SlideShare a Scribd company logo
1 of 18
Download to read offline
Dr. LUIS A. MARTINEZ TIPE
IV SIMPOSIO INTERNACIONAL
DE PLANEAMIENTO DE MINADO
UNCERTAINTY IN MINE PLANNING
What is the effect of the ‘What if..?’ uncertainties on
project economics/What are the best strategies to follow
2
Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
3
Lack of knowledge about the differences between making
decisions based on expectations
Published Sunday, October 8, 2000, in the San Jose Mercury News. Copyright ©2000 by Sam Savage
Mining imperative calls for new alternatives and tools to analyse
and evaluate a mine operation in the face of uncertainty
4
Mining companies can’t just dabble
at the edges by keep using
traditional processes and techniques
which do not consider uncertainty.
Time
Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
Quantifying the effect of uncertainty
Monte Carlo Simulation
Wednesday, 26 October 2016
Quantifying the effect of the uncertainty in orebody modelling
6
Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
Current industry practice for price forecasting
7
Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
Production cost uncertainty
8
Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
Uncertainty and risk in open pit mine planning and design
(ultimate pit and production scheduling final limits)
9
Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
Going beyond risk analysis
Wednesday, 26 October 2016
So, What can we do to protect from uncertainty?
How can we minimise risk and maximise opportunities…
Real options as tool to manage uncertainty in decision making
11
Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
Real options as tool to manage uncertainty in decision making
12
Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
Valuing a silver mine project in the face of price uncertainty with
options to close and defer investment
13
The technical/operational/economic characteristics of the mining project are:
• The project requires an initial investment of USD 48 million (CAPEX);
• Production cost assumed to be US$7.5 per ounce of silver produced;
• There are not variable extraction costs;
• Life of mine is estimated to be 5 years;
• The annual silver production (million Oz) for the next 5 years are estimated to be
0.051, 0.842, 2001, 3337, and 3416, respectively.
• Annual risk adjusted discount rate is 10%;
• Management has the option to invest now or defer project investment and
development for 1 year at a cost of $1.0 million (paid at the end).
• Salvage value = Closure cost + selling of all assets, is expected to be breakeven (i.e.,
US$0).
• For practical and comparison purposes, all cash flow calculations will be done
using the annual RADR of 10%, so all results can be compared against the bench
mark, i.e., the traditional discounted cash flow (however for the sake of
completeness the annual risk free rate is 4%);
Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
Valuing a silver mine project in the face of price uncertainty with
options to close and defer investment
14
Key management questions to be answered are:
• Given the size of investment outlay, the long term silver price scenarios, and the
dynamics (volatility) of silver price over time, is this a good investment?
• Should management invest now, or should it wait and see how silver prices will
develop next year?
• What is the cut-off investment (CAPEX) that management should consider to
decide to either invest today or next year?
• What is the maximum cost management should negotiate to have the option to
defer project investment for 1 year?
• How would the project value and decision making vary with different initial silver
prices?
• What is the effect of delaying the project investment on project Internal Rate of
Return (IRR)?
• In case of low silver prices (pessimistic scenarios) what is the best course of action
to take?
Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
Valuing a silver mine project in the face of price uncertainty with
options to close and defer investment
15
PROJECT MAIN SOURCE OF UNCERTAINTY
• Uncertainty over the value of the project is closely related to the dynamics
in future silver prices.
• Currently silver is priced at US$16/Oz.
• However, it is forecasted that silver prices will change in the following
years with a volatility of 28%, and following an erratic movement over
time which is modelled as a Geometric Brownian Motion (GBM).
Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
Options Thinking: Recognising real options and how they add
value - Proactive
16
ExpectedMineProjectValue($m) Project Value Creation from Flexibility
Base Case
Project
Time 1
Option 1
Operational
Drilling
Optimised
Project
Time 2
Option 2
Operational
Cut-Off
Option 3
Managerial
Expand
FlexibilityValue
Decision Making
NPV
ExpandedNPV
Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
Add value by identifying optimal strategies over time in the face
of uncertainty
17
Shift of paradigm
from numbers to
distribution of
probabilities
Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
R&O-Analytics
Cooperating with:
Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved

More Related Content

Similar to 011_UncertaintyInMinePlanning_SIPLAMIN_Martinez

BMO - Investor Presentation
BMO - Investor PresentationBMO - Investor Presentation
BMO - Investor PresentationSemafoCorporate
 
Market entry strategy drilling contractor-iran
Market entry strategy drilling contractor-iranMarket entry strategy drilling contractor-iran
Market entry strategy drilling contractor-iranSadegh Yazdani
 
A New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsA New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsCurt Huber
 
