ROOF TOP SPV POWER GENERATION
Pilot Scheme of MNRE for Large Scale Grid Connected
Roof Top Solar Power Generation
Solar Energy Corporation of India
(A Govt. of India Enterprise)
NBCC Plaza, Tower-1, 4th Floor, Pushp Vihar
Sector-V, Saket-V, New Delhi-110017
Ph: 011-29563834 Fax: 011-29564033
e-mail: ashvinikr@nic.in/ybkrseci@gmail.com
ROOF TOP SPV POWER GENERATION
1. Background
Government of India launched Jawaharlal Nehru National Solar Mission
(JNNSM) in January 2010 with a view to accelerate development and
promotion of solar energy technologies in the country. India is having high
potential of generating solar power as availability of solar radiation in various
parts of the country is quite good. Solar PV systems represents an attractive
option due to low cost and ability to install in various sizes (kW to MW level).
Ministry of New and Renewable Energy (MNRE) has brought out various
schemes for promoting solar power projects in different capacity ranges. This
includes utility scale megawatt size projects as well as off-grid applications up
to 100 kW.
To meet the JNNSM objectives, large area roof top installations are
considered as one of the potential route. In this type of systems, the
generated solar power is may be self-consumed and excess power could be
fed to grid. These projects are envisaged to mitigate diesel consumption when
the buildings are operating with diesel generator backup. In European
countries, grid interactive roof top systems are adding huge quantities to the
overall solar power capacities. MNRE has brought out pilot scheme to
promote grid connected roof top PV solar PV systems with a view tro
generate feedback and further promotion in India.
2. Objectives of the scheme
Acute power shortages in India are making most of the commercial and office
establishments to have diesel generator backup. By setting up the grid
interactive solar power plants on the rooftops would help in reducing the
consumption of diesel during the day time in the areas where grid power is
intermittent. If the grid power is continuous, the solar power generated will be
utilized along with the grid power and the proportionate amount of grid power
usage will get reduced. During minimum load periods (e.g. during weekends),
the excess power generated from solar systems could be fed to grid. The
consumer can be compensated for the exported power as per policy by the
State. Connectivity of these projects to the grid also has to be in accordance
with the prevailing CEA guidelines or policy by the State regulators/
DISCOMs.
ROOF TOP SPV POWER GENERATION
The specific objectives of the scheme include:
 Demonstration of grid connected roof top solar power plants to facilitate
reduction in consumption of diesel for power generation and
dependency on grid power.
 To establish the effectiveness of these solar systems in different
locations of India.
3. Approach
The scheme is being implemented by Solar Energy Corporation of India (SECI).
SECI has already concluded the bidding process to implement these projects.
Capacity allocations in three cities, viz. Bangalore, Chennai and Delhi have
been made to the successful bidders. As a part of scheme, the grant support
would be provided through SECI and SECI will monitor the projects during
implementation and as well as after implementation for at least two years.
The buildings for setting up solar PV roof top system would be identified by
the successful bidders and the beneficiary is required to meet 70% of the
project cost in lieu of benefit of electricity at free of cost. The MNRE, State
Nodal Agency and SECI would also facilitate identification of buildings and
interaction with State Energy Regulator and State DISCOMs wherever
necessary.
Highlight of the scheme would be to have involvement of beneficiary from
concept to installation. Beneficiaries are encouraged to get in touch with the
project developer as well as SECI as and when felt necessary by him.
4. Financial support
30% subsidy on the system cost arrived at the conclusion of bids by SECI to
the developer to whom the project has been allocated. The system cost also
includes annual maintenance charges for 2 years. The manner of disbursal of
subsidy is as follows:
- 20% after successful installation and commissioning of the system
- 5% after one year of successful operation of the project
- Balance 5% after two years of successful operation of the project.
ROOF TOP SPV POWER GENERATION
5. Project size:
Under this scheme, project size between 100 kW to 500 kW is allowed. The
minimum size of project size can also be arrived through adding roofs of
different buildings available in same campus.
6. Eligible Buildings
All buildings of the Government, PSUs, Commercial establishments,
hospitals, cold storages, warehouses, industries and educational institutions.
SECI in consultation with MNRE would ensure at least 50% of coverage for
the Government/ PSU buildings in the overall capacity allocation under this
scheme.
7. Submission of Proposals from interested beneficiaries:
 Interested beneficiaries may apply for the projects where adequate
shadow free roof area (@1000-1200 sq. metrs /100kW) is available.
 Priority will be given to the projects which would have approved
funds to meet the system cost.
 The proposals may be submitted to the following as per the format
for submission of proposals is enclosed in Annexure-1 (also
available on www.mnre.gov.in):
Sr. Manger (SPV)
Solar Energy Corporation of India
NBCC Plaza, Tower-1, 4th
Floor
Saket, New Delhi-110017
e-mail: ybkrseci@gmail.com, ashvinikr@nic.in
ROOF TOP SPV POWER GENERATION
Format for submission of preliminary information about the roof top
project proposal to SECI: ( to be submitted on company letter head)
Sr.
No
Item Details
1 Name of the contact person
2 Name of the Institution/Company:
Address:
3 Proposed capacity ( kWp)
4 Available roof area (m2
):
Roof type (RCC, sheets etc):
Roof orientation (E-W or N-S):
Roof size (Length X Breadth):
Any structures nearby causing Shade:
Expected Clear roof area:
4 Connected load:
Monthly electricity consumption (units):
Average peak load and time:
Average minimum load and time:
Connected distribution line
(11kV/33kV):
5 Details of Back up ( if any):
DG Set capacity:
Monthly Diesel consumption
(last 6 months average)
6 Financial Commitment:
Indicate the source to meet 70% of the
project cost.
Status of approval
Approved by competent
authority : YES/NO
If yes enclose the letter.

