SlideShare a Scribd company logo
1 of 7
Download to read offline
Cirriculum Vitae
BSc. Civil Engineer IBRAHIM YALCINER
Page | 1
SUMMARY
BSc. CIVIL ENGINEER IBRAHIM YALCINER
Ibrahim Yalciner is an experienced Certified Construction, Engineering Manager with 14 years of
technical constructability and construction management experience in different location (Middle
East, North Africa, home town Turkey) for known Highway, Coastal&Marine, Energy and
Tramway projects.
His field of experience, Construction and Project Management includes;
- Feasibility and Design
- Projects Constructability Oversight and Design support,
- Estimating & Bid Preparation;
- Evaluation and Management of Subcontractors,
- Cost-Source-Risk planning & Management;
- Scheduling and Cash flow&Budget study, Mitigation-Precaution plan,
- Field Supervision & Inspection;
- Quality Assurance & Quality Control
- Procurement, Material Management,
- Onshore&Offshore Machinery and Manpower Management,
- Project & Construction Methodologies and Execution Plans,
- HSE Risk Assessment and Hazard Analysis, Incident Investigations & Analysis, Coaching & Monitoring,
Specifically for Offshore&Coastal Construction;
- Mobilizations
- Plants and Quarry Operations
- Breakwater and Shore Protection
- Dredging and Reclamation
- Precasting and Placing of Units
- Quaywall and Pier Construction
- Intake and Discharge Pipe lines
- Dewatering, Piling&Sheetpiling
- Metocean, Geophysical and Geotechnical Survey
- Topographical and Bathymetrical Survey
Specifically for Onshore Construction;
- Mobilizations
- Infrastructures, Dewatering and Drainage
- Piling, Jet grouting, Anchorage and injections
- Plants and Quarry-Drill/Blast Operations
- Earth Works; excavation and filling works
- Structural works; Cast insitu and Precasting
- Concrete and Bituminous Paving
- Bridges and Viaducts
- Light Railway and Tram lines
- Steel structures buildings and depots.
- Finishing works and urban landscaping
His intention is optimum utilization of knowledge and experience besides enjoying new challenges. Work with an
organization that he can use all his skills and knowledge efficiently in dynamic and competitive business scenario by working
with all wiling and zeal for the excellence of organization, society and satisfaction of himself.
Best Regards,
Ibrahim YALCINER
Cirriculum Vitae
BSc. Civil Engineer IBRAHIM YALCINER
Page | 2
CURRICULUM VITAE
BSc. CIVIL ENGINEER IBRAHIM YALCINER
E- mail : yalciners@hotmail.com
Contact Number : +90 530 554 44 65 - +213 561 69 71 95
Date of Birth/Place : 27/ 04 / 1979 Adana / Turkey
Military Obligation :Done (2007)
Marriage status :Married (2006)
EDUCATION and CERTIFICATES
Language : Turkish; Mother Language
: English; Advance (fluent),
: French; Intermediate (fluent)
: Arabic; Elementary (beginner, able to communicate)
Driving Licence : Light type (B class) of Turkey, Sultanate of Oman, UAE, Algeria, Libya
Computer : MS Office, Auto Cad, Primavera, MS Project
Education
 Yildiz Technical University / Istanbul Civil Engineer BSc. 2001
 Cagribey College / Adana Sciences 1997
Certificates
 Health and Safety at Construction Site. Safe System of Work (SSoW), Certified-2013
 Construction Project Management, Certified-2010
WORKING EXPERIENCES
2013-… SIDI BEL ABBES TRAM PROJECT / ALGERIA YAPI MERKEZI
Deputy Project Manager HEAD OFFICE / ISTANBUL-TURKEY CONSTRUCTION CO.
Project Coordinator
Client: E.M.A - Algeria
Consultant: EGIS (French)
Total amount of project : 250.000.000 Euro
Position: As a Deputy Project Manager; Direct and regular coordination with department manager
under responsibility, reporting and sharing all the data with Project Manager and head office of the
company.
As a project Coordinator;Management of projects under resbonsibilities
Scope of work and responsibility;
 Total length of project is 18km. Evaluating site progress, plant operations and optimizations,
including; infrastructures, platform works, urban planning and landscape, steel construction (total
4.500tos) maintenance center, its equipment and depot field, stations and administrational buildings,
piling and structures,
 Quality Control and Assurance Management
 Contract and Payment Management, reporting, correspondence
 Accounting and Financial Management, evaluation of invoices and cash flow of the project
 Cost control Management and Evaluation of Budget
 Procurement and Material Management, Administration and Human Resources
Cirriculum Vitae
BSc. Civil Engineer IBRAHIM YALCINER
Page | 3
2012- 2013 ERZIN CCGT POWER PLANT / TURKEY GAMA &
Group Manager GENERAL ELECTRIC
Client: Akenerji
Consultant: Parson’s Brinckerhoff
Total amount of project : 300.000.000 USD
Position: As a Group Manager; Direct and regular coordination, management and inspections of
subcontractors and department chiefs under responsibility. Reporting and sharing all the data with
Project Manager and head office of the company.
Machinery-Manpower: Onshore&Offshore personnel and machinery under responsibility
Scope of work and responsibility;
 Onshore and Offshore Feasibility works,
 Evaluating subcontractors and following their documentation and progress,
 Selecting of appropriate method and equipment,
 Onshore civil works; Intake and Discharge pit construction that are -9,0m foundation elevation and
supported with cross piling, Jet grouting and strut systems.
 Onshore&Offshore discharge and intake HDPE pipe welding&hydrotesting and installation about
