THE INSTITUTION OF ENGINEERS, SRI LANKA
PROFESSIONAL REVIEW EXAMINATION
2022
Eng. K.Pirahas
B.Sc.Eng(Hons)
Irrigation Engineer,
Irrigation Department, NP
AM-12827
OUTLINE OF THE PRESENTATION
1. Introduction.
2. Application of five core competences.
3. Design of Nithakai Tank.
4. Carrier Development Action Plan
5. Photo Gallery
SUMMARY OF RECOGNIZED TRAINING AND RESPONSIBLE EXPERIENCE
SER NO DESCRIPTION
Duration /
(Months)
01 Training Prior to Graduation 06
02 Recognized Training After to Graduation on Construction 44
03 Recognized Training After to Graduation on Design 19
A Summary of Recognized Training 69
04 Responsible Experience on Construction 68
05 Responsible Experience on Design 06
B Summary of Responsible Experience 74
C=A+B Summary of Recognized Training and Responsible Experience 143
1. INTRODUCTION
4
Trainee Engineer
6 Months
Instructor
3 Months
Irrigation Engineer – NP
17 Months
Professional Review 2022
1.1 WORKING EXPERIENCE
Irrigation Engineer
24 Months
Irrigation Engineer
93 Months
Project Engineer/
Assistant Resident Engineer–
Iranamadu Project
30 Months
Divisional Irrigation Engineer –
Vavunikulam Division
48 Months
12 Years
2. PERFORMANCE ON FIVE CORE COMPETENCES
2.1 Understanding of Engineering Principles
2.2 Practical Application of Engineering Knowledge
2.3 Managerial Involvement
2.4 Communication and Interpersonal Skills
2.5 Professional Conduct
2.1 Understanding of Engineering Principles
 Design of Nithakai Kulam
Operation Study
Hydrology Study (Unit Hydrograph Method)
Hydraulics Design for Spillway – Augment by 2ft
Structure Design - Abutment
 Collection of data of Iranamadu Downstream (D3-7 off RB Main Canal)
Collection of Existing Structures & Condition
Prepare Drawings with Levels & Collected Data
Proposal for Renovation
Proposed Drawings & Estimates
Submitted as a Book for Project Director
2.1 Understanding of Engineering Principle Con..
 Application of Works through New Technology VIBER/WHATSAPP.
 Design & Construct a Minor Tank
Department of AP&H seek technical assistant to Construct a Minor
tank in their Farm
Analysis Catchment area using Q GIS
Using Rational Formula to Calculate Inflow & Determine the Spill
Length
Preparation of Estimate & Carryout the Procurement activities
Implement the Project & Store Water
2.2 Practical Application of Engineering Knowledge
 Repair of Vavunikulam Major Tank Sluice Gates Water Level in FSL.
Vavunikulam Major Tank at FSL 26’, The Rod which connects the
Sluice Gate Broken
Hired Divers & inspect the actual problem
The Existing Pin Cannot removable from Gate
Proposed a “U” Clip and connect the new Rod with Gate.
Issued Water for Cultivation & Repair fully after Water Issue
2.2 Practical Application of Engineering Knowledge
 Arrest Piping Through Palayamurukandy Tank
A Piping (2”) Observed in Palayamurukandy Reservoir
Temporary Filter Provided and Measure the Flow
Dying in the Several Places at Upstream
Observed Dye in the Piping flow
Inspection in the Upstream & Find out the Upstream Place
Excavate a Trench in the upstream
Place & Compact by Clay Material
Attended the Piping Section when water level goes down.
2.2 Practical Application of Engineering Knowledge
 Arrest Piping Through Palayamurukandy Tank
2.2 Practical Application of Engineering Knowledge
 Introduce OFC Cultivation in Vavunikulam Lowland Area
Considerable Rainfall received after yala Seeding
I Calculate the Balance Water & Find out 400 Acs of OFC Cultivable
Discuss With GA & Arrange a inter Yala Meeting During COVID Lock down
Mostly Black gram Cultivated in Low Land & Harvested (350kg/Ac)
Farmers Get income 200,000/Ac