More Related Content

What's hot

Solar Energy India Sample
Solar Energy   India   SampleSolar Energy   India   Sample
Solar Energy India Samplevandalmax
 
Solar power in India - A financial analysis
Solar power in India - A financial analysisSolar power in India - A financial analysis
Solar power in India - A financial analysisAnkur Agarwal
 
How China become Solar PV manufacturing hub ?
How China become Solar PV manufacturing hub ?How China become Solar PV manufacturing hub ?
How China become Solar PV manufacturing hub ?Ashish Verma
 
A new Clean technology for Electricity Generation
A new Clean technology for Electricity GenerationA new Clean technology for Electricity Generation
A new Clean technology for Electricity GenerationBiswajit Bhuyan
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014Headway Solar
 
Jawaharlal nehru national solar mission
Jawaharlal nehru national solar missionJawaharlal nehru national solar mission
Jawaharlal nehru national solar missionDileep V Raj
 
Overview of solar power generation in india
Overview of solar power generation in indiaOverview of solar power generation in india
Overview of solar power generation in indiaBinit Das
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Headway Solar
 
Solar mission
Solar missionSolar mission
Solar missionkundana
 
Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016glsomani
 
Rbsa Research Report rise of solar power in India
Rbsa Research Report  rise of solar power in IndiaRbsa Research Report  rise of solar power in India
Rbsa Research Report rise of solar power in IndiaRBSA Advisors
 
Evolgence Solar Energy
Evolgence Solar EnergyEvolgence Solar Energy
Evolgence Solar Energyaravind7799
 
Indiasolaropportunity
Indiasolaropportunity Indiasolaropportunity
Indiasolaropportunity Naman Kumar
 
Integrating wind and solar energy in India for a Smart Grid platform
Integrating wind and solar energy in India for a Smart Grid platformIntegrating wind and solar energy in India for a Smart Grid platform
Integrating wind and solar energy in India for a Smart Grid platformFarhan Beg
 
Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...
Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...
Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...Ashish Sachdeva
 
Kerala solar energy policy 2013
Kerala solar energy policy 2013Kerala solar energy policy 2013
Kerala solar energy policy 2013Headway Solar
 
Potential of Solar Power in India
Potential of Solar Power in IndiaPotential of Solar Power in India
Potential of Solar Power in IndiaAkash Jauhari
 

What's hot (20)

Solar mission
Solar missionSolar mission
Solar mission
 
Solar Energy India Sample
Solar Energy   India   SampleSolar Energy   India   Sample
Solar Energy India Sample
 
Solar power in India - A financial analysis
Solar power in India - A financial analysisSolar power in India - A financial analysis
Solar power in India - A financial analysis
 
How China become Solar PV manufacturing hub ?
How China become Solar PV manufacturing hub ?How China become Solar PV manufacturing hub ?
How China become Solar PV manufacturing hub ?
 