Risks Assessment Matrix and its importance in Oil Shale Mining Projects
Risks Assessment Matrix and its importance in Oil Shale Mining Projects Risks Assessment Matrix and its importance in Oil Shale Mining Projects
Risks Assessment Matrix and its importance in Oil Shale Mining Projects Sergei Sabanov
 
23.05.2012 Aspire's strategic investor interest, Glen Ainsworth
23.05.2012 Aspire's strategic investor interest, Glen Ainsworth23.05.2012 Aspire's strategic investor interest, Glen Ainsworth
23.05.2012 Aspire's strategic investor interest, Glen AinsworthThe Business Council of Mongolia
 
23.05.2012, PRESENTATION, Aspire's strategic investor interest, Glen Ainsworth
23.05.2012, PRESENTATION, Aspire's strategic investor interest, Glen Ainsworth23.05.2012, PRESENTATION, Aspire's strategic investor interest, Glen Ainsworth
23.05.2012, PRESENTATION, Aspire's strategic investor interest, Glen AinsworthThe Business Council of Mongolia
 
Tumazos march 31 2016 web
Tumazos march 31 2016 webTumazos march 31 2016 web
Tumazos march 31 2016 webSemafoCorporate
 
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...Curt Huber
 
AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...crwh888
 
AB Minerals - Tantalite Processing Project Presentation - web 2.0
AB Minerals - Tantalite Processing Project Presentation - web 2.0AB Minerals - Tantalite Processing Project Presentation - web 2.0
AB Minerals - Tantalite Processing Project Presentation - web 2.0Nikolas Perrault
 
AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...Frank Balestra
 

Similar to 011_UncertaintyInMinePlanning_SIPLAMIN_Martinez (20)

13 december 2016 investor deck final
13 december 2016 investor deck final13 december 2016 investor deck final
13 december 2016 investor deck final
 
13 december 2016 investor deck
13 december 2016 investor deck13 december 2016 investor deck
13 december 2016 investor deck
 
BMO - Investor Presentation
BMO - Investor PresentationBMO - Investor Presentation
BMO - Investor Presentation
 
Fresnillo presentation-denver-gold-forum-2015-v3
Fresnillo presentation-denver-gold-forum-2015-v3Fresnillo presentation-denver-gold-forum-2015-v3
Fresnillo presentation-denver-gold-forum-2015-v3
 
Torex jan2013presentation
Torex jan2013presentationTorex jan2013presentation
Torex jan2013presentation
 
Market entry strategy drilling contractor-iran
Market entry strategy drilling contractor-iranMarket entry strategy drilling contractor-iran
Market entry strategy drilling contractor-iran
 
Denver Gold Forum
Denver Gold ForumDenver Gold Forum
Denver Gold Forum
 
Q3 Earnings Results Presentation 2016
Q3 Earnings Results Presentation 2016Q3 Earnings Results Presentation 2016
Q3 Earnings Results Presentation 2016
 
Nem december 2016 investor presentation
Nem december 2016 investor presentationNem december 2016 investor presentation
Nem december 2016 investor presentation
 
Torex apr13pres
Torex apr13presTorex apr13pres
Torex apr13pres
 
A New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsA New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing Minerals
 
Risks Assessment Matrix and its importance in Oil Shale Mining Projects
Risks Assessment Matrix and its importance in Oil Shale Mining Projects Risks Assessment Matrix and its importance in Oil Shale Mining Projects
Risks Assessment Matrix and its importance in Oil Shale Mining Projects
 
November 2016 investor presentation
November 2016 investor presentationNovember 2016 investor presentation
November 2016 investor presentation
 
23.05.2012 Aspire's strategic investor interest, Glen Ainsworth
23.05.2012 Aspire's strategic investor interest, Glen Ainsworth23.05.2012 Aspire's strategic investor interest, Glen Ainsworth
23.05.2012 Aspire's strategic investor interest, Glen Ainsworth
 
23.05.2012, PRESENTATION, Aspire's strategic investor interest, Glen Ainsworth
23.05.2012, PRESENTATION, Aspire's strategic investor interest, Glen Ainsworth23.05.2012, PRESENTATION, Aspire's strategic investor interest, Glen Ainsworth
23.05.2012, PRESENTATION, Aspire's strategic investor interest, Glen Ainsworth
 
Tumazos march 31 2016 web
Tumazos march 31 2016 webTumazos march 31 2016 web
Tumazos march 31 2016 web
 
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...
 
AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...
 
AB Minerals - Tantalite Processing Project Presentation - web 2.0
AB Minerals - Tantalite Processing Project Presentation - web 2.0AB Minerals - Tantalite Processing Project Presentation - web 2.0
AB Minerals - Tantalite Processing Project Presentation - web 2.0
 
AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Technology to Process Tantalite Bearing ...
 