Next Season the OFC in Low Land increased to 600 Acs by the result of this.
 Measuring Excess Cultivation in Vavunikulam
In 2019, Farmers cultivated more than Meeting Decision in Yala
Water Scarcity raised due to excess cultivation for tail end Farmers
Measure the Cultivation using GPS with the help of FOs & Tos.
The water issue re-arranged on Time Basis
The 400 acs of excess cultivation too saved by the time basis issue
The excess cultivators fined in next Maha
The Measured Document compiled & used to define cultivation area
2.3 Managerial Involvement
 Operation & Maintenance of 12 Major/ Medium Schemes
Managed 12 Schemes with 11,400 Acs
Managed Office administration with 40 staffs
TO: 15 Nos DO: 5 Nos MSO: 3 Nos ML: 13 (36)
Managed 26 FOs and Farmers under 12 tanks
Preparing Master Plan for Clearing of Tank Bunds by MLs
& Executed
Organize Shramadana Campaigns with FO’s, Sri Lanka
Army
Attended Emergency works during Rainy Season
Taken Precautionary action during Flood Situations.
2.3 Managerial Involvement
 New Version of Bethma Cultivation in Vavunikulam 2022 Yala
Vavunikulam Yala was Cultivated in Share Basis (3 AC lot get 1 Ac Yala)
In 2022, we introduce the selection of Cultivable lands by Canal basis.
Tail end Farmers gratitude ID that They Cultivated first time Yala in their own Lands
0
1000
2000
3000
4000
5000
6000
7000
8000
Production(mt)
Production
Normal Bethma
0
500
1000
1500
2000
2500
3000
3500
toikahd
eilKiw
ngj;kh
eilKiw
Harvested
Extent
(Ac)
Harvested Extent
Normal Bethma 0
1
2
3
4
5
6
7
8
Water
Usage
(ft/Ac);
Tank Duty
Normal Bethma
2.3 Managerial Involvement
 Management of Significant Engineering Works
Perform as Engineer to the Contract for Works implement under various fund in
Vavunikulam Division.
Managed the Contract works executed under the Division
More than 20 Works per year nearly 50 mn of Local Funds
Foreign Funded projects such as CSIAP, ASMP, IWWRMP
Perform as ARE in Iranamadu Head works Project - Rs.2400 mn
 Implementation of Konayankulam Tank – Force Account Rs.10 mn
Implementation of Poovarasankulam Lift Irrigation – PVC Pipe line Rs.45 mn
Rehabilitation of Ampalaperumal Head Works Rs 35 mn
Rehabilitation of Maruthankulam Head Works Rs.17 mn
2.4 Interpersonal Skills
Interpersonal Skills as DIE in Vavunikulam Division
Attended Cultivation Meetings, DCC, DAC, Progress Review Meeting represent
Irrigation Engineer’s Office
Coordinate Different Stake Holders Such as Farmers, Contractors, Religious
Leaders, Military, Police, Other Government agencies & Politicians.
Coordinate Precaution measures before NE monsoon & attended emergency
precautions with help of farmers & Military.
Sharing of Water to Drinking Water Supply
A request from NWSDB to share the water (800ac.ft/yr) from Vavunikulam Tank
Farmers opposed to share the water initially.
I proposed Karumpulliyan tank which is a feeder tank of Vavunikulam which have
a own capacity of 900 ac.ft.
I explained the farmers regarding the CKD patients in that area & importance of
sharing as without much reduction in their Cultivation & Convinced them.
As NWSDB’s existing water tank is located near this tank, They too agreed.
2.4 Interpersonal Skills
Undermining of CO spill in Maruthankulam
A undermining in CO Spill was observed in Maruthankulam.
I Coordinate with DS, Disaster Management, Farmers & Downstream Tank IE &
Military.
Attended to Prevent the undermining but LB abutment was collapsed.
Make a sand bag barrier & keep 4’ of water to save the Paddy cultivated.
During the April Rainfall Season increased the temporary barrier height & keep 6’
water.
Cultivate & harvested 60 acs of Paddy in that yala Season.
