right of way.
 It includes interception and diversion of water from
the road surface and sub grade.
2
 Excess moisture in soil subgrade causes considerable lowering
of its stability.
 Increase in moisture cause reduction in strength of many
pavement materials like stabilized soil and water bound
macadam.
 Sustained contact of water with bituminous pavements causes
failure due to stripping of bitumen from aggregates like loosening
or detachment of some of the bituminous pavement layers and
formations of pot holes
 Excess water on shoulders and pavement edges causes
considerable damage.
3
 Adjoining land
 Camber
 Gradient
 Cross drainage works
 Highest flood level
 Side drains
 Intercepting drains
 Water table
 Underground source of water 4
 Removal and diversion of surface water from the road
way and adjoining land is termed as surface drainage.
 Diversion and removal of excess of soil water from the
subgrade is termed as Surface Drainage.
5
1. By Longitudinal side drains.
2. Catch basins and Inlets in urbanareas
3. Providing damp proof course
4. Providing proper camber
5. Providing sufficient slope to the sides
6. Keeping the level of carriage way at least 60 cm above the HFL.
6
A) Side drains for road inembankment
-
7
 It is necessary to provide side drain on one side or both
sides, when road is constructed in embankment.
 Side drains should be at least 2.0 m away from bottom
edge of an embankment.
 Depth of side drains is kept 1.0 to 1.5 m to prevent
the entry of drain water into the embankment.
8
 B) Side drains for road in cutting
9
 A) Catch basins
10
 Catch basin is a structure like chamber constructed on a
sewer line.
 Water from pavement surface is collected in catch basin
and discharged to the sewer line.
 The catch basin (catch pit) is provided with grating to
prevent the entry of rubbish into the drainage system.
11
 Inlets is a concrete box with grating either at the top or in the
side.
12
 Removal or Diversion of excess soil-water from sub-grade is
termed as sub-surface drainage.
13
 When road is in cutting and water seeping from sides.
 When road is near the foot or hill and is likely to be damaged by
water flowing down the hill.
 When road is passing through plain area and water is likely
to accumulated on sides.
 Where water rises up to sub-grade by capillary action.
 Where sub-grade soil is affected by the drain passing near the
road.
Lowering ofWater
Table
ControllingSeepage
Flow
ControllingCapillary
Water
14
 In order to that the sub-grade and pavement are not
subjected to excessive moisture the water table should kept
at least 1.0 to 1.2 m below the sub-grade.
 In places where water table is high to take the road formation
on embankment of height not less than 1.0-1.2m is the best
approach.
 But When the formation level is at or below the general ground
level it is
necessary to lower the water table.
15
(a) If soil is relatively permeable, it may be possible to
lower WT by constructing longitudinal drainage trenches
with drain pipe and filter sand and top of trenches is
covered with clay seal
The depth of trench depend on:
(i) The required lowering of water table
(ii) distance b/w the drainage trenches
(iii)Types of soil
16
17
(b) If the soil is relatively
less permeable, the
lowering of groundWT
may not be adequate.
Hence in addition to the
longitudinal drains
traverse drains have to be
installed at suitable
intervals in effectively
drain off the water.
18
 When the general ground as well as impervious
strata below are sloping, seepage flow is likely to
exist.
 If seepage zone is at depth less than 0.6-0.9 m
from sub-grade level, longitudinal pipe drain in
trench filled with filter material and clay seal may
be constructed to intercept the flow.
19
20
 If the water reaching the sub-grade due to capillary rise is likely to
be detrimental, it is possible to solve the problem by arresting
the capillary rise.
 It can be done by following methods:
(a)A layer of granular materials of suitable thickness is provided
during the construction of embankment, between the sub-grade
and the highest level of sub surface water table.
(b)Alternate method is providing the capillary cut off is by
inserting an impermeable or a bituminous layer in place of
granular blanket.
21
22
23
Maintenance of surface and subsurface
drainage system
1.By cleaning drains
2. Controlling erosion of
drain
24

More Related Content

What's hot

What's hot (20)

Highway Drainage System
Highway Drainage SystemHighway Drainage System
Highway Drainage System
 
Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)
 
Site distance in highway engineering
Site distance in highway engineeringSite distance in highway engineering
Site distance in highway engineering
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
Types of earth dams
Types of earth damsTypes of earth dams
Types of earth dams
 
Canal Fall
Canal FallCanal Fall
Canal Fall
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway lines
 
Wash boring
Wash boringWash boring
Wash boring
 
Lined canal ppt
Lined canal ppt Lined canal ppt
Lined canal ppt
 
Cross drainage works irrigation engineering
Cross drainage works irrigation engineeringCross drainage works irrigation engineering
Cross drainage works irrigation engineering
 
Highway engg. (road m aterial)
Highway engg. (road m aterial)Highway engg. (road m aterial)
Highway engg. (road m aterial)
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Earthen Dam
Earthen DamEarthen Dam
Earthen Dam
 
Canal Irrigation
Canal IrrigationCanal Irrigation
Canal Irrigation
 
Highway drainage system
Highway drainage systemHighway drainage system
Highway drainage system
 