4000 lm;
-Pipe installation by sheet piled excavation and backfilling at onshore,
-Pipe installation with ‘’S’’ sinking method by dredging, back filling and antiscouring with classified
quarry material at offshore.
 Precasting of intake structure and offshore installation.
 Installation of discharge line diffuser section.
 Progress reports, machinery and manpower management, expectations of employer, best way to
improve progress and following correspondents, invoices, harmony between planning and progress
of group works.
2011 - 2012 COMOROS DEVELOPMENT PROGRAM / COMOR KULAK
Marine Group Construction Co.
Projects Manager
Client: Comoros Government & Foundation
Consultant: Hill International
Total amount of project : 500.000.000 USD
Position: As a Prejects Manager; Direct and regular coordination with department managers.
Reporting and sharing all the data with country manager and head office of the company.
Machinery and Manpower: 200 person man power and plant of machinery equipment and plants
under responsibility
Scope of work and responsibility;
 Management and Coordination of marine projects which are on three different islands of Comoros.
 Country mobilization
 Management of surveying projects;
- Metocean, Geotechnical (onshore-offshore) and Geophysical (onshore-offshore) surveying project
for; two marine fill airport, four harbor, two hospitals and university location. (Project is successfully
completed)
- Topographic and Bathymetric survey project for; two marine fill airport, four harbor, two hospital
and university location. (Project is successfully completed)
 Tendering and following of Design works for port projects
Cirriculum Vitae
BSc. Civil Engineer IBRAHIM YALCINER
Page | 4
 Construction of Moroni harbor and ferry terminal
- Quarry / Plant Operations; opening-improvement new quarry yard, Plants and Crushers installation-
Operations,
- Coastal and offshore filling and protection works; Breakwater and Reclamation
- Field supervision and inspections,
- Contract management, reporting, and leading meetings with owner and consultant,
- Quality Control and Assurance
- HSE Risk Assessment and Hazard Analysis, Incident Investigations & Analysis, Coaching &
Monitoring,
- Controlling and feasibility of production (daily, weekly, monthly progress, management of
machinery and manpower, expectations of employer, best way to improve progress ...etc.) and
following documentation (correspondents, invoices, harmony between planning and progress ...etc.)
of projects.
2010- 2011 BATINAH COASTAL ROAD PROJECT / OMAN MAK-YOL Cons. Co
Paving&Plants ONUR-CETIN Cons. Co.
Group Manager
Client: Sultanate of Oman, Supreme Committee
Consultant: Nespak
Total amount of project : 350.000.000 USD
Position; As a Group Manager; Direct and regular coordination with site chiefs. Reporting and
sharing all the data with Project Manager and head office of the company.
Machinery and Manpower: 400 person manpower and plant of machinery equipment and plants
under responsibility
Scope of work and responsibility;
 60 km Main Carriageway (2x2), 20 km Link Roads (2x2), 80 km Service Roads,
 Paving activities ;
- 1.200.000 tons Sub-base (preparing, laying and compaction)
- 1.950.000 tons Aggregate Base Course (preparing, laying and compaction)
- Prime Coat and Tack Coat Activities
- 600.000 tons Bituminous Base Course (preparing, laying and compaction)
- 350.000 tons Wearing Course (preparing, laying and compaction)
 Quarries mobilization and management (Drill-Blast Quarry and Wadi Quarry)
 Plants, Crushers mobilizations-Operations, (2Nos Crushers, Asphalt plant,Pre-mix Plant)
 Controlling production (daily, weekly, monthly progress, management of machinery and manpower,
expectations of employer, best way to improve progress ...etc.) and following documentation
(correspondents, invoices, harmony between planning and progress ...etc.) of projects, related
paving section.
2009 - 2010 NORTH AJDABIAH AS-KA
Project Manager FULL INFRASTRUCTURE PROJECT / LIBYA International Cons. Co.
Client: HIB / Libya
Consultant: Aecom International
Total amount of project : 120.000.000 USD
Position: As a Prejects Manager; Direct and regular coordination with department managers and
section chiefs under responsibility. Reporting and sharing all the data with General and Deputy
General Manager of the company.
Machinery and Manpower: 150 person manpower and plant of machinery, equipment and plants
under responsibility
Cirriculum Vitae
BSc. Civil Engineer IBRAHIM YALCINER
Page | 5
Scope of work and responsibility;
 55.000ml Storm-Rain water line (G.R.P, Upvc) and manholes
 1.000.000 m3
road excavation (soil-rock), and filling works
 85.000ml (1.000.000m2
) road pavement, asphalt works and sidewalk
 Quarry and plants management; installation and operation
 Electric and Telecommunication network
 Scheduling and mitigation plans,
 Evaluation of invoices budget and cash flow of the project,
 Contract management, reporting, correspondences and leading meetings with owner and consultant,
 Quality Control and Assurance,
 Procurement and Material management,
 Field supervision and inspections,
 HSE Risk Assessment and Hazard Analysis,
2008 – 2009 MARINE PROJECTS / ALGERIA AS-KA
Projects Manager International Cons. Co.
Client; DTP / ALGERIA
Consultant; LEM
Total amount of projects; 60.000.000 USD
