International Journal Of Computational Engineering Research (ijceronline.com) Vol. 3 Issue 3
328
||Issn||2250-3005|| (Online) ||March||2013|| ||www.ijceronline.com||
The Industrial Maintenance Management and Implementing
Maintenance Policies for Improvement in Productivity
Ajay S. Bonde1,
Ashwadeep C. Fulzele2
1,2,Department Of Mechanical Engineering, Yashvantrao Chavan College Of Engineering, Nagpur,
Abstract:
As a consequence, of the implementation of advanced manufacturing technologies and just-in-time
production systems, the nature of the production environment has changed during the last two decades. This has
allowed companies to massively produce products in a customized way. But the increase in automation and the
reduction in buffers of inventory in the plants clearly put more pressure on the maintenance system. The present
maintenance management policy has been proposed in order to diminish this pressure. Whatever the policy an
organization adopts, it has to be evolving to continue being useful against the fast changes that occur in
business, communications and industry. Most companies lack a formal method to address maintainability during
the project delivery process, yet maintenance can seriously affect productivity. This paper outlines the proposed
model process and describes the potential roles and benefits of maintenance policy [1].
Keywords: Maintainability, Maintenance, Organization, Production Environment, Productivity, Maintenance
Policy,
1. Introduction
Maintenance is defined as the combination of all technical, administrative and managerial actions
during the life cycle of an item intended to retain it in, or restore it to, a state in which it can perform the
required function. In the same standards, maintenance management is defined as all the activities of the
management that determine the maintenance objectives or priorities, strategies, and responsibilities and
implement them by means such as maintenance planning, maintenance control and supervision, and several
improving the methods including economical aspects in the organization. The maintenance management policy
can be viewed as one of the basic and integral parts of the maintenance management function. The maintenance
management function consists of planning, organizing, implementing and controlling maintenance activities.
The management organizes, provides resources (personnel, capital, assets, material and hardware, etc.) and leads
to performing tasks and accomplishing targets. Once the plans are created, the management’s task is to ensure
that they are carried out in an effective and efficient manner. Having a clear mission, strategy, and objectives
facilitated by a corporate culture, organizing starts the process of implementation by clarifying job and working
relations (chain of command, span of control, delegation of
authority, etc.) [2].
2. Maintenance Management Policy
2.1 The Maintenance Schedule
It is generally accepted that, in any maintenance department where there are more than 10 crafts
persons and more than two or three crafts, some planning, other than day-to-day allocation of work by
supervisor or leadsperson, can result in improved efficiency. As the size of the maintenance organization, for
example, scheduling, increases, the extent to which work planning can be formalized and the amount of time
that should be spent on this activity are increased. There should be only as much planning as necessary for
maximum overall efficiency so long as the system costs less than the cost of operating without it.
The Industrial Maintenance Management And Implementing…
329
||Issn||2250-3005|| (Online) ||March||2013|| ||www.ijceronline.com||
Fig: 1. The Maintenance policy [3].
2.2 The Procedure for Scheduling
There are practical limitations to any scheduling system. A very detailed schedule that because of
emergencies becomes obsolete after the first hour or two of use is of little value. If, however, actual performance
indicates from 60 to 80 percent adherence during normal operation, the value of the schedule is real.
Justification of any scheduling system requires proof of its effectiveness in dollars saved. Where some form of
incentive system or work measurement exists, such proof is readily available. But in most maintenance
departments no such definitive method is available and the only criteria of measurement are overall trends in
maintenance costs and quality of service. Some aspects to be considered in arriving at a sound work-scheduling
procedure are work unit, size of jobs scheduled, percent of total work load scheduled, and lead time for
scheduling.
Work Unit. Most detailed schedules are laid out in terms of labour-hours or, if standard times are used,
fractions of hours. Other scheduling systems use a half craft-day as a minimum work unit. Others may use a
craft-day or even a craft-week as a basis.
Size of Jobs Scheduled. Some work-scheduling systems handle small jobs as well as large ones. Others
schedule only handle major work where the number of crafts persons and the length of time involved are
appreciable.
Percent of Total Work Load Scheduled. Although in some cases all work may be scheduled, the most
effective systems recognize the inability of any maintenance engineering department to anticipate all jobs,
especially those of an emergency nature, and do not attempt scheduling for the entire work force. A portion of
the available work force is left free for quick assignment to emergency jobs or other priority work not
anticipated at the time of scheduling.
