A Conjoint Analysis of the Design Irregularities and Public
Realms of a National Highway in Bangalore
Varuna M.*
, Rajesh Gopinath**
, and Fathima Samana S.***
*Assistant Professor, Dept. of Civil Engineering, R.V. College of Engineering, Bangalore 56.
** Assistant Professor, Dept. of Civil Engineering, Acharya Institute of Technology, Bangalore 107.
***Assistant Professor, Acharya‟s N.R.V. School of Architecture, Bangalore 107.
ABSTRACT
A 40m stretch along National Highway
(NH4) is considered, which is located on either
side of an unmanned exit from Yeswanthpur
Railway station. This stretch of pedestrian
walkway was extremely congested, with an
average pedestrian count of about 4000/hour.
This also led to pedestrian spillover and
jaywalkers on the main carriageway. The
absence of guardrails and the encroachment of
footpath by street-hawkers aggravated the
problem. Hence, the disruption of smooth
pedestrian movement raises the accident rate
and causes traffic delays. The width of the
existing footpath is only 1.2m, while the ideal
width should have been atleast 4m, as per
standards. A high blank wall, demarcating the
station and footpath, aggravated the persisting
problem, by cutting the possible visual
connection between them. This stimulated the
abuse of the walkway by pedestrians. The
dilapidated walkway and the unaltered footpath
width continue to be a distress, with the level of
service being ‘F’. The remedial measures must
incorporate proper design of walkways, ensuring
transparency and fenestrations in the barricades,
to establish a visual access between them, and
thereby enhancing the urban public realm of
‘seeing’ and ‘being seen’.
Keywords - Walkway, pedestrian, urban,
jaywalkers, transparency.
I. INTRODUCTION
With the advent of urbanisation,
Bangalore has witnessed an exponential rise in its
population, due to its natural growth and influx of
migrants for better opportunities. Globalisation and
industrialisation have been the driving forces
behind the changing landscape of Bangalore city.
One such feature, which is being impacted due to
rising urbanisation, is the pedestrian walkway
(footpath).
II. CURRENT STUDY
The study analyses the pedestrian
walkway with respect to design factors and public
realm in the current urban scenario. Primarily, the
land-use pattern was studied to comprehend
potential and frequent users. Then, the footpath was
analysed for its design characteristics. This was
accompanied by a 10 hour survey to determine the
pedestrian count, further followed by a 24 hour
survey to ascertain the traffic volume. Public realm
studies were later carried out to infer its possible
influence.
III. LAND-USE ANALYSIS
The study has been carried out at a
walkway in one of the most congested and
developed area – Yeshwanthpur (figure 1) in
Bangalore West, where NH4, connecting Mumbai
and Bangalore passes alongside. While the area to
the west of the walkway encompasses
Yeshwanthpur Railway station (figure 2) and
residential outgrowth, the eastern side comprises of
Peenya Industrial Area.
Fig. 1: Bird-View of Yeshwanthpur.
Fig. 2: Bird-View of Stretch under Scanner.
Varuna M., Rajesh Gopinath, Fathima Samana S./ International Journal of Engineering
Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com
Vol. 3, Issue 3, May-Jun 2013, pp.454-457
455 | P a g e
IV. SITE CHARACTERISTICS
The study basically visualizes 40m of the
walkway adjacent to an unmanned exit (figure 3)
from the Yeshwanthpur Railway station. The visual
access from the walkway to the rail terminal is
interrupted by a large blank wall. The walkway also
comprises of fruit vendors and other street hawkers,
luring the potential customers entering and leaving
the railway station.
The survey confirmed that the walkway
did not comply with the IRC standards, as its width
was only about 1.2m (figure 4) and also lacked
guardrails, compulsory requisite for all National
Highways. The level of service for the walkway
was found to be „F‟, which is the lowest rating, as
per Highway Capacity Manual (HCM) 2010. The
stretch parallel to the walkway also houses a petrol
bunk, an auto-rickshaw stand and an unsheltered
bus-stop, adding to larger agglomeration of public.
Under the current circumstances, with less width
and high pedestrian density, people often tend to
walk on the road to save time and avoid collisions
with other people, sharing the same space. This
causes pedestrian spillover onto the main
carriageway.
Fig. 3: The unmanned exit from railway station.
Fig. 4: The walkway under investigation.
V. PEDESTRIAN AND TRAFFIC ANALYSIS
As an intercity rail transit terminal, the
area is a major hub for people of all ages, classes
and occupations. In the survey conducted between
8:30AM–6:30PM on a weekday, the walkway was
found to be extremely congested with a maximum
pedestrian count of about 4000, and the pedestrian
walking speed reduced to as low as 0.54m/sec
during the peak hours. Even the space occupied by
the pedestrians dwindled from 0.18 to 0.08
m2/person, forcing spillover and jaywalkers (figure
5) with a disturbing hourly average pedestrian flow
of 26. The high frequency in usage may be
attributed to the fact, that apart from the railway
station, people from the surrounding residential and
industrial sectors also used the stretch to board and
alight from the buses. The pedestrian density was
found to vary from 5.3 to 11.42 person/m2, around
the peak hours.
Fig. 5: Traffic Disruption by pedestrians.
Fig. 6: Heavy traffic volume.
The width of the two-lane carriageway
was found to be 7m with the maximum users being
motor-bikes, followed by cars. The traffic volume
(figure 6) along the walkway was found to be
38,498 alongside a disturbing hourly average
pedestrian flow of 26. As there was no provision of
zebra-crossing and median, the unruly crossing
speed of pedestrians was found to be around