4. Highway Materials.pdf
4. Highway Materials.pdf4. Highway Materials.pdf
4. Highway Materials.pdf
 
Canal
CanalCanal
Canal
 
Highway Materials Unit-III
Highway Materials  Unit-IIIHighway Materials  Unit-III
Highway Materials Unit-III
 
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
 
GEOMETRIC DESIGN OF HIGHWAY
GEOMETRIC DESIGN OF HIGHWAYGEOMETRIC DESIGN OF HIGHWAY
GEOMETRIC DESIGN OF HIGHWAY
 

Similar to Chapter 4 Drainge and maintenance of road

Chapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdfChapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdfrajundauliya
 
Module 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway EconomicsModule 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway EconomicsDhananjayM6
 
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...VATSAL PATEL
 
Water logging.pptx
Water logging.pptxWater logging.pptx
Water logging.pptxEmaan Sharma
 
3. Highway Drainage.pdf
3. Highway Drainage.pdf3. Highway Drainage.pdf
3. Highway Drainage.pdfRoshani Shahi
 
Ground water recharge & water logging
Ground water recharge & water loggingGround water recharge & water logging
Ground water recharge & water loggingNIKHIL PAKWANNE
 
Ground water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil PakwanneGround water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil PakwanneNIKHIL PAKWANNE
 
Canal of design
Canal of designCanal of design
Canal of designPREMKUMAR
 
Modes of failure earth dams
Modes of failure   earth damsModes of failure   earth dams
Modes of failure earth damssaibabu48
 
IMPORTANCE OF DRAINAGE IN IRRIGATED AREAS
IMPORTANCE OF DRAINAGE IN IRRIGATED AREASIMPORTANCE OF DRAINAGE IN IRRIGATED AREAS
IMPORTANCE OF DRAINAGE IN IRRIGATED AREASYallanagouda Madagoudra
 

Similar to Chapter 4 Drainge and maintenance of road (20)

Chapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdfChapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdf
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
 
Module 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway EconomicsModule 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway Economics
 
To be presented
To be presentedTo be presented
To be presented
 
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
 
Drainage system
Drainage systemDrainage system
Drainage system
 
Water logging.pptx
Water logging.pptxWater logging.pptx
Water logging.pptx
 
chapt 6.pptx
chapt 6.pptxchapt 6.pptx
chapt 6.pptx
 
3. Highway Drainage.pdf
3. Highway Drainage.pdf3. Highway Drainage.pdf
3. Highway Drainage.pdf
 
3. Highway Drainage.pdf
3. Highway Drainage.pdf3. Highway Drainage.pdf
3. Highway Drainage.pdf
 
20160716_WATER SUPPLY.ppt
20160716_WATER SUPPLY.ppt20160716_WATER SUPPLY.ppt
20160716_WATER SUPPLY.ppt
 
Ground water recharge & water logging
Ground water recharge & water loggingGround water recharge & water logging
Ground water recharge & water logging
 
Ground water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil PakwanneGround water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil Pakwanne
 
Lecture 8
Lecture 8Lecture 8
Lecture 8
 
Water logging
Water loggingWater logging
Water logging
 
Drainage
DrainageDrainage
Drainage
 
Canal of design
Canal of designCanal of design
Canal of design
 
Modes of failure earth dams
Modes of failure   earth damsModes of failure   earth dams
Modes of failure earth dams
 
IMPORTANCE OF DRAINAGE IN IRRIGATED AREAS
IMPORTANCE OF DRAINAGE IN IRRIGATED AREASIMPORTANCE OF DRAINAGE IN IRRIGATED AREAS
IMPORTANCE OF DRAINAGE IN IRRIGATED AREAS
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 

More from KHUSHBU SHAH

PLANE TABLE SURVEY
PLANE TABLE SURVEYPLANE TABLE SURVEY
PLANE TABLE SURVEYKHUSHBU SHAH
 
DEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKDEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKKHUSHBU SHAH
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWAREKHUSHBU SHAH
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge EngineeringKHUSHBU SHAH
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackKHUSHBU SHAH
 
Chapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsChapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsKHUSHBU SHAH
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railwayKHUSHBU SHAH
 
Chapter 2 Road geometrics
Chapter 2 Road geometricsChapter 2 Road geometrics
Chapter 2 Road geometricsKHUSHBU SHAH
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to roadKHUSHBU SHAH
 
Equipment management
Equipment managementEquipment management
Equipment managementKHUSHBU SHAH
 
Material management
Material managementMaterial management
Material managementKHUSHBU SHAH
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsKHUSHBU SHAH
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsKHUSHBU SHAH
 
Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-damKHUSHBU SHAH
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSKHUSHBU SHAH
 
Chapter 13 green building
Chapter 13 green buildingChapter 13 green building
Chapter 13 green buildingKHUSHBU SHAH
 
Chapter 12 special treatments
Chapter 12 special treatmentsChapter 12 special treatments
Chapter 12 special treatmentsKHUSHBU SHAH
 

More from KHUSHBU SHAH (20)

