1. Highlights achievements as Process Engineer at DSM
Temperature inert gas
from condenser >
Double-walled
boiling point medium
SS hose
My ambition is to
become a
projectmanager.
Start SIL-compliance project Reduced waste & losses
total of 47 scopes
from purification section
New IVR (75k€/yr) .
Improved control distillation column
completed
saves 240k€/yr on raw materials.
Jan 2006 Jan 2007 Jan 2008 Jan 2009
Highest number of accepted ideas
within the department in 2007/2008
Reduction of catalyst spills from New storage tank completed
decanter (180k€/yr) (investment: 1.25M€) Start debottlenecking project
Plug fitted in the inlet
spargers
BEFORE
AFTER
Current capacity
10kton/jr
CFD shows defective flow pattern Crude product