1m/sec, thereby interfering with the smooth flow of
traffic, leading to delays.
Varuna M., Rajesh Gopinath, Fathima Samana S./ International Journal of Engineering
Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com
Vol. 3, Issue 3, May-Jun 2013, pp.454-457
456 | P a g e
For every 1 minute, the vehicles were
found to be delayed by an average of 5 seconds,
thereby aggravating noise levels and vehicle
operating cost.
VI. PUBLIC REALM ANALYSIS
To aggravate the persisting problem of
jaywalkers and high pedestrian density, the high
blank wall demarcating the railway station and
footpath, cuts the possible visual connection
between the two, stimulating the abuse of the
walkways by pedestrians and its encroachment by
street hawkers (figure 7). As the other side is not
visible, due to the presence of a huge wall along the
footpath, the commuters or pedestrians tend to
blemish the walkway (figure 8), by disposing
garbage, spitting & urinating. Thereby, making the
walkway a misfit, failing to actually serve its
purpose. The use of walkway by pedestrians may
also be biased by factors such as adjacent land-
uses, its visual and physical connections with the
walkway and the prevailing condition of the
footpath. Instead of paintings and sticking pictures
of deities on the wall to sensitize public, it is better
to ensure cleanliness and hygiene, through
transparency and design.
Fig. 7: Encroachment along walkway.
Fig. 8: Public abuse & spillover along walkway.
VII. ENVIRONMENTAL ANALYSIS
The solutions, envisaged for the current
issue, have incorporated road widening, without
any regard or consideration for the roadside
elements contributing to the urban landscape. This
has severely impacted the natural environment and
elevated air pollution levels, compounding the loss
of trees, which act as natural air-purifiers. Metro
rail project, which has been initiated along this
stretch to reduce stress on transportation and
environment, has failed too, as it has added to the
present congestion. With the commencement of the
Metro construction, roads have deteriorated, with
the top layer of the tarred road (figure 9) being
worn out at several places causing dust pollution.
Potholes and bottlenecks, introduced by Metro
construction and its barricades have increased the
waiting time and crossing time of vehicles, thereby
hiking the rate of automobile exhaust.
Fig. 9: Widened Roads near stretch
Fig. 10: Flash Flooding, alongside walkway.
The area presently is a mute witness to Air
Quality Index (AQI) of 256, which incidentally
falls under the category/rating of „Severe Air
Pollution‟. Coincidentally, even the average daily
„maximum‟ and „minimum‟ noise levels have been
observed to be above 92 and 62 dB, both being
above city tolerance levels. All along this, the
stretch is already experiencing flash floods during
rainy seasons (figure 10), due to clogged drains,
compounded by the fact that it is located at a lower
Varuna M., Rajesh Gopinath, Fathima Samana S./ International Journal of Engineering
Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com
Vol. 3, Issue 3, May-Jun 2013, pp.454-457
457 | P a g e
level than the station. Along with all this, air
pollution levels are also further elevated.
VIII. RECOMMENDATIONS AND
DISCUSSION
The existing footpath width is only 1.2m,
whereas as per IRC standards, the ideal width
should have been atleast 4m with provisions of
guard rails and zebra-crossing, along with regular
maintenance of the road infrastructure. The
corrective measures must also incorporate
fenestrations in the barricades, to establish a visual
access, such that the link between them is enhanced
by the urban public realm. Since sky-walkers or
foot-over bridge cannot be incorporated with metro
being commissioned, an „I‟ shaped Subway (figure
11) having a width of 4m and vertical clearance of
atleast 2.5m, starting from the point of unmanned
exit, leading to the other side must be provided.
The subway apart from providing structural
stability and necessary safety measures for
pedestrians must also be pedestrian friendly,
promoting its use. The subways, instead of being
used solely for crossing can be made more
interesting with activities like informal hawking,
incorporated in the design itself. Informal hawking
in the subway would not only enrich the experience
of the pedestrians who use it, but also would help in
maintaining the place neat and clean.
Fig. 10: Proposed Subway.
IX. CONCLUSION
The study has revealed that the stretch
under investigation was inferior in all standards,
with respect to the service offered to pedestrians.
The high usage factor and the absence of guardrails
has further enhanced the problem of pedestrian
spillover and jaywalkers, disrupting the smooth
flow of traffic movement, raising the accident rate
and causing traffic delays by a maximum of 30
seconds per crossing.
The government initiated road widening at
the cost of roadside trees; all along with unaltered
footpath width has continued to contribute to the
spilling over of pedestrians onto the main
carriageway, aggravated by the dilapidated state of
walkway, as an outcome of pedestrian abuse and
encroachment by street hawkers. Recommendations
to counter the current situation, apart from
inclusions of corrective designs along with periodic
maintenance, also envisages provisions of grade
separated pedestrian facilities such as subway,
keeping public realm in mind.
REFERENCES
[1] W.J. Book, EIA Report of Metro Rail
Project for Bangalore City, 2010.
[2] IRC: 103-1988, “Guidelines for pedestrian
facilities”.
[3] Flaherty, “Transport Planning and Traffic
Engineering”, Butterworth-Heinemann,
1996.
[4] Chakraborty et al., “Facilities for
Pedestrian Movement in Metropolitan
centres”, IRC.
[5] Rakesh S., “Evaluation of the Pedestrian
Environment”, Chennai, 2003.