Position: As a Coordinator; Direct and regular coordination with project and construction managers
under responsibility. Reporting and sharing all the data with General Manager of the company.
Machinery and Manpower; 200 person man power and plant of onshore-offshore machinery and
equipment under responsibility
Scope of work and responsibility;
 Coordination of construction activities three harbor projects, location Algeria
- Mobilizations
- Plants and Quarry Operations
- Breakwater and Shore Protection
- Dredging
- Precasting and Placing of Units
- Quaywall and Pier Construction
- Topographical and Bathymetrical Survey
 Evaluating subcontractors and following their documentation and progress,
 Scheduling and mitigation plans,
 Evaluation of invoices budget and cash flow of the project,
 Contract management, correspondences and leading meetings with owner and consultant,
 Quality Control and Assurance,
 Procurement and Material management,
 Field supervision and inspections,
2007 – 2008 CONSTRUCTION OF TALA GUILEF AS-KA
Construction & FISHER-YACHT HARBOR / ALGERIA International Cons. Co.
Project Manager
Client; DTP / ALGERIA
Consultant; LEM
Total amount of projects; 30.000.000 USD
Position: As a Project Manager; Direct and regular coordination with construction manager and
section chiefs under responsibility, Reporting and sharing all the data to General Manager of the
company.
Machinery and Manpower; 100 person of manpower and plant of onshore-offshore machinery and
equipment under responsibility
Cirriculum Vitae
BSc. Civil Engineer IBRAHIM YALCINER
Page | 6
Scope of work and responsibility;
 Mobilization of project
 Plants and Quarry Operations
 Construction of Breakwater 600 meters;
- Management of Quarries; searching sources, suitability, Drilling and blasting,
- Classification of material and transportation
- Onshore and offshore filling works with classified material and Rock Armoring
- Production and placing of 6000 pieces different type B.C.R units,
- Construction of Crowning of the Pier
 780 ml Quays (-4.00 and -5.50)
 400 ml Wharves (-4.00 and -2.5)
 30.000 m^3 rock dredging works
 Sewage-Rain drainage and electric network
 Controlling production (daily, weekly, monthly progress, management of machinery and human
power, expectations of employer, best way to improve progress ...etc.) and following documentation
(correspondents, invoices, harmony between planning and progress ...etc.) of projects,
2006- 2007 QURIYAT-SUR ROAD PROJECT / OMAN STFA–POLAT J.V
Earth work Chief
Client; Sultanate of Oman
Consultant; Nespak
Total amount of projects; 120.000.000 USD
Position; As a Earthwork Chief; Direct and regular coordination of site engineers and supervisors
under responsibility. Reporting and sharing all the data to Construction and Project Manager
Machinery and Manpower; 300 person of man power and plant of machinery and equipment under
responsibility.
Scope of work and responsibility;
 Total 62km Highway road
 6 million m^3 excavation, 5 million m^3 filling works
 Transportation program for excavated material which is suitable for filling
 Drilling and blasting organization for cut areas with subcontractors
 Barrow works; searching sources, suitability of material, cost affect
 Preparation of foundation and backfilling for culverts and bridges abutments
2003-2006 SOHAR INDUSTRIAL AREA STFA Marine
Site Engineer SEAWATER INTAKE AND RETURN SYSTEM / OMAN Construction Co.
(01.01.2005 section chief)
Client; Sultanate of Oman
Total amount of projects: 40.000.000 USD
Position: As a Section Chief; Direct and regular coordination with site engineer and supervisors
under responsibility. Reporting and sharing all the data to Construction and Project Manager.
Machinery and Manpower; 60 Person of manpower and plant of onshore-offshore machinery and
equipment under responsibility
Scope of work and responsibility;
 Construction of two Breakwaters 650-1250 meters;
- Management of Quarries; searching sources, suitability, Drilling and blasting,
Classification of material and transportation
- Onshore and offshore filling works with classified material and Rock Armoring
- Precasting and placing of 3150 pieces Core-Loc units,
Cirriculum Vitae
BSc. Civil Engineer IBRAHIM YALCINER
Page | 7
 Construction of Outfall structure;
- Dewatering and sheet piling for preparation of structure foundation which is at -4,5m level
- Dredging and pitching works with barges
- Shore protections
- Placing of oil barrier
2001 - 2002 SUGOZU THERMAL POWER PLANT / TURKEY STFA Marine
Site Engineer Construction Co.
Client; Isken Enerji / Gama-Tekfen
Consultant; Gama-Tekfen
Total amount of projects: 20.000.000 USD
Position: As a Site Engineer; Direct and regular coordination with supervisors under responsibility.
Reporting and sharing all the data to Section Chief and Construction Manager
Machinery and Manpower; 50 person of manpower and plant of onshore-offshore machinery and
equipment under responsibility
Scope of work and responsibility;
 Seawater Intake and Discharge Pipe laying Onshore and Offshore (GRP 2400-2800mm)
 Dredging-Excavation of pipe channel and bedding
 Backfilling and placing of Gabion units
 Shore protection,
 Precasting and placing of 4 special head units (each one 600 ton) and diffusers installations
2000 ADANA LIGHT RAIL SYSTEM / TURKEY ALSIM/ALARKO
Under Training Construction Co.
 Viaducts,
 Open-close tunnels;
 XA systems,
 Fore piles and Ground Anchorages
 Infrastructures

