The document describes several wastewater treatment stations installed in Azerbaijan to purify sewage water, including the installation of biological treatments and disinfectors, with capacities ranging from 100-500 cubic meters per day, with the overall purpose of purifying wastewater and seawater in surrounding areas to return them to normal microbiological conditions. Locations included areas near villages, beaches, and recreation centers.
1. Country: Azerbaijan
City: Baku
Lyceum named after Academic Zarifa Aliyeva
Suleymanova Safura & Huseynzade Sakina
Resources: http://www.eco.gov.az/
2. In Station biological treatment with 500m3
daily power and subsidiary oil-refining
equipment conforming composition of
sewage water were installed.
Installation area: near Bilgah Snatory of
Cardiology.
Purpose: to purify 500 m3
sewage water to the last
density extent and as a
result purifying sea water
in Bilgah-Zagulba area of
water and returning
microbiological condition
to normal.
3. Purpose: to purify water of these ponds and water supplied from this source
to the last density extent and to prevent sewage water run to Mardakan
beach and returning sea water to normal in area of water.
In Station
biological
treatment with
150 m3 daily
power was
installed.
Installation area: two ponds with 24 thousand m2 and 40 thousand m3
area swamped by sewage water near to “Gizil Gum” recreation center,
alongshore territory of Mardakan settlement.
4. Disinfector with 240 m3 daily power was installed in Station.
Installation area: whose links with the residential
district located in that area, "Marian Beach"recreation
center. 240 m3 per day capacity of the station was
established disinfector.
5. Biological treatment with 500 m3
daily power and 2 disinfectors with
daily 240 m3 power were installed.
Installation area: swamped reedy
area with 12 ha between Buzovna
and Shaghan villages and on average
with 40m3/h sewage water.
Purpose: to purify water of swamped
pond and water supplied from this
source to the last density extent and to
prevent sewage water run to Buzovna
beach and return sea water to normal
in area of water.
6. Installation area: swamped pond with
52 thousand m3 generated from sewage
water behind “Ali ayaghi” sanctuary.
Biological treatment with 100 m3
daily power was installed in
Station.
7. Installation area: way out of line Shor pool with
1200 m length and 50-200 m width and 30-35
cm average depth in Pirshaghi settlement.
Purpose: to purify sewage water with sanitary
origin intervened the line from Shor pool in
Pirshaghi settlement and from recreation centre
named after H.Aliyev and water supplied from
this source to the last density extent and to
prevent sewage water run to Pirshaghi beach
and return sea water to normal in area of water.
8. Biological treatment with 350 m3
daily power was installed in Station.
Installation area: way out of line from
Gizilnohur pool.
Purpose: to purify water of swamped pond
and water supplied from this source to the
last density extent and to prevent sewage
water run to Pirshaghi beach and return
sea water to normal in area of water.
9. Disinfector with 240 m3 daily power
was installed in Station.
Installation area: Nardaran beach and
50 m2 area near it.
Purpose: to return swamped area
and water of sources supplying this
area to microbiological norm.
10. Biological treatment with 500 m3 daily
power and subsidiary oil-refining equipment
conforming composition of sewage water
were installed in Station.
Installation area: territory of Amburan
recreation center.
Purpose: to purify 500 m3 sewage water
to the last density extent and purify sea
water in water area and returning
microbiological condition to normal.
11. Disinfector with 500 m3 daily power was installed in Station.
Installation area: alongshore area in Novkhani.