Carryout the design & Close the CO Spill & extended the already available
Natural Spill in next year
Keep the Water at FSL in 2022 & Cultivate Full extent of Yala.
Maruthankulam CO Spill Undermining
2.5 Professional Conduct
Professional Conduct in my Carrier
Instruct & ensure the Staffs with Personnel Protective Equipment at Site.
Used Safety sign boards at the Construction site.
Blocked the Vavunikulam Tank bund access road for Public with the approval of
DCC after an accident at Bund.
Carryout a Legal action against unauthorized cultivation at Kalvilan Kulam
Fined for excess cultivation in Vavunikulam as per Cultivation decision.
Follow the Certificate Course in Procurement, Served as TEC Chairman in
Department, Predishiya Sabha, Divisional Secretariat , Adopt Government circulars
& Procurement Guideline & Manual in evaluation of Bids.
I Submit a Technical report regarding Construction of minor Tank on the request of
DCC Chairman.
President of Vavunikulam Sivan Kovil For Last 3 Years.
2.5 Professional Conduct Continued…
Involvement with IESL
An Active member of IESL Kilinochchi District Center in 21/22.
Currently Perform as Secretary of IESL Kilinochchi District Center.
Currently perform as Chairman of Building Sub Committee of IESL Vadakkin
Chapter
Publish a Paper in 2022 Transection of IESL Vadakkin Chapter
Publish a book of “Vavunikulam Yala Success Story” during 2022/23 Maha
meeting on behalf of Department.
3. Design of Nithakai Tank
Basic Details of Nithakai Tank
Province - Northern
District - Mullaitivu
I.E. Division - Muthu Iyan Kaddu
D.S. Division - Maritimepattu
River Basin - Paladi Aru
Acre - 370 Ac
Catchment Area - 11.78 sq.mile
The Tank was Constructed in 1980s &
abandoned due to Conflicts.
3.1 HYDROLOGICAL DESIGN
Rainfall for 100 Yrs
Return Period Inflow hydrograph
Determination of BTL
Unit Hydrograph
Flood routing to determine
HFL for critical storm
Checking for over
topping for PMP
Calculation of PMP
Operation Study for
the existing
acreage and FSL
3.2 HYDRAULIC DESIGN
1.Determination of Ogee Profile
y/H0 = - K (x/H0)n
2. Design of Stilling Basin
Froude number,
FF = VF/(gYF)0.5
3. Determination of Stilling Basin Thickness
3.3 STRUCTURAL DESIGN
 Propose the dimensions of the retaining wall for the abutment of spill structure.
 Check the over turning moment.
 Check for sliding.
 Check for ground bearing pressure.
 Calculation of bending reinforcement of wall.
 Calculation of minimum reinforcement of wall.
 Design of heel.
 Design of toe.
 Reinforcement calculations of spilling section and cushion
3. Design Output
Description Unit Existing Proposed
Full Supply Level ft.asl 43.94 45.94
Afflux ft 2.2 2.08
High Flood Level ft.asl 46.14 48.02
Bund Top Level ft.asl 47.24 52.00
Length of CO Spill ft 400 400
Length of Natural Spill ft - 400
Dimension of RB Sluice ft 1Dia 4*4
Dimension of LB Sluice ft 2 Dia 2 Dia
Capacity ac.ft 2,502 3,376
Area at FSL ac 462 556
4. CAREER DEVELOPMENT ACTION PLAN
 Short Term Goals
– Complete my Professional Review Exam to get Charter.
 Medium Term Goals
– Carryout a Master Degree
– Writing Technical papers to Share experiences
– Became as Middle Level Manager in Water Sector
 Long Term Goals
– Using my Knowledge in Irrigation System to Contribute to Nation
– Became as Engineering Expertise
“Pay Back to Nation what I Got from Free Education”
5. PHOTO GALLERY
IRANAMADU HEAD WORKS
5. PHOTO GALLERY
IRANAMADU HEAD WORKS
5. PHOTO GALLERY
IRANAMADU HEAD WORKS
5. PHOTO GALLERY
IRANAMADU HEAD WORKS – SCB Wall Construction
5. PHOTO GALLERY
Nithakai Tank Inspection With District Secretary
THANK YOU.

