White paper – engineering & construction project management principles



1. Introduction

This paper outlines an approach to achieving effective management governance
of programmes and projects, ensuring tight control of costs and risks and delivery
of work to schedule, budget and specification. The governance concepts adopted
are based on best practice employed by industries undertaking major
infrastructure projects and professional bodies such as the Association for
Project Management (APM), PRINCE and the Office of Government Commerce
(OGC).

Governance is provided through implementation of a Project Management
Framework. This framework provides the necessary process, system, people and
organisational improvements to enable effective control and delivery of work
across a portfolio of minor and major projects/programmes.

2. Project Management Framework

2.1 Aim

Implementation of Project Management Framework (PMF) must be viewed as a
substantial business change programme, taking many months to define and then
implement across a business. Successful implementation will provide improved
project control and delivery. It will also provide consistency and standardisation
of approach, improved visibility of performance and predictability of project
outcome. This will impact not just those within a business, but also working
relationships with its contractors. From a people perspective, the PMF will also
ensure the development of professional standards and the development of
project management capability across the organisation involved.

2.2 Elements

The PMF will define and integrate the 3 fundamental elements of project
management: processes, systems and people.

Consistent application of process is key to effective project status reporting,
facilitating control and therefore improved delivery of projects. This will involve
defining and promulgating top level lifecycle management process (e.g. GRIP in
Network Rail, LCM in BAES) to control investment and programme risk, as well
as a project control cycle process to ensure effective day to day management of
estimating, costs, planning, subcontractors, change control and project risks. The
control cycle will need to be flowed down to contractors where relevant, including
specification of reporting requirements, work breakdown/cost breakdown
structures etc.




                                   Page 1 of 3
White paper – engineering & construction project management principles


                            The Seven Elements of the Project Control Cycle




                                                 Establish Baselines
                                  Prepare &           Plan, schedule           Authorise
                                  organise               And cost                work




                       Change   Manage
                     management change                                         Manage Risk



                                                   Manage and control
                                                         work
                                                                          Work
                                              Review and               management
                                                control




         Enterprise Programme Solutions Ltd                     All rights reserved ©      2008
                                                                                                  EPS Consulting


Effective management information systems underpin and enable efficient project
control and delivery by providing the early warnings necessary to avoid
deterioration in schedule and cost performance. In essence – the “radar” for the
project. This will involve ensuring new or existing systems accurately automate
well designed processes to accelerate the visibility of project performance threats
and allow the pro-active interventions to mitigate any consequences BEFORE
too much time or money is wasted.

If new systems are required, the most cost effective method is to tender and
deploy those that are able to be integrated with each other and within an industry
standard central repository such as Oracle or MS SQL Server. Essentially the
case for an enterprise data model. Only with such an architecture can an
organisation expect to get rapid visibility of project performance across different
functional management tools, often made by different manufacturers. Systems
are needed for estimating (e.g. RIB), planning (e.g. P3e), cost control (e.g.
Oracle Projects), earned value management (e.g. Cobra) and risk management
(e.g. ARM).

Excellent project management skills are essential for successful project delivery.
This requires matching personal skills sets to requisite project roles and
developing peoples’ capability in a structured, progressive and professional
framework. This can be achieved through establishing a competence framework,


                                                     Page 2 of 3
White paper – engineering & construction project management principles

which initially needs to address basic skills and systems training to support the
fundamentals of implementing the PMF. In the longer term, the focus can shift to
developing the professional disciplines of the wider project management
community, e.g. commercial, engineering, estimating, planning, procurement etc.

3. Implementation timescales

Typically a PMF may be developed and rolled out in 3 phases:

Phase 1 (definition) will involve defining the basics of the framework specific to
an organisation’s work. This will cover assessment of current capabilities across
process, systems and people; authorisation of business case for the PMF;
establishment of PMF project team; definition of core processes; compilation of
new system specifications and tendering for them; definition of revised
management arrangements for contractors; and definition of a competence
framework and associated training and development programme.

Phase 2 (roll-out) will involve preparation and initial implementation of the PMF
across targeted areas of an organisation. This will cover implementation of core
processes; procurement, testing, integration and go-live of new systems;
establishment of revised management arrangements for contractors; user
training based on the competence framework; and a period of specialist support.