More Related Content

What's hot (19)

CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1
 
Awad CV 20-10-2016
Awad CV 20-10-2016Awad CV 20-10-2016
Awad CV 20-10-2016
 
Faheem CV
Faheem CVFaheem CV
Faheem CV
 
23-09-2014u3
23-09-2014u323-09-2014u3
23-09-2014u3
 
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014
 
ABDO CV
ABDO CVABDO CV
ABDO CV
 
My cv 9-2015 scan PDF
My cv  9-2015 scan PDFMy cv  9-2015 scan PDF
My cv 9-2015 scan PDF
 
Cv qc (002)
Cv qc (002)Cv qc (002)
Cv qc (002)
 
Sherif Takla CV
Sherif Takla CVSherif Takla CV
Sherif Takla CV
 
CV[1]_(1)[1]
CV[1]_(1)[1]CV[1]_(1)[1]
CV[1]_(1)[1]
 
c.v M_Helal 8-2016
c.v M_Helal  8-2016c.v M_Helal  8-2016
c.v M_Helal 8-2016
 
Surveying Engineer cv2001
Surveying Engineer  cv2001Surveying Engineer  cv2001
Surveying Engineer cv2001
 
George Kamel 12-2014
George Kamel 12-2014George Kamel 12-2014
George Kamel 12-2014
 
Haitham ALAli-C.V
Haitham ALAli-C.VHaitham ALAli-C.V
Haitham ALAli-C.V
 
c.v_ahmed_samy
c.v_ahmed_samyc.v_ahmed_samy
c.v_ahmed_samy
 
Ys cv june 2013
Ys cv june 2013Ys cv june 2013
Ys cv june 2013
 
HSE-CV_Renante_ADPC_updated_07 2015
HSE-CV_Renante_ADPC_updated_07 2015HSE-CV_Renante_ADPC_updated_07 2015
HSE-CV_Renante_ADPC_updated_07 2015
 
Shady f 2.15
Shady f 2.15Shady f 2.15
Shady f 2.15
 
Fouad, Mohd. CV
Fouad, Mohd. CVFouad, Mohd. CV
Fouad, Mohd. CV
 

Viewers also liked

hcp-as-continuous-integration-build-artifact-storage-system
hcp-as-continuous-integration-build-artifact-storage-systemhcp-as-continuous-integration-build-artifact-storage-system
hcp-as-continuous-integration-build-artifact-storage-system
Ingrid Fernandez, PhD
 
EN Survey Tool for ME Management
EN Survey Tool for ME ManagementEN Survey Tool for ME Management
EN Survey Tool for ME Management
Georgi Atanasov
 
3.dllo psicosocial a.joven 2014
3.dllo psicosocial a.joven 20143.dllo psicosocial a.joven 2014
3.dllo psicosocial a.joven 2014
Claudio Haro
 

Viewers also liked (14)

hcp-as-continuous-integration-build-artifact-storage-system
hcp-as-continuous-integration-build-artifact-storage-systemhcp-as-continuous-integration-build-artifact-storage-system
hcp-as-continuous-integration-build-artifact-storage-system
 
Radiation Effects on MHD Free Convective Rotating Flow with Hall Effects
Radiation Effects on MHD Free Convective Rotating Flow with Hall EffectsRadiation Effects on MHD Free Convective Rotating Flow with Hall Effects
Radiation Effects on MHD Free Convective Rotating Flow with Hall Effects
 