More Related Content

Similar to Presentation Charter

Design of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E finalDesign of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E final
Syed Salman
 
M & E Power Point Presentation
M & E Power Point PresentationM & E Power Point Presentation
M & E Power Point Presentation
Beryl Odhiambo
 

Similar to Presentation Charter (20)

Waterworks - The Bengaluru story
Waterworks - The Bengaluru storyWaterworks - The Bengaluru story
Waterworks - The Bengaluru story
 
Research uo j_foe_jaffna lagoons
Research uo j_foe_jaffna lagoonsResearch uo j_foe_jaffna lagoons
Research uo j_foe_jaffna lagoons
 
Proposal
ProposalProposal
Proposal
 
Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project
 
Reuse of wastewater as a climate mitigation strategy - Bengaluru and its hint...
Reuse of wastewater as a climate mitigation strategy - Bengaluru and its hint...Reuse of wastewater as a climate mitigation strategy - Bengaluru and its hint...
Reuse of wastewater as a climate mitigation strategy - Bengaluru and its hint...
 
Irrigation field report
Irrigation field reportIrrigation field report
Irrigation field report
 
Solar_powered_deep_well_community_water.pdf
Solar_powered_deep_well_community_water.pdfSolar_powered_deep_well_community_water.pdf
Solar_powered_deep_well_community_water.pdf
 
Water Resources Management in Brantas River Basin
Water Resources Management in Brantas River BasinWater Resources Management in Brantas River Basin
Water Resources Management in Brantas River Basin
 
Krishana bhagya jala nigam limited
Krishana bhagya jala nigam limitedKrishana bhagya jala nigam limited
Krishana bhagya jala nigam limited
 
Melamchi Water Supply Project
Melamchi Water Supply ProjectMelamchi Water Supply Project
Melamchi Water Supply Project
 
poster
posterposter
poster
 
RAINWATER HARVESTING MINIPROJECT REPORT.pdf
RAINWATER HARVESTING MINIPROJECT REPORT.pdfRAINWATER HARVESTING MINIPROJECT REPORT.pdf
RAINWATER HARVESTING MINIPROJECT REPORT.pdf
 
Water harvesting – a solution to drought & falling level of ground water ...
Water harvesting – a solution to drought & falling level of ground water ...Water harvesting – a solution to drought & falling level of ground water ...
Water harvesting – a solution to drought & falling level of ground water ...
 
Design of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E finalDesign of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E final
 
M & E Power Point Presentation
M & E Power Point PresentationM & E Power Point Presentation
M & E Power Point Presentation
 
Water sustainability at Nandideepa apartments.pdf
Water sustainability at Nandideepa apartments.pdfWater sustainability at Nandideepa apartments.pdf
Water sustainability at Nandideepa apartments.pdf
 
training report
training reporttraining report
training report
 
The Rainbow Drive Story
The Rainbow Drive  StoryThe Rainbow Drive  Story
The Rainbow Drive Story
 
Lakefront development at kanelav lake
Lakefront development at kanelav lakeLakefront development at kanelav lake
Lakefront development at kanelav lake
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam
 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 