More Related Content

What's hot

Performance evaluation of santasi roundabout, kumasi ghana using micro simula...
Performance evaluation of santasi roundabout, kumasi ghana using micro simula...Performance evaluation of santasi roundabout, kumasi ghana using micro simula...
Performance evaluation of santasi roundabout, kumasi ghana using micro simula...eSAT Journals
 
IRJET- A Study on Life Cycle Cost Analysis for Roads
IRJET- A Study on Life Cycle Cost Analysis for RoadsIRJET- A Study on Life Cycle Cost Analysis for Roads
IRJET- A Study on Life Cycle Cost Analysis for RoadsIRJET Journal
 
Introduction of basic transportation engineering
Introduction of basic transportation engineeringIntroduction of basic transportation engineering
Introduction of basic transportation engineeringGhan Shyam
 
Existing Facilities And Deficiencies In A Busy Intersection At Dhaka Based On...
Existing Facilities And Deficiencies In A Busy Intersection At Dhaka Based On...Existing Facilities And Deficiencies In A Busy Intersection At Dhaka Based On...
Existing Facilities And Deficiencies In A Busy Intersection At Dhaka Based On...IJERA Editor
 
Capacity and performance analysis of suame
Capacity and performance analysis of suameCapacity and performance analysis of suame
Capacity and performance analysis of suameeSAT Publishing House
 
Capacity and performance analysis of suame roundabout, kumasi ghana
Capacity and performance analysis of suame roundabout, kumasi ghanaCapacity and performance analysis of suame roundabout, kumasi ghana
Capacity and performance analysis of suame roundabout, kumasi ghanaeSAT Journals
 
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLYSTUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLYJournal For Research
 
IRJET- Mobility Planning for an Indian Pilgrimage City- A Case of Omkares...
IRJET-  	  Mobility Planning for an Indian Pilgrimage City- A Case of Omkares...IRJET-  	  Mobility Planning for an Indian Pilgrimage City- A Case of Omkares...
IRJET- Mobility Planning for an Indian Pilgrimage City- A Case of Omkares...IRJET Journal
 
Transportation Engineering Presentation
Transportation Engineering PresentationTransportation Engineering Presentation
Transportation Engineering PresentationSanduli Weerasekara
 
Planning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at RourkelaPlanning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at RourkelaMaitreyi Yellapragada
 
Transportation Engineering I
Transportation Engineering  ITransportation Engineering  I
Transportation Engineering IGAURAV. H .TANDON
 
Lec 01 Introduction of Transportation Engineering (Transportation Engineering...
Lec 01 Introduction of Transportation Engineering (Transportation Engineering...Lec 01 Introduction of Transportation Engineering (Transportation Engineering...
Lec 01 Introduction of Transportation Engineering (Transportation Engineering...Hossam Shafiq I
 
Transportation Planning & Management
Transportation Planning & ManagementTransportation Planning & Management
Transportation Planning & ManagementLiving Online
 
Ananad vihar
Ananad viharAnanad vihar
Ananad viharcmahima98
 
Ppt on mono rail by rahul
Ppt on mono rail by rahulPpt on mono rail by rahul
Ppt on mono rail by rahulVikas Gupta
 

What's hot (20)

Performance evaluation of santasi roundabout, kumasi ghana using micro simula...
Performance evaluation of santasi roundabout, kumasi ghana using micro simula...Performance evaluation of santasi roundabout, kumasi ghana using micro simula...
Performance evaluation of santasi roundabout, kumasi ghana using micro simula...
 
