The hanging basket stress calculation and stability analysis during
cantilever construction
Yupeng Cao1
, Huapeng Liang1
1
(School of Civil Engineering & Architecture, Chongqing Jiaotong University, China)
ABSTRACT
The bearing capacity and stability of the Hanging Basket is a key point in the process of cantilever construction. It
is important to set up finite element analytical model accord with the actual stress state of structure. According to
the Laotuanpo NO.2 bridge as an engineering example, the strength, stiffness and stability of the Hanging Basket
is analyzed using the space truss model. The analytical calculation shows that the design for Hanging Basket in
cast-in-cantilever construction plan completely conforms to the specifications and design requirements. It is
provide a solid theoretical foundation for the reliability of Hanging Basket during cast-in-cantilever construction.
Keywords-Triangle Hanging Basket, strength, stiffness, stability
I. FOREWORD
Hanging Basket suspended pouring construction
is the longitudinal beam is divided into some little
sections, with a Hanging Basket as construction
equipment to Symmetrical cantilever construction.
Hanging Basket is structure that able to move along
the top of the box girder, anchored on the already
completed pouring sections, make all the
construction work of the next element in the Hanging
Basket, and the cycle until the job is completed
cantilever pouring [1]. Construction of Hanging
Basket is safe, reliable, high efficiency of
construction, during construction of a small amount
of deformation characteristics, are widely used in the
Continuous Rigid Frame bridge construction.
This paper refer to do analysis of a building
continuous rigid frame bridge in Yunnan province.
The bridge is 90 m + 160 m + 90 m variable
cross-section single box single chamber structure,
The Box girder with vertical web , the width of top
palate is 12 m, the width of bottom palate is 6.5m,the
length of flange plate is 2.75 m, The height of
NO.0 section is 10 m, The height of the box grider in
middle span is 3.5 m, The web with a variable
thickness from 100cm to 50cm, The bottom palate is
from 140cm to 32cm. The length of NO.0 section is
12m, The length of closure section in middle span is
2m, The super large bridge box girder cantilever
pouring using Triangle Hanging Basket
construction,In this paper ,the finite element analysis
software Midas civil 2012 for the Triangle Hanging
Basket in the cantilever construction process of stress
calculation and stability analysis.
II. THE STRUCTURE OF THE HANGING
BASKET
This Triangle Hanging Basket usually have five
parts,they are main truss system,anchorage system,
working system , formwork system , suspension
system. The main truss system is consisted of vertical
rod, Front beam,back coss beam, Oblique rod,
Bottom chord rod,Bottom longitudinal beam,Bottom
cross beam, Bottom end beam, The anchoring system
is consisted of several fine rolled twisted bars, they
are 32 mm in diameter, They put the Hanging Basket
anchor on the already pouring beams; Running
system is rolling running system, Through the
Hanging Basket of main girder supporting steel
RESEARCH ARTICLE OPEN ACCESS
Yupeng Cao Int. Journal of Engineering Research and Applications www.ijera.com
ISSN : 2248-9622, Vol. 5, Issue 4, ( Part -6) April 2015, pp.18-24
www.ijera.com 19 | P a g e
pillow it forward on the wheel, Formwork system is
composed of bottom formword, side formwork and
internal formwork[2]
, Suspension system is consisted
of several 32mm diameter fine rolled twisted bars,
which are connected to the bottom of the hanging
baske to the upper together to ensure the overall
force. This Triangle Hanging Basket weighing about
750KN, the Triangle Hanging Basket structure
shown in Figure 1.
Fig1.Hanging Basket structure diagram.
Fig2.Hanging Basket structure diagram
In accordance with the relevant
specifications[3][4]
, Hanging baske weight and the
weight of the concrete to be poured ratio should be
controlled at between 0.3-0.5, under special
circumstances and should not be more than 0.7, The
maximum allowable amount of deformation of the
main truss for 25mm, Bottom longitudinal beams
deflection allowable amount of L / 400, This
Triangle Hanging Baske of steel using Q 235, Elastic
Modulus is 2.1×105MPa, Allowable
Stress[σ]=205MPa, Tensile strength of the standard
value 32mm diameter fine rolled twisted bars
fpk=930MPa, Design value of tensile strength
fpd=770 MPa, When the hanging baske Construction
and walking safety factor against overturning K=2.
III. HANGING BASKET LOAD PARAMETER
CALCULATION
3.1 Load Factor.
Overload factor of 1.2 when pouring concrete
box girder, Pouring concrete power factor is
1.2Hanging Basket Shock load factor was 1.3 when
walking.
3.2 Load Combinations
In order to verify the strength of the Hanging
Basket structure, stability, and stability when walking.
Take load combinations I: concrete weight +
additional power load + dead weight + people and
equipment loads; load combinations II: dead weigh +
additional impact load.
Load combinations I for the main truss bearing
checking calculation system strength and
stability,Load combinations II for Hanging Basket
walking for checking.
3.3 Hanging Basket Design Load Calculation
(1) The No. 0 and NO.1 Long span bridge in the
element using bracket cast construction, the rest
of the element using the Traveler Symmetrical
Cantilever pouring Construction, No. 2 element
maximum weight, so take the load box girder No.
2 element calculation, the length of this element
is 3.0m, No. 2 element pouring concrete weight
is 1930KN, Hanging Basket of quality and
quality ratio is 0.389 concrete beams meet
regulatory requirements [3]
, considering overload
load factor is 1930 × 1.2 = 2316KN, concreting
power coefficient of 0.2, So this element of the
additional power load is 1930 × 0.2 = 386KN.
(2) The weight load of Hanging Basket is 750KN, It
includes the weight of the main truss, the
internal formwork, formwork and the bottom
side of the formwork, etc.
Flat link
Oblique rod
beam
Internal model
sliding beam
External mold
slide beam
1
2 3 4
5
NO.O NO.1 NO.2
Front beam
Main truss
Yupeng Cao Int. Journal of Engineering Research and Applications www.ijera.com
ISSN : 2248-9622, Vol. 5, Issue 4, ( Part -6) April 2015, pp.18-24
www.ijera.com 20 | P a g e
(3) Crowd and construction machinery loading is
2.5KN / m2.
(4) Shock additional load: Hanging Basket Shock
factor of 0.3 when walking, the Shock the
additional load 0.3 × 750 = 225KN.
IV. HANGING BASKET STRENGTH AND
RIGIDITY CALCULATION
When pouring concrete box girder weight is
shared by side forwork and bottom forwork,
assuming Hanging Basket force when the force
transmission route follows[5].
(1) The weight of the concrete box girder flange plate
and side formwork of, put on external guiding beam
and external removable beam, and then passed to a
finished construction of the element of the wing and
the Hanging Basket of the former main truss beams
respectively.
(2)The weight of the concrete box girder roof of the
next segment, in-mold, and its weight within the stent
by sliding beams were applied in the previous
sections has finished construction of the main beam
ceiling and Hanging Basket on the front beam.
(3) The weight of the front of the box girder beams
concrete floor, concrete weight and the weight of the
web platform Hanging Basket bottom section has
been applied to the segment finished pouring the
girders and stringers Hanging Basket bottom front,
and then spread to the main truss.
Therefore, it is necessary to carry out their
assigned weight, weight distribution concrete box
girder shown in Figure 3,This Triangle Hanging
Basket made using Midas Civil 2012 space truss
system modeling analysis, Beam element simulation
with the main truss, truss elements to simulate the
suspender, it's the model shown in Figure 4.
Fig3. Box girder weight distribution
Fig4. Hanging Basket calculation model
4.1 Hanging Basket strength checking
4.1.1 Main truss strength checking
Main truss bottom stringers and vertical rod is
constituted by a square cross-section rod composed
2I40b ordinary hot-rolled steel channel, Oblique rod
produced by the 2 [40b ordinary hot-rolled steel
channel, Front beam by 2I50c ordinary joist steel
composition. Bottom stringers by I40b ordinary joist
steel composition, With the load combination I for
checking the strength of the main truss, after
computing model to get this Hanging Basket of
internal forces and the main truss girder stresses in
Table 1.
Table 1 Main truss internal forces Table
Main truss rods Oblique rod vertical rod Bottom chord rods Front beam Flat link rods
stress(Mpa) 119.43 -175.10 -164.80 -172.4 37.73
F(KN) 1724.47 -2226.1 -1314.71 0.06 -5.08
My(KN.m) -35.16 107.50 -216.33 438.99 -4.14
From Table 1, the maximum tension of main
truss is 1724.47KN, maximum pressure of main truss
is -2226.11KN. Main truss maximum tensile stress is
119.43 Mpa <[σ] = 205Mpa. Its location on the
Oblique rod, the maximum compressive stress is the
main truss 175.10Mpa <[σ] = 205Mpa, its position
on the vertical rods[6]
.
Yupeng Cao Int. Journal of Engineering Research and Applications www.ijera.com
ISSN : 2248-9622, Vol. 5, Issue 4, ( Part -6) April 2015, pp.18-24
www.ijera.com 21 | P a g e
4.1.2 The main girder stiffness calculation[7]
Hanging Basket of the main truss deformation
shown in Figure 5:
Fig5.Hanging Basket of main truss deformation
figure
Maximum deformation occurs as shown in
Figure 4 on the front Hanging Basket of beams, The
maximum deformation of 20.6mm <[ξ] = 25mm,
Hanging Basket of the main truss stiffness to meet
the requirements. Hanging Basket by the model
calculation shows the maximum anchor reaction
force for 1074KN. Middle fulcrum supporting force
for 2283.3KN.
4.2 Bottom die structure calculation
4.2.1 The calculation of longitudinal beam under
the web
(1)The calculation of load
Take NO.2 block box girder load calculation
The length is 3.0m The concrete weight of the web is
about 530 KN. Box girder web plate width is 0.7 m,
Set up four I40b joist steel, the spacing of 200
mm.Template by weight 2.5KN / m2
meter; crowd
equipment load by 2.5KN / m2 meter; pour concrete
load by 2KN / m2 meter; So the local load of the
bottom of the web plate girder is q=1.2×
(530/3+2.5×0.7)+1.4×(2.5×0.7+2×0.7)=218.51KN;
Then each longitudinal beam line load is: q / 4 =
54.63 KN/m.
2)Force calculation
Midas civil 2012 is adopted to establish the
model calculating the longitudinal beam, It is
concluded that the beam stress diagram, as shown in
Figure 6.
Fig6. Web of girder stress diagram
4.2.2 The calculation of longitudinal beam under
the baseplate
(1) The calculation of load
Take NO.2 section box girder load calculation
The length is 3.0m, Baseplate concrete weight of
about 452.5 KN, Set up eight I40b joist steel, The
baseplate width of box girder (excluding web) is 5.1
m, Template by weight 2.5KN / m2 meter; crowd
equipment load by 2.5KN / m2 meter; pour concrete
load by 2KN / m2 meter; So the local load of the
bottom of the baseplate girder
is q=1.2×(452.5/3+2.5×5.1) + 1.4 ×(2.0× 5.1+2×5.1)
=224.86KN;Then each longitudinal beam line load
is: q/8=28.11 KN/m.
(2) Force calculation
Midas civil 2012 is adopted to establish the
model calculati
Midas civil 2012 is adopted to establish the
model calculatingthe longitudinal beam, It is
concluded that the beam stress diagram, as shown in
Figure 7.
Fig7. Floor bottom longitudinal beam stress
diagram
Yupeng Cao Int. Journal of Engineering Research and Applications www.ijera.com
ISSN : 2248-9622, Vol. 5, Issue 4, ( Part -6) April 2015, pp.18-24
www.ijera.com 22 | P a g e
The model calculation, as shown in figure 6 can
be concluded that the plate bottom longitudinal beam
under the maximum stress of 75.7 Mpa < [united] =
205 Mpa, maximum deflection is 5.7 mm < L / 400 =
13 mm, former fulcrum reaction of 48 KN, protection
after a counterforce 40.3 KN, meet the specification
requirements.
4.2.3 The calculation of the cross rods behine the
Bottom die structure
The cross rods behine the Bottom die structure
adopts two I40b hot rolled joist steel, Those cross
rods s under load is mainly by the longitudinal beam
passed. The bottom longitudinal beam calculation
shows that the bottom of the web in longitudinal
beam counterforce 75.6 KN, after floor place after
the bottom longitudinal beam counterforce 40.3 KN,
using Midas civil 2012 model, the beam deformation
diagram and the beam stress calculated.
Fig8. The back bottom formwork beam
deformation figure
Fig9. The back bottom formwork beam stress
diagram
Figure 9 illustrates the bottom die beam
maximum stress is 61.36 Mpa, each joist steel
maximum stress is 30.68 Mpa < [σ] = 205 Mpa, from
Figure 8 shows the maximum deformation of 0.56
mm to meet specification requirements.
4.2.4 The Calculation ofcross rods before the
Bottom die structure
The cross rods before the Bottom die structure
adopts two I40b hot rolled joist steel, Those cross
rods under load is mainly by the longitudinal beam
passed. The bottom longitudinal beam calculation
shows that the bottom of the web in longitudinal
beam counterforce 91.4 KN, after floor place after
the bottom longitudinal beam counterforce 48KN,
using Midas civil 2012 model, the beam deformation
diagram and the beam stress calculated. As shown in
Figure 10 and shown in Figure 11.
Fig10.The front bottom formwork beam
deformation figure
Fig11. The front bottom formwork beam stress
diagram
Figure 11 illustrates the bottom die beam
maximum stress is 25.46 Mpa, each joist steel
maximum stress is 12.73 Mpa < [σ] = 205 Mpa, from
Figure 10 shows the maximum deformation of 0.24
mm to meet specification requirements.
4.3 Force calculation of the suspender
By the model data shows: in the pourng state
suspender axial maximum tension is 385.1
kN;Hanging Basket to walk, that the maximum axial
tensile force of suspender is 53.77 KN. The
Yupeng Cao Int. Journal of Engineering Research and Applications www.ijera.com
ISSN : 2248-9622, Vol. 5, Issue 4, ( Part -6) April 2015, pp.18-24
www.ijera.com 23 | P a g e
suspender is 32 mm diameter Finish Rolled Threaded
Reinforcing Bar, its tensile strength standard values
is 770 mpa.
A=804.25mm2 ,
2
385.1
= 478.83 770
804.25
N KN
Mpa Mpa
A mm
   