Lead Time for Scheduling. Lead time for scheduling, or the length of time covered by the schedule, is another
variable to be considered. Some scheduling systems do not attempt to cover breakdown repairs and are limited
to the routine preventive maintenance and to major work that can be anticipated and scheduled well in advance.
In these cases a monthly or biweekly allocation of manpower suffices. In most instances, however, a weekly
schedule with a 2- or 3-day lead time results in good performance, yet is sufficiently flexible to handle most
unexpected work. In extreme situations a daily schedule with a 16- to 18-hr lead time may be necessary to
provide the necessary control. A more workable solution for this situation, however, involves use of a master
schedule for a minimum of 2 weeks with provision for modifying it daily.
The Industrial Maintenance Management And Implementing…
330
||Issn||2250-3005|| (Online) ||March||2013|| ||www.ijceronline.com||
3. Selection And Implementation Of A Scheduling System
3.1 Flow-of-Work Requests.
Before any formalized scheduling program can be initiated, the method of requesting work from the
maintenance department should be formalized. This request may take the form of a work description or job
ticket, listing labour hours or equipment requirement, or it can be in the form of a work sheet on which the same
type of information is accumulated by either verbal or written communication. Regardless of the form this
information takes, it must be routed to one central point if a scheduling system is to be used. In a small plant this
can be the supervisor, self direct team leader, the maintenance superintendent, or the maintenance engineer. In a
larger maintenance department it should be through a staff individual or group. The amount of information on
the work request depends upon the type of talent used in the scheduling group. If the individual charged with
planning is completely familiar with the job requirements and can determine the craft skills and labour-hours
involved, the necessary equipment, and any other information required for scheduling, a summary of the jobs
will suffice. On the other hand, where complexity of work is such that it is practically impossible for any
individual to have this information, or if the person charged with scheduling does not have the training
necessary to analyze the work, then the information on the work request must be presented in more detail. The
number of labour-hours required, by craft, the timing, the relation between crafts, the location and availability of
parts and equipment, and any special requirements concerning coordination with production schedules or
personnel should be included. In addition to job information required for planning, it is equally important to
have a feedback on actual performance in terms of notification of completion and actual time consumed, by
craft. This may be incorporated in the work-request system, but provision must be made for channelling this
information back to the scheduling centre. The scheduling system should also provide for work scheduled but
not completed becoming a part of the work backlog. As such, it is considered, along with new work, for new
scheduling.
3.2 Determination of Priority.
In any maintenance organization which is efficiently manned, the work load, in terms of quantity or
timing, exceeds the availability of men and/or equipment. For this reason the problem of defining the order in
which the work is to be carried out, or establishing priority, exists and is an important factor in scheduling. In a
small plant with one operating department and a small maintenance organization, establishment of priorities
may amount to casual discussion between maintenance and production. However, as the plant grows and the
maintenance department is called upon to provide service to more than one production department, the problem
of equitable and efficient priority assignment becomes more involved. One of the most serious problems in
maintaining good relations between maintenance and production departments is in this sphere. Too frequently
personalities, working conditions, accessibility, or geographic location with respect to central shops influence
the order of work assignment. This may decrease the overall efficiency of the plant. The means for determining
work priority figures most importantly in the establishment of a work-scheduling system. On the surface a
solution to this problem would reserve decisions concerning priorities to an individual who is in position to
judge the effect on overall plant performance.
In a plant of any size, it is usually most effective to handle such decisions at a lower level of management, with
the plant manager having the final say when no decision as to priority of work can be reached. A method which
has proved satisfactory in many instances has been to assign a rough allocation of craft manpower to each
production department, then to establish the priority of work within each department by consultation with its
supervision. When it is necessary to vary the allocation of men, this should be done by negotiation between
production departments to arrange a mutually agreeable exchange. If such a reallocation cannot be concluded, as
a last resort the plant manager must make the decision.
3.3 Coordinating and Dispatching.
In the execution of an effective scheduling system it is necessary to compromise with the practical
considerations of getting the work done, and done economically. If a supervisor or team leader guided his or her