A new Clean technology for Electricity Generation
A new Clean technology for Electricity GenerationA new Clean technology for Electricity Generation
A new Clean technology for Electricity Generation
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
 
Jawaharlal nehru national solar mission
Jawaharlal nehru national solar missionJawaharlal nehru national solar mission
Jawaharlal nehru national solar mission
 
Solar power plant Opportunity and Costing
Solar power plant Opportunity and CostingSolar power plant Opportunity and Costing
Solar power plant Opportunity and Costing
 
Overview of solar power generation in india
Overview of solar power generation in indiaOverview of solar power generation in india
Overview of solar power generation in india
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015
 
Solar mission
Solar missionSolar mission
Solar mission
 
Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016
 
Rbsa Research Report rise of solar power in India
Rbsa Research Report  rise of solar power in IndiaRbsa Research Report  rise of solar power in India
Rbsa Research Report rise of solar power in India
 
Evolgence Solar Energy
Evolgence Solar EnergyEvolgence Solar Energy
Evolgence Solar Energy
 
Indiasolaropportunity
Indiasolaropportunity Indiasolaropportunity
Indiasolaropportunity
 
Integrating wind and solar energy in India for a Smart Grid platform
Integrating wind and solar energy in India for a Smart Grid platformIntegrating wind and solar energy in India for a Smart Grid platform
Integrating wind and solar energy in India for a Smart Grid platform
 
Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...
Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...
Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...
 
Kerala solar energy policy 2013
Kerala solar energy policy 2013Kerala solar energy policy 2013
Kerala solar energy policy 2013
 
Potential of Solar Power in India
Potential of Solar Power in IndiaPotential of Solar Power in India
Potential of Solar Power in India
 

Viewers also liked

refrigerator AND WORKING PROCESS
refrigerator AND WORKING PROCESSrefrigerator AND WORKING PROCESS
refrigerator AND WORKING PROCESSArbab Tariq
 
Rooftop solar power plant components
Rooftop solar power plant   componentsRooftop solar power plant   components
Rooftop solar power plant componentsNeha Pathak Kher
 
Troubleshooting of internal combustion engine
Troubleshooting of internal combustion engineTroubleshooting of internal combustion engine
Troubleshooting of internal combustion engineNur E Alam Siddike
 
Deg presentation
Deg presentationDeg presentation
Deg presentationasif.rajput
 
Air Conditioning System
Air Conditioning SystemAir Conditioning System
Air Conditioning SystemSumit Ranjan
 
INTERNAL COMBUSTION ENGINES PPT
INTERNAL COMBUSTION ENGINES PPT INTERNAL COMBUSTION ENGINES PPT
INTERNAL COMBUSTION ENGINES PPT AKASH1001
 

Viewers also liked (6)

refrigerator AND WORKING PROCESS
refrigerator AND WORKING PROCESSrefrigerator AND WORKING PROCESS
refrigerator AND WORKING PROCESS
 
Rooftop solar power plant components
Rooftop solar power plant   componentsRooftop solar power plant   components
Rooftop solar power plant components
 
Troubleshooting of internal combustion engine
Troubleshooting of internal combustion engineTroubleshooting of internal combustion engine
Troubleshooting of internal combustion engine
 
Deg presentation
Deg presentationDeg presentation
Deg presentation
 
Air Conditioning System
Air Conditioning SystemAir Conditioning System
Air Conditioning System
 
INTERNAL COMBUSTION ENGINES PPT
INTERNAL COMBUSTION ENGINES PPT INTERNAL COMBUSTION ENGINES PPT
INTERNAL COMBUSTION ENGINES PPT
 

Similar to Adv seci april2013

Solar rooftop opportunities and challenges
Solar rooftop opportunities and challengesSolar rooftop opportunities and challenges
Solar rooftop opportunities and challengesJay Ranvir
 
Various Schemes of Renewable Energy.pptx
Various Schemes of Renewable Energy.pptxVarious Schemes of Renewable Energy.pptx
Various Schemes of Renewable Energy.pptxSonalikaM3
 