EN Survey Tool for ME Management
EN Survey Tool for ME ManagementEN Survey Tool for ME Management
EN Survey Tool for ME Management
 
3.dllo psicosocial a.joven 2014
3.dllo psicosocial a.joven 20143.dllo psicosocial a.joven 2014
3.dllo psicosocial a.joven 2014
 
Aspectos legales y éticos de la seguridad informática.tic actividad 4
Aspectos legales y éticos de la seguridad informática.tic actividad 4Aspectos legales y éticos de la seguridad informática.tic actividad 4
Aspectos legales y éticos de la seguridad informática.tic actividad 4
 
HTTP: Basics & More
HTTP: Basics & More HTTP: Basics & More
HTTP: Basics & More
 
Додавання та віднімання натуральних чисел
Додавання та віднімання натуральних чиселДодавання та віднімання натуральних чисел
Додавання та віднімання натуральних чисел
 
Tccc profile company
Tccc profile company   Tccc profile company
Tccc profile company
 
fisica
fisicafisica
fisica
 
Obra no poética de quevedo
Obra no poética de quevedoObra no poética de quevedo
Obra no poética de quevedo
 
Hanjin broke, What´s next?
Hanjin broke,  What´s next?Hanjin broke,  What´s next?
Hanjin broke, What´s next?
 
Трикутник і його види.
Трикутник і його види.Трикутник і його види.
Трикутник і його види.
 
Image022.jpg
Image022.jpgImage022.jpg
Image022.jpg
 
Image005.jpg
Image005.jpgImage005.jpg
Image005.jpg
 

Similar to IBRAHIM YALCINER CV+SUMMARY 14.08.2015

cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
ahmed mansour
 
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGER
Khaled mohamed
 
CV_Chibuzo_Temple_Ochulo2
CV_Chibuzo_Temple_Ochulo2CV_Chibuzo_Temple_Ochulo2
CV_Chibuzo_Temple_Ochulo2
Chibuzo Ochulor
 
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
Tambe John Bita
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
ali haider
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
ali haider
 
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling SupervisorCURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
walid madani
 

Similar to IBRAHIM YALCINER CV+SUMMARY 14.08.2015 (20)

M Akhras CV (7)
M Akhras CV (7)M Akhras CV (7)
M Akhras CV (7)
 
Khalaf Hassanin-EPC Project Manager 2014
Khalaf Hassanin-EPC Project Manager 2014 Khalaf Hassanin-EPC Project Manager 2014
Khalaf Hassanin-EPC Project Manager 2014
 
Cv civil engineer ahmed mansour
Cv civil engineer ahmed mansourCv civil engineer ahmed mansour
Cv civil engineer ahmed mansour
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
 
Cv civil ahmed mansour
Cv civil ahmed mansourCv civil ahmed mansour
Cv civil ahmed mansour
 
Shakir CV
Shakir CV Shakir CV
Shakir CV
 
Ahmed Mahran
Ahmed MahranAhmed Mahran
Ahmed Mahran
 
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGER
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
 
Cv 2019
Cv  2019Cv  2019
Cv 2019
 
MAMDOUH_CV
MAMDOUH_CVMAMDOUH_CV
MAMDOUH_CV
 
CV_Chibuzo_Temple_Ochulo2
CV_Chibuzo_Temple_Ochulo2CV_Chibuzo_Temple_Ochulo2
CV_Chibuzo_Temple_Ochulo2
 
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
 
george nasralla CV
george nasralla CVgeorge nasralla CV
george nasralla CV
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling SupervisorCURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
 
CV1
CV1CV1
CV1
 
C v
C vC v
C v
 
Digital Connection Co.Ltd.
Digital Connection Co.Ltd.Digital Connection Co.Ltd.
Digital Connection Co.Ltd.
 