Phase 3 (consolidation) will involve the bedding in of the PMF into the business.
This will cover periodic maturity assessments to judge the rate of take up of the
PMF; continuous improvement programmes; wider professional development of
project staff; and benchmarking of capability with similar organisations. During
this phase an organisation may then wish to consider roll out of the PMF to other
parts of its business.

In all, the above programme could involve up to 3 years work, depending upon
the extent of implementation, current capability levels, new systems/processes
deployed and duration of phase 3.




                                   Page 3 of 3

More Related Content

What's hot

Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part twoHossam Maghrabi
 
Pmbok 5th executing process group
Pmbok 5th executing process groupPmbok 5th executing process group
Pmbok 5th executing process groupHossam Maghrabi
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessRuffin Veal and Associates, Inc.
 
Project management office value
Project management office valueProject management office value
Project management office valueHumanWare
 
Public Service Partnership Maturity Model
Public Service Partnership Maturity ModelPublic Service Partnership Maturity Model
Public Service Partnership Maturity ModelNoel Hatch
 
Integration Services from Fujitsu
Integration Services from FujitsuIntegration Services from Fujitsu
Integration Services from FujitsuFujitsu UK
 
PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OnePMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OneHossam Maghrabi
 
Business scorecard multiple workstreams - Travis Barker, MPA GCPM (2018)
Business scorecard   multiple workstreams - Travis Barker, MPA GCPM (2018)Business scorecard   multiple workstreams - Travis Barker, MPA GCPM (2018)
Business scorecard multiple workstreams - Travis Barker, MPA GCPM (2018)Innovate Vancouver
 
BPM PowerPoint Presentation Slides
BPM PowerPoint Presentation SlidesBPM PowerPoint Presentation Slides
BPM PowerPoint Presentation SlidesSlideTeam
 
Program Management Outsourcing: Challenges & Factors Contributing to Success
Program Management Outsourcing: Challenges & Factors Contributing to SuccessProgram Management Outsourcing: Challenges & Factors Contributing to Success
Program Management Outsourcing: Challenges & Factors Contributing to SuccessMoataz Y. Hussein
 
Transition Plan for New Business & Project
Transition Plan for New Business & ProjectTransition Plan for New Business & Project
Transition Plan for New Business & ProjectPraveen Yadav
 
Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...
Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...
Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...TURKI , PMP
 
Quality and Strategy Summary
Quality and Strategy SummaryQuality and Strategy Summary
Quality and Strategy SummaryQQMD
 
Steps to a successful performance management implementation
Steps to a successful performance management implementationSteps to a successful performance management implementation
Steps to a successful performance management implementationaemu123456
 

What's hot (20)

Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part two
 
Pmbok 5th executing process group
Pmbok 5th executing process groupPmbok 5th executing process group
Pmbok 5th executing process group
 
Governance
GovernanceGovernance
Governance
 
071 Maturity Assessment
071 Maturity Assessment071 Maturity Assessment
071 Maturity Assessment
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition Success
 
Project management office value
Project management office valueProject management office value
Project management office value
 
Public Service Partnership Maturity Model
Public Service Partnership Maturity ModelPublic Service Partnership Maturity Model
Public Service Partnership Maturity Model
 
Integration Services from Fujitsu
Integration Services from FujitsuIntegration Services from Fujitsu
Integration Services from Fujitsu
 
PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OnePMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part One
 
Business scorecard multiple workstreams - Travis Barker, MPA GCPM (2018)
Business scorecard   multiple workstreams - Travis Barker, MPA GCPM (2018)Business scorecard   multiple workstreams - Travis Barker, MPA GCPM (2018)
Business scorecard multiple workstreams - Travis Barker, MPA GCPM (2018)
 
BPM PowerPoint Presentation Slides
BPM PowerPoint Presentation SlidesBPM PowerPoint Presentation Slides
BPM PowerPoint Presentation Slides
 
Program Management Outsourcing: Challenges & Factors Contributing to Success
Program Management Outsourcing: Challenges & Factors Contributing to SuccessProgram Management Outsourcing: Challenges & Factors Contributing to Success
Program Management Outsourcing: Challenges & Factors Contributing to Success
 
Transition Plan for New Business & Project
Transition Plan for New Business & ProjectTransition Plan for New Business & Project
Transition Plan for New Business & Project
 
Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...
Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...
Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...
 