Presentation Charter

  • 1. THE INSTITUTION OF ENGINEERS, SRI LANKA PROFESSIONAL REVIEW EXAMINATION 2022 Eng. K.Pirahas B.Sc.Eng(Hons) Irrigation Engineer, Irrigation Department, NP AM-12827
  • 2. OUTLINE OF THE PRESENTATION 1. Introduction. 2. Application of five core competences. 3. Design of Nithakai Tank. 4. Carrier Development Action Plan 5. Photo Gallery
  • 3. SUMMARY OF RECOGNIZED TRAINING AND RESPONSIBLE EXPERIENCE SER NO DESCRIPTION Duration / (Months) 01 Training Prior to Graduation 06 02 Recognized Training After to Graduation on Construction 44 03 Recognized Training After to Graduation on Design 19 A Summary of Recognized Training 69 04 Responsible Experience on Construction 68 05 Responsible Experience on Design 06 B Summary of Responsible Experience 74 C=A+B Summary of Recognized Training and Responsible Experience 143 1. INTRODUCTION
  • 4. 4 Trainee Engineer 6 Months Instructor 3 Months Irrigation Engineer – NP 17 Months Professional Review 2022 1.1 WORKING EXPERIENCE Irrigation Engineer 24 Months Irrigation Engineer 93 Months Project Engineer/ Assistant Resident Engineer– Iranamadu Project 30 Months Divisional Irrigation Engineer – Vavunikulam Division 48 Months 12 Years
  • 5. 2. PERFORMANCE ON FIVE CORE COMPETENCES 2.1 Understanding of Engineering Principles 2.2 Practical Application of Engineering Knowledge 2.3 Managerial Involvement 2.4 Communication and Interpersonal Skills 2.5 Professional Conduct
  • 6. 2.1 Understanding of Engineering Principles  Design of Nithakai Kulam Operation Study Hydrology Study (Unit Hydrograph Method) Hydraulics Design for Spillway – Augment by 2ft Structure Design - Abutment  Collection of data of Iranamadu Downstream (D3-7 off RB Main Canal) Collection of Existing Structures & Condition Prepare Drawings with Levels & Collected Data Proposal for Renovation Proposed Drawings & Estimates Submitted as a Book for Project Director
  • 7. 2.1 Understanding of Engineering Principle Con..  Application of Works through New Technology VIBER/WHATSAPP.  Design & Construct a Minor Tank Department of AP&H seek technical assistant to Construct a Minor tank in their Farm Analysis Catchment area using Q GIS Using Rational Formula to Calculate Inflow & Determine the Spill Length Preparation of Estimate & Carryout the Procurement activities Implement the Project & Store Water
  • 8. 2.2 Practical Application of Engineering Knowledge  Repair of Vavunikulam Major Tank Sluice Gates Water Level in FSL. Vavunikulam Major Tank at FSL 26’, The Rod which connects the Sluice Gate Broken Hired Divers & inspect the actual problem The Existing Pin Cannot removable from Gate Proposed a “U” Clip and connect the new Rod with Gate. Issued Water for Cultivation & Repair fully after Water Issue
  • 9. 2.2 Practical Application of Engineering Knowledge  Arrest Piping Through Palayamurukandy Tank A Piping (2”) Observed in Palayamurukandy Reservoir Temporary Filter Provided and Measure the Flow Dying in the Several Places at Upstream Observed Dye in the Piping flow Inspection in the Upstream & Find out the Upstream Place Excavate a Trench in the upstream Place & Compact by Clay Material Attended the Piping Section when water level goes down.
  • 10. 2.2 Practical Application of Engineering Knowledge  Arrest Piping Through Palayamurukandy Tank