The results show that the strength of suspender
satisfies the requirement of technical specification for
construction of Bridges.
V. STABILITY CALCULATION OF THE
HANGING BASKET
Based on literature [8] and in combination with
the practical situation of Hanging Basket. For the
rigidity calculation of Hanging Basket pouring
condition and the walking state resistive overturning
of the calculation, the following calculation for the
calculation of a triangle truss [8]
.
5.1 Hanging Basket rigidity calculation of pouring
condition
Hanging Basket pouring conditions of the back
anchor point of the each main truss reaction is 1074
KN, According to the Hanging Basket design
drawings, The back fulcrum is made of four root
diameter is 32 mm Finish Rolled Threaded
Reinforcing Bar anchorage on the already finished
pouring box girder. The Finish Rolled Threaded
Reinforcing Bar tensile strength design value
of fpd=770 MPa, The calculation every Finish Rolled
Threaded design of Reinforcing Bar tension of 619.3
KN, So the back anchor point allowable force [F] = 4
x 619.3 KN = 2477.2 KN,Calculate the Hanging
Basket pouring state safety factor K = 2.3 > 2,The
results show that the stability of the Hanging Basket
in the pouring state meet the requirements of
technical specification for construction of Bridges.
5.2 Hanging Basket rigidity calculation of walking
condition
The Hanging Basket triangle truss and bearing
when installed firmly welded into a whole. Use a
jack walked in the orbit, When walking Hanging
Basket, anchor beam reinforcement need to be
removed, Hanging Basket backend relies on the
vertical prestressed anchorage box girder, and when
walking Hanging Basket, the back anchor point
hanging wheel fixed on the box girder, this make the
Hanging Basket not capsize, so the load combination
II is adopted for checking, Hanging Basket load for
the weight of 750 KN, bearing impact load of 225
KN, After model calculation shows the anchor point
with single main truss reaction force of 233.8 KN.
According to the Hanging Basket design drawings,
the walking condition the back anchor point
allowable force [F] = 686 KN. Calculation of
Hanging Basket state safety factor K = 2.93 > 2, the
results show that the state of walking stability of the
Hanging Basket satisfies the requirement of technical
specification for construction of Bridges.
5.3 Calculate the stability of vertical rod
The vertical rod use 2I40b section form, the
section form is shown in Figure 12.The height of
vertical rod is 4500mm, Calculated by the model in
the condition of concrete pouring, The vertical rod
the maximum axial force is 2226.11 KN.
Fig12. the uprightsectional view
Calculate the features section I=4.5563×108 mm4
;
A=1.88×104 mm2
;
455630000
155.7
18800
i  
;
4500
28.9
155.7
l
i
   
