SlideShare a Scribd company logo
1 of 22
Airport Consulting
Project Briefings
AVS 4999 – Aviation Systems Safety
Airport Consulting & Airport Management
Why is this applicable for you?
Lifestyle
Highly Qualified
Excellent Backup Plan!
Ensures you are well rounded in your profession
A better fit for your strengths
My story at FIT
I didn’t even know this was an option starting out!
This makes you a more well rounded professional, regardless of
the aviation discipline you enter for your career path!
This industry NEEDS your specialized knowledge!!
2
Airport Consulting
Advising airports on strategic, aeronautical, and commercial
issues.
A focus on highly technical design focusing on terminal
development, and airfield development.
Exists to assist airport management by supplementing existing
staff with high-level technical experience.
This enables management staff to stay lean, and consulting
firms to become highly skilled at specific tasks by practicing at
many different airports.
What is it?
Airport Consulting
The core product of a consultancy is their employees'
knowledge and experience.
As a consultant you are paid for your technical knowledge.
You are expected to multitask and work on many projects within
the same time frame juggling multiple deadlines
Therefore you charge your time to each project hourly. (Like a
lawyer)
Life of a Consultant
Airport Consulting
Typically an office environment.
Work from home and flexible schedule options available.
You are on demand to meet client needs, which sometimes
requires work outside of the typical 9-5 schedule.
Flexibility depends on office culture and employee
achievement.
Life of a Consultant
15-20 Years
130K – 160K
10-15 Years
100K – 130K
5-10 Years
70K-100K
0-5 Years
55k – 70K
Airport Consulting
Career Path & Pay Escalation
* Pay estimates based on Central Florida 2020 Rates, escalation
/ reduction required for locale
Consulting
Aviation Planner II/III
Project Manager
Senior Aviation Planner
Aviation Planner I
Project Director
Senior Technical Director
Typical Airport Consultant Project
Forecast Future Demand
What facilities will create the capacity the airport will need to
add to meet the forecasted demand
Decide where these facilities should go, and when they should
be constructed.
Devise a plan for the airport to finance these projects.
Airport Master Plan
Lakeland Linder International Airport
LAL is located on an approximate 1,710-acre property in Polk
County.
The Airport is located approximately five miles southwest of
the City of Lakeland and 27 miles east of Tampa International
Airport (TPA)
Forecasting
Forecasting
Annual Service Volume
An airport’s ASV is the maximum number of annual operations
that can occur at an airport before an assumed reasonable
operational delay value is encountered.
ASV is calculated based on factors like the existing runway
configuration, aircraft mix, and instrument approaches.
LAL ASV = 222,437 ops / yr
ASV vs. Forecast
60 % of ASV: Begin planning for Capacity Enhancing Projects
80 % of ASV: Planning should be complete, construction
beginning
100 % of ASV: Total number of annual operations (demand)
that can be accommodated has been reached and capacity-
enhancing improvements should be made to avoid extensive
delays
How to we add Capacity?
Airspace Capacity
Approaches
Air Traffic Control Tower
Departure/Arrival Procedures
Airside Capacity
Runways
Taxiways
Landside Capacity
Terminals
Aprons
Hangars
Vehicle Parking
Airport Capitol Improvement Program:
Airport projects are broken up and phased to create a year-by-
year playbook for the airport to accomplish their 20-year vision.
JFK
A lot of airport terminals in the US are the product of
incremental expansion and no limited planning in the first few
decades. Building and adding on to what already exists without
a clear idea of future needs. (The band-aid effect)
JFK is an Extreme example of this
A lot has been learned about terminal and airfield expansion in
the past 50 years about what works and what doesn’t
Go to GOOGLE EARTH DEN is an example of a green-field
airport built using best practices to ensure efficiency and
expansion possibilities.
More and More In developing countries, they are learning from
the past 50 years of airport expansion. Often, instead of
building urban band aid approaches like JFK, they are selecting
Greenfield sites like Denver years in advance in order to
accommodate the next 50 years of aviation growth.
17
JFK
A lot of airport terminals in the US are the product of
incremental expansion and no limited planning in the first few
decades. Building and adding on to what already exists without
a clear idea of future needs. (The band-aid effect)
JFK is an Extreme example of this
A lot has been learned about terminal and airfield expansion in
the past 50 years about what works and what doesn’t
Go to GOOGLE EARTH DEN is an example of a green-field
airport built using best practices to ensure efficiency and