Solar PV landscape_india
Solar PV landscape_indiaSolar PV landscape_india
Solar PV landscape_indiaMehul Raval
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeSanman Rajput
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeSanman Rajput
 
Solar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy CrisisSolar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy Crisissolarindia
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...Harish Sharma
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...Harish Sharma
 
India's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - DraftHeadway Solar
 
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - DraftHeadway Solar
 
Jharkhand solar power policy 2013
Jharkhand solar power policy 2013Jharkhand solar power policy 2013
Jharkhand solar power policy 2013Headway Solar
 
India's National Solar Mission Phase 2 Batch 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 1 Guidelines - DraftHeadway Solar
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010Headway Solar
 
Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Headway Solar
 
Design analysis for solar photovoltaic with and without nem
Design analysis for solar  photovoltaic with and without nemDesign analysis for solar  photovoltaic with and without nem
Design analysis for solar photovoltaic with and without nemyhckelvin
 

Similar to Adv seci april2013 (20)

Grid Connected Roof Top Solar Power Generation: A Review
Grid Connected Roof Top Solar Power Generation: A ReviewGrid Connected Roof Top Solar Power Generation: A Review
Grid Connected Roof Top Solar Power Generation: A Review
 
Solar rooftop opportunities and challenges
Solar rooftop opportunities and challengesSolar rooftop opportunities and challenges
Solar rooftop opportunities and challenges
 
Various Schemes of Renewable Energy.pptx
Various Schemes of Renewable Energy.pptxVarious Schemes of Renewable Energy.pptx
Various Schemes of Renewable Energy.pptx
 
Solar PV landscape_india
Solar PV landscape_indiaSolar PV landscape_india
Solar PV landscape_india
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-scheme
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-scheme
 
Solar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy CrisisSolar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy Crisis
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
 
India's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - Draft
 
GREEN POWER PROJECT
GREEN POWER PROJECTGREEN POWER PROJECT
GREEN POWER PROJECT
 
National Solar Mission Status (July'17)
National Solar Mission Status (July'17)National Solar Mission Status (July'17)
National Solar Mission Status (July'17)
 
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
 
Success Story of Solar Parks in India
Success Story of Solar Parks in IndiaSuccess Story of Solar Parks in India
Success Story of Solar Parks in India
 
Jharkhand solar power policy 2013
Jharkhand solar power policy 2013Jharkhand solar power policy 2013
Jharkhand solar power policy 2013
 
India's National Solar Mission Phase 2 Batch 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 1 Guidelines - Draft
 
Solar mission
Solar missionSolar mission
Solar mission
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010
 
Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014
 
Design analysis for solar photovoltaic with and without nem
Design analysis for solar  photovoltaic with and without nemDesign analysis for solar  photovoltaic with and without nem
Design analysis for solar photovoltaic with and without nem
 

Recently uploaded

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 

Recently uploaded (20)