  • 11. 2.2 Practical Application of Engineering Knowledge  Introduce OFC Cultivation in Vavunikulam Lowland Area Considerable Rainfall received after yala Seeding I Calculate the Balance Water & Find out 400 Acs of OFC Cultivable Discuss With GA & Arrange a inter Yala Meeting During COVID Lock down Mostly Black gram Cultivated in Low Land & Harvested (350kg/Ac) Farmers Get income 200,000/Ac Next Season the OFC in Low Land increased to 600 Acs by the result of this.  Measuring Excess Cultivation in Vavunikulam In 2019, Farmers cultivated more than Meeting Decision in Yala Water Scarcity raised due to excess cultivation for tail end Farmers Measure the Cultivation using GPS with the help of FOs & Tos. The water issue re-arranged on Time Basis The 400 acs of excess cultivation too saved by the time basis issue The excess cultivators fined in next Maha The Measured Document compiled & used to define cultivation area
  • 12. 2.3 Managerial Involvement  Operation & Maintenance of 12 Major/ Medium Schemes Managed 12 Schemes with 11,400 Acs Managed Office administration with 40 staffs TO: 15 Nos DO: 5 Nos MSO: 3 Nos ML: 13 (36) Managed 26 FOs and Farmers under 12 tanks Preparing Master Plan for Clearing of Tank Bunds by MLs & Executed Organize Shramadana Campaigns with FO’s, Sri Lanka Army Attended Emergency works during Rainy Season Taken Precautionary action during Flood Situations.
  • 13. 2.3 Managerial Involvement  New Version of Bethma Cultivation in Vavunikulam 2022 Yala Vavunikulam Yala was Cultivated in Share Basis (3 AC lot get 1 Ac Yala) In 2022, we introduce the selection of Cultivable lands by Canal basis. Tail end Farmers gratitude ID that They Cultivated first time Yala in their own Lands 0 1000 2000 3000 4000 5000 6000 7000 8000 Production(mt) Production Normal Bethma 0 500 1000 1500 2000 2500 3000 3500 toikahd eilKiw ngj;kh eilKiw Harvested Extent (Ac) Harvested Extent Normal Bethma 0 1 2 3 4 5 6 7 8 Water Usage (ft/Ac); Tank Duty Normal Bethma
  • 14. 2.3 Managerial Involvement  Management of Significant Engineering Works Perform as Engineer to the Contract for Works implement under various fund in Vavunikulam Division. Managed the Contract works executed under the Division More than 20 Works per year nearly 50 mn of Local Funds Foreign Funded projects such as CSIAP, ASMP, IWWRMP Perform as ARE in Iranamadu Head works Project - Rs.2400 mn  Implementation of Konayankulam Tank – Force Account Rs.10 mn Implementation of Poovarasankulam Lift Irrigation – PVC Pipe line Rs.45 mn Rehabilitation of Ampalaperumal Head Works Rs 35 mn Rehabilitation of Maruthankulam Head Works Rs.17 mn
  • 15. 2.4 Interpersonal Skills Interpersonal Skills as DIE in Vavunikulam Division Attended Cultivation Meetings, DCC, DAC, Progress Review Meeting represent Irrigation Engineer’s Office Coordinate Different Stake Holders Such as Farmers, Contractors, Religious Leaders, Military, Police, Other Government agencies & Politicians. Coordinate Precaution measures before NE monsoon & attended emergency precautions with help of farmers & Military. Sharing of Water to Drinking Water Supply A request from NWSDB to share the water (800ac.ft/yr) from Vavunikulam Tank Farmers opposed to share the water initially. I proposed Karumpulliyan tank which is a feeder tank of Vavunikulam which have a own capacity of 900 ac.ft. I explained the farmers regarding the CKD patients in that area & importance of sharing as without much reduction in their Cultivation & Convinced them. As NWSDB’s existing water tank is located near this tank, They too agreed.
  • 16. 2.4 Interpersonal Skills Undermining of CO spill in Maruthankulam A undermining in CO Spill was observed in Maruthankulam. I Coordinate with DS, Disaster Management, Farmers & Downstream Tank IE & Military. Attended to Prevent the undermining but LB abutment was collapsed. Make a sand bag barrier & keep 4’ of water to save the Paddy cultivated. During the April Rainfall Season increased the temporary barrier height & keep 6’ water. Cultivate & harvested 60 acs of Paddy in that yala Season. Carryout the design & Close the CO Spill & extended the already available Natural Spill in next year Keep the Water at FSL in 2022 & Cultivate Full extent of Yala.
