This presentation discusses using stochastic modeling in mine planning to account for uncertainties in material type and grade. Traditional direct block scheduling is compared to a stochastic approach. A case study of a copper deposit with oxide and sulphide zones shows that considering geological uncertainties through 20 simulated models improved the net present value by 4% compared to the average case, reducing risk from 9% to 8% probability. Moving forward, more robust algorithms and multistage approaches could further improve mine planning under uncertainty.
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Stochastic Mine Planning with DBS Reduces Project NPV Uncertainty
1. IV SIMPOSIO INTERNACIONAL
DE PLANEAMIENTO DE MINADO
www.simsched.com 1
TRADITIONAL VERSUS
STOCHASTIC MINE PLANNING
UNDER MATERIAL TYPE AND
GRADE UNCERTAINTIES
M. SC. ALEXANDRE MARINHO
MiningMath
DR. LUIS MARTINEZ TIPE
R&O Analytics
3. Direct Block Scheduling
www.simsched.com 3
Block values for each
possible destination
Image taken from Micromine
Multi-period scheduling with
blending and stockpiling
Image taken from Micromine
4. Stochastic Mine Planning with DBS
www.simsched.com 4
Block values for each model
and possible destination
Multi-period scheduling
under uncertainty with
blending and stockpiling
1 3 5 7 9 11 13 15 17
Indicators with risk profiles
5. Case Study
www.simsched.com 5
Sulphide zone Oxide zone
Slope angle, degrees 55 47
Density, t/m³ 2.7 2.2
• Copper deposit with oxide and sulphide zones
• Uncertainty represented by 20 simulated models
• Blocks with 40x40x20m³
13. Conclusions – Stochastic Modelling
Ability to model uncertainties from different sources
simultaneously.
www.simsched.com 13
14. Conclusions – Results
• The average case overestimated the project NPV in 37%.
• Considering geological uncertainties, the project NPV
improved by 4%, with the uncertainty reducing from 9 to 8%
with 80% probability.
www.simsched.com 14
15. Conclusions – Moving Forward
• Application of a robust algorithm for direct block scheduling (pessimistic,
updateable).
• A multistage view could also be implemented (optimistic, assumes perfect
knowledge once the first block is extracted).
• So, what would be “the realistic view”? We should look deeper into
mining policies and procedures, not only mine plans.
www.simsched.com 15
16. Contacts
Visit our website
www.simsched.com
Direct Block Scheduling – LinkedIn Group
www.linkedin.com/groups/8552888
Thank you!
Alexandre Marinho Luis Martinez
alexandre.marinho@miningmath.com lmartinez@randoanalytics.com
www.simsched.com 16