Please provide answer(s) to the following queries by __________ DATE :20/6/2015
Item Queries Assumptions Answer
1
2
3
4
5
6
What type of surface treatment?
Size of door for handicapped toilet
Size of entrance door for female and male toilet
Height of wall between individual toilet and
changing room
Size of two columns at left side
Height of stage
Steel trowel
1.00m x 2.10m
0.75m x 2.10m
2.20m high
115mm x 350mm
0.6m high
Prepared by HII PAI LING

More Related Content

What's hot

Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQashleyyeap
 
Presentation on Mat Foundation
Presentation on Mat FoundationPresentation on Mat Foundation
Presentation on Mat FoundationTanvir Alam Khan
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)Zairul Zaiky
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof coveringEst
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Lee Pei Gie
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...Firdaurs Abdullah
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Panduan step buat rumah
Panduan step buat rumahPanduan step buat rumah
Panduan step buat rumahclover18
 
Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2Azizan Supardi
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)ahmong4
 

What's hot (20)

8. door , window , floor ,lintel
8. door , window , floor ,lintel8. door , window , floor ,lintel
8. door , window , floor ,lintel
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
Presentation on Mat Foundation
Presentation on Mat FoundationPresentation on Mat Foundation
Presentation on Mat Foundation
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
 
BQ
BQBQ
BQ
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Reinforced column design
Reinforced column design Reinforced column design
Reinforced column design
 
Bq floor
Bq floorBq floor
Bq floor
 
Elemental Cost Analysis
Elemental Cost AnalysisElemental Cost Analysis
Elemental Cost Analysis
 
Panduan step buat rumah
Panduan step buat rumahPanduan step buat rumah
Panduan step buat rumah
 
Stairs
StairsStairs
Stairs
 
Ibs score
Ibs scoreIbs score
Ibs score
 
Stairs
StairsStairs
Stairs
 
UBBL 1984 pdf
UBBL 1984 pdfUBBL 1984 pdf
UBBL 1984 pdf
 
Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2
 
waterproofing
waterproofingwaterproofing
waterproofing
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
 

Viewers also liked

Measurement 2 assignment cover pages
Measurement 2 assignment cover pagesMeasurement 2 assignment cover pages
Measurement 2 assignment cover pagesJeanne Hoo
 
5) int walls finishes bq
5) int walls finishes bq5) int walls finishes bq
5) int walls finishes bqJeanne Hoo
 
Int walls finishes to list
Int walls finishes to list Int walls finishes to list
Int walls finishes to list Jeanne Hoo
 
Building services-power-point
Building services-power-pointBuilding services-power-point
Building services-power-pointJeanne Hoo
 
Introduction to law assignment
Introduction to law assignmentIntroduction to law assignment
Introduction to law assignmentJeanne Hoo
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2 Jeanne Hoo
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2 Jeanne Hoo
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second editionBt Lee
 

Viewers also liked (8)

Measurement 2 assignment cover pages
Measurement 2 assignment cover pagesMeasurement 2 assignment cover pages
Measurement 2 assignment cover pages
 
5) int walls finishes bq
5) int walls finishes bq5) int walls finishes bq
5) int walls finishes bq
 
Int walls finishes to list
Int walls finishes to list Int walls finishes to list
Int walls finishes to list
 
Building services-power-point
Building services-power-pointBuilding services-power-point
Building services-power-point
 
Introduction to law assignment
Introduction to law assignmentIntroduction to law assignment
Introduction to law assignment
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
 

More from Jeanne Hoo

Financial Management - Financial Ratio Formula
Financial Management - Financial Ratio FormulaFinancial Management - Financial Ratio Formula
Financial Management - Financial Ratio FormulaJeanne Hoo
 
Management Science
Management Science Management Science
Management Science Jeanne Hoo
 
Int walls element to list
Int walls element   to listInt walls element   to list
Int walls element to listJeanne Hoo
 
Ext walls-to-list
Ext walls-to-listExt walls-to-list
Ext walls-to-listJeanne Hoo
 
Ext wall-finishes-1-to
Ext wall-finishes-1-toExt wall-finishes-1-to
Ext wall-finishes-1-toJeanne Hoo
 
8) ext wall-finishes-1-query
8) ext wall-finishes-1-query8) ext wall-finishes-1-query
8) ext wall-finishes-1-queryJeanne Hoo
 
7) ext wall-finishes-1-bq
7) ext wall-finishes-1-bq7) ext wall-finishes-1-bq
7) ext wall-finishes-1-bqJeanne Hoo
 
4) ext walls-element-revised-query
4) ext walls-element-revised-query4) ext walls-element-revised-query
4) ext walls-element-revised-queryJeanne Hoo
 
3) ext walls-bq
3) ext walls-bq3) ext walls-bq
3) ext walls-bqJeanne Hoo
 
1) int walls element bq
1) int walls element   bq1) int walls element   bq
1) int walls element bqJeanne Hoo
 

More from Jeanne Hoo (10)

Financial Management - Financial Ratio Formula
Financial Management - Financial Ratio FormulaFinancial Management - Financial Ratio Formula
Financial Management - Financial Ratio Formula
 
Management Science
Management Science Management Science
Management Science
 
Int walls element to list
Int walls element   to listInt walls element   to list
Int walls element to list
 
Ext walls-to-list
Ext walls-to-listExt walls-to-list
Ext walls-to-list
 
Ext wall-finishes-1-to
Ext wall-finishes-1-toExt wall-finishes-1-to
Ext wall-finishes-1-to
 
8) ext wall-finishes-1-query
8) ext wall-finishes-1-query8) ext wall-finishes-1-query
8) ext wall-finishes-1-query
 
7) ext wall-finishes-1-bq
7) ext wall-finishes-1-bq7) ext wall-finishes-1-bq
7) ext wall-finishes-1-bq
 
4) ext walls-element-revised-query
4) ext walls-element-revised-query4) ext walls-element-revised-query
4) ext walls-element-revised-query
 
3) ext walls-bq
3) ext walls-bq3) ext walls-bq
3) ext walls-bq
 
1) int walls element bq
1) int walls element   bq1) int walls element   bq
1) int walls element bq
 

6) int walls finishes query

  • 1. QUERY SHEET JOB TITLE : INTERNAL WALL FINISHES Q/S NO. : PAGE NO. : 3 TO : FAX NO. : ATTN. : NO. OF PAGES (Incl.this page) : FROM : HII PAI LING Please provide answer(s) to the following queries by __________ DATE :20/6/2015 Item Queries Assumptions Answer 1 2 3 4 5 6 What type of surface treatment? Size of door for handicapped toilet Size of entrance door for female and male toilet Height of wall between individual toilet and changing room Size of two columns at left side Height of stage Steel trowel 1.00m x 2.10m 0.75m x 2.10m 2.20m high 115mm x 350mm 0.6m high
  • 2. Prepared by HII PAI LING