crafts persons on the assumption that the job must be completed at the exact time he had estimated and then
continued to assign work on the basis of his estimate of the time necessary, it is obvious that confusion,
incomplete work, and idle craft time would result. A formal schedule, issued weekly and followed blindly,
would have the same effects. Instead, the schedule should be used as a guide, and modifications can be made as
needed. Rapid communication of such modifications to the men responsible for carrying them out is essential to
the success of a work schedule. It is also essential that any changes or unexpected work for which provision has
not been made in the schedule be funnelled through the dispatch centre. Usually the dispatch centre can
incorporate this type of work more efficiently than is possible by random selection of the nearest craftsmen or
injection of higher authority into the picture [4].
The Industrial Maintenance Management And Implementing…
331
||Issn||2250-3005|| (Online) ||March||2013|| ||www.ijceronline.com||
4. Preventive versus Breakdown Maintenance
Preventive maintenance has long been recognized as extremely important in the reduction of
maintenance costs and improvement of asset reliability. In practice it takes many forms. Two major factors that
should control the extent of a preventive program are first, the cost of the program compared with the carefully
measured reduction in total repair costs and improved asset performance; second, the percent utilization of the
asset being maintained. If the cost of preparation for a preventive-maintenance inspection is essentially the same
as the cost of repair after a failure accompanied by preventive inspections, the justification is small. If, on the
other hand, breakdown could result in severe damage to the asset and a far more costly repair, the scheduled
inspection time should be considered. Furthermore, in the average plant preventive maintenance should be
tailored to fit the function of different items of equipment rather than applied in the same manner to all
equipment. Key pieces of equipment in many other integrated manufacturing lines are in the same category.
Conversely, periodic inspections of small electric motors and power transmissions can easily exceed the cost of
unit replacement at the time of failure. Indeed, a program of asset or component replacements can result in
considerably lower maintenance costs where complete preventive maintenance is impractical. In a plant using
many pumps, for instance, a program of standardization, coupled with an inventory of complete units of pumps
most widely used, may provide a satisfactory program for this equipment. This spare-tire philosophy can be
extended to many other components or subassemblies with gratifying results. Sometimes, instead of using a
centrally administered formal preventive program, qualified mechanics are assigned to individual pieces of
equipment, or equipment groups, as mechanical custodians. Operating without clerical assistance and with a
minimum of paperwork, these men, because of familiarity with equipment and ability to sense mechanical
difficulties in advance, can effectively reduce maintenance costs and breakdowns. These compromise devices
can frequently be used to greater advantage, even in plants where equipment is not in continuous operation and a
more comprehensive preventive program might be set up.
Periodic shutdown for complete overhaul of a whole production unit, similar to the turnaround period
in oil refineries, is another method of minimizing breakdowns and performing maintenance most efficiently.
Unfortunately, this is a difficult approach to sell to management of a 7-day, around the- clock manufacturing
plant not accustomed to this method. One of the most effective methods of tempering ideal preventive
maintenance with practical considerations of a continuous operation is that of taking advantage of a breakdown
in some component of the line to perform vital inspections and replacements which can be accomplished in
about the same time as the primary repair. This requires recording of deficiencies observed during operating
inspections and moving in quickly with craftsmen and supervision prepared to work until the job is done.
Production supervision usually can be sold the need for a few more hours’ time for additional work with repair
of a breakdown much more easily than they can be convinced of its necessity when things are apparently
running smoothly [5].
References
[1] A. Crespo Ma´rquez, P. Moreu de Leo´n, J.F. Go´mez Ferna´ndez, C. Parra Ma´rquez and M. Lo´pez
Campos Department of Industrial Management, School of Engineering, University of Seville, Seville,
Spain.
[2] Bradley PS (2002) Designing the Best Maintenance. http:www.samicorp.com:1–5
[3] Morel G, Suhner M, Iung B, Léger JB. (2001, October). Maintenance holistic framework for optimizing
the
cost/availability compromise ofmanuf acturing systems. In: Proceedings ofthe sixth IFAC symposium on
cost oriented
automation. Survey Paper, Berlin, Germany, October, 2001. ISBN:0-08-043907-1.
[4] Chelson VJ, Payne CA, Reavill RP (2005) Management for Engineers Scientists and Technologists, 2nd
edn. Wiley, Chichester England
[5] Lindley R. Higgins Darrin J. Wikoff, Maintenance Engineering Handbook.
Duffuaa, S.O. (2000), “Mathematical models in maintenance planning and scheduling”, in Ben-Daya, M.,
Duffuaa, S.O. and Raouf, A. (Eds), Maintenance, Modelling and Optimization, Kluwer Academic
Publishers, Boston, MA.