More from Jose Gregorio Freites

Promoción curso RecMin y SimSched. Vzla 02 y 03 dic
Promoción curso RecMin y SimSched. Vzla 02 y 03 dicPromoción curso RecMin y SimSched. Vzla 02 y 03 dic
Promoción curso RecMin y SimSched. Vzla 02 y 03 dicJose Gregorio Freites
 
Presentación Método Pentaédrico de RecMin IUTEB
Presentación Método Pentaédrico de RecMin  IUTEB Presentación Método Pentaédrico de RecMin  IUTEB
Presentación Método Pentaédrico de RecMin IUTEB Jose Gregorio Freites
 
Método Pentaédrico en RecMin (18-215-3-PB)
Método Pentaédrico en RecMin (18-215-3-PB)Método Pentaédrico en RecMin (18-215-3-PB)
Método Pentaédrico en RecMin (18-215-3-PB)Jose Gregorio Freites
 
010_TraditionalVersusStochasticMinePlanning_SIPLAMIN_Marinho
010_TraditionalVersusStochasticMinePlanning_SIPLAMIN_Marinho010_TraditionalVersusStochasticMinePlanning_SIPLAMIN_Marinho
010_TraditionalVersusStochasticMinePlanning_SIPLAMIN_MarinhoJose Gregorio Freites
 
Explicación para crear un sondeo de ejemplo
Explicación para crear un sondeo de ejemploExplicación para crear un sondeo de ejemplo
Explicación para crear un sondeo de ejemploJose Gregorio Freites
 
Base de Conocimiento de RecMin - Software Geológico-Minero
Base de Conocimiento de RecMin - Software Geológico-MineroBase de Conocimiento de RecMin - Software Geológico-Minero
Base de Conocimiento de RecMin - Software Geológico-MineroJose Gregorio Freites
 

More from Jose Gregorio Freites (17)

Promoción curso RecMin y SimSched. Vzla 02 y 03 dic
Promoción curso RecMin y SimSched. Vzla 02 y 03 dicPromoción curso RecMin y SimSched. Vzla 02 y 03 dic
Promoción curso RecMin y SimSched. Vzla 02 y 03 dic
 
006 imss simsched-siplamin_lozano
006 imss simsched-siplamin_lozano006 imss simsched-siplamin_lozano
006 imss simsched-siplamin_lozano
 
Instalación de SimSched PO
Instalación de SimSched POInstalación de SimSched PO
Instalación de SimSched PO
 
SimSched Pit optimizer
SimSched Pit optimizerSimSched Pit optimizer
SimSched Pit optimizer
 
Presentación Método Pentaédrico de RecMin IUTEB
Presentación Método Pentaédrico de RecMin  IUTEB Presentación Método Pentaédrico de RecMin  IUTEB
Presentación Método Pentaédrico de RecMin IUTEB
 
Método Pentaédrico en RecMin (18-215-3-PB)
Método Pentaédrico en RecMin (18-215-3-PB)Método Pentaédrico en RecMin (18-215-3-PB)
Método Pentaédrico en RecMin (18-215-3-PB)
 
SimSched DBS
SimSched DBSSimSched DBS
SimSched DBS
 
SimSched DBS y RecMin
SimSched DBS y RecMinSimSched DBS y RecMin
SimSched DBS y RecMin
 
Kb sim sched (sp)
Kb sim sched (sp)Kb sim sched (sp)
Kb sim sched (sp)
 
Blk calc geo-min(sp)
Blk calc geo-min(sp)Blk calc geo-min(sp)
Blk calc geo-min(sp)
 
010_TraditionalVersusStochasticMinePlanning_SIPLAMIN_Marinho
010_TraditionalVersusStochasticMinePlanning_SIPLAMIN_Marinho010_TraditionalVersusStochasticMinePlanning_SIPLAMIN_Marinho
010_TraditionalVersusStochasticMinePlanning_SIPLAMIN_Marinho
 
Ley de corte (cut off grade)
Ley de corte (cut off grade)Ley de corte (cut off grade)
Ley de corte (cut off grade)
 
Importación de sondeos
Importación de sondeosImportación de sondeos
Importación de sondeos
 
Explicación para crear un sondeo de ejemplo
Explicación para crear un sondeo de ejemploExplicación para crear un sondeo de ejemplo
Explicación para crear un sondeo de ejemplo
 
Blk-CalcGeoMin(sp)
Blk-CalcGeoMin(sp)Blk-CalcGeoMin(sp)
Blk-CalcGeoMin(sp)
 