expansion possibilities.
More and More In developing countries, they are learning from
the past 50 years of airport expansion. Often, instead of
building urban band aid approaches like JFK, they are selecting
Greenfield sites like Denver years in advance in order to
accommodate the next 50 years of aviation growth.
18
DEN
A lot of airport terminals in the US are the product of
incremental expansion and no limited planning in the first few
decades. Building and adding on to what already exists without
a clear idea of future needs. (The band-aid effect)
JFK is an Extreme example of this
A lot has been learned about terminal and airfield expansion in
the past 50 years about what works and what doesn’t
Go to GOOGLE EARTH DEN is an example of a green-field
airport built using best practices to ensure efficiency and
expansion possibilities.
More and More In developing countries, they are learning from
the past 50 years of airport expansion. Often, instead of
building urban band aid approaches like JFK, they are selecting
Greenfield sites like Denver years in advance in order to
accommodate the next 50 years of aviation growth.
19
DEN
A lot of airport terminals in the US are the product of
incremental expansion and no limited planning in the first few
decades. Building and adding on to what already exists without
a clear idea of future needs. (The band-aid effect)
JFK is an Extreme example of this
A lot has been learned about terminal and airfield expansion in
the past 50 years about what works and what doesn’t
Go to GOOGLE EARTH DEN is an example of a green-field
airport built using best practices to ensure efficiency and
expansion possibilities.
More and More In developing countries, they are learning from
the past 50 years of airport expansion. Often, instead of
building urban band aid approaches like JFK, they are selecting
Greenfield sites like Denver years in advance in order to
accommodate the next 50 years of aviation growth.
20
New Qingdao International Airport
145 Gates
32 Remote Parking Stands
4 Parallel Runways
ICAO Code F Aircraft (A-380)
15 Cargo Parking Positions
Airport Enterprise Zone (Business Park)
GTC – Ground Transportation Center (Rail, Taxi, Parking)
Basically have these parameters.
Forecasting is complete, they know what demand will be on the
facility and what their capacity needs are. They want the layout.
Airport Planner’s dream.
Where do you start?
21
New Qingdao International Airport
145 Gates
32 Remote Parking Stands
4 Parallel Runways
ICAO Code F Aircraft (A-380)
15 Cargo Parking Positions
Airport Enterprise Zone (Business Park)
GTC – Ground Transportation Center (Rail, Taxi, Parking)
Basically have these parameters.
Forecasting is complete, they know what demand will be on the
facility and what their capacity needs are. They want the layout.
Airport Planner’s dream.
Where do you start?
22
Site
10%
20%
58%
12%
Future Demand
Terminal Configuration
Preferred Configuration
South Access
Cargo Development Potential
Airport Enterprise Zone (Business Park)
GTC – Ground Transportation Center (Rail, Taxi, Parking)
Small amount of Duplication of facilities
No APM
Passenger Walking Distance is a huge priority in terminal
design
In an analysis it was found that using a 5 Pier approach, we
would be able to accommodate the number of gates required,
with the shortest possible walking distance for the passenger
South Access
High Cargo Development Potential
Airport Enterprise Zone (Business Park)
GTC – Ground Transportation Center (Rail, Taxi, Parking)
Limited Duplication of facilities
No APM
South Access
High Cargo Development Potential
Airport Enterprise Zone (Business Park)
GTC – Ground Transportation Center (Rail, Taxi, Parking)
Limited Duplication of facilities
No APM
28
End Around Taxiways
These add significant capacity and safety enhancements
End around taxiways allow aircraft landing out outer runways to
taxi under departing aircraft. Without affecting Departure
delays. 30% imprvements have been seen on runway
efficiencies and airlines have estimated saving tens of millions
of dollars in fuel per year.
Less Delay, and increased safety.
At ATL it has saved over 700 runway crossings per year.
Cargo Facilities can easily add 50 % capacity in the ultimate
configuration
Dual Parallel Taxiways
High Speed Taxiway Exits
1970 Meters – 70% of Code C traffic
2340 Meters – 90% Code C Aircraft
29
image1.png
image5.jpeg
image11.png
image12.png
image13.png
image14.png
image15.jpeg
image16.jpeg
image17.png
image18.png
image19.png
image20.jpeg
image21.jpeg
image22.jpeg
image23.jpeg
image24.png
image4.jpeg
image25.jpeg
image26.png
image27.png
image28.png
image29.png
image30.png
image31.png
image32.png
image33.png
image34.png
image35.png
image36.png
image37.png
image38.png
image39.png
image40.png
image41.jpeg
image42.jpeg
image43.jpeg
image44.jpeg
image45.jpeg
image46.jpeg
image47.jpeg
image48.jpeg
image49.jpeg