More Related Content

What's hot

How to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance ProgramHow to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance ProgramSchoolDude
 
Operations and-maintenance-best-practices
Operations and-maintenance-best-practicesOperations and-maintenance-best-practices
Operations and-maintenance-best-practicesNikhil Nangia
 
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...IJERA Editor
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementFemi Obiomah
 
Reliability and Maintenance in production Management
Reliability and Maintenance in production ManagementReliability and Maintenance in production Management
Reliability and Maintenance in production ManagementNazneen sheikh
 
General Maintenance Standards V0.6
General Maintenance Standards V0.6General Maintenance Standards V0.6
General Maintenance Standards V0.6Bart Den Tijn
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementramduttkholia
 
General Maintenance
General MaintenanceGeneral Maintenance
General Maintenancepradhyot05
 
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual ConferenceThe 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual ConferenceJames Kovacevic, MMP CMRP CAMA
 
Business continuity plan
Business continuity planBusiness continuity plan
Business continuity planzaffar abbasi
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Managementshrinivas kulkarni
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 
S6 Lec1 Maintenance Definition Note
S6 Lec1 Maintenance Definition NoteS6 Lec1 Maintenance Definition Note
S6 Lec1 Maintenance Definition Noteno suhaila
 
U2 chap1 itsm service design
U2 chap1 itsm service designU2 chap1 itsm service design
U2 chap1 itsm service designMusTufa Nullwala
 

What's hot (18)

How to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance ProgramHow to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance Program
 
Operations and-maintenance-best-practices
Operations and-maintenance-best-practicesOperations and-maintenance-best-practices
Operations and-maintenance-best-practices
 
Slides 2015 for contact 6
Slides 2015 for contact 6Slides 2015 for contact 6
Slides 2015 for contact 6
 
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Reliability and Maintenance in production Management
Reliability and Maintenance in production ManagementReliability and Maintenance in production Management
Reliability and Maintenance in production Management
 
Maintenace management and TPM
Maintenace management and TPMMaintenace management and TPM
Maintenace management and TPM
 
General Maintenance Standards V0.6
General Maintenance Standards V0.6General Maintenance Standards V0.6
General Maintenance Standards V0.6
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
General Maintenance
General MaintenanceGeneral Maintenance
General Maintenance
 
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual ConferenceThe 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
 
Business continuity plan
Business continuity planBusiness continuity plan
Business continuity plan
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance Technician
 
Tomas bsc eng
Tomas bsc engTomas bsc eng
Tomas bsc eng
 
S6 Lec1 Maintenance Definition Note
S6 Lec1 Maintenance Definition NoteS6 Lec1 Maintenance Definition Note
S6 Lec1 Maintenance Definition Note
 
U2 chap1 itsm service design
U2 chap1 itsm service designU2 chap1 itsm service design
U2 chap1 itsm service design
 

Viewers also liked

Chainsaw Ticket - Tree Felling
Chainsaw Ticket - Tree FellingChainsaw Ticket - Tree Felling
Chainsaw Ticket - Tree Fellingfitecaustralia
 
A Paper on Problems Generated By Junk Food in India
A Paper on Problems Generated By Junk Food in IndiaA Paper on Problems Generated By Junk Food in India
A Paper on Problems Generated By Junk Food in Indiaijceronline
 
Description of condensation and evaporation processes in cylindrical-type por...
Description of condensation and evaporation processes in cylindrical-type por...Description of condensation and evaporation processes in cylindrical-type por...
Description of condensation and evaporation processes in cylindrical-type por...ijceronline
 
Effect on heat transfer for laminar flow over Backward Facing Step with squar...
Effect on heat transfer for laminar flow over Backward Facing Step with squar...Effect on heat transfer for laminar flow over Backward Facing Step with squar...
Effect on heat transfer for laminar flow over Backward Facing Step with squar...ijceronline
 

Viewers also liked (7)

B03308011
B03308011B03308011
B03308011
 
Chainsaw Ticket - Tree Felling
Chainsaw Ticket - Tree FellingChainsaw Ticket - Tree Felling
Chainsaw Ticket - Tree Felling
 
Ax03303120316
Ax03303120316Ax03303120316
Ax03303120316
 
Ay03303170322
Ay03303170322Ay03303170322
Ay03303170322
 
A Paper on Problems Generated By Junk Food in India
A Paper on Problems Generated By Junk Food in IndiaA Paper on Problems Generated By Junk Food in India
A Paper on Problems Generated By Junk Food in India
 
Description of condensation and evaporation processes in cylindrical-type por...
Description of condensation and evaporation processes in cylindrical-type por...Description of condensation and evaporation processes in cylindrical-type por...
Description of condensation and evaporation processes in cylindrical-type por...
 
Effect on heat transfer for laminar flow over Backward Facing Step with squar...
Effect on heat transfer for laminar flow over Backward Facing Step with squar...Effect on heat transfer for laminar flow over Backward Facing Step with squar...
Effect on heat transfer for laminar flow over Backward Facing Step with squar...
 