IBRAHIM YALCINER CV+SUMMARY 14.08.2015

  • 1. Cirriculum Vitae BSc. Civil Engineer IBRAHIM YALCINER Page | 1 SUMMARY BSc. CIVIL ENGINEER IBRAHIM YALCINER Ibrahim Yalciner is an experienced Certified Construction, Engineering Manager with 14 years of technical constructability and construction management experience in different location (Middle East, North Africa, home town Turkey) for known Highway, Coastal&Marine, Energy and Tramway projects. His field of experience, Construction and Project Management includes; - Feasibility and Design - Projects Constructability Oversight and Design support, - Estimating & Bid Preparation; - Evaluation and Management of Subcontractors, - Cost-Source-Risk planning & Management; - Scheduling and Cash flow&Budget study, Mitigation-Precaution plan, - Field Supervision & Inspection; - Quality Assurance & Quality Control - Procurement, Material Management, - Onshore&Offshore Machinery and Manpower Management, - Project & Construction Methodologies and Execution Plans, - HSE Risk Assessment and Hazard Analysis, Incident Investigations & Analysis, Coaching & Monitoring, Specifically for Offshore&Coastal Construction; - Mobilizations - Plants and Quarry Operations - Breakwater and Shore Protection - Dredging and Reclamation - Precasting and Placing of Units - Quaywall and Pier Construction - Intake and Discharge Pipe lines - Dewatering, Piling&Sheetpiling - Metocean, Geophysical and Geotechnical Survey - Topographical and Bathymetrical Survey Specifically for Onshore Construction; - Mobilizations - Infrastructures, Dewatering and Drainage - Piling, Jet grouting, Anchorage and injections - Plants and Quarry-Drill/Blast Operations - Earth Works; excavation and filling works - Structural works; Cast insitu and Precasting - Concrete and Bituminous Paving - Bridges and Viaducts - Light Railway and Tram lines - Steel structures buildings and depots. - Finishing works and urban landscaping His intention is optimum utilization of knowledge and experience besides enjoying new challenges. Work with an organization that he can use all his skills and knowledge efficiently in dynamic and competitive business scenario by working with all wiling and zeal for the excellence of organization, society and satisfaction of himself. Best Regards, Ibrahim YALCINER
  • 2. Cirriculum Vitae BSc. Civil Engineer IBRAHIM YALCINER Page | 2 CURRICULUM VITAE BSc. CIVIL ENGINEER IBRAHIM YALCINER E- mail : yalciners@hotmail.com Contact Number : +90 530 554 44 65 - +213 561 69 71 95 Date of Birth/Place : 27/ 04 / 1979 Adana / Turkey Military Obligation :Done (2007) Marriage status :Married (2006) EDUCATION and CERTIFICATES Language : Turkish; Mother Language : English; Advance (fluent), : French; Intermediate (fluent) : Arabic; Elementary (beginner, able to communicate) Driving Licence : Light type (B class) of Turkey, Sultanate of Oman, UAE, Algeria, Libya Computer : MS Office, Auto Cad, Primavera, MS Project Education  Yildiz Technical University / Istanbul Civil Engineer BSc. 2001  Cagribey College / Adana Sciences 1997 Certificates  Health and Safety at Construction Site. Safe System of Work (SSoW), Certified-2013  Construction Project Management, Certified-2010 WORKING EXPERIENCES 2013-… SIDI BEL ABBES TRAM PROJECT / ALGERIA YAPI MERKEZI Deputy Project Manager HEAD OFFICE / ISTANBUL-TURKEY CONSTRUCTION CO. Project Coordinator Client: E.M.A - Algeria Consultant: EGIS (French) Total amount of project : 250.000.000 Euro Position: As a Deputy Project Manager; Direct and regular coordination with department manager under responsibility, reporting and sharing all the data with Project Manager and head office of the company. As a project Coordinator;Management of projects under resbonsibilities Scope of work and responsibility;  Total length of project is 18km. Evaluating site progress, plant operations and optimizations, including; infrastructures, platform works, urban planning and landscape, steel construction (total 4.500tos) maintenance center, its equipment and depot field, stations and administrational buildings, piling and structures,  Quality Control and Assurance Management  Contract and Payment Management, reporting, correspondence  Accounting and Financial Management, evaluation of invoices and cash flow of the project  Cost control Management and Evaluation of Budget  Procurement and Material Management, Administration and Human Resources
  • 3. Cirriculum Vitae BSc. Civil Engineer IBRAHIM YALCINER Page | 3 2012- 2013 ERZIN CCGT POWER PLANT / TURKEY GAMA & Group Manager GENERAL ELECTRIC Client: Akenerji Consultant: Parson’s Brinckerhoff Total amount of project : 300.000.000 USD Position: As a Group Manager; Direct and regular coordination, management and inspections of subcontractors and department chiefs under responsibility. Reporting and sharing all the data with Project Manager and head office of the company. Machinery-Manpower: Onshore&Offshore personnel and machinery under responsibility Scope of work and responsibility;  Onshore and Offshore Feasibility works,  Evaluating subcontractors and following their documentation and progress,  Selecting of appropriate method and equipment,  Onshore civil works; Intake and Discharge pit construction that are -9,0m foundation elevation and supported with cross piling, Jet grouting and strut systems.  