More Related Content

Similar to Airport ConsultingProject BriefingsAVS 4999 – Aviation Syste.docx

Managing_Airport_Construction_Projects
Managing_Airport_Construction_ProjectsManaging_Airport_Construction_Projects
Managing_Airport_Construction_Projects
Dr. Anders Adrem
 
INFORM-Measuring and Monitoring Aircraft Turn Operations v3
INFORM-Measuring and Monitoring Aircraft Turn Operations v3INFORM-Measuring and Monitoring Aircraft Turn Operations v3
INFORM-Measuring and Monitoring Aircraft Turn Operations v3
David Foster
 
Running head AVIATION MAINTENANCE SYSTEM DEFICIENCY1Aviation.docx
Running head AVIATION MAINTENANCE SYSTEM DEFICIENCY1Aviation.docxRunning head AVIATION MAINTENANCE SYSTEM DEFICIENCY1Aviation.docx
Running head AVIATION MAINTENANCE SYSTEM DEFICIENCY1Aviation.docx
joellemurphey
 
Airfield Engineering and Asset Management Asia Brochure
Airfield Engineering and Asset Management Asia BrochureAirfield Engineering and Asset Management Asia Brochure
Airfield Engineering and Asset Management Asia Brochure
Jasmine Whiting
 

Similar to Airport ConsultingProject BriefingsAVS 4999 – Aviation Syste.docx (20)

Airport Layout Plan For Efficient Airport Design
Airport Layout Plan For Efficient Airport DesignAirport Layout Plan For Efficient Airport Design
Airport Layout Plan For Efficient Airport Design
 
Report on airport engineering
Report on airport engineeringReport on airport engineering
Report on airport engineering
 
Thai vs Air Asia
Thai vs Air AsiaThai vs Air Asia
Thai vs Air Asia
 
Managing_Airport_Construction_Projects
Managing_Airport_Construction_ProjectsManaging_Airport_Construction_Projects
Managing_Airport_Construction_Projects
 
Profit maximization
Profit maximizationProfit maximization
Profit maximization
 
ACI ACRIS Semantic Model. Airport Ecosystem Knowledge Management
ACI ACRIS Semantic Model. Airport Ecosystem Knowledge ManagementACI ACRIS Semantic Model. Airport Ecosystem Knowledge Management
ACI ACRIS Semantic Model. Airport Ecosystem Knowledge Management
 
Jet blue airways managing growth
Jet blue airways managing growthJet blue airways managing growth
Jet blue airways managing growth
 
Flight data analysis using apache pig--------------Final Year Project
Flight data analysis using apache pig--------------Final Year ProjectFlight data analysis using apache pig--------------Final Year Project
Flight data analysis using apache pig--------------Final Year Project
 
PowerLogistics Asia 2013- Project Air Cargo - Removing The Gaps In Project Ex...
PowerLogistics Asia 2013- Project Air Cargo - Removing The Gaps In Project Ex...PowerLogistics Asia 2013- Project Air Cargo - Removing The Gaps In Project Ex...
PowerLogistics Asia 2013- Project Air Cargo - Removing The Gaps In Project Ex...
 