IRJET- A Study on Life Cycle Cost Analysis for Roads
IRJET- A Study on Life Cycle Cost Analysis for RoadsIRJET- A Study on Life Cycle Cost Analysis for Roads
IRJET- A Study on Life Cycle Cost Analysis for Roads
 
Introduction of basic transportation engineering
Introduction of basic transportation engineeringIntroduction of basic transportation engineering
Introduction of basic transportation engineering
 
Existing Facilities And Deficiencies In A Busy Intersection At Dhaka Based On...
Existing Facilities And Deficiencies In A Busy Intersection At Dhaka Based On...Existing Facilities And Deficiencies In A Busy Intersection At Dhaka Based On...
Existing Facilities And Deficiencies In A Busy Intersection At Dhaka Based On...
 
Capacity and performance analysis of suame
Capacity and performance analysis of suameCapacity and performance analysis of suame
Capacity and performance analysis of suame
 
Capacity and performance analysis of suame roundabout, kumasi ghana
Capacity and performance analysis of suame roundabout, kumasi ghanaCapacity and performance analysis of suame roundabout, kumasi ghana
Capacity and performance analysis of suame roundabout, kumasi ghana
 
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLYSTUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
 
IRJET- Mobility Planning for an Indian Pilgrimage City- A Case of Omkares...
IRJET-  	  Mobility Planning for an Indian Pilgrimage City- A Case of Omkares...IRJET-  	  Mobility Planning for an Indian Pilgrimage City- A Case of Omkares...
IRJET- Mobility Planning for an Indian Pilgrimage City- A Case of Omkares...
 
Transportation Engineering Presentation
Transportation Engineering PresentationTransportation Engineering Presentation
Transportation Engineering Presentation
 
ppt on monorail technology
ppt on monorail technologyppt on monorail technology
ppt on monorail technology
 
Mumbai Road Safety Initiative
Mumbai Road Safety InitiativeMumbai Road Safety Initiative
Mumbai Road Safety Initiative
 
20320140503005
2032014050300520320140503005
20320140503005
 
Planning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at RourkelaPlanning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at Rourkela
 
Transportation Engineering I
Transportation Engineering  ITransportation Engineering  I
Transportation Engineering I
 
Monorail
MonorailMonorail
Monorail
 
Lec 01 Introduction of Transportation Engineering (Transportation Engineering...
Lec 01 Introduction of Transportation Engineering (Transportation Engineering...Lec 01 Introduction of Transportation Engineering (Transportation Engineering...
Lec 01 Introduction of Transportation Engineering (Transportation Engineering...
 
Transportation Planning & Management
Transportation Planning & ManagementTransportation Planning & Management
Transportation Planning & Management
 
Ananad vihar
Ananad viharAnanad vihar
Ananad vihar
 
report on monorail technolgy
report on monorail technolgyreport on monorail technolgy
report on monorail technolgy
 
Ppt on mono rail by rahul
Ppt on mono rail by rahulPpt on mono rail by rahul
Ppt on mono rail by rahul
 

Viewers also liked (20)

Ar33252258
Ar33252258Ar33252258
Ar33252258
 
An33233237
An33233237An33233237
An33233237
 
Av33274282
Av33274282Av33274282
Av33274282
 
Ba33301306
Ba33301306Ba33301306
Ba33301306
 
Bo33402408
Bo33402408Bo33402408
Bo33402408
 
Bf33335340
Bf33335340Bf33335340
Bf33335340
 
Gc3310851089
Gc3310851089Gc3310851089
Gc3310851089
 
Du31816820
Du31816820Du31816820
Du31816820
 
Es31954961
Es31954961Es31954961
Es31954961
 
Eg31880886
Eg31880886Eg31880886
Eg31880886
 
Ec31858863
Ec31858863Ec31858863
Ec31858863
 
Dl31758761
Dl31758761Dl31758761
Dl31758761
 
Ey3110051010
Ey3110051010Ey3110051010
Ey3110051010
 
Dq31784792
Dq31784792Dq31784792
Dq31784792
 
Kj3418691871
Kj3418691871Kj3418691871
Kj3418691871
 
Jz3418011804
Jz3418011804Jz3418011804
Jz3418011804
 
Bg35329332
Bg35329332Bg35329332
Bg35329332
 
Bk35349352
Bk35349352Bk35349352
Bk35349352
 
Bo35377383
Bo35377383Bo35377383
Bo35377383
 
Atps tecnologias de gestão
Atps tecnologias de gestãoAtps tecnologias de gestão
Atps tecnologias de gestão
 