0.969 215 18813.777 3919KN>2226.1KNN A    
The results show that the vertical rod stability meet
the requirements of technical specification for
construction of Bridges.
Yupeng Cao Int. Journal of Engineering Research and Applications www.ijera.com
ISSN : 2248-9622, Vol. 5, Issue 4, ( Part -6) April 2015, pp.18-24
www.ijera.com 24 | P a g e
VI. CONCLUSION
In this paper according to the Hanging Basket
structure form and mechanical characteristics, spatial
truss finite element model is established, the analysis
model of the whole stress and the stability of
Hanging Basket, can draw the following conclusions:
(1)This Triangle Hanging Basket of main truss
strength checking each bar in the case of load
combination I stress are less than the allowable stress,
meet the specification requirements. vertical rod and
oblique rod stress is the largest, they are the largest
stress in the process of Hanging Basket construction
rod, so to them the highest strength, stiffness and
stability requirements.
(2) The stability of the Hanging Basket rod checking
and integrity checking: The Hanging Basket of main
truss rods can satisfy the requirements of rod stability,
In the front and back beam with triangle main truss
junction, should be in strict accordance with the
design of welding steel plate to improve, Channel
steel, i-steel and H section steel compound of
stiffening rib box section should be enough, The
integrity stability of the Hanging Basket experience
is also meet the requirements of specification.
(3) Hanging Basket construction scheme of the main
truss stressing definite and rational design. Specific
operation should not only guarantee the Hanging
Basket in the uniform synchronous walk slow,
prevent reverse Hanging Basket, and strictly to
strengthen the control of Hanging Basket
deformation observation.
REFERENCE
[1] Du X B .The Zhu Jiang bridge construction
Hanging Basket technology
research[D].Harbin.Harbin Engineering
University 2007
[2] Yu s. Zhang Y B.Qiang S Z. Suspended
Basket Design of Wider Bridge and
Technigue of Cantilever Construction[J].
Journal of Railway Engineering
Society.2006,9(4):39-42
[3] Technical Specifications for Construction of
Highway Bridges and Culverts[s].
JT041-2000
[4] Code for Design of Highway Reinforcrd
concrete and Prestrsssed Concrete Bridges
and Culverts [S] JTG D62—2004,
[5] Cai J L.Wang Y. Safety Analysis of Diamond
Basket Walking in Cantilever Construction
[J]. Highway Engineering, 2014,
39(4):215-217
[6] Specifictions for Design of Steel Structure
and Timber Structure Highway Bridge and
Culverts[S].J025-86,
[7] Xu Y H,Xiang J G, Yang K.Triangle
Hanging Basket of Main Bearing Stress
Modeling Analysis. System[J]. Highway,
2012,(7):148-154.
[8] Yan R M, Research on the stability of
cast-in-place cantilever construction of the
Hefei Paihe bridge with Cradle [J]. Journal
of Hefei University of Technology, 2009,
32(5):734-737

More Related Content

What's hot

Building construction report
Building construction reportBuilding construction report
Building construction reportmiranazrin
 
Design of mat and combined footing
Design of mat and combined footingDesign of mat and combined footing
Design of mat and combined footingMd Faiz Ali
 
Shear connector 081281000409
Shear connector 081281000409Shear connector 081281000409
Shear connector 081281000409shear connector
 
IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...
IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...
IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...IRJET Journal
 
Fettuccine truss bridge report
Fettuccine truss bridge reportFettuccine truss bridge report
Fettuccine truss bridge reportIvy Yee
 
Comparison Of Square And Raft Footing For A Multistory Building Under Static ...
Comparison Of Square And Raft Footing For A Multistory Building Under Static ...Comparison Of Square And Raft Footing For A Multistory Building Under Static ...
Comparison Of Square And Raft Footing For A Multistory Building Under Static ...Lovneesh Modi
 
slovak journal_lukas kowalski
slovak journal_lukas kowalskislovak journal_lukas kowalski
slovak journal_lukas kowalskiLukas Kowalski
 