Aviation Article : Getting The Right Picture
Aviation Article  : Getting The Right PictureAviation Article  : Getting The Right Picture
Aviation Article : Getting The Right Picture
 
A-CDM
A-CDMA-CDM
A-CDM
 
INFORM-Measuring and Monitoring Aircraft Turn Operations v3
INFORM-Measuring and Monitoring Aircraft Turn Operations v3INFORM-Measuring and Monitoring Aircraft Turn Operations v3
INFORM-Measuring and Monitoring Aircraft Turn Operations v3
 
Running head AVIATION MAINTENANCE SYSTEM DEFICIENCY1Aviation.docx
Running head AVIATION MAINTENANCE SYSTEM DEFICIENCY1Aviation.docxRunning head AVIATION MAINTENANCE SYSTEM DEFICIENCY1Aviation.docx
Running head AVIATION MAINTENANCE SYSTEM DEFICIENCY1Aviation.docx
 
Getting Giants to Dance (Stephen Pollard at DesignOps Summit 2017)
Getting Giants to Dance (Stephen Pollard at DesignOps Summit 2017)Getting Giants to Dance (Stephen Pollard at DesignOps Summit 2017)
Getting Giants to Dance (Stephen Pollard at DesignOps Summit 2017)
 
Getting Started Using Drones in Architecture, Engineering, and Construction (...
Getting Started Using Drones in Architecture, Engineering, and Construction (...Getting Started Using Drones in Architecture, Engineering, and Construction (...
Getting Started Using Drones in Architecture, Engineering, and Construction (...
 
industrial
industrialindustrial
industrial
 
Pasha_CV
Pasha_CVPasha_CV
Pasha_CV
 
Airport Analytics (AA+) Solution, Airport Analysis
Airport Analytics (AA+) Solution, Airport AnalysisAirport Analytics (AA+) Solution, Airport Analysis
Airport Analytics (AA+) Solution, Airport Analysis
 
Five ways to drive process adoption
Five ways to drive process adoptionFive ways to drive process adoption
Five ways to drive process adoption
 
Airfield Engineering and Asset Management Asia Brochure
Airfield Engineering and Asset Management Asia BrochureAirfield Engineering and Asset Management Asia Brochure
Airfield Engineering and Asset Management Asia Brochure
 

More from jesuslightbody

Bad time to be humble! When andwhy leaders should not be hum.docx
Bad time to be humble! When andwhy leaders should not be hum.docxBad time to be humble! When andwhy leaders should not be hum.docx
Bad time to be humble! When andwhy leaders should not be hum.docx
jesuslightbody
 
BCO 117 IT Software for Business Lecture Reference Notes.docx
BCO 117 IT Software for Business Lecture Reference Notes.docxBCO 117 IT Software for Business Lecture Reference Notes.docx
BCO 117 IT Software for Business Lecture Reference Notes.docx
jesuslightbody
 
Authors Anna, Alisa, David & PreslavaThis article is desi.docx
Authors Anna, Alisa, David & PreslavaThis article is desi.docxAuthors Anna, Alisa, David & PreslavaThis article is desi.docx
Authors Anna, Alisa, David & PreslavaThis article is desi.docx
jesuslightbody
 
Authoritarianism, Populism, and the GlobalRetreat of Democra.docx
Authoritarianism, Populism, and the GlobalRetreat of Democra.docxAuthoritarianism, Populism, and the GlobalRetreat of Democra.docx
Authoritarianism, Populism, and the GlobalRetreat of Democra.docx
jesuslightbody
 