Similar to Bx33454457

MODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONS
MODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONSMODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONS
MODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONSIRJET Journal
 
Pedestrian priority in urban area and usefulness towards community
Pedestrian priority in urban area and usefulness towards communityPedestrian priority in urban area and usefulness towards community
Pedestrian priority in urban area and usefulness towards communityeSAT Journals
 
Pedestrian priority in urban area and usefulness
Pedestrian priority in urban area and usefulnessPedestrian priority in urban area and usefulness
Pedestrian priority in urban area and usefulnesseSAT Publishing House
 
Urban traffic problems and solutions
Urban traffic problems and solutionsUrban traffic problems and solutions
Urban traffic problems and solutionseSAT Journals
 
Simulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested areaSimulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested areaeSAT Publishing House
 
Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...
Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...
Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...eSAT Journals
 
Appraisal of airport roundabout on the antoa road,
Appraisal of airport roundabout on the antoa road,Appraisal of airport roundabout on the antoa road,
Appraisal of airport roundabout on the antoa road,eSAT Publishing House
 
Quality and safety assesment of pedestrians sidewalk in panipat city
Quality and safety assesment of pedestrians sidewalk in panipat cityQuality and safety assesment of pedestrians sidewalk in panipat city
Quality and safety assesment of pedestrians sidewalk in panipat citykaran verma
 
IRJET- Evaluating Traffic Congestion and its Remedial Measures
IRJET-  	  Evaluating Traffic Congestion and its Remedial MeasuresIRJET-  	  Evaluating Traffic Congestion and its Remedial Measures
IRJET- Evaluating Traffic Congestion and its Remedial MeasuresIRJET Journal
 
Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...eSAT Publishing House
 
Theoritical framework
Theoritical frameworkTheoritical framework
Theoritical frameworkIsha Kirti
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...EditorIJAERD
 
The Study on Method to Determine the Priority in Sidewalk Installation on Rur...
The Study on Method to Determine the Priority in Sidewalk Installation on Rur...The Study on Method to Determine the Priority in Sidewalk Installation on Rur...
The Study on Method to Determine the Priority in Sidewalk Installation on Rur...inventionjournals
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)theijes
 
DESIGN OF A CIRCULAR COMPOSITE FOOTBRIDGE AT THE.pptx
DESIGN OF A CIRCULAR COMPOSITE FOOTBRIDGE AT THE.pptxDESIGN OF A CIRCULAR COMPOSITE FOOTBRIDGE AT THE.pptx
DESIGN OF A CIRCULAR COMPOSITE FOOTBRIDGE AT THE.pptxMrSJoe1
 
Study of Road Safety Audit in Municipal Area’s
Study of Road Safety Audit in Municipal  Area’sStudy of Road Safety Audit in Municipal  Area’s
Study of Road Safety Audit in Municipal Area’sIRJET Journal
 
IRJET- Appraisal and Design of Foot Over Bridge
IRJET- Appraisal and Design of Foot Over BridgeIRJET- Appraisal and Design of Foot Over Bridge
IRJET- Appraisal and Design of Foot Over BridgeIRJET Journal
 
IRJET- Upcoming Longest Elevated Flyover Carridor of the State of Madhya Prad...
IRJET- Upcoming Longest Elevated Flyover Carridor of the State of Madhya Prad...IRJET- Upcoming Longest Elevated Flyover Carridor of the State of Madhya Prad...
IRJET- Upcoming Longest Elevated Flyover Carridor of the State of Madhya Prad...IRJET Journal
 
The Cause, Effect and Possible Solution to Traffic Congestion on Nigeria Road...
The Cause, Effect and Possible Solution to Traffic Congestion on Nigeria Road...The Cause, Effect and Possible Solution to Traffic Congestion on Nigeria Road...
The Cause, Effect and Possible Solution to Traffic Congestion on Nigeria Road...inventionjournals
 

Similar to Bx33454457 (20)

MODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONS
MODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONSMODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONS
MODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONS
 
Pedestrian priority in urban area and usefulness towards community
Pedestrian priority in urban area and usefulness towards communityPedestrian priority in urban area and usefulness towards community
Pedestrian priority in urban area and usefulness towards community
 
Pedestrian priority in urban area and usefulness
Pedestrian priority in urban area and usefulnessPedestrian priority in urban area and usefulness
Pedestrian priority in urban area and usefulness
 
Urban traffic problems and solutions
Urban traffic problems and solutionsUrban traffic problems and solutions
Urban traffic problems and solutions
 
Simulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested areaSimulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested area
 
Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...
Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...
Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...
 