PLANE TABLE SURVEY
PLANE TABLE SURVEYPLANE TABLE SURVEY
PLANE TABLE SURVEY
 
DEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKDEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORK
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge Engineering
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
 
Chapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsChapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yards
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railway
 
Chapter 2 Road geometrics
Chapter 2 Road geometricsChapter 2 Road geometrics
Chapter 2 Road geometrics
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to road
 
Equipment management
Equipment managementEquipment management
Equipment management
 
Labour management
Labour managementLabour management
Labour management
 
Material management
Material managementMaterial management
Material management
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipments
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavations
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-dam
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Chapter 13 green building
Chapter 13 green buildingChapter 13 green building
Chapter 13 green building
 
Chapter 12 special treatments
Chapter 12 special treatmentsChapter 12 special treatments
Chapter 12 special treatments
 

Recently uploaded

Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 

Recently uploaded (20)

Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

Chapter 4 Drainge and maintenance of road

  • 1. CH- 4 DRAINAGE AND MAINTENANCE OF ROAD 1
  • 2.  Highway drainage is a process of removing and controlling excess surface and sub-soil water within the right of way.  It includes interception and diversion of water from the road surface and sub grade. 2
  • 3.  Excess moisture in soil subgrade causes considerable lowering of its stability.  Increase in moisture cause reduction in strength of many pavement materials like stabilized soil and water bound macadam.  Sustained contact of water with bituminous pavements causes failure due to stripping of bitumen from aggregates like loosening or detachment of some of the bituminous pavement layers and formations of pot holes  Excess water on shoulders and pavement edges causes considerable damage. 3
  • 4.  Adjoining land  Camber  Gradient  Cross drainage works  Highest flood level  Side drains  Intercepting drains  Water table  Underground source of water 4
  • 5.  Removal and diversion of surface water from the road way and adjoining land is termed as surface drainage.  Diversion and removal of excess of soil water from the subgrade is termed as Surface Drainage. 5
  • 6. 1. By Longitudinal side drains. 2. Catch basins and Inlets in urbanareas 3. Providing damp proof course 4. Providing proper camber 5. Providing sufficient slope to the sides 6. Keeping the level of carriage way at least 60 cm above the HFL. 6
  • 7. A) Side drains for road inembankment - 7
  • 8.  It is necessary to provide side drain on one side or both sides, when road is constructed in embankment.  Side drains should be at least 2.0 m away from bottom edge of an embankment.  Depth of side drains is kept 1.0 to 1.5 m to prevent the entry of drain water into the embankment. 8
  • 9.  B) Side drains for road in cutting 9
  • 10.  A) Catch basins 10
  • 11.  Catch basin is a structure like chamber constructed on a sewer line.  Water from pavement surface is collected in catch basin and discharged to the sewer line.  The catch basin (catch pit) is provided with grating to prevent the entry of rubbish into the drainage system. 11
  • 12.  Inlets is a concrete box with grating either at the top or in the side. 12
  • 13.  Removal or Diversion of excess soil-water from sub-grade is termed as sub-surface drainage. 13  When road is in cutting and water seeping from sides.  When road is near the foot or hill and is likely to be damaged by water flowing down the hill.  When road is passing through plain area and water is likely to accumulated on sides.  Where water rises up to sub-grade by capillary action.  Where sub-grade soil is affected by the drain passing near the road.
  • 15.  In order to that the sub-grade and pavement are not subjected to excessive moisture the water table should kept at least 1.0 to 1.2 m below the sub-grade.  In places where water table is high to take the road formation on embankment of height not less than 1.0-1.2m is the best approach.  But When the formation level is at or below the general ground level it is necessary to lower the water table. 15
  • 16. (a) If soil is relatively permeable, it may be possible to lower WT by constructing longitudinal drainage trenches with drain pipe and filter sand and top of trenches is covered with clay seal The depth of trench depend on: (i) The required lowering of water table (ii) distance b/w the drainage trenches (iii)Types of soil 16
  • 17. 17
  • 18. (b) If the soil is relatively less permeable, the lowering of groundWT may not be adequate. Hence in addition to the longitudinal drains traverse drains have to be installed at suitable intervals in effectively drain off the water. 18
  • 19.  When the general ground as well as impervious strata below are sloping, seepage flow is likely to exist.  If seepage zone is at depth less than 0.6-0.9 m from sub-grade level, longitudinal pipe drain in trench filled with filter material and clay seal may be constructed to intercept the flow. 19
  • 20. 20
  • 21.  If the water reaching the sub-grade due to capillary rise is likely to be detrimental, it is possible to solve the problem by arresting the capillary rise.  It can be done by following methods: (a)A layer of granular materials of suitable thickness is provided during the construction of embankment, between the sub-grade and the highest level of sub surface water table. (b)Alternate method is providing the capillary cut off is by inserting an impermeable or a bituminous layer in place of granular blanket. 21
  • 22. 22
  • 23. 23 Maintenance of surface and subsurface drainage system 1.By cleaning drains 2. Controlling erosion of drain
  • 24. 24