Similar to Ba03303280331

Production Control for Financial Operation v4
Production Control for Financial Operation v4Production Control for Financial Operation v4
Production Control for Financial Operation v4Jon LaBerge
 
Business paper: Employee Productivity in Oil Refineries
Business paper: Employee Productivity in Oil RefineriesBusiness paper: Employee Productivity in Oil Refineries
Business paper: Employee Productivity in Oil RefineriesCarolina Marino Sargeant
 
FacilitySystem Continuity PlanContinuity Plan Template.docx
FacilitySystem Continuity PlanContinuity Plan Template.docxFacilitySystem Continuity PlanContinuity Plan Template.docx
FacilitySystem Continuity PlanContinuity Plan Template.docxssuser454af01
 
IRJET- A Review of Performance Management Systems in Manufacturing Indust...
IRJET-  	  A Review of Performance Management Systems in Manufacturing Indust...IRJET-  	  A Review of Performance Management Systems in Manufacturing Indust...
IRJET- A Review of Performance Management Systems in Manufacturing Indust...IRJET Journal
 
Business continuity & disaster recovery
Business continuity & disaster recoveryBusiness continuity & disaster recovery
Business continuity & disaster recoveryGeorge Coutsoumbidis
 
Turnaround Project Planner Primer
Turnaround Project Planner PrimerTurnaround Project Planner Primer
Turnaround Project Planner Primerahmad bassiouny
 
IRJET- Real Time Tracking Office Management System
IRJET-  	  Real Time Tracking Office Management SystemIRJET-  	  Real Time Tracking Office Management System
IRJET- Real Time Tracking Office Management SystemIRJET Journal
 
Assignment 1 - Decision Framing - Taylor Wildberger
Assignment 1 - Decision Framing - Taylor WildbergerAssignment 1 - Decision Framing - Taylor Wildberger
Assignment 1 - Decision Framing - Taylor WildbergerTaylor Wildberger
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction ProjectIRJET Journal
 
A Review on Training and Placement Management System
A Review on Training and Placement Management SystemA Review on Training and Placement Management System
A Review on Training and Placement Management SystemIRJET Journal
 
Business Continuity Plan TemplateCIO Maria Sosa has asked you to p.docx
Business Continuity Plan TemplateCIO Maria Sosa has asked you to p.docxBusiness Continuity Plan TemplateCIO Maria Sosa has asked you to p.docx
Business Continuity Plan TemplateCIO Maria Sosa has asked you to p.docxfelicidaddinwoodie
 
Performance Methodology It Project Metrics Workbook
Performance Methodology It Project Metrics WorkbookPerformance Methodology It Project Metrics Workbook
Performance Methodology It Project Metrics WorkbookDavid Paschane, Ph.D.
 
Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Ricky Smith CMRP
 
Unit structure
Unit structureUnit structure
Unit structurejhakku
 
Business continuity - 5 key steps to effective business impact analysis
Business continuity - 5 key steps to effective business impact analysisBusiness continuity - 5 key steps to effective business impact analysis
Business continuity - 5 key steps to effective business impact analysismoranjustin
 
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...CHED
 
A CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCEA CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCEZubair Ali ali
 

Similar to Ba03303280331 (20)

Viziya
Viziya Viziya
Viziya
 
Production Control for Financial Operation v4
Production Control for Financial Operation v4Production Control for Financial Operation v4
Production Control for Financial Operation v4
 
Business paper: Employee Productivity in Oil Refineries
Business paper: Employee Productivity in Oil RefineriesBusiness paper: Employee Productivity in Oil Refineries
Business paper: Employee Productivity in Oil Refineries
 
FacilitySystem Continuity PlanContinuity Plan Template.docx
FacilitySystem Continuity PlanContinuity Plan Template.docxFacilitySystem Continuity PlanContinuity Plan Template.docx
FacilitySystem Continuity PlanContinuity Plan Template.docx
 
IRJET- A Review of Performance Management Systems in Manufacturing Indust...
IRJET-  	  A Review of Performance Management Systems in Manufacturing Indust...IRJET-  	  A Review of Performance Management Systems in Manufacturing Indust...
IRJET- A Review of Performance Management Systems in Manufacturing Indust...
 
Business continuity & disaster recovery
Business continuity & disaster recoveryBusiness continuity & disaster recovery
Business continuity & disaster recovery
 
Production planning
Production planningProduction planning
Production planning
 
Turnaround Project Planner Primer
Turnaround Project Planner PrimerTurnaround Project Planner Primer
Turnaround Project Planner Primer
 
IRJET- Real Time Tracking Office Management System
IRJET-  	  Real Time Tracking Office Management SystemIRJET-  	  Real Time Tracking Office Management System
IRJET- Real Time Tracking Office Management System
 
Assignment 1 - Decision Framing - Taylor Wildberger
Assignment 1 - Decision Framing - Taylor WildbergerAssignment 1 - Decision Framing - Taylor Wildberger
Assignment 1 - Decision Framing - Taylor Wildberger
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
A Review on Training and Placement Management System
A Review on Training and Placement Management SystemA Review on Training and Placement Management System
A Review on Training and Placement Management System
 