Appraisal of airport roundabout on the antoa road,
Appraisal of airport roundabout on the antoa road,Appraisal of airport roundabout on the antoa road,
Appraisal of airport roundabout on the antoa road,
 
Quality and safety assesment of pedestrians sidewalk in panipat city
Quality and safety assesment of pedestrians sidewalk in panipat cityQuality and safety assesment of pedestrians sidewalk in panipat city
Quality and safety assesment of pedestrians sidewalk in panipat city
 
IRJET- Evaluating Traffic Congestion and its Remedial Measures
IRJET-  	  Evaluating Traffic Congestion and its Remedial MeasuresIRJET-  	  Evaluating Traffic Congestion and its Remedial Measures
IRJET- Evaluating Traffic Congestion and its Remedial Measures
 
Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...
 
Theoritical framework
Theoritical frameworkTheoritical framework
Theoritical framework
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...
 
The Study on Method to Determine the Priority in Sidewalk Installation on Rur...
The Study on Method to Determine the Priority in Sidewalk Installation on Rur...The Study on Method to Determine the Priority in Sidewalk Installation on Rur...
The Study on Method to Determine the Priority in Sidewalk Installation on Rur...
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
 
DESIGN OF A CIRCULAR COMPOSITE FOOTBRIDGE AT THE.pptx
DESIGN OF A CIRCULAR COMPOSITE FOOTBRIDGE AT THE.pptxDESIGN OF A CIRCULAR COMPOSITE FOOTBRIDGE AT THE.pptx
DESIGN OF A CIRCULAR COMPOSITE FOOTBRIDGE AT THE.pptx
 
Study of Road Safety Audit in Municipal Area’s
Study of Road Safety Audit in Municipal  Area’sStudy of Road Safety Audit in Municipal  Area’s
Study of Road Safety Audit in Municipal Area’s
 
IRJET- Appraisal and Design of Foot Over Bridge
IRJET- Appraisal and Design of Foot Over BridgeIRJET- Appraisal and Design of Foot Over Bridge
IRJET- Appraisal and Design of Foot Over Bridge
 
Pedestrian Friendly Shopping Plaza at M.G. Road, Kochi
Pedestrian Friendly Shopping Plaza at M.G. Road, KochiPedestrian Friendly Shopping Plaza at M.G. Road, Kochi
Pedestrian Friendly Shopping Plaza at M.G. Road, Kochi
 
IRJET- Upcoming Longest Elevated Flyover Carridor of the State of Madhya Prad...
IRJET- Upcoming Longest Elevated Flyover Carridor of the State of Madhya Prad...IRJET- Upcoming Longest Elevated Flyover Carridor of the State of Madhya Prad...
IRJET- Upcoming Longest Elevated Flyover Carridor of the State of Madhya Prad...
 
The Cause, Effect and Possible Solution to Traffic Congestion on Nigeria Road...
The Cause, Effect and Possible Solution to Traffic Congestion on Nigeria Road...The Cause, Effect and Possible Solution to Traffic Congestion on Nigeria Road...
The Cause, Effect and Possible Solution to Traffic Congestion on Nigeria Road...
 

Recently uploaded

Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGSujit Pal
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 

Recently uploaded (20)

Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAG
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 