Onshore&Offshore discharge and intake HDPE pipe welding&hydrotesting and installation about 4000 lm; -Pipe installation by sheet piled excavation and backfilling at onshore, -Pipe installation with ‘’S’’ sinking method by dredging, back filling and antiscouring with classified quarry material at offshore.  Precasting of intake structure and offshore installation.  Installation of discharge line diffuser section.  Progress reports, machinery and manpower management, expectations of employer, best way to improve progress and following correspondents, invoices, harmony between planning and progress of group works. 2011 - 2012 COMOROS DEVELOPMENT PROGRAM / COMOR KULAK Marine Group Construction Co. Projects Manager Client: Comoros Government & Foundation Consultant: Hill International Total amount of project : 500.000.000 USD Position: As a Prejects Manager; Direct and regular coordination with department managers. Reporting and sharing all the data with country manager and head office of the company. Machinery and Manpower: 200 person man power and plant of machinery equipment and plants under responsibility Scope of work and responsibility;  Management and Coordination of marine projects which are on three different islands of Comoros.  Country mobilization  Management of surveying projects; - Metocean, Geotechnical (onshore-offshore) and Geophysical (onshore-offshore) surveying project for; two marine fill airport, four harbor, two hospitals and university location. (Project is successfully completed) - Topographic and Bathymetric survey project for; two marine fill airport, four harbor, two hospital and university location. (Project is successfully completed)  Tendering and following of Design works for port projects
  • 4. Cirriculum Vitae BSc. Civil Engineer IBRAHIM YALCINER Page | 4  Construction of Moroni harbor and ferry terminal - Quarry / Plant Operations; opening-improvement new quarry yard, Plants and Crushers installation- Operations, - Coastal and offshore filling and protection works; Breakwater and Reclamation - Field supervision and inspections, - Contract management, reporting, and leading meetings with owner and consultant, - Quality Control and Assurance - HSE Risk Assessment and Hazard Analysis, Incident Investigations & Analysis, Coaching & Monitoring, - Controlling and feasibility of production (daily, weekly, monthly progress, management of machinery and manpower, expectations of employer, best way to improve progress ...etc.) and following documentation (correspondents, invoices, harmony between planning and progress ...etc.) of projects. 2010- 2011 BATINAH COASTAL ROAD PROJECT / OMAN MAK-YOL Cons. Co Paving&Plants ONUR-CETIN Cons. Co. Group Manager Client: Sultanate of Oman, Supreme Committee Consultant: Nespak Total amount of project : 350.000.000 USD Position; As a Group Manager; Direct and regular coordination with site chiefs. Reporting and sharing all the data with Project Manager and head office of the company. Machinery and Manpower: 400 person manpower and plant of machinery equipment and plants under responsibility Scope of work and responsibility;  60 km Main Carriageway (2x2), 20 km Link Roads (2x2), 80 km Service Roads,  Paving activities ; - 1.200.000 tons Sub-base (preparing, laying and compaction) - 1.950.000 tons Aggregate Base Course (preparing, laying and compaction) - Prime Coat and Tack Coat Activities - 600.000 tons Bituminous Base Course (preparing, laying and compaction) - 350.000 tons Wearing Course (preparing, laying and compaction)  Quarries mobilization and management (Drill-Blast Quarry and Wadi Quarry)  Plants, Crushers mobilizations-Operations, (2Nos Crushers, Asphalt plant,Pre-mix Plant)  Controlling production (daily, weekly, monthly progress, management of machinery and manpower, expectations of employer, best way to improve progress ...etc.) and following documentation (correspondents, invoices, harmony between planning and progress ...etc.) of projects, related paving section. 2009 - 2010 NORTH AJDABIAH AS-KA Project Manager FULL INFRASTRUCTURE PROJECT / LIBYA International Cons. Co. Client: HIB / Libya Consultant: Aecom International Total amount of project : 120.000.000 USD Position: As a Prejects Manager; Direct and regular coordination with department managers and section chiefs under responsibility. Reporting and sharing all the data with General and Deputy General Manager of the company. Machinery and Manpower: 150 person manpower and plant of machinery, equipment and plants under responsibility
  • 5. Cirriculum Vitae BSc. Civil Engineer IBRAHIM YALCINER Page | 5 Scope of work and responsibility;  55.000ml Storm-Rain water line (G.R.P, Upvc) and manholes  1.000.000 m3 road excavation (soil-rock), and filling works  85.000ml (1.000.000m2 ) road pavement, asphalt works and sidewalk  Quarry and plants management; installation and operation  Electric and Telecommunication network  Scheduling and mitigation plans,  Evaluation of invoices budget and cash flow of the project,  Contract management, reporting, correspondences and leading meetings with owner and consultant,  Quality Control and Assurance,  Procurement and Material management,  Field supervision and inspections,  HSE Risk Assessment and Hazard Analysis, 2008 – 2009 MARINE PROJECTS / ALGERIA AS-KA Projects Manager International Cons. Co. Client; DTP / ALGERIA Consultant; LEM Total amount of projects; 60.000.000 USD Position: As a Coordinator; Direct and regular