A Comperative study of Analysis of a G+3 Residential Building by the Equivale...
A Comperative study of Analysis of a G+3 Residential Building by the Equivale...A Comperative study of Analysis of a G+3 Residential Building by the Equivale...
A Comperative study of Analysis of a G+3 Residential Building by the Equivale...Kumar Aman
 
Analysis of outrigger system for tall vertical irregularites structures subje...
Analysis of outrigger system for tall vertical irregularites structures subje...Analysis of outrigger system for tall vertical irregularites structures subje...
Analysis of outrigger system for tall vertical irregularites structures subje...eSAT Journals
 
Topology optimisation of braced frames for high rise buildings
Topology optimisation of braced frames for high rise buildingsTopology optimisation of braced frames for high rise buildings
Topology optimisation of braced frames for high rise buildingsIAEME Publication
 
Analysis and Design of Earthquake Resistant RC multi storied (G+3) Residentia...
Analysis and Design of Earthquake Resistant RC multi storied (G+3) Residentia...Analysis and Design of Earthquake Resistant RC multi storied (G+3) Residentia...
Analysis and Design of Earthquake Resistant RC multi storied (G+3) Residentia...Kumar Aman
 
Analytical Study of Steel Fibre Reinforced Rigid Pavements under Static Load
Analytical Study of Steel Fibre Reinforced Rigid Pavements under Static LoadAnalytical Study of Steel Fibre Reinforced Rigid Pavements under Static Load
Analytical Study of Steel Fibre Reinforced Rigid Pavements under Static Loadijsrd.com
 
Comparison of performance of lateral load resisting systems in multi storey f...
Comparison of performance of lateral load resisting systems in multi storey f...Comparison of performance of lateral load resisting systems in multi storey f...
Comparison of performance of lateral load resisting systems in multi storey f...eSAT Journals
 
A study on behaviour of outrigger system on high rise steel structure by vary...
A study on behaviour of outrigger system on high rise steel structure by vary...A study on behaviour of outrigger system on high rise steel structure by vary...
A study on behaviour of outrigger system on high rise steel structure by vary...eSAT Journals
 
REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...
REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...
REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...IAEME Publication
 

What's hot (20)

Building construction report
Building construction reportBuilding construction report
Building construction report
 
Company introduction
Company introduction Company introduction
Company introduction
 
G012263441
G012263441G012263441
G012263441
 
Design of mat and combined footing
Design of mat and combined footingDesign of mat and combined footing
Design of mat and combined footing
 
Shear connector 081281000409
Shear connector 081281000409Shear connector 081281000409
Shear connector 081281000409
 
Sub.ass.2
Sub.ass.2Sub.ass.2
Sub.ass.2
 
IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...
IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...
IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...
 
Fettuccine truss bridge report
Fettuccine truss bridge reportFettuccine truss bridge report
Fettuccine truss bridge report
 
Comparison Of Square And Raft Footing For A Multistory Building Under Static ...
Comparison Of Square And Raft Footing For A Multistory Building Under Static ...Comparison Of Square And Raft Footing For A Multistory Building Under Static ...
Comparison Of Square And Raft Footing For A Multistory Building Under Static ...
 
slovak journal_lukas kowalski
slovak journal_lukas kowalskislovak journal_lukas kowalski
slovak journal_lukas kowalski
 
A Comperative study of Analysis of a G+3 Residential Building by the Equivale...
A Comperative study of Analysis of a G+3 Residential Building by the Equivale...A Comperative study of Analysis of a G+3 Residential Building by the Equivale...
A Comperative study of Analysis of a G+3 Residential Building by the Equivale...
 
Analysis of outrigger system for tall vertical irregularites structures subje...
Analysis of outrigger system for tall vertical irregularites structures subje...Analysis of outrigger system for tall vertical irregularites structures subje...
Analysis of outrigger system for tall vertical irregularites structures subje...
 
Topology optimisation of braced frames for high rise buildings
Topology optimisation of braced frames for high rise buildingsTopology optimisation of braced frames for high rise buildings
Topology optimisation of braced frames for high rise buildings
 
Analysis and Design of Earthquake Resistant RC multi storied (G+3) Residentia...
Analysis and Design of Earthquake Resistant RC multi storied (G+3) Residentia...Analysis and Design of Earthquake Resistant RC multi storied (G+3) Residentia...
Analysis and Design of Earthquake Resistant RC multi storied (G+3) Residentia...
 
Analytical Study of Steel Fibre Reinforced Rigid Pavements under Static Load
Analytical Study of Steel Fibre Reinforced Rigid Pavements under Static LoadAnalytical Study of Steel Fibre Reinforced Rigid Pavements under Static Load
Analytical Study of Steel Fibre Reinforced Rigid Pavements under Static Load
 
Stair case
Stair caseStair case
Stair case
 
Comparison of performance of lateral load resisting systems in multi storey f...
Comparison of performance of lateral load resisting systems in multi storey f...Comparison of performance of lateral load resisting systems in multi storey f...
Comparison of performance of lateral load resisting systems in multi storey f...
 
A study on behaviour of outrigger system on high rise steel structure by vary...
A study on behaviour of outrigger system on high rise steel structure by vary...A study on behaviour of outrigger system on high rise steel structure by vary...
A study on behaviour of outrigger system on high rise steel structure by vary...
 
REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...
REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...
REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...
 
Fettucine Bridge Report
Fettucine Bridge ReportFettucine Bridge Report
Fettucine Bridge Report
 

Viewers also liked

Workshop PTK (Penelitian Tindakan Kelas / Classroom Action Research)
Workshop PTK (Penelitian Tindakan Kelas / Classroom Action Research)Workshop PTK (Penelitian Tindakan Kelas / Classroom Action Research)
Workshop PTK (Penelitian Tindakan Kelas / Classroom Action Research)Budi Setiyarso
 
Academia dancing
Academia dancingAcademia dancing
Academia dancingmpercap
 
Matematica docent epdf
Matematica docent epdfMatematica docent epdf
Matematica docent epdfCissi Vera
 
Ig3 music_video_assignment_updated_02.2013
 Ig3 music_video_assignment_updated_02.2013 Ig3 music_video_assignment_updated_02.2013
Ig3 music_video_assignment_updated_02.2013Joe Hayes
 
Lavoro di gruppo per scienze umane
Lavoro di gruppo per scienze umaneLavoro di gruppo per scienze umane
Lavoro di gruppo per scienze umaneAlessia Morichi
 
Citi conference presentation final - 8.20.14
Citi conference presentation   final - 8.20.14Citi conference presentation   final - 8.20.14
Citi conference presentation final - 8.20.14EnLinkMidstreamLLC
 
2014 Rejuvenation biotechnology full program
2014 Rejuvenation biotechnology full program2014 Rejuvenation biotechnology full program
2014 Rejuvenation biotechnology full programJohn Redaelli
 
Cuenta historias. narración audiovisual y storytelling en el aula
Cuenta historias. narración audiovisual y storytelling en el aulaCuenta historias. narración audiovisual y storytelling en el aula
Cuenta historias. narración audiovisual y storytelling en el aulaJulio Real
 

Viewers also liked (14)

Workshop PTK (Penelitian Tindakan Kelas / Classroom Action Research)
Workshop PTK (Penelitian Tindakan Kelas / Classroom Action Research)Workshop PTK (Penelitian Tindakan Kelas / Classroom Action Research)
Workshop PTK (Penelitian Tindakan Kelas / Classroom Action Research)
 
Academia dancing
Academia dancingAcademia dancing
Academia dancing
 
Matematica docent epdf
Matematica docent epdfMatematica docent epdf
Matematica docent epdf
 
Ig3 music_video_assignment_updated_02.2013
 Ig3 music_video_assignment_updated_02.2013 Ig3 music_video_assignment_updated_02.2013
Ig3 music_video_assignment_updated_02.2013
 
Prezentare Wallet Buzz
Prezentare Wallet BuzzPrezentare Wallet Buzz
Prezentare Wallet Buzz
 
Power point
Power pointPower point
Power point
 
Lavoro di gruppo per scienze umane
Lavoro di gruppo per scienze umaneLavoro di gruppo per scienze umane
Lavoro di gruppo per scienze umane
 
Analise de Projetos
Analise de ProjetosAnalise de Projetos
Analise de Projetos
 
2da j cronograma
2da j cronograma2da j cronograma
2da j cronograma
 
Citi conference presentation final - 8.20.14
Citi conference presentation   final - 8.20.14Citi conference presentation   final - 8.20.14
Citi conference presentation final - 8.20.14
 
2014 Rejuvenation biotechnology full program
2014 Rejuvenation biotechnology full program2014 Rejuvenation biotechnology full program
2014 Rejuvenation biotechnology full program
 
Bob marley
Bob marleyBob marley
Bob marley
 
Suzanne Miller Resume
Suzanne Miller ResumeSuzanne Miller Resume
Suzanne Miller Resume
 
Cuenta historias. narración audiovisual y storytelling en el aula
Cuenta historias. narración audiovisual y storytelling en el aulaCuenta historias. narración audiovisual y storytelling en el aula
Cuenta historias. narración audiovisual y storytelling en el aula
 

Similar to The hanging basket stress calculation and stability analysis during cantilever construction

STRUCTURAL PERFORMANCE OF INNOVATIVE FABRICATED COUPLED COMPOSITE COLUMN IN M...
STRUCTURAL PERFORMANCE OF INNOVATIVE FABRICATED COUPLED COMPOSITE COLUMN IN M...STRUCTURAL PERFORMANCE OF INNOVATIVE FABRICATED COUPLED COMPOSITE COLUMN IN M...
STRUCTURAL PERFORMANCE OF INNOVATIVE FABRICATED COUPLED COMPOSITE COLUMN IN M...IRJET Journal
 
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeThe Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeIJERA Editor
 
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeThe Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeIJERA Editor
 
Rail and Road Over Rail Bridge
Rail and Road Over Rail BridgeRail and Road Over Rail Bridge
Rail and Road Over Rail BridgeKorutla Harish
 
IRJET- Study on Effect of Column Shape on Fire Resistance of CFST Column wi...
IRJET- 	 Study on Effect of Column Shape on Fire Resistance of CFST Column wi...IRJET- 	 Study on Effect of Column Shape on Fire Resistance of CFST Column wi...
IRJET- Study on Effect of Column Shape on Fire Resistance of CFST Column wi...IRJET Journal
 
Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeColby Hooi
 
Analyzing Utility of Component Elements of Outrigger System
Analyzing Utility of Component Elements of Outrigger System Analyzing Utility of Component Elements of Outrigger System
Analyzing Utility of Component Elements of Outrigger System IRJET Journal
 
Analysis of Soil-Structure Interaction Mechanisms on Integral Abutment Bridge
Analysis of Soil-Structure Interaction Mechanisms on Integral Abutment BridgeAnalysis of Soil-Structure Interaction Mechanisms on Integral Abutment Bridge
Analysis of Soil-Structure Interaction Mechanisms on Integral Abutment BridgeIRJET Journal
 
Dynamic analysis of steel tube structure with bracing systems
Dynamic analysis of steel tube structure with bracing systemsDynamic analysis of steel tube structure with bracing systems
Dynamic analysis of steel tube structure with bracing systemseSAT Journals
 
IRJET- Building Performance of Steel
IRJET-  	  Building Performance of SteelIRJET-  	  Building Performance of Steel
IRJET- Building Performance of SteelIRJET Journal
 
Comparative Study of Wind Analysis of High Rise Building with Diagrid and Out...
Comparative Study of Wind Analysis of High Rise Building with Diagrid and Out...Comparative Study of Wind Analysis of High Rise Building with Diagrid and Out...
Comparative Study of Wind Analysis of High Rise Building with Diagrid and Out...IRJET Journal
 
concrete filled steel tube structure.pptx
concrete filled steel tube structure.pptxconcrete filled steel tube structure.pptx
concrete filled steel tube structure.pptxURVESHKUMARPATEL1
 
Earthquake considiration on pier design
Earthquake considiration on pier designEarthquake considiration on pier design
Earthquake considiration on pier designSushil Dhungana
 
CE4410 Final Design Report
CE4410 Final Design ReportCE4410 Final Design Report
CE4410 Final Design ReportChase Bowman
 

Similar to The hanging basket stress calculation and stability analysis during cantilever construction (20)

STRUCTURAL PERFORMANCE OF INNOVATIVE FABRICATED COUPLED COMPOSITE COLUMN IN M...
STRUCTURAL PERFORMANCE OF INNOVATIVE FABRICATED COUPLED COMPOSITE COLUMN IN M...STRUCTURAL PERFORMANCE OF INNOVATIVE FABRICATED COUPLED COMPOSITE COLUMN IN M...
STRUCTURAL PERFORMANCE OF INNOVATIVE FABRICATED COUPLED COMPOSITE COLUMN IN M...
 
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeThe Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
 
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeThe Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
 
Rail and Road Over Rail Bridge
Rail and Road Over Rail BridgeRail and Road Over Rail Bridge
Rail and Road Over Rail Bridge
 
IRJET- Study on Effect of Column Shape on Fire Resistance of CFST Column wi...
IRJET- 	 Study on Effect of Column Shape on Fire Resistance of CFST Column wi...IRJET- 	 Study on Effect of Column Shape on Fire Resistance of CFST Column wi...
IRJET- Study on Effect of Column Shape on Fire Resistance of CFST Column wi...
 
Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine Bridge
 
Analyzing Utility of Component Elements of Outrigger System
Analyzing Utility of Component Elements of Outrigger System Analyzing Utility of Component Elements of Outrigger System
Analyzing Utility of Component Elements of Outrigger System
 
F012475664
F012475664F012475664
F012475664
 
ANALYSIS OF ULTIMATE BEARING CAPACITY FOR LONG-SPAN STEEL BOX TRUSS ARCH BRIDGE
ANALYSIS OF ULTIMATE BEARING CAPACITY FOR LONG-SPAN STEEL BOX TRUSS ARCH BRIDGEANALYSIS OF ULTIMATE BEARING CAPACITY FOR LONG-SPAN STEEL BOX TRUSS ARCH BRIDGE
ANALYSIS OF ULTIMATE BEARING CAPACITY FOR LONG-SPAN STEEL BOX TRUSS ARCH BRIDGE
 
Analysis of Soil-Structure Interaction Mechanisms on Integral Abutment Bridge
Analysis of Soil-Structure Interaction Mechanisms on Integral Abutment BridgeAnalysis of Soil-Structure Interaction Mechanisms on Integral Abutment Bridge
Analysis of Soil-Structure Interaction Mechanisms on Integral Abutment Bridge
 
Dynamic analysis of steel tube structure with bracing systems
Dynamic analysis of steel tube structure with bracing systemsDynamic analysis of steel tube structure with bracing systems
Dynamic analysis of steel tube structure with bracing systems
 
D044032430
D044032430D044032430
D044032430
 
IRJET- Building Performance of Steel
IRJET-  	  Building Performance of SteelIRJET-  	  Building Performance of Steel
IRJET- Building Performance of Steel
 
TECHNOLOGY RESEARCH FOR MAIN ARCH ON STONE ARCH BRIDGE REINFORCEMENT ENGINEER...
TECHNOLOGY RESEARCH FOR MAIN ARCH ON STONE ARCH BRIDGE REINFORCEMENT ENGINEER...TECHNOLOGY RESEARCH FOR MAIN ARCH ON STONE ARCH BRIDGE REINFORCEMENT ENGINEER...
TECHNOLOGY RESEARCH FOR MAIN ARCH ON STONE ARCH BRIDGE REINFORCEMENT ENGINEER...
 
Comparative Study of Wind Analysis of High Rise Building with Diagrid and Out...
Comparative Study of Wind Analysis of High Rise Building with Diagrid and Out...Comparative Study of Wind Analysis of High Rise Building with Diagrid and Out...
Comparative Study of Wind Analysis of High Rise Building with Diagrid and Out...
 
Hospital building project
Hospital building projectHospital building project
Hospital building project
 
concrete filled steel tube structure.pptx
concrete filled steel tube structure.pptxconcrete filled steel tube structure.pptx
concrete filled steel tube structure.pptx
 
I012274853
I012274853I012274853
I012274853
 
Earthquake considiration on pier design
Earthquake considiration on pier designEarthquake considiration on pier design
Earthquake considiration on pier design
 
CE4410 Final Design Report
CE4410 Final Design ReportCE4410 Final Design Report
CE4410 Final Design Report
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 

Recently uploaded (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 

The hanging basket stress calculation and stability analysis during cantilever construction