Bx33454457

  • 1. Varuna M., Rajesh Gopinath, Fathima Samana S./ International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 3, Issue 3, May-Jun 2013, pp.454-457 454 | P a g e A Conjoint Analysis of the Design Irregularities and Public Realms of a National Highway in Bangalore Varuna M.* , Rajesh Gopinath** , and Fathima Samana S.*** *Assistant Professor, Dept. of Civil Engineering, R.V. College of Engineering, Bangalore 56. ** Assistant Professor, Dept. of Civil Engineering, Acharya Institute of Technology, Bangalore 107. ***Assistant Professor, Acharya‟s N.R.V. School of Architecture, Bangalore 107. ABSTRACT A 40m stretch along National Highway (NH4) is considered, which is located on either side of an unmanned exit from Yeswanthpur Railway station. This stretch of pedestrian walkway was extremely congested, with an average pedestrian count of about 4000/hour. This also led to pedestrian spillover and jaywalkers on the main carriageway. The absence of guardrails and the encroachment of footpath by street-hawkers aggravated the problem. Hence, the disruption of smooth pedestrian movement raises the accident rate and causes traffic delays. The width of the existing footpath is only 1.2m, while the ideal width should have been atleast 4m, as per standards. A high blank wall, demarcating the station and footpath, aggravated the persisting problem, by cutting the possible visual connection between them. This stimulated the abuse of the walkway by pedestrians. The dilapidated walkway and the unaltered footpath width continue to be a distress, with the level of service being ‘F’. The remedial measures must incorporate proper design of walkways, ensuring transparency and fenestrations in the barricades, to establish a visual access between them, and thereby enhancing the urban public realm of ‘seeing’ and ‘being seen’. Keywords - Walkway, pedestrian, urban, jaywalkers, transparency. I. INTRODUCTION With the advent of urbanisation, Bangalore has witnessed an exponential rise in its population, due to its natural growth and influx of migrants for better opportunities. Globalisation and industrialisation have been the driving forces behind the changing landscape of Bangalore city. One such feature, which is being impacted due to rising urbanisation, is the pedestrian walkway (footpath). II. CURRENT STUDY The study analyses the pedestrian walkway with respect to design factors and public realm in the current urban scenario. Primarily, the land-use pattern was studied to comprehend potential and frequent users. Then, the footpath was analysed for its design characteristics. This was accompanied by a 10 hour survey to determine the pedestrian count, further followed by a 24 hour survey to ascertain the traffic volume. Public realm studies were later carried out to infer its possible influence. III. LAND-USE ANALYSIS The study has been carried out at a walkway in one of the most congested and developed area – Yeshwanthpur (figure 1) in Bangalore West, where NH4, connecting Mumbai and Bangalore passes alongside. While the area to the west of the walkway encompasses Yeshwanthpur Railway station (figure 2) and residential outgrowth, the eastern side comprises of Peenya Industrial Area. Fig. 1: Bird-View of Yeshwanthpur. Fig. 2: Bird-View of Stretch under Scanner.
  • 2. Varuna M., Rajesh Gopinath, Fathima Samana S./ International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 3, Issue 3, May-Jun 2013, pp.454-457 455 | P a g e IV. SITE CHARACTERISTICS The study basically visualizes 40m of the walkway adjacent to an unmanned exit (figure 3) from the Yeshwanthpur Railway station. The visual access from the walkway to the rail terminal is interrupted by a large blank wall. The walkway also comprises of fruit vendors and other street hawkers, luring the potential customers entering and leaving the railway station. The survey confirmed that the walkway did not comply with the IRC standards, as its width was only about 1.2m (figure 4) and also lacked guardrails, compulsory requisite for all National Highways. The level of service for the walkway was found to be „F‟, which is the lowest rating, as per Highway Capacity Manual (HCM) 2010. The stretch parallel to the walkway also houses a petrol bunk, an auto-rickshaw stand and an unsheltered bus-stop, adding to larger agglomeration of public. Under the current circumstances, with less width and high pedestrian density, people often tend to walk on the road to save time and avoid collisions with other people, sharing the same space. This causes pedestrian spillover onto the main carriageway. Fig. 3: The unmanned exit from railway station. Fig. 4: The walkway under investigation. V. PEDESTRIAN AND TRAFFIC ANALYSIS As an intercity rail transit terminal, the area is a major hub for people of all ages, classes and occupations. In the survey conducted between 8:30AM–6:30PM on a weekday, the walkway was found to be extremely congested with a maximum pedestrian count of about 4000, and the pedestrian walking speed reduced to as low as 0.54m/sec during the peak hours. Even the space occupied by the pedestrians dwindled from 0.18 to 0.08 m2/person, forcing spillover and jaywalkers (figure 5) with a disturbing hourly average pedestrian flow of 26. The high frequency in usage may be attributed to the fact, that apart from the railway station, people from the surrounding residential and industrial sectors also used the stretch to board and alight from the buses. The pedestrian density was found to vary from 5.3 to 11.42 person/m2, around the peak hours. Fig. 5: Traffic Disruption by pedestrians. Fig. 6: Heavy traffic volume. The width of the two-lane carriageway was found to be 7m with the maximum users being motor-bikes, followed by cars. The traffic volume (figure 6) along the walkway was found to be 38,498 alongside a disturbing hourly average pedestrian flow of 26. As there was no provision of zebra-crossing and median, the unruly crossing speed of pedestrians was found to be around 1m/sec, thereby interfering with the smooth flow of traffic, leading to delays.
