Wetback vs Dryback
Scotch Marine Boiler Design
2
Wetback vs Dryback
Goal
The purpose of this presentation is to
provide project decision-makers with
fundamental, and critical, boiler design
information.
3
Wetback vs Dryback
Two Basic Designs
Dominate the Scotch Marine
Boiler Market:
Wetback
Dryback
4
Wetback vs Dryback
Wetback vs. Dryback
• Basic construction comparison
• Design principles
• Technical considerations
• Total operating costs comparison
This presentation will show you the differences
5
Wetback vs Dryback
Three-Pass Wetback
6
Wetback vs Dryback
Wetback Design Principles
• Separate tube sheets between all major
temperature changes (between tube passes)
• Rear turnaround is totally surrounded by water
• No expensive refractory to maintain
• Rear doors are either lightweight lift off type or
split-hinged
• Sealing materials are inexpensive, non-proprietary
• Efficient “functional footprint”
7
Wetback vs Dryback
Four-Pass Dryback
8
Wetback vs Dryback
Dryback Design Principles
• Common rear tube sheet between passes
• Rear turnaround is a refractory wall
• Door refractory is a maintenance item
• Rear door is vessel-sized in diameter,
extremely heavy, and hinged or davited
• Sealing materials are typically proprietary
• Large “functional footprint”
9
Wetback vs Dryback
Tube Sheets
Wetback
Separate rear tube
sheets
• Separate tube sheets
are free to expand and
contract at their own
rate in response to the
1300 – 1600 F temp.
differential between
passes.
Dryback
Common rear tube
sheet
• Common tube sheet
experiences extreme
thermal stress in
response to temp.
differentials,
increasing the
likelihood of leaks.
10
Wetback vs Dryback
Rear Tube Sheets
Wetback is Separate Dryback is Common
11
Wetback vs Dryback
Rear Turnaround
Wetback
• Surrounding water
absorbs burner heat,
improving efficiency by
1 to 3%.
• Efficiency is
sustainable, as
turnaround does not
deteriorate over time.
Dryback
• Rear refractory wall
reflects burner heat,
promoting greater
exterior radiation losses.
• Hot flue gases erode
refractory baffle
resulting in “short
circuiting,” and loss of
efficiency.
14
Wetback vs Dryback
Rear Refractory Replacement
Wetback
• NO expensive
refractory to maintain
• Significant
maintenance cost
savings over the life of
ownership
Dryback
• Refractory must be
inspected regularly
and replaced
periodically
• Replacement costs are
burdensome, involving
proprietary sealing
kits, special rigging
and down time
15
Wetback vs Dryback
Doors
Wetback
• Front Doors are typically split-hinged, or davited
• Rear Doors are lightweight (< 60#) lift-type
16
Wetback vs Dryback
Doors
Wetback
• Larger models typically feature hinged, or davited
rear doors
• Split doors maintain efficient “functional footprint”
17
Wetback vs Dryback
Doors
Dryback
Annual inspections are typically more costly for the dryback, requiring proprietary door sealing
kits, special tools, and considerable manpower in “muscling” massive, and typically sagging,
doors into “bolt-thru” alignment.
18
Wetback vs Dryback
Doors
Dryback
• Large, heavy, single
front door offers
complicated multi-
sectioned design
• Additional costs for
seal kits and labor can
significantly impact
annual operating
expenses
19
Wetback vs Dryback
Simplified design requires far fewer seals
All are non-proprietary, inexpensive, and easy to install
Sealing Kits
Wetback
20
Wetback vs Dryback
Sealing Kits
Dryback
“Watch Case” design requires numerous proprietary sealing
kits for each inspection, and every vessel service
21
Wetback vs Dryback
Functional Footprint
Dryback
Wetback
• Dryback: Vessel-diameter door means a larger functional footprint, demanding
additional floorspace
•Wetback: Lift-type or split-hinged doors have minimal impact on floorspace
requirements
23
Wetback vs Dryback
The Wetback Advantage:
Summary
• Offer far fewer maintenance concerns:
- No rear door refractory to repair
- No refractory baffling to burn-out
- Far less thermal stress on tube sheets, and tube ends
• Don’t require proprietary parts
• Offer maximum sustainable efficiency: Maintenance-
free water backed turnaround provides better heat
absorption at the most critical heat transfer point.
Wetback Boilers -
24
Wetback vs Dryback
Maintenance Costs Comparison
Bottom Line
We surveyed a few of our service reps who perform
repair/maintenance work on boilers and
specifically asked them to share dryback
expenses.
We averaged them together and came up with the
following maintenance report;
25
Wetback vs Dryback
Based on repairs costs of a 300 HP boiler with
a life span of 25 years
• Average cost to replace refractory rear door;
$6,000 each time
• Average cost to replace proprietary door
gaskets; $500 each time
26
Wetback vs Dryback
The rear door needs to be replaced every 3
years, or 8 times. The gaskets need replaced
2-3 times per year.
• Refractory door; $6,000 x 8 times = $48,000
• Door gaskets; $500 x 2 times/year x 25 = $25,000
• Wetback gaskets; $30 x 1/year x 25 years = $750
Total maintenance costs for 25 years $72,250
They could have bought a new boiler
and burner!!
27
Wetback vs Dryback
Add In Consideration to
Sustainable Efficiency
Improvement.
Don’t You Think Someone
Should Know That Before Making
an Equipment Decision?
Any Questions?