ASSOCIATE SCIENCE IN NURSINGCLINICAL WORKSHEET MATERNITY NU.docx
ASSOCIATE SCIENCE IN NURSINGCLINICAL WORKSHEET MATERNITY NU.docxASSOCIATE SCIENCE IN NURSINGCLINICAL WORKSHEET MATERNITY NU.docx
ASSOCIATE SCIENCE IN NURSINGCLINICAL WORKSHEET MATERNITY NU.docx
jesuslightbody
 
AssignmentYour healthcare organization’s.docx
AssignmentYour healthcare organization’s.docxAssignmentYour healthcare organization’s.docx
AssignmentYour healthcare organization’s.docx
jesuslightbody
 
Assignment Marketing Plan – Part 2 of 2Positioning and Adverti.docx
Assignment Marketing Plan – Part 2 of 2Positioning and Adverti.docxAssignment Marketing Plan – Part 2 of 2Positioning and Adverti.docx
Assignment Marketing Plan – Part 2 of 2Positioning and Adverti.docx
jesuslightbody
 
Assignment WK 8 Advocating for the Nursing Role in Program Design .docx
Assignment WK 8 Advocating for the Nursing Role in Program Design .docxAssignment WK 8 Advocating for the Nursing Role in Program Design .docx
Assignment WK 8 Advocating for the Nursing Role in Program Design .docx
jesuslightbody
 
Assignment WK 9Assessing a Healthcare ProgramPolicy Evaluation.docx
Assignment WK 9Assessing a Healthcare ProgramPolicy Evaluation.docxAssignment WK 9Assessing a Healthcare ProgramPolicy Evaluation.docx
Assignment WK 9Assessing a Healthcare ProgramPolicy Evaluation.docx
jesuslightbody
 
Assignment OverviewYou and a few of your fellow learners have be.docx
Assignment OverviewYou and a few of your fellow learners have be.docxAssignment OverviewYou and a few of your fellow learners have be.docx
Assignment OverviewYou and a few of your fellow learners have be.docx
jesuslightbody
 

More from jesuslightbody (20)

Be prepared to answer the following questionsWhat are the thr.docx
Be prepared to answer the following questionsWhat are the thr.docxBe prepared to answer the following questionsWhat are the thr.docx
Be prepared to answer the following questionsWhat are the thr.docx
 
Based  upon our readings concerning the work of Pierre Bourdieu, ple.docx
Based  upon our readings concerning the work of Pierre Bourdieu, ple.docxBased  upon our readings concerning the work of Pierre Bourdieu, ple.docx
Based  upon our readings concerning the work of Pierre Bourdieu, ple.docx
 
Based on the documentary and the article, please answer the followin.docx
Based on the documentary and the article, please answer the followin.docxBased on the documentary and the article, please answer the followin.docx
Based on the documentary and the article, please answer the followin.docx
 
Based on Case Study Fetal Abnormality and the required topic Reso.docx
Based on Case Study Fetal Abnormality and the required topic Reso.docxBased on Case Study Fetal Abnormality and the required topic Reso.docx
Based on Case Study Fetal Abnormality and the required topic Reso.docx
 
Bad time to be humble! When andwhy leaders should not be hum.docx
Bad time to be humble! When andwhy leaders should not be hum.docxBad time to be humble! When andwhy leaders should not be hum.docx
Bad time to be humble! When andwhy leaders should not be hum.docx
 
be 3-5 sentences per answerDescribe what is meant by Maslo.docx
be 3-5 sentences per answerDescribe what is meant by Maslo.docxbe 3-5 sentences per answerDescribe what is meant by Maslo.docx
be 3-5 sentences per answerDescribe what is meant by Maslo.docx
 
Be sure to complete the topic Physical Development before particip.docx
Be sure to complete the topic Physical Development before particip.docxBe sure to complete the topic Physical Development before particip.docx
Be sure to complete the topic Physical Development before particip.docx
 
BCO 117 IT Software for Business Lecture Reference Notes.docx
BCO 117 IT Software for Business Lecture Reference Notes.docxBCO 117 IT Software for Business Lecture Reference Notes.docx
BCO 117 IT Software for Business Lecture Reference Notes.docx
 
Authors Anna, Alisa, David & PreslavaThis article is desi.docx
Authors Anna, Alisa, David & PreslavaThis article is desi.docxAuthors Anna, Alisa, David & PreslavaThis article is desi.docx
Authors Anna, Alisa, David & PreslavaThis article is desi.docx
 
Authoritarianism, Populism, and the GlobalRetreat of Democra.docx
Authoritarianism, Populism, and the GlobalRetreat of Democra.docxAuthoritarianism, Populism, and the GlobalRetreat of Democra.docx
Authoritarianism, Populism, and the GlobalRetreat of Democra.docx
 
ASSOCIATE SCIENCE IN NURSINGCLINICAL WORKSHEET MATERNITY NU.docx
ASSOCIATE SCIENCE IN NURSINGCLINICAL WORKSHEET MATERNITY NU.docxASSOCIATE SCIENCE IN NURSINGCLINICAL WORKSHEET MATERNITY NU.docx
ASSOCIATE SCIENCE IN NURSINGCLINICAL WORKSHEET MATERNITY NU.docx
 
Assume that you are a Healthcare Quality Specialist at a healthcare .docx
Assume that you are a Healthcare Quality Specialist at a healthcare .docxAssume that you are a Healthcare Quality Specialist at a healthcare .docx
Assume that you are a Healthcare Quality Specialist at a healthcare .docx
 
AssignmentYour healthcare organization’s.docx
AssignmentYour healthcare organization’s.docxAssignmentYour healthcare organization’s.docx
AssignmentYour healthcare organization’s.docx
 
ASSIGNMENT Planning an Effective Press ReleaseSelect a topic an.docx
ASSIGNMENT Planning an Effective Press ReleaseSelect a topic an.docxASSIGNMENT Planning an Effective Press ReleaseSelect a topic an.docx
ASSIGNMENT Planning an Effective Press ReleaseSelect a topic an.docx
 
Assignment Marketing Plan – Part 2 of 2Positioning and Adverti.docx
Assignment Marketing Plan – Part 2 of 2Positioning and Adverti.docxAssignment Marketing Plan – Part 2 of 2Positioning and Adverti.docx
Assignment Marketing Plan – Part 2 of 2Positioning and Adverti.docx
 
Assume an African American character and write from the perspective .docx
Assume an African American character and write from the perspective .docxAssume an African American character and write from the perspective .docx
Assume an African American character and write from the perspective .docx
 
Assignment WK 8 Advocating for the Nursing Role in Program Design .docx
Assignment WK 8 Advocating for the Nursing Role in Program Design .docxAssignment WK 8 Advocating for the Nursing Role in Program Design .docx
Assignment WK 8 Advocating for the Nursing Role in Program Design .docx
 
Assignment TitleStudents NameCourse TitleProfessor.docx
Assignment TitleStudents NameCourse TitleProfessor.docxAssignment TitleStudents NameCourse TitleProfessor.docx
Assignment TitleStudents NameCourse TitleProfessor.docx
 
Assignment WK 9Assessing a Healthcare ProgramPolicy Evaluation.docx
Assignment WK 9Assessing a Healthcare ProgramPolicy Evaluation.docxAssignment WK 9Assessing a Healthcare ProgramPolicy Evaluation.docx
Assignment WK 9Assessing a Healthcare ProgramPolicy Evaluation.docx
 
Assignment OverviewYou and a few of your fellow learners have be.docx
Assignment OverviewYou and a few of your fellow learners have be.docxAssignment OverviewYou and a few of your fellow learners have be.docx
Assignment OverviewYou and a few of your fellow learners have be.docx
 

Recently uploaded

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Recently uploaded (20)

Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 

Airport ConsultingProject BriefingsAVS 4999 – Aviation Syste.docx

  • 1. Airport Consulting Project Briefings AVS 4999 – Aviation Systems Safety Airport Consulting & Airport Management Why is this applicable for you? Lifestyle Highly Qualified Excellent Backup Plan! Ensures you are well rounded in your profession A better fit for your strengths
  • 2. My story at FIT I didn’t even know this was an option starting out! This makes you a more well rounded professional, regardless of the aviation discipline you enter for your career path! This industry NEEDS your specialized knowledge!! 2 Airport Consulting Advising airports on strategic, aeronautical, and commercial issues. A focus on highly technical design focusing on terminal development, and airfield development. Exists to assist airport management by supplementing existing staff with high-level technical experience. This enables management staff to stay lean, and consulting firms to become highly skilled at specific tasks by practicing at many different airports. What is it?
  • 3. Airport Consulting The core product of a consultancy is their employees' knowledge and experience. As a consultant you are paid for your technical knowledge. You are expected to multitask and work on many projects within the same time frame juggling multiple deadlines Therefore you charge your time to each project hourly. (Like a lawyer) Life of a Consultant Airport Consulting Typically an office environment. Work from home and flexible schedule options available. You are on demand to meet client needs, which sometimes requires work outside of the typical 9-5 schedule. Flexibility depends on office culture and employee achievement. Life of a Consultant
  • 4. 15-20 Years 130K – 160K 10-15 Years 100K – 130K 5-10 Years 70K-100K 0-5 Years 55k – 70K Airport Consulting
  • 5. Career Path & Pay Escalation * Pay estimates based on Central Florida 2020 Rates, escalation / reduction required for locale Consulting Aviation Planner II/III Project Manager Senior Aviation Planner Aviation Planner I Project Director Senior Technical Director
  • 6. Typical Airport Consultant Project Forecast Future Demand What facilities will create the capacity the airport will need to add to meet the forecasted demand Decide where these facilities should go, and when they should be constructed. Devise a plan for the airport to finance these projects. Airport Master Plan
  • 7. Lakeland Linder International Airport LAL is located on an approximate 1,710-acre property in Polk County. The Airport is located approximately five miles southwest of the City of Lakeland and 27 miles east of Tampa International Airport (TPA) Forecasting
  • 8. Forecasting Annual Service Volume An airport’s ASV is the maximum number of annual operations that can occur at an airport before an assumed reasonable operational delay value is encountered. ASV is calculated based on factors like the existing runway configuration, aircraft mix, and instrument approaches. LAL ASV = 222,437 ops / yr ASV vs. Forecast 60 % of ASV: Begin planning for Capacity Enhancing Projects 80 % of ASV: Planning should be complete, construction beginning
  • 9. 100 % of ASV: Total number of annual operations (demand) that can be accommodated has been reached and capacity- enhancing improvements should be made to avoid extensive delays How to we add Capacity? Airspace Capacity Approaches Air Traffic Control Tower Departure/Arrival Procedures Airside Capacity Runways Taxiways Landside Capacity Terminals Aprons Hangars Vehicle Parking
  • 10. Airport Capitol Improvement Program: Airport projects are broken up and phased to create a year-by- year playbook for the airport to accomplish their 20-year vision. JFK
  • 11. A lot of airport terminals in the US are the product of incremental expansion and no limited planning in the first few decades. Building and adding on to what already exists without a clear idea of future needs. (The band-aid effect) JFK is an Extreme example of this A lot has been learned about terminal and airfield expansion in the past 50 years about what works and what doesn’t Go to GOOGLE EARTH DEN is an example of a green-field airport built using best practices to ensure efficiency and expansion possibilities. More and More In developing countries, they are learning from the past 50 years of airport expansion. Often, instead of building urban band aid approaches like JFK, they are selecting Greenfield sites like Denver years in advance in order to accommodate the next 50 years of aviation growth. 17 JFK A lot of airport terminals in the US are the product of incremental expansion and no limited planning in the first few decades. Building and adding on to what already exists without a clear idea of future needs. (The band-aid effect) JFK is an Extreme example of this