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 

Adv seci april2013

  • 1. ROOF TOP SPV POWER GENERATION Pilot Scheme of MNRE for Large Scale Grid Connected Roof Top Solar Power Generation Solar Energy Corporation of India (A Govt. of India Enterprise) NBCC Plaza, Tower-1, 4th Floor, Pushp Vihar Sector-V, Saket-V, New Delhi-110017 Ph: 011-29563834 Fax: 011-29564033 e-mail: ashvinikr@nic.in/ybkrseci@gmail.com
  • 2. ROOF TOP SPV POWER GENERATION 1. Background Government of India launched Jawaharlal Nehru National Solar Mission (JNNSM) in January 2010 with a view to accelerate development and promotion of solar energy technologies in the country. India is having high potential of generating solar power as availability of solar radiation in various parts of the country is quite good. Solar PV systems represents an attractive option due to low cost and ability to install in various sizes (kW to MW level). Ministry of New and Renewable Energy (MNRE) has brought out various schemes for promoting solar power projects in different capacity ranges. This includes utility scale megawatt size projects as well as off-grid applications up to 100 kW. To meet the JNNSM objectives, large area roof top installations are considered as one of the potential route. In this type of systems, the generated solar power is may be self-consumed and excess power could be fed to grid. These projects are envisaged to mitigate diesel consumption when the buildings are operating with diesel generator backup. In European countries, grid interactive roof top systems are adding huge quantities to the overall solar power capacities. MNRE has brought out pilot scheme to promote grid connected roof top PV solar PV systems with a view tro generate feedback and further promotion in India. 2. Objectives of the scheme Acute power shortages in India are making most of the commercial and office establishments to have diesel generator backup. By setting up the grid interactive solar power plants on the rooftops would help in reducing the consumption of diesel during the day time in the areas where grid power is intermittent. If the grid power is continuous, the solar power generated will be utilized along with the grid power and the proportionate amount of grid power usage will get reduced. During minimum load periods (e.g. during weekends), the excess power generated from solar systems could be fed to grid. The consumer can be compensated for the exported power as per policy by the State. Connectivity of these projects to the grid also has to be in accordance with the prevailing CEA guidelines or policy by the State regulators/ DISCOMs.
  • 3. ROOF TOP SPV POWER GENERATION The specific objectives of the scheme include:  Demonstration of grid connected roof top solar power plants to facilitate reduction in consumption of diesel for power generation and dependency on grid power.  To establish the effectiveness of these solar systems in different locations of India. 3. Approach The scheme is being implemented by Solar Energy Corporation of India (SECI). SECI has already concluded the bidding process to implement these projects. Capacity allocations in three cities, viz. Bangalore, Chennai and Delhi have been made to the successful bidders. As a part of scheme, the grant support would be provided through SECI and SECI will monitor the projects during implementation and as well as after implementation for at least two years. The buildings for setting up solar PV roof top system would be identified by the successful bidders and the beneficiary is required to meet 70% of the project cost in lieu of benefit of electricity at free of cost. The MNRE, State Nodal Agency and SECI would also facilitate identification of buildings and interaction with State Energy Regulator and State DISCOMs wherever necessary. Highlight of the scheme would be to have involvement of beneficiary from concept to installation. Beneficiaries are encouraged to get in touch with the project developer as well as SECI as and when felt necessary by him. 4. Financial support 30% subsidy on the system cost arrived at the conclusion of bids by SECI to the developer to whom the project has been allocated. The system cost also includes annual maintenance charges for 2 years. The manner of disbursal of subsidy is as follows: - 20% after successful installation and commissioning of the system - 5% after one year of successful operation of the project - Balance 5% after two years of successful operation of the project.
  • 4. ROOF TOP SPV POWER GENERATION 5. Project size: Under this scheme, project size between 100 kW to 500 kW is allowed. The minimum size of project size can also be arrived through adding roofs of different buildings available in same campus. 6. Eligible Buildings All buildings of the Government, PSUs, Commercial establishments, hospitals, cold storages, warehouses, industries and educational institutions. SECI in consultation with MNRE would ensure at least 50% of coverage for the Government/ PSU buildings in the overall capacity allocation under this scheme. 7. Submission of Proposals from interested beneficiaries:  Interested beneficiaries may apply for the projects where adequate shadow free roof area (@1000-1200 sq. metrs /100kW) is available.  Priority will be given to the projects which would have approved funds to meet the system cost.  The proposals may be submitted to the following as per the format for submission of proposals is enclosed in Annexure-1 (also available on www.mnre.gov.in): Sr. Manger (SPV) Solar Energy Corporation of India NBCC Plaza, Tower-1, 4th Floor Saket, New Delhi-110017 e-mail: ybkrseci@gmail.com, ashvinikr@nic.in
  • 5. ROOF TOP SPV POWER GENERATION Format for submission of preliminary information about the roof top project proposal to SECI: ( to be submitted on company letter head) Sr. No Item Details 1 Name of the contact person 2 Name of the Institution/Company: Address: 3 Proposed capacity ( kWp) 4 Available roof area (m2 ): Roof type (RCC, sheets etc): Roof orientation (E-W or N-S): Roof size (Length X Breadth): Any structures nearby causing Shade: Expected Clear roof area: 4 Connected load: Monthly electricity consumption (units): Average peak load and time: Average minimum load and time: Connected distribution line (11kV/33kV): 5 Details of Back up ( if any): DG Set capacity: Monthly Diesel consumption (last 6 months average) 6 Financial Commitment: Indicate the source to meet 70% of the project cost. Status of approval Approved by competent authority : YES/NO If yes enclose the letter.