Business Continuity Plan TemplateCIO Maria Sosa has asked you to p.docx
Business Continuity Plan TemplateCIO Maria Sosa has asked you to p.docxBusiness Continuity Plan TemplateCIO Maria Sosa has asked you to p.docx
Business Continuity Plan TemplateCIO Maria Sosa has asked you to p.docx
 
Performance Methodology It Project Metrics Workbook
Performance Methodology It Project Metrics WorkbookPerformance Methodology It Project Metrics Workbook
Performance Methodology It Project Metrics Workbook
 
Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)
 
Unit structure
Unit structureUnit structure
Unit structure
 
Business continuity - 5 key steps to effective business impact analysis
Business continuity - 5 key steps to effective business impact analysisBusiness continuity - 5 key steps to effective business impact analysis
Business continuity - 5 key steps to effective business impact analysis
 
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
 
A CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCEA CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCE
 

Recently uploaded

Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfngoud9212
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Neo4j
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 

Recently uploaded (20)

Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdf
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 

Ba03303280331

  • 1. International Journal Of Computational Engineering Research (ijceronline.com) Vol. 3 Issue 3 328 ||Issn||2250-3005|| (Online) ||March||2013|| ||www.ijceronline.com|| The Industrial Maintenance Management and Implementing Maintenance Policies for Improvement in Productivity Ajay S. Bonde1, Ashwadeep C. Fulzele2 1,2,Department Of Mechanical Engineering, Yashvantrao Chavan College Of Engineering, Nagpur, Abstract: As a consequence, of the implementation of advanced manufacturing technologies and just-in-time production systems, the nature of the production environment has changed during the last two decades. This has allowed companies to massively produce products in a customized way. But the increase in automation and the reduction in buffers of inventory in the plants clearly put more pressure on the maintenance system. The present maintenance management policy has been proposed in order to diminish this pressure. Whatever the policy an organization adopts, it has to be evolving to continue being useful against the fast changes that occur in business, communications and industry. Most companies lack a formal method to address maintainability during the project delivery process, yet maintenance can seriously affect productivity. This paper outlines the proposed model process and describes the potential roles and benefits of maintenance policy [1]. Keywords: Maintainability, Maintenance, Organization, Production Environment, Productivity, Maintenance Policy, 1. Introduction Maintenance is defined as the combination of all technical, administrative and managerial actions during the life cycle of an item intended to retain it in, or restore it to, a state in which it can perform the required function. In the same standards, maintenance management is defined as all the activities of the management that determine the maintenance objectives or priorities, strategies, and responsibilities and implement them by means such as maintenance planning, maintenance control and supervision, and several improving the methods including economical aspects in the organization. The maintenance management policy can be viewed as one of the basic and integral parts of the maintenance management function. The maintenance management function consists of planning, organizing, implementing and controlling maintenance activities. The management organizes, provides resources (personnel, capital, assets, material and hardware, etc.) and leads to performing tasks and accomplishing targets. Once the plans are created, the management’s task is to ensure that they are carried out in an effective and efficient manner. Having a clear mission, strategy, and objectives facilitated by a corporate culture, organizing starts the process of implementation by clarifying job and working relations (chain of command, span of control, delegation of authority, etc.) [2]. 2. Maintenance Management Policy 2.1 The Maintenance Schedule It is generally accepted that, in any maintenance department where there are more than 10 crafts persons and more than two or three crafts, some planning, other than day-to-day allocation of work by supervisor or leadsperson, can result in improved efficiency. As the size of the maintenance organization, for example, scheduling, increases, the extent to which work planning can be formalized and the amount of time that should be spent on this activity are increased. There should be only as much planning as necessary for maximum overall efficiency so long as the system costs less than the cost of operating without it.
  • 2. The Industrial Maintenance Management And Implementing… 329 ||Issn||2250-3005|| (Online) ||March||2013|| ||www.ijceronline.com|| Fig: 1. The Maintenance policy [3]. 