  • 17. Maruthankulam CO Spill Undermining
  • 18. 2.5 Professional Conduct Professional Conduct in my Carrier Instruct & ensure the Staffs with Personnel Protective Equipment at Site. Used Safety sign boards at the Construction site. Blocked the Vavunikulam Tank bund access road for Public with the approval of DCC after an accident at Bund. Carryout a Legal action against unauthorized cultivation at Kalvilan Kulam Fined for excess cultivation in Vavunikulam as per Cultivation decision. Follow the Certificate Course in Procurement, Served as TEC Chairman in Department, Predishiya Sabha, Divisional Secretariat , Adopt Government circulars & Procurement Guideline & Manual in evaluation of Bids. I Submit a Technical report regarding Construction of minor Tank on the request of DCC Chairman. President of Vavunikulam Sivan Kovil For Last 3 Years.
  • 19. 2.5 Professional Conduct Continued… Involvement with IESL An Active member of IESL Kilinochchi District Center in 21/22. Currently Perform as Secretary of IESL Kilinochchi District Center. Currently perform as Chairman of Building Sub Committee of IESL Vadakkin Chapter Publish a Paper in 2022 Transection of IESL Vadakkin Chapter Publish a book of “Vavunikulam Yala Success Story” during 2022/23 Maha meeting on behalf of Department.
  • 20. 3. Design of Nithakai Tank Basic Details of Nithakai Tank Province - Northern District - Mullaitivu I.E. Division - Muthu Iyan Kaddu D.S. Division - Maritimepattu River Basin - Paladi Aru Acre - 370 Ac Catchment Area - 11.78 sq.mile The Tank was Constructed in 1980s & abandoned due to Conflicts.
  • 21. 3.1 HYDROLOGICAL DESIGN Rainfall for 100 Yrs Return Period Inflow hydrograph Determination of BTL Unit Hydrograph Flood routing to determine HFL for critical storm Checking for over topping for PMP Calculation of PMP Operation Study for the existing acreage and FSL
  • 22. 3.2 HYDRAULIC DESIGN 1.Determination of Ogee Profile y/H0 = - K (x/H0)n 2. Design of Stilling Basin Froude number, FF = VF/(gYF)0.5 3. Determination of Stilling Basin Thickness
  • 23. 3.3 STRUCTURAL DESIGN  Propose the dimensions of the retaining wall for the abutment of spill structure.  Check the over turning moment.  Check for sliding.  Check for ground bearing pressure.  Calculation of bending reinforcement of wall.  Calculation of minimum reinforcement of wall.  Design of heel.  Design of toe.  Reinforcement calculations of spilling section and cushion
  • 24. 3. Design Output Description Unit Existing Proposed Full Supply Level ft.asl 43.94 45.94 Afflux ft 2.2 2.08 High Flood Level ft.asl 46.14 48.02 Bund Top Level ft.asl 47.24 52.00 Length of CO Spill ft 400 400 Length of Natural Spill ft - 400 Dimension of RB Sluice ft 1Dia 4*4 Dimension of LB Sluice ft 2 Dia 2 Dia Capacity ac.ft 2,502 3,376 Area at FSL ac 462 556
  • 25. 4. CAREER DEVELOPMENT ACTION PLAN  Short Term Goals – Complete my Professional Review Exam to get Charter.  Medium Term Goals – Carryout a Master Degree – Writing Technical papers to Share experiences – Became as Middle Level Manager in Water Sector  Long Term Goals – Using my Knowledge in Irrigation System to Contribute to Nation – Became as Engineering Expertise “Pay Back to Nation what I Got from Free Education”
  • 29. 5. PHOTO GALLERY IRANAMADU HEAD WORKS – SCB Wall Construction
  • 30. 5. PHOTO GALLERY Nithakai Tank Inspection With District Secretary