Process Improvement and Change Management, 29th October 2015
Process Improvement and Change Management, 29th October 2015Process Improvement and Change Management, 29th October 2015
Process Improvement and Change Management, 29th October 2015
 
Erp-PMO
Erp-PMOErp-PMO
Erp-PMO
 
Gurtu 2010
Gurtu 2010Gurtu 2010
Gurtu 2010
 
Quality and Strategy Summary
Quality and Strategy SummaryQuality and Strategy Summary
Quality and Strategy Summary
 
Pmo final 1
Pmo final 1Pmo final 1
Pmo final 1
 
Steps to a successful performance management implementation
Steps to a successful performance management implementationSteps to a successful performance management implementation
Steps to a successful performance management implementation
 

Viewers also liked

ПОРТФОЛИО ИЛЬИ БОГОМОЛОВА
ПОРТФОЛИО ИЛЬИ БОГОМОЛОВАПОРТФОЛИО ИЛЬИ БОГОМОЛОВА
ПОРТФОЛИО ИЛЬИ БОГОМОЛОВАIlya
 
期中報告
期中報告期中報告
期中報告k9578574
 
CANTANTES ESPAÑOLES
CANTANTES ESPAÑOLESCANTANTES ESPAÑOLES
CANTANTES ESPAÑOLESinaenaito
 
Dailymotion Infographic 2012
Dailymotion Infographic 2012Dailymotion Infographic 2012
Dailymotion Infographic 2012Nick Fortunato
 
Government Oversight of Financial Institutions
Government Oversight of Financial InstitutionsGovernment Oversight of Financial Institutions
Government Oversight of Financial InstitutionsErica Bennett
 
Role of NGOs in the Delivery of Social Security
Role of NGOs in the Delivery of Social SecurityRole of NGOs in the Delivery of Social Security
Role of NGOs in the Delivery of Social Securityebba09
 
Java Generics Introduction - Syntax Advantages and Pitfalls
Java Generics Introduction - Syntax Advantages and PitfallsJava Generics Introduction - Syntax Advantages and Pitfalls
Java Generics Introduction - Syntax Advantages and PitfallsRakesh Waghela
 
Holt Waterloo International Catalogue
Holt Waterloo International CatalogueHolt Waterloo International Catalogue
Holt Waterloo International Cataloguemartijnmaas
 

Viewers also liked (14)

ПОРТФОЛИО ИЛЬИ БОГОМОЛОВА
ПОРТФОЛИО ИЛЬИ БОГОМОЛОВАПОРТФОЛИО ИЛЬИ БОГОМОЛОВА
ПОРТФОЛИО ИЛЬИ БОГОМОЛОВА
 
Test
TestTest
Test
 
Cumulativeproject 12.5
Cumulativeproject 12.5Cumulativeproject 12.5
Cumulativeproject 12.5
 
Greta Clio
Greta ClioGreta Clio
Greta Clio
 
期中報告
期中報告期中報告
期中報告
 
CANTANTES ESPAÑOLES
CANTANTES ESPAÑOLESCANTANTES ESPAÑOLES
CANTANTES ESPAÑOLES
 
On prend un verre?
On prend un verre?On prend un verre?
On prend un verre?
 