2.2 The Procedure for Scheduling There are practical limitations to any scheduling system. A very detailed schedule that because of emergencies becomes obsolete after the first hour or two of use is of little value. If, however, actual performance indicates from 60 to 80 percent adherence during normal operation, the value of the schedule is real. Justification of any scheduling system requires proof of its effectiveness in dollars saved. Where some form of incentive system or work measurement exists, such proof is readily available. But in most maintenance departments no such definitive method is available and the only criteria of measurement are overall trends in maintenance costs and quality of service. Some aspects to be considered in arriving at a sound work-scheduling procedure are work unit, size of jobs scheduled, percent of total work load scheduled, and lead time for scheduling. Work Unit. Most detailed schedules are laid out in terms of labour-hours or, if standard times are used, fractions of hours. Other scheduling systems use a half craft-day as a minimum work unit. Others may use a craft-day or even a craft-week as a basis. Size of Jobs Scheduled. Some work-scheduling systems handle small jobs as well as large ones. Others schedule only handle major work where the number of crafts persons and the length of time involved are appreciable. Percent of Total Work Load Scheduled. Although in some cases all work may be scheduled, the most effective systems recognize the inability of any maintenance engineering department to anticipate all jobs, especially those of an emergency nature, and do not attempt scheduling for the entire work force. A portion of the available work force is left free for quick assignment to emergency jobs or other priority work not anticipated at the time of scheduling. Lead Time for Scheduling. Lead time for scheduling, or the length of time covered by the schedule, is another variable to be considered. Some scheduling systems do not attempt to cover breakdown repairs and are limited to the routine preventive maintenance and to major work that can be anticipated and scheduled well in advance. In these cases a monthly or biweekly allocation of manpower suffices. In most instances, however, a weekly schedule with a 2- or 3-day lead time results in good performance, yet is sufficiently flexible to handle most unexpected work. In extreme situations a daily schedule with a 16- to 18-hr lead time may be necessary to provide the necessary control. A more workable solution for this situation, however, involves use of a master schedule for a minimum of 2 weeks with provision for modifying it daily.
  • 3. The Industrial Maintenance Management And Implementing… 330 ||Issn||2250-3005|| (Online) ||March||2013|| ||www.ijceronline.com|| 3. Selection And Implementation Of A Scheduling System 3.1 Flow-of-Work Requests. Before any formalized scheduling program can be initiated, the method of requesting work from the maintenance department should be formalized. This request may take the form of a work description or job ticket, listing labour hours or equipment requirement, or it can be in the form of a work sheet on which the same type of information is accumulated by either verbal or written communication. Regardless of the form this information takes, it must be routed to one central point if a scheduling system is to be used. In a small plant this can be the supervisor, self direct team leader, the maintenance superintendent, or the maintenance engineer. In a larger maintenance department it should be through a staff individual or group. The amount of information on the work request depends upon the type of talent used in the scheduling group. If the individual charged with planning is completely familiar with the job requirements and can determine the craft skills and labour-hours involved, the necessary equipment, and any other information required for scheduling, a summary of the jobs will suffice. On the other hand, where complexity of work is such that it is practically impossible for any individual to have this information, or if the person charged with scheduling does not have the training necessary to analyze the work, then the information on the work request must be presented in more detail. The number of labour-hours required, by craft, the timing, the relation between crafts, the location and availability of parts and equipment, and any special requirements concerning coordination with production schedules or personnel should be included. In addition to job information required for planning, it is equally important to have a feedback on actual performance in terms of notification of completion and actual time consumed, by craft. This may be incorporated in the work-request system, but provision must be made for channelling this information back to the scheduling centre. The scheduling system should also provide for work scheduled but not completed becoming a part of the work backlog. As such, it is considered, along with new work, for new scheduling. 3.2 Determination of Priority. In any maintenance organization which is efficiently manned, the work load, in terms of quantity or timing, exceeds the availability of men and/or equipment. For this reason the problem of defining the order in which the work is to be carried out, or establishing priority, exists and is an important factor in scheduling. In a small plant with one operating department and a small maintenance organization, establishment of priorities may amount to casual discussion between maintenance and production. However, as the plant grows and the maintenance department is called upon to provide service to more than one production department, the problem of equitable and efficient priority assignment becomes more involved. One of the most serious problems in maintaining good relations between maintenance and production departments is in this sphere. Too frequently personalities, working conditions, accessibility, or geographic location with respect to central shops influence the order of work assignment. This may decrease the overall efficiency of the plant. The means for determining work priority figures most importantly in the establishment of a work-scheduling system. On the surface a solution to this problem would reserve decisions concerning priorities to an individual who is in position to judge the effect on overall plant performance. In a plant of any size, it is usually most effective to handle such decisions at a lower level of management, with the plant manager having the final say when no decision as to priority of work can be reached. A method which has proved satisfactory in many instances has been to assign a rough allocation of craft manpower to each production department, then to establish the priority of work within each department by consultation with its supervision. When it is necessary to vary the allocation of men, this should be done by negotiation between production departments to arrange a mutually agreeable exchange. If such a reallocation cannot be concluded, as a last resort the plant manager must make the decision. 