  • 1. Yupeng Cao Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 5, Issue 4, ( Part -6) April 2015, pp.18-24 www.ijera.com 18 | P a g e The hanging basket stress calculation and stability analysis during cantilever construction Yupeng Cao1 , Huapeng Liang1 1 (School of Civil Engineering & Architecture, Chongqing Jiaotong University, China) ABSTRACT The bearing capacity and stability of the Hanging Basket is a key point in the process of cantilever construction. It is important to set up finite element analytical model accord with the actual stress state of structure. According to the Laotuanpo NO.2 bridge as an engineering example, the strength, stiffness and stability of the Hanging Basket is analyzed using the space truss model. The analytical calculation shows that the design for Hanging Basket in cast-in-cantilever construction plan completely conforms to the specifications and design requirements. It is provide a solid theoretical foundation for the reliability of Hanging Basket during cast-in-cantilever construction. Keywords-Triangle Hanging Basket, strength, stiffness, stability I. FOREWORD Hanging Basket suspended pouring construction is the longitudinal beam is divided into some little sections, with a Hanging Basket as construction equipment to Symmetrical cantilever construction. Hanging Basket is structure that able to move along the top of the box girder, anchored on the already completed pouring sections, make all the construction work of the next element in the Hanging Basket, and the cycle until the job is completed cantilever pouring [1]. Construction of Hanging Basket is safe, reliable, high efficiency of construction, during construction of a small amount of deformation characteristics, are widely used in the Continuous Rigid Frame bridge construction. This paper refer to do analysis of a building continuous rigid frame bridge in Yunnan province. The bridge is 90 m + 160 m + 90 m variable cross-section single box single chamber structure, The Box girder with vertical web , the width of top palate is 12 m, the width of bottom palate is 6.5m,the length of flange plate is 2.75 m, The height of NO.0 section is 10 m, The height of the box grider in middle span is 3.5 m, The web with a variable thickness from 100cm to 50cm, The bottom palate is from 140cm to 32cm. The length of NO.0 section is 12m, The length of closure section in middle span is 2m, The super large bridge box girder cantilever pouring using Triangle Hanging Basket construction,In this paper ,the finite element analysis software Midas civil 2012 for the Triangle Hanging Basket in the cantilever construction process of stress calculation and stability analysis. II. THE STRUCTURE OF THE HANGING BASKET This Triangle Hanging Basket usually have five parts,they are main truss system,anchorage system, working system , formwork system , suspension system. The main truss system is consisted of vertical rod, Front beam,back coss beam, Oblique rod, Bottom chord rod,Bottom longitudinal beam,Bottom cross beam, Bottom end beam, The anchoring system is consisted of several fine rolled twisted bars, they are 32 mm in diameter, They put the Hanging Basket anchor on the already pouring beams; Running system is rolling running system, Through the Hanging Basket of main girder supporting steel RESEARCH ARTICLE OPEN ACCESS
  • 2. Yupeng Cao Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 5, Issue 4, ( Part -6) April 2015, pp.18-24 www.ijera.com 19 | P a g e pillow it forward on the wheel, Formwork system is composed of bottom formword, side formwork and internal formwork[2] , Suspension system is consisted of several 32mm diameter fine rolled twisted bars, which are connected to the bottom of the hanging baske to the upper together to ensure the overall force. This Triangle Hanging Basket weighing about 750KN, the Triangle Hanging Basket structure shown in Figure 1. Fig1.Hanging Basket structure diagram. Fig2.Hanging Basket structure diagram In accordance with the relevant specifications[3][4] , Hanging baske weight and the weight of the concrete to be poured ratio should be controlled at between 0.3-0.5, under special circumstances and should not be more than 0.7, The maximum allowable amount of deformation of the main truss for 25mm, Bottom longitudinal beams deflection allowable amount of L / 400, This Triangle Hanging Baske of steel using Q 235, Elastic Modulus is 2.1×105MPa, Allowable Stress[σ]=205MPa, Tensile strength of the standard value 32mm diameter fine rolled twisted bars fpk=930MPa, Design value of tensile strength fpd=770 MPa, When the hanging baske Construction and walking safety factor against overturning K=2. III. HANGING BASKET LOAD PARAMETER CALCULATION 3.1 Load Factor. Overload factor of 1.2 when pouring concrete box girder, Pouring concrete power factor is 1.2Hanging Basket Shock load factor was 1.3 when walking. 3.2 Load Combinations In order to verify the strength of the Hanging Basket structure, stability, and stability when walking. Take load combinations I: concrete weight + additional power load + dead weight + people and equipment loads; load combinations II: dead weigh + additional impact load. Load combinations I for the main truss bearing checking calculation system strength and stability,Load combinations II for Hanging Basket walking for checking. 3.3 Hanging Basket Design Load Calculation (1) The No. 0 and NO.1 Long span bridge in the element using bracket cast construction, the rest of the element using the Traveler Symmetrical Cantilever pouring Construction, No. 2 element maximum weight, so take the load box girder No. 2 element calculation, the length of this element is 3.0m, No. 2 element pouring concrete weight is 1930KN, Hanging Basket of quality and quality ratio is 0.389 concrete beams meet regulatory requirements [3] , considering overload load factor is 1930 × 1.2 = 2316KN, concreting power coefficient of 0.2, So this element of the additional power load is 1930 × 0.2 = 386KN. (2) The weight load of Hanging Basket is 750KN, It includes the weight of the main truss, the internal formwork, formwork and the bottom side of the formwork, etc. Flat link Oblique rod beam Internal model sliding beam External mold slide beam 1 2 3 4 5 NO.O NO.1 NO.2 Front beam Main truss
  • 3. Yupeng Cao Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 5, Issue 4, ( Part -6) April 2015, pp.18-24 www.ijera.com 20 | P a g e (3) Crowd and construction machinery loading is 2.5KN / m2. (4) Shock additional load: Hanging Basket Shock factor of 0.3 when walking, the Shock the additional load 0.3 × 750 = 225KN. IV. HANGING BASKET STRENGTH AND RIGIDITY CALCULATION When pouring concrete box girder weight is shared by side forwork and bottom forwork, assuming Hanging Basket force when the force transmission route follows[5]. (1) The weight of the concrete box girder flange plate and side formwork of, put on external guiding beam and external removable beam, and then passed to a finished construction of the element of the wing and the Hanging Basket of the former main truss beams respectively. (2)The weight of the concrete box girder roof of the next segment, in-mold, and its weight within the stent by sliding beams were applied in the previous sections has finished construction of the main beam ceiling and Hanging Basket on the front beam. (3) The weight of the front of the box girder beams concrete floor, concrete weight and the weight of the web platform Hanging Basket bottom section has been applied to the segment finished pouring the girders and stringers Hanging Basket bottom front, and then spread to the main truss. Therefore, it is necessary to carry out their assigned weight, weight distribution concrete box girder shown in Figure 3,This Triangle Hanging Basket made using Midas Civil 2012 space truss system modeling analysis, Beam element simulation with the main truss, truss elements to simulate the suspender, it's the model shown in Figure 4. Fig3. Box girder weight distribution Fig4. Hanging Basket calculation model 4.1 Hanging Basket strength checking 4.1.1 Main truss strength checking Main truss bottom stringers and vertical rod is constituted by a square cross-section rod composed 2I40b ordinary hot-rolled steel channel, Oblique rod produced by the 2 [40b ordinary hot-rolled steel channel, Front beam by 2I50c ordinary joist steel composition. Bottom stringers by I40b ordinary joist steel composition, With the load combination I for checking the strength of the main truss, after computing model to get this Hanging Basket of internal forces and the main truss girder stresses in Table 1. Table 1 Main truss internal forces Table Main truss rods Oblique rod vertical rod Bottom chord rods Front beam Flat link rods stress(Mpa) 119.43 -175.10 -164.80 -172.4 37.73 F(KN) 1724.47 -2226.1 -1314.71 0.06 -5.08 My(KN.m) -35.16 107.50 -216.33 438.99 -4.14 From Table 1, the maximum tension of main truss is 1724.47KN, maximum pressure of main truss is -2226.11KN. Main truss maximum tensile stress is 119.43 Mpa <[σ] = 205Mpa. Its location on the Oblique rod, the maximum compressive stress is the main truss 175.10Mpa <[σ] = 205Mpa, its position on the vertical rods[6] .