  • 3. Varuna M., Rajesh Gopinath, Fathima Samana S./ International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 3, Issue 3, May-Jun 2013, pp.454-457 456 | P a g e For every 1 minute, the vehicles were found to be delayed by an average of 5 seconds, thereby aggravating noise levels and vehicle operating cost. VI. PUBLIC REALM ANALYSIS To aggravate the persisting problem of jaywalkers and high pedestrian density, the high blank wall demarcating the railway station and footpath, cuts the possible visual connection between the two, stimulating the abuse of the walkways by pedestrians and its encroachment by street hawkers (figure 7). As the other side is not visible, due to the presence of a huge wall along the footpath, the commuters or pedestrians tend to blemish the walkway (figure 8), by disposing garbage, spitting & urinating. Thereby, making the walkway a misfit, failing to actually serve its purpose. The use of walkway by pedestrians may also be biased by factors such as adjacent land- uses, its visual and physical connections with the walkway and the prevailing condition of the footpath. Instead of paintings and sticking pictures of deities on the wall to sensitize public, it is better to ensure cleanliness and hygiene, through transparency and design. Fig. 7: Encroachment along walkway. Fig. 8: Public abuse & spillover along walkway. VII. ENVIRONMENTAL ANALYSIS The solutions, envisaged for the current issue, have incorporated road widening, without any regard or consideration for the roadside elements contributing to the urban landscape. This has severely impacted the natural environment and elevated air pollution levels, compounding the loss of trees, which act as natural air-purifiers. Metro rail project, which has been initiated along this stretch to reduce stress on transportation and environment, has failed too, as it has added to the present congestion. With the commencement of the Metro construction, roads have deteriorated, with the top layer of the tarred road (figure 9) being worn out at several places causing dust pollution. Potholes and bottlenecks, introduced by Metro construction and its barricades have increased the waiting time and crossing time of vehicles, thereby hiking the rate of automobile exhaust. Fig. 9: Widened Roads near stretch Fig. 10: Flash Flooding, alongside walkway. The area presently is a mute witness to Air Quality Index (AQI) of 256, which incidentally falls under the category/rating of „Severe Air Pollution‟. Coincidentally, even the average daily „maximum‟ and „minimum‟ noise levels have been observed to be above 92 and 62 dB, both being above city tolerance levels. All along this, the stretch is already experiencing flash floods during rainy seasons (figure 10), due to clogged drains, compounded by the fact that it is located at a lower
  • 4. Varuna M., Rajesh Gopinath, Fathima Samana S./ International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 3, Issue 3, May-Jun 2013, pp.454-457 457 | P a g e level than the station. Along with all this, air pollution levels are also further elevated. VIII. RECOMMENDATIONS AND DISCUSSION The existing footpath width is only 1.2m, whereas as per IRC standards, the ideal width should have been atleast 4m with provisions of guard rails and zebra-crossing, along with regular maintenance of the road infrastructure. The corrective measures must also incorporate fenestrations in the barricades, to establish a visual access, such that the link between them is enhanced by the urban public realm. Since sky-walkers or foot-over bridge cannot be incorporated with metro being commissioned, an „I‟ shaped Subway (figure 11) having a width of 4m and vertical clearance of atleast 2.5m, starting from the point of unmanned exit, leading to the other side must be provided. The subway apart from providing structural stability and necessary safety measures for pedestrians must also be pedestrian friendly, promoting its use. The subways, instead of being used solely for crossing can be made more interesting with activities like informal hawking, incorporated in the design itself. Informal hawking in the subway would not only enrich the experience of the pedestrians who use it, but also would help in maintaining the place neat and clean. Fig. 10: Proposed Subway. IX. CONCLUSION The study has revealed that the stretch under investigation was inferior in all standards, with respect to the service offered to pedestrians. The high usage factor and the absence of guardrails has further enhanced the problem of pedestrian spillover and jaywalkers, disrupting the smooth flow of traffic movement, raising the accident rate and causing traffic delays by a maximum of 30 seconds per crossing. The government initiated road widening at the cost of roadside trees; all along with unaltered footpath width has continued to contribute to the spilling over of pedestrians onto the main carriageway, aggravated by the dilapidated state of walkway, as an outcome of pedestrian abuse and encroachment by street hawkers. Recommendations to counter the current situation, apart from inclusions of corrective designs along with periodic maintenance, also envisages provisions of grade separated pedestrian facilities such as subway, keeping public realm in mind. REFERENCES [1] W.J. Book, EIA Report of Metro Rail Project for Bangalore City, 2010. [2] IRC: 103-1988, “Guidelines for pedestrian facilities”. [3] Flaherty, “Transport Planning and Traffic Engineering”, Butterworth-Heinemann, 1996. [4] Chakraborty et al., “Facilities for Pedestrian Movement in Metropolitan centres”, IRC. [5] Rakesh S., “Evaluation of the Pedestrian Environment”, Chennai, 2003.