3.3 Coordinating and Dispatching. In the execution of an effective scheduling system it is necessary to compromise with the practical considerations of getting the work done, and done economically. If a supervisor or team leader guided his or her crafts persons on the assumption that the job must be completed at the exact time he had estimated and then continued to assign work on the basis of his estimate of the time necessary, it is obvious that confusion, incomplete work, and idle craft time would result. A formal schedule, issued weekly and followed blindly, would have the same effects. Instead, the schedule should be used as a guide, and modifications can be made as needed. Rapid communication of such modifications to the men responsible for carrying them out is essential to the success of a work schedule. It is also essential that any changes or unexpected work for which provision has not been made in the schedule be funnelled through the dispatch centre. Usually the dispatch centre can incorporate this type of work more efficiently than is possible by random selection of the nearest craftsmen or injection of higher authority into the picture [4].
  • 4. The Industrial Maintenance Management And Implementing… 331 ||Issn||2250-3005|| (Online) ||March||2013|| ||www.ijceronline.com|| 4. Preventive versus Breakdown Maintenance Preventive maintenance has long been recognized as extremely important in the reduction of maintenance costs and improvement of asset reliability. In practice it takes many forms. Two major factors that should control the extent of a preventive program are first, the cost of the program compared with the carefully measured reduction in total repair costs and improved asset performance; second, the percent utilization of the asset being maintained. If the cost of preparation for a preventive-maintenance inspection is essentially the same as the cost of repair after a failure accompanied by preventive inspections, the justification is small. If, on the other hand, breakdown could result in severe damage to the asset and a far more costly repair, the scheduled inspection time should be considered. Furthermore, in the average plant preventive maintenance should be tailored to fit the function of different items of equipment rather than applied in the same manner to all equipment. Key pieces of equipment in many other integrated manufacturing lines are in the same category. Conversely, periodic inspections of small electric motors and power transmissions can easily exceed the cost of unit replacement at the time of failure. Indeed, a program of asset or component replacements can result in considerably lower maintenance costs where complete preventive maintenance is impractical. In a plant using many pumps, for instance, a program of standardization, coupled with an inventory of complete units of pumps most widely used, may provide a satisfactory program for this equipment. This spare-tire philosophy can be extended to many other components or subassemblies with gratifying results. Sometimes, instead of using a centrally administered formal preventive program, qualified mechanics are assigned to individual pieces of equipment, or equipment groups, as mechanical custodians. Operating without clerical assistance and with a minimum of paperwork, these men, because of familiarity with equipment and ability to sense mechanical difficulties in advance, can effectively reduce maintenance costs and breakdowns. These compromise devices can frequently be used to greater advantage, even in plants where equipment is not in continuous operation and a more comprehensive preventive program might be set up. Periodic shutdown for complete overhaul of a whole production unit, similar to the turnaround period in oil refineries, is another method of minimizing breakdowns and performing maintenance most efficiently. Unfortunately, this is a difficult approach to sell to management of a 7-day, around the- clock manufacturing plant not accustomed to this method. One of the most effective methods of tempering ideal preventive maintenance with practical considerations of a continuous operation is that of taking advantage of a breakdown in some component of the line to perform vital inspections and replacements which can be accomplished in about the same time as the primary repair. This requires recording of deficiencies observed during operating inspections and moving in quickly with craftsmen and supervision prepared to work until the job is done. Production supervision usually can be sold the need for a few more hours’ time for additional work with repair of a breakdown much more easily than they can be convinced of its necessity when things are apparently running smoothly [5]. References [1] A. Crespo Ma´rquez, P. Moreu de Leo´n, J.F. Go´mez Ferna´ndez, C. Parra Ma´rquez and M. Lo´pez Campos Department of Industrial Management, School of Engineering, University of Seville, Seville, Spain. [2] Bradley PS (2002) Designing the Best Maintenance. http:www.samicorp.com:1–5 [3] Morel G, Suhner M, Iung B, Léger JB. (2001, October). Maintenance holistic framework for optimizing the cost/availability compromise ofmanuf acturing systems. In: Proceedings ofthe sixth IFAC symposium on cost oriented automation. Survey Paper, Berlin, Germany, October, 2001. ISBN:0-08-043907-1. [4] Chelson VJ, Payne CA, Reavill RP (2005) Management for Engineers Scientists and Technologists, 2nd edn. Wiley, Chichester England [5] Lindley R. Higgins Darrin J. Wikoff, Maintenance Engineering Handbook. Duffuaa, S.O. (2000), “Mathematical models in maintenance planning and scheduling”, in Ben-Daya, M., Duffuaa, S.O. and Raouf, A. (Eds), Maintenance, Modelling and Optimization, Kluwer Academic Publishers, Boston, MA.