Ikebana
IkebanaIkebana
Ikebana
 
Tequieromucho
TequieromuchoTequieromucho
Tequieromucho
 
Dailymotion Infographic 2012
Dailymotion Infographic 2012Dailymotion Infographic 2012
Dailymotion Infographic 2012
 
Government Oversight of Financial Institutions
Government Oversight of Financial InstitutionsGovernment Oversight of Financial Institutions
Government Oversight of Financial Institutions
 
Role of NGOs in the Delivery of Social Security
Role of NGOs in the Delivery of Social SecurityRole of NGOs in the Delivery of Social Security
Role of NGOs in the Delivery of Social Security
 
Java Generics Introduction - Syntax Advantages and Pitfalls
Java Generics Introduction - Syntax Advantages and PitfallsJava Generics Introduction - Syntax Advantages and Pitfalls
Java Generics Introduction - Syntax Advantages and Pitfalls
 
Holt Waterloo International Catalogue
Holt Waterloo International CatalogueHolt Waterloo International Catalogue
Holt Waterloo International Catalogue
 

Similar to Engineering & construction project management white paper

Project management best practices
Project management best practicesProject management best practices
Project management best practiceswalkerswu
 
document-part- (17).doc
document-part- (17).docdocument-part- (17).doc
document-part- (17).docPawanNegi39
 
EFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTEFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTAssignment Studio
 
Efficacy of Project Management,
Efficacy of Project Management, Efficacy of Project Management,
Efficacy of Project Management, Assignment Studio
 
Raid based approach for efficient project management in a pragmatic way towar...
Raid based approach for efficient project management in a pragmatic way towar...Raid based approach for efficient project management in a pragmatic way towar...
Raid based approach for efficient project management in a pragmatic way towar...Phanindra Kishore
 
IRJET- Project Management, Planning and its Prospectus in the Context of Proj...
IRJET- Project Management, Planning and its Prospectus in the Context of Proj...IRJET- Project Management, Planning and its Prospectus in the Context of Proj...
IRJET- Project Management, Planning and its Prospectus in the Context of Proj...IRJET Journal
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdfJamieDornan2
 
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloud
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloudCloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloud
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloudPoornima N
 
Project management
Project managementProject management
Project managementRohit Mishra
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementAnil Singh
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxwrite30
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxwrite22
 
The project-managment-processes
The project-managment-processesThe project-managment-processes
The project-managment-processesDavid Toyohashi
 

Similar to Engineering & construction project management white paper (20)

Project management best practices
Project management best practicesProject management best practices
Project management best practices
 
Project Management
Project ManagementProject Management
Project Management
 
document-part- (17).doc
document-part- (17).docdocument-part- (17).doc
document-part- (17).doc
 
EFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTEFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENT
 
Efficacy of Project Management,
Efficacy of Project Management, Efficacy of Project Management,
Efficacy of Project Management,
 
Raid based approach for efficient project management in a pragmatic way towar...
Raid based approach for efficient project management in a pragmatic way towar...Raid based approach for efficient project management in a pragmatic way towar...
Raid based approach for efficient project management in a pragmatic way towar...
 
IRJET- Project Management, Planning and its Prospectus in the Context of Proj...
IRJET- Project Management, Planning and its Prospectus in the Context of Proj...IRJET- Project Management, Planning and its Prospectus in the Context of Proj...
IRJET- Project Management, Planning and its Prospectus in the Context of Proj...
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdf
 
Biju 2008 Pmi Whitepaper
Biju 2008 Pmi WhitepaperBiju 2008 Pmi Whitepaper
Biju 2008 Pmi Whitepaper
 
Stopping the insanity
Stopping the insanityStopping the insanity
Stopping the insanity
 
Entra lecture6 PM1.pdf
Entra lecture6 PM1.pdfEntra lecture6 PM1.pdf
Entra lecture6 PM1.pdf
 
Fixing Project Management: A Must-Have
Fixing Project Management: A Must-HaveFixing Project Management: A Must-Have
Fixing Project Management: A Must-Have
 
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloud
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloudCloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloud
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloud
 
Project management
Project managementProject management
Project management
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docx
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docx
 
Project plan overview
Project plan overviewProject plan overview
Project plan overview
 
The project-managment-processes
The project-managment-processesThe project-managment-processes
The project-managment-processes
 
PMP integration review
PMP integration reviewPMP integration review
PMP integration review
 

Recently uploaded

RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 

Recently uploaded (20)

RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 

Engineering & construction project management white paper

  • 1. White paper – engineering & construction project management principles 1. Introduction This paper outlines an approach to achieving effective management governance of programmes and projects, ensuring tight control of costs and risks and delivery of work to schedule, budget and specification. The governance concepts adopted are based on best practice employed by industries undertaking major infrastructure projects and professional bodies such as the Association for Project Management (APM), PRINCE and the Office of Government Commerce (OGC). Governance is provided through implementation of a Project Management Framework. This framework provides the necessary process, system, people and organisational improvements to enable effective control and delivery of work across a portfolio of minor and major projects/programmes. 2. Project Management Framework 2.1 Aim Implementation of Project Management Framework (PMF) must be viewed as a substantial business change programme, taking many months to define and then implement across a business. Successful implementation will provide improved project control and delivery. It will also provide consistency and standardisation of approach, improved visibility of performance and predictability of project outcome. This will impact not just those within a business, but also working relationships with its contractors. From a people perspective, the PMF will also ensure the development of professional standards and the development of project management capability across the organisation involved. 2.2 Elements The PMF will define and integrate the 3 fundamental elements of project management: processes, systems and people. Consistent application of process is key to effective project status reporting, facilitating control and therefore improved delivery of projects. This will involve defining and promulgating top level lifecycle management process (e.g. GRIP in Network Rail, LCM in BAES) to control investment and programme risk, as well as a project control cycle process to ensure effective day to day management of estimating, costs, planning, subcontractors, change control and project risks. The control cycle will need to be flowed down to contractors where relevant, including specification of reporting requirements, work breakdown/cost breakdown structures etc. Page 1 of 3
  • 2. White paper – engineering & construction project management principles The Seven Elements of the Project Control Cycle Establish Baselines Prepare & Plan, schedule Authorise organise And cost work Change Manage management change Manage Risk Manage and control work Work Review and management control Enterprise Programme Solutions Ltd All rights reserved © 2008 EPS Consulting Effective management information systems underpin and enable efficient project control and delivery by providing the early warnings necessary to avoid deterioration in schedule and cost performance. In essence – the “radar” for the project. This will involve ensuring new or existing systems accurately automate well designed processes to accelerate the visibility of project performance threats and allow the pro-active interventions to mitigate any consequences BEFORE too much time or money is wasted. If new systems are required, the most cost effective method is to tender and deploy those that are able to be integrated with each other and within an industry standard central repository such as Oracle or MS SQL Server. Essentially the case for an enterprise data model. Only with such an architecture can an organisation expect to get rapid visibility of project performance across different functional management tools, often made by different manufacturers. Systems are needed for estimating (e.g. RIB), planning (e.g. P3e), cost control (e.g. Oracle Projects), earned value management (e.g. Cobra) and risk management (e.g. ARM). Excellent project management skills are essential for successful project delivery. This requires matching personal skills sets to requisite project roles and developing peoples’ capability in a structured, progressive and professional framework. This can be achieved through establishing a competence framework, Page 2 of 3
  • 3. White paper – engineering & construction project management principles which initially needs to address basic skills and systems training to support the fundamentals of implementing the PMF. In the longer term, the focus can shift to developing the professional disciplines of the wider project management community, e.g. commercial, engineering, estimating, planning, procurement etc. 3. Implementation timescales Typically a PMF may be developed and rolled out in 3 phases: Phase 1 (definition) will involve defining the basics of the framework specific to an organisation’s work. This will cover assessment of current capabilities across process, systems and people; authorisation of business case for the PMF; establishment of PMF project team; definition of core processes; compilation of new system specifications and tendering for them; definition of revised management arrangements for contractors; and definition of a competence framework and associated training and development programme. Phase 2 (roll-out) will involve preparation and initial implementation of the PMF across targeted areas of an organisation. This will cover implementation of core processes; procurement, testing, integration and go-live of new systems; establishment of revised management arrangements for contractors; user training based on the competence framework; and a period of specialist support. Phase 3 (consolidation) will involve the bedding in of the PMF into the business. This will cover periodic maturity assessments to judge the rate of take up of the PMF; continuous improvement programmes; wider professional development of project staff; and benchmarking of capability with similar organisations. During this phase an organisation may then wish to consider roll out of the PMF to other parts of its business. In all, the above programme could involve up to 3 years work, depending upon the extent of implementation, current capability levels, new systems/processes deployed and duration of phase 3. Page 3 of 3