  • 4. Yupeng Cao Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 5, Issue 4, ( Part -6) April 2015, pp.18-24 www.ijera.com 21 | P a g e 4.1.2 The main girder stiffness calculation[7] Hanging Basket of the main truss deformation shown in Figure 5: Fig5.Hanging Basket of main truss deformation figure Maximum deformation occurs as shown in Figure 4 on the front Hanging Basket of beams, The maximum deformation of 20.6mm <[ξ] = 25mm, Hanging Basket of the main truss stiffness to meet the requirements. Hanging Basket by the model calculation shows the maximum anchor reaction force for 1074KN. Middle fulcrum supporting force for 2283.3KN. 4.2 Bottom die structure calculation 4.2.1 The calculation of longitudinal beam under the web (1)The calculation of load Take NO.2 block box girder load calculation The length is 3.0m The concrete weight of the web is about 530 KN. Box girder web plate width is 0.7 m, Set up four I40b joist steel, the spacing of 200 mm.Template by weight 2.5KN / m2 meter; crowd equipment load by 2.5KN / m2 meter; pour concrete load by 2KN / m2 meter; So the local load of the bottom of the web plate girder is q=1.2× (530/3+2.5×0.7)+1.4×(2.5×0.7+2×0.7)=218.51KN; Then each longitudinal beam line load is: q / 4 = 54.63 KN/m. 2)Force calculation Midas civil 2012 is adopted to establish the model calculating the longitudinal beam, It is concluded that the beam stress diagram, as shown in Figure 6. Fig6. Web of girder stress diagram 4.2.2 The calculation of longitudinal beam under the baseplate (1) The calculation of load Take NO.2 section box girder load calculation The length is 3.0m, Baseplate concrete weight of about 452.5 KN, Set up eight I40b joist steel, The baseplate width of box girder (excluding web) is 5.1 m, Template by weight 2.5KN / m2 meter; crowd equipment load by 2.5KN / m2 meter; pour concrete load by 2KN / m2 meter; So the local load of the bottom of the baseplate girder is q=1.2×(452.5/3+2.5×5.1) + 1.4 ×(2.0× 5.1+2×5.1) =224.86KN;Then each longitudinal beam line load is: q/8=28.11 KN/m. (2) Force calculation Midas civil 2012 is adopted to establish the model calculati Midas civil 2012 is adopted to establish the model calculatingthe longitudinal beam, It is concluded that the beam stress diagram, as shown in Figure 7. Fig7. Floor bottom longitudinal beam stress diagram
  • 5. Yupeng Cao Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 5, Issue 4, ( Part -6) April 2015, pp.18-24 www.ijera.com 22 | P a g e The model calculation, as shown in figure 6 can be concluded that the plate bottom longitudinal beam under the maximum stress of 75.7 Mpa < [united] = 205 Mpa, maximum deflection is 5.7 mm < L / 400 = 13 mm, former fulcrum reaction of 48 KN, protection after a counterforce 40.3 KN, meet the specification requirements. 4.2.3 The calculation of the cross rods behine the Bottom die structure The cross rods behine the Bottom die structure adopts two I40b hot rolled joist steel, Those cross rods s under load is mainly by the longitudinal beam passed. The bottom longitudinal beam calculation shows that the bottom of the web in longitudinal beam counterforce 75.6 KN, after floor place after the bottom longitudinal beam counterforce 40.3 KN, using Midas civil 2012 model, the beam deformation diagram and the beam stress calculated. Fig8. The back bottom formwork beam deformation figure Fig9. The back bottom formwork beam stress diagram Figure 9 illustrates the bottom die beam maximum stress is 61.36 Mpa, each joist steel maximum stress is 30.68 Mpa < [σ] = 205 Mpa, from Figure 8 shows the maximum deformation of 0.56 mm to meet specification requirements. 4.2.4 The Calculation ofcross rods before the Bottom die structure The cross rods before the Bottom die structure adopts two I40b hot rolled joist steel, Those cross rods under load is mainly by the longitudinal beam passed. The bottom longitudinal beam calculation shows that the bottom of the web in longitudinal beam counterforce 91.4 KN, after floor place after the bottom longitudinal beam counterforce 48KN, using Midas civil 2012 model, the beam deformation diagram and the beam stress calculated. As shown in Figure 10 and shown in Figure 11. Fig10.The front bottom formwork beam deformation figure Fig11. The front bottom formwork beam stress diagram Figure 11 illustrates the bottom die beam maximum stress is 25.46 Mpa, each joist steel maximum stress is 12.73 Mpa < [σ] = 205 Mpa, from Figure 10 shows the maximum deformation of 0.24 mm to meet specification requirements. 4.3 Force calculation of the suspender By the model data shows: in the pourng state suspender axial maximum tension is 385.1 kN;Hanging Basket to walk, that the maximum axial tensile force of suspender is 53.77 KN. The
  • 6. Yupeng Cao Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 5, Issue 4, ( Part -6) April 2015, pp.18-24 www.ijera.com 23 | P a g e suspender is 32 mm diameter Finish Rolled Threaded Reinforcing Bar, its tensile strength standard values is 770 mpa. A=804.25mm2 , 2 385.1 = 478.83 770 804.25 N KN Mpa Mpa A mm     The results show that the strength of suspender satisfies the requirement of technical specification for construction of Bridges. V. STABILITY CALCULATION OF THE HANGING BASKET Based on literature [8] and in combination with the practical situation of Hanging Basket. For the rigidity calculation of Hanging Basket pouring condition and the walking state resistive overturning of the calculation, the following calculation for the calculation of a triangle truss [8] . 5.1 Hanging Basket rigidity calculation of pouring condition Hanging Basket pouring conditions of the back anchor point of the each main truss reaction is 1074 KN, According to the Hanging Basket design drawings, The back fulcrum is made of four root diameter is 32 mm Finish Rolled Threaded Reinforcing Bar anchorage on the already finished pouring box girder. The Finish Rolled Threaded Reinforcing Bar tensile strength design value of fpd=770 MPa, The calculation every Finish Rolled Threaded design of Reinforcing Bar tension of 619.3 KN, So the back anchor point allowable force [F] = 4 x 619.3 KN = 2477.2 KN,Calculate the Hanging Basket pouring state safety factor K = 2.3 > 2,The results show that the stability of the Hanging Basket in the pouring state meet the requirements of technical specification for construction of Bridges. 5.2 Hanging Basket rigidity calculation of walking condition The Hanging Basket triangle truss and bearing when installed firmly welded into a whole. Use a jack walked in the orbit, When walking Hanging Basket, anchor beam reinforcement need to be removed, Hanging Basket backend relies on the vertical prestressed anchorage box girder, and when walking Hanging Basket, the back anchor point hanging wheel fixed on the box girder, this make the Hanging Basket not capsize, so the load combination II is adopted for checking, Hanging Basket load for the weight of 750 KN, bearing impact load of 225 KN, After model calculation shows the anchor point with single main truss reaction force of 233.8 KN. According to the Hanging Basket design drawings, the walking condition the back anchor point allowable force [F] = 686 KN. Calculation of Hanging Basket state safety factor K = 2.93 > 2, the results show that the state of walking stability of the Hanging Basket satisfies the requirement of technical specification for construction of Bridges. 5.3 Calculate the stability of vertical rod The vertical rod use 2I40b section form, the section form is shown in Figure 12.The height of vertical rod is 4500mm, Calculated by the model in the condition of concrete pouring, The vertical rod the maximum axial force is 2226.11 KN. Fig12. the uprightsectional view Calculate the features section I=4.5563×108 mm4 ; A=1.88×104 mm2 ; 455630000 155.7 18800 i   ; 4500 28.9 155.7 l i     0.969 215 18813.777 3919KN>2226.1KNN A     The results show that the vertical rod stability meet the requirements of technical specification for construction of Bridges.
  • 7. Yupeng Cao Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 5, Issue 4, ( Part -6) April 2015, pp.18-24 www.ijera.com 24 | P a g e VI. CONCLUSION In this paper according to the Hanging Basket structure form and mechanical characteristics, spatial truss finite element model is established, the analysis model of the whole stress and the stability of Hanging Basket, can draw the following conclusions: (1)This Triangle Hanging Basket of main truss strength checking each bar in the case of load combination I stress are less than the allowable stress, meet the specification requirements. vertical rod and oblique rod stress is the largest, they are the largest stress in the process of Hanging Basket construction rod, so to them the highest strength, stiffness and stability requirements. (2) The stability of the Hanging Basket rod checking and integrity checking: The Hanging Basket of main truss rods can satisfy the requirements of rod stability, In the front and back beam with triangle main truss junction, should be in strict accordance with the design of welding steel plate to improve, Channel steel, i-steel and H section steel compound of stiffening rib box section should be enough, The integrity stability of the Hanging Basket experience is also meet the requirements of specification. (3) Hanging Basket construction scheme of the main truss stressing definite and rational design. Specific operation should not only guarantee the Hanging Basket in the uniform synchronous walk slow, prevent reverse Hanging Basket, and strictly to strengthen the control of Hanging Basket deformation observation. REFERENCE [1] Du X B .The Zhu Jiang bridge construction Hanging Basket technology research[D].Harbin.Harbin Engineering University 2007 [2] Yu s. Zhang Y B.Qiang S Z. Suspended Basket Design of Wider Bridge and Technigue of Cantilever Construction[J]. Journal of Railway Engineering Society.2006,9(4):39-42 [3] Technical Specifications for Construction of Highway Bridges and Culverts[s]. JT041-2000 [4] Code for Design of Highway Reinforcrd concrete and Prestrsssed Concrete Bridges and Culverts [S] JTG D62—2004, [5] Cai J L.Wang Y. Safety Analysis of Diamond Basket Walking in Cantilever Construction [J]. Highway Engineering, 2014, 39(4):215-217 [6] Specifictions for Design of Steel Structure and Timber Structure Highway Bridge and Culverts[S].J025-86, [7] Xu Y H,Xiang J G, Yang K.Triangle Hanging Basket of Main Bearing Stress Modeling Analysis. System[J]. Highway, 2012,(7):148-154. [8] Yan R M, Research on the stability of cast-in-place cantilever construction of the Hefei Paihe bridge with Cradle [J]. Journal of Hefei University of Technology, 2009, 32(5):734-737