coordination with project and construction managers under responsibility. Reporting and sharing all the data with General Manager of the company. Machinery and Manpower; 200 person man power and plant of onshore-offshore machinery and equipment under responsibility Scope of work and responsibility;  Coordination of construction activities three harbor projects, location Algeria - Mobilizations - Plants and Quarry Operations - Breakwater and Shore Protection - Dredging - Precasting and Placing of Units - Quaywall and Pier Construction - Topographical and Bathymetrical Survey  Evaluating subcontractors and following their documentation and progress,  Scheduling and mitigation plans,  Evaluation of invoices budget and cash flow of the project,  Contract management, correspondences and leading meetings with owner and consultant,  Quality Control and Assurance,  Procurement and Material management,  Field supervision and inspections, 2007 – 2008 CONSTRUCTION OF TALA GUILEF AS-KA Construction & FISHER-YACHT HARBOR / ALGERIA International Cons. Co. Project Manager Client; DTP / ALGERIA Consultant; LEM Total amount of projects; 30.000.000 USD Position: As a Project Manager; Direct and regular coordination with construction manager and section chiefs under responsibility, Reporting and sharing all the data to General Manager of the company. Machinery and Manpower; 100 person of manpower and plant of onshore-offshore machinery and equipment under responsibility
  • 6. Cirriculum Vitae BSc. Civil Engineer IBRAHIM YALCINER Page | 6 Scope of work and responsibility;  Mobilization of project  Plants and Quarry Operations  Construction of Breakwater 600 meters; - Management of Quarries; searching sources, suitability, Drilling and blasting, - Classification of material and transportation - Onshore and offshore filling works with classified material and Rock Armoring - Production and placing of 6000 pieces different type B.C.R units, - Construction of Crowning of the Pier  780 ml Quays (-4.00 and -5.50)  400 ml Wharves (-4.00 and -2.5)  30.000 m^3 rock dredging works  Sewage-Rain drainage and electric network  Controlling production (daily, weekly, monthly progress, management of machinery and human power, expectations of employer, best way to improve progress ...etc.) and following documentation (correspondents, invoices, harmony between planning and progress ...etc.) of projects, 2006- 2007 QURIYAT-SUR ROAD PROJECT / OMAN STFA–POLAT J.V Earth work Chief Client; Sultanate of Oman Consultant; Nespak Total amount of projects; 120.000.000 USD Position; As a Earthwork Chief; Direct and regular coordination of site engineers and supervisors under responsibility. Reporting and sharing all the data to Construction and Project Manager Machinery and Manpower; 300 person of man power and plant of machinery and equipment under responsibility. Scope of work and responsibility;  Total 62km Highway road  6 million m^3 excavation, 5 million m^3 filling works  Transportation program for excavated material which is suitable for filling  Drilling and blasting organization for cut areas with subcontractors  Barrow works; searching sources, suitability of material, cost affect  Preparation of foundation and backfilling for culverts and bridges abutments 2003-2006 SOHAR INDUSTRIAL AREA STFA Marine Site Engineer SEAWATER INTAKE AND RETURN SYSTEM / OMAN Construction Co. (01.01.2005 section chief) Client; Sultanate of Oman Total amount of projects: 40.000.000 USD Position: As a Section Chief; Direct and regular coordination with site engineer and supervisors under responsibility. Reporting and sharing all the data to Construction and Project Manager. Machinery and Manpower; 60 Person of manpower and plant of onshore-offshore machinery and equipment under responsibility Scope of work and responsibility;  Construction of two Breakwaters 650-1250 meters; - Management of Quarries; searching sources, suitability, Drilling and blasting, Classification of material and transportation - Onshore and offshore filling works with classified material and Rock Armoring - Precasting and placing of 3150 pieces Core-Loc units,
  • 7. Cirriculum Vitae BSc. Civil Engineer IBRAHIM YALCINER Page | 7  Construction of Outfall structure; - Dewatering and sheet piling for preparation of structure foundation which is at -4,5m level - Dredging and pitching works with barges - Shore protections - Placing of oil barrier 2001 - 2002 SUGOZU THERMAL POWER PLANT / TURKEY STFA Marine Site Engineer Construction Co. Client; Isken Enerji / Gama-Tekfen Consultant; Gama-Tekfen Total amount of projects: 20.000.000 USD Position: As a Site Engineer; Direct and regular coordination with supervisors under responsibility. Reporting and sharing all the data to Section Chief and Construction Manager Machinery and Manpower; 50 person of manpower and plant of onshore-offshore machinery and equipment under responsibility Scope of work and responsibility;  Seawater Intake and Discharge Pipe laying Onshore and Offshore (GRP 2400-2800mm)  Dredging-Excavation of pipe channel and bedding  Backfilling and placing of Gabion units  Shore protection,  Precasting and placing of 4 special head units (each one 600 ton) and diffusers installations 2000 ADANA LIGHT RAIL SYSTEM / TURKEY ALSIM/ALARKO Under Training Construction Co.  Viaducts,  Open-close tunnels;  XA systems,  Fore piles and Ground Anchorages  Infrastructures