2. Key Benchmarks so far at Samalkot…
Highest production for the month – 10999 cum (July 11)
Highest production in a day – 919 cum ( July 11)
Total volume produced till date – 45700cum(as on date)
Avg. pumping qty per month – 7000 cum
Max Pumping qty per month – 9500 cum
Highest concrete grade produced – M40 (Temp
controlled)
Largest Temperature controlled concrete pour – 1300
cum in 16 Hrs
Mix design approvals for RMC Mixes in place of JNTUK
2
25.03.2012
5. Bag ratio
12000 80
70
10000
60 B
V A
8000
O 50 G
L R
6000 40
U A
M 30 T
4000
E I
20
O
2000
10
0 0
5
25.03.2012
6. Nellore Action plan
Target date for commencement – 26th September’2011.
Manpower
Shuffle one person each from production and technical
from samalkot to Nellore.
Production officers will be sourced locally.
Raw Materials vendors and plant vehicle will be finalized
by 2nd week.
Admin activities like guest house etc will be finalized by
3rd week.
Shuffle Transit mixers from Samalkot to Nellore and vice
versa.
6
Concrete Constituents 25.03.2012