Base de Conocimiento de RecMin - Software Geológico-Minero
Base de Conocimiento de RecMin - Software Geológico-MineroBase de Conocimiento de RecMin - Software Geológico-Minero
Base de Conocimiento de RecMin - Software Geológico-Minero
 
Knowledge Base - SimSched
Knowledge Base - SimSchedKnowledge Base - SimSched
Knowledge Base - SimSched
 

Recently uploaded

College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 

Recently uploaded (20)

Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 

011_UncertaintyInMinePlanning_SIPLAMIN_Martinez

  • 1. Dr. LUIS A. MARTINEZ TIPE IV SIMPOSIO INTERNACIONAL DE PLANEAMIENTO DE MINADO UNCERTAINTY IN MINE PLANNING
  • 2. What is the effect of the ‘What if..?’ uncertainties on project economics/What are the best strategies to follow 2 Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
  • 3. 3 Lack of knowledge about the differences between making decisions based on expectations Published Sunday, October 8, 2000, in the San Jose Mercury News. Copyright ©2000 by Sam Savage
  • 4. Mining imperative calls for new alternatives and tools to analyse and evaluate a mine operation in the face of uncertainty 4 Mining companies can’t just dabble at the edges by keep using traditional processes and techniques which do not consider uncertainty. Time Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
  • 5. Quantifying the effect of uncertainty Monte Carlo Simulation Wednesday, 26 October 2016
  • 6. Quantifying the effect of the uncertainty in orebody modelling 6 Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
  • 7. Current industry practice for price forecasting 7 Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
  • 8. Production cost uncertainty 8 Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
  • 9. Uncertainty and risk in open pit mine planning and design (ultimate pit and production scheduling final limits) 9 Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
  • 10. Going beyond risk analysis Wednesday, 26 October 2016 So, What can we do to protect from uncertainty? How can we minimise risk and maximise opportunities…
  • 11. Real options as tool to manage uncertainty in decision making 11 Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
  • 12. Real options as tool to manage uncertainty in decision making 12 Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
  • 13. Valuing a silver mine project in the face of price uncertainty with options to close and defer investment 13 The technical/operational/economic characteristics of the mining project are: • The project requires an initial investment of USD 48 million (CAPEX); • Production cost assumed to be US$7.5 per ounce of silver produced; • There are not variable extraction costs; • Life of mine is estimated to be 5 years; • The annual silver production (million Oz) for the next 5 years are estimated to be 0.051, 0.842, 2001, 3337, and 3416, respectively. • Annual risk adjusted discount rate is 10%; • Management has the option to invest now or defer project investment and development for 1 year at a cost of $1.0 million (paid at the end). • Salvage value = Closure cost + selling of all assets, is expected to be breakeven (i.e., US$0). • For practical and comparison purposes, all cash flow calculations will be done using the annual RADR of 10%, so all results can be compared against the bench mark, i.e., the traditional discounted cash flow (however for the sake of completeness the annual risk free rate is 4%); Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
  • 14. Valuing a silver mine project in the face of price uncertainty with options to close and defer investment 14 Key management questions to be answered are: • Given the size of investment outlay, the long term silver price scenarios, and the dynamics (volatility) of silver price over time, is this a good investment? • Should management invest now, or should it wait and see how silver prices will develop next year? • What is the cut-off investment (CAPEX) that management should consider to decide to either invest today or next year? • What is the maximum cost management should negotiate to have the option to defer project investment for 1 year? • How would the project value and decision making vary with different initial silver prices? • What is the effect of delaying the project investment on project Internal Rate of Return (IRR)? • In case of low silver prices (pessimistic scenarios) what is the best course of action to take? Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
  • 15. Valuing a silver mine project in the face of price uncertainty with options to close and defer investment 15 PROJECT MAIN SOURCE OF UNCERTAINTY • Uncertainty over the value of the project is closely related to the dynamics in future silver prices. • Currently silver is priced at US$16/Oz. • However, it is forecasted that silver prices will change in the following years with a volatility of 28%, and following an erratic movement over time which is modelled as a Geometric Brownian Motion (GBM). Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
  • 16. Options Thinking: Recognising real options and how they add value - Proactive 16 ExpectedMineProjectValue($m) Project Value Creation from Flexibility Base Case Project Time 1 Option 1 Operational Drilling Optimised Project Time 2 Option 2 Operational Cut-Off Option 3 Managerial Expand FlexibilityValue Decision Making NPV ExpandedNPV Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
  • 17. Add value by identifying optimal strategies over time in the face of uncertainty 17 Shift of paradigm from numbers to distribution of probabilities Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved
  • 18. R&O-Analytics Cooperating with: Copyright © 2016 R&O ANALYTICS Pty Ltd. All rights reserved