  • 12. A lot has been learned about terminal and airfield expansion in the past 50 years about what works and what doesn’t Go to GOOGLE EARTH DEN is an example of a green-field airport built using best practices to ensure efficiency and expansion possibilities. More and More In developing countries, they are learning from the past 50 years of airport expansion. Often, instead of building urban band aid approaches like JFK, they are selecting Greenfield sites like Denver years in advance in order to accommodate the next 50 years of aviation growth. 18 DEN A lot of airport terminals in the US are the product of incremental expansion and no limited planning in the first few decades. Building and adding on to what already exists without a clear idea of future needs. (The band-aid effect) JFK is an Extreme example of this A lot has been learned about terminal and airfield expansion in the past 50 years about what works and what doesn’t Go to GOOGLE EARTH DEN is an example of a green-field airport built using best practices to ensure efficiency and expansion possibilities. More and More In developing countries, they are learning from
  • 13. the past 50 years of airport expansion. Often, instead of building urban band aid approaches like JFK, they are selecting Greenfield sites like Denver years in advance in order to accommodate the next 50 years of aviation growth. 19 DEN A lot of airport terminals in the US are the product of incremental expansion and no limited planning in the first few decades. Building and adding on to what already exists without a clear idea of future needs. (The band-aid effect) JFK is an Extreme example of this A lot has been learned about terminal and airfield expansion in the past 50 years about what works and what doesn’t Go to GOOGLE EARTH DEN is an example of a green-field airport built using best practices to ensure efficiency and expansion possibilities. More and More In developing countries, they are learning from the past 50 years of airport expansion. Often, instead of building urban band aid approaches like JFK, they are selecting Greenfield sites like Denver years in advance in order to accommodate the next 50 years of aviation growth. 20
  • 14. New Qingdao International Airport 145 Gates 32 Remote Parking Stands 4 Parallel Runways ICAO Code F Aircraft (A-380) 15 Cargo Parking Positions Airport Enterprise Zone (Business Park) GTC – Ground Transportation Center (Rail, Taxi, Parking) Basically have these parameters. Forecasting is complete, they know what demand will be on the facility and what their capacity needs are. They want the layout. Airport Planner’s dream. Where do you start? 21 New Qingdao International Airport 145 Gates 32 Remote Parking Stands 4 Parallel Runways ICAO Code F Aircraft (A-380) 15 Cargo Parking Positions
  • 15. Airport Enterprise Zone (Business Park) GTC – Ground Transportation Center (Rail, Taxi, Parking) Basically have these parameters. Forecasting is complete, they know what demand will be on the facility and what their capacity needs are. They want the layout. Airport Planner’s dream. Where do you start? 22 Site
  • 17. Preferred Configuration South Access Cargo Development Potential Airport Enterprise Zone (Business Park) GTC – Ground Transportation Center (Rail, Taxi, Parking) Small amount of Duplication of facilities No APM Passenger Walking Distance is a huge priority in terminal design In an analysis it was found that using a 5 Pier approach, we would be able to accommodate the number of gates required, with the shortest possible walking distance for the passenger
  • 18. South Access High Cargo Development Potential Airport Enterprise Zone (Business Park) GTC – Ground Transportation Center (Rail, Taxi, Parking) Limited Duplication of facilities No APM South Access High Cargo Development Potential Airport Enterprise Zone (Business Park) GTC – Ground Transportation Center (Rail, Taxi, Parking) Limited Duplication of facilities No APM 28
  • 19. End Around Taxiways These add significant capacity and safety enhancements End around taxiways allow aircraft landing out outer runways to taxi under departing aircraft. Without affecting Departure delays. 30% imprvements have been seen on runway efficiencies and airlines have estimated saving tens of millions of dollars in fuel per year. Less Delay, and increased safety. At ATL it has saved over 700 runway crossings per year. Cargo Facilities can easily add 50 % capacity in the ultimate configuration Dual Parallel Taxiways High Speed Taxiway Exits 1970 Meters – 70% of Code C traffic 2340 Meters – 90% Code C Aircraft 29
  • 20.