More Related Content

What's hot

Heating, ventilation and air conditioning (3)
Heating, ventilation and air conditioning (3)Heating, ventilation and air conditioning (3)
Heating, ventilation and air conditioning (3)Shanu Jp
 
module 4,part 3 CLADDING REF.pdf
module 4,part 3 CLADDING REF.pdfmodule 4,part 3 CLADDING REF.pdf
module 4,part 3 CLADDING REF.pdfAnoHossey
 
Glass : A Building Material
Glass : A Building MaterialGlass : A Building Material
Glass : A Building MaterialMohd Kashif
 
False Ceiling Information and Joinary Details
False Ceiling Information and Joinary DetailsFalse Ceiling Information and Joinary Details
False Ceiling Information and Joinary DetailsMihirPawar5
 
Evaporative cooling
Evaporative coolingEvaporative cooling
Evaporative coolingNEHA SINGHI
 
HALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptxHALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptxswethaasukumar
 
Thermal insulation materilials and its application
Thermal insulation materilials and its application Thermal insulation materilials and its application
Thermal insulation materilials and its application Shreyas Sasapara
 
LECTURE VI CONST.TEC V Thermal Insulation of Buildings
LECTURE VI CONST.TEC V Thermal Insulation of BuildingsLECTURE VI CONST.TEC V Thermal Insulation of Buildings
LECTURE VI CONST.TEC V Thermal Insulation of BuildingsDarpan Arora
 
Sanitary fittings and accesories
Sanitary fittings and accesoriesSanitary fittings and accesories
Sanitary fittings and accesoriesManish Khatri
 
Thermal Storage Wall or Thrombe Wall (prototype model)
Thermal Storage Wall or Thrombe Wall (prototype model)Thermal Storage Wall or Thrombe Wall (prototype model)
Thermal Storage Wall or Thrombe Wall (prototype model)Prachurya Sarma
 
Air cooled chillers
Air cooled  chillersAir cooled  chillers
Air cooled chillersJayakumar297
 

What's hot (20)

Roof covering
Roof coveringRoof covering
Roof covering
 
Heating, ventilation and air conditioning (3)
Heating, ventilation and air conditioning (3)Heating, ventilation and air conditioning (3)
Heating, ventilation and air conditioning (3)
 
module 4,part 3 CLADDING REF.pdf
module 4,part 3 CLADDING REF.pdfmodule 4,part 3 CLADDING REF.pdf
module 4,part 3 CLADDING REF.pdf
 
Doors &; windows
Doors &; windowsDoors &; windows
Doors &; windows
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Green interiors
Green interiorsGreen interiors
Green interiors
 
Glass : A Building Material
Glass : A Building MaterialGlass : A Building Material
Glass : A Building Material
 
False Ceiling Information and Joinary Details
False Ceiling Information and Joinary DetailsFalse Ceiling Information and Joinary Details
False Ceiling Information and Joinary Details
 
Evaporative cooling
Evaporative coolingEvaporative cooling
Evaporative cooling
 
HALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptxHALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptx
 
Thermal insulation materilials and its application
Thermal insulation materilials and its application Thermal insulation materilials and its application
Thermal insulation materilials and its application
 
Building finishes
Building finishesBuilding finishes
Building finishes
 
LECTURE VI CONST.TEC V Thermal Insulation of Buildings
LECTURE VI CONST.TEC V Thermal Insulation of BuildingsLECTURE VI CONST.TEC V Thermal Insulation of Buildings
LECTURE VI CONST.TEC V Thermal Insulation of Buildings
 
types of flooring
 types of flooring types of flooring
types of flooring
 
Sanitary fittings and accesories
Sanitary fittings and accesoriesSanitary fittings and accesories
Sanitary fittings and accesories
 
Thermal Storage Wall or Thrombe Wall (prototype model)
Thermal Storage Wall or Thrombe Wall (prototype model)Thermal Storage Wall or Thrombe Wall (prototype model)
Thermal Storage Wall or Thrombe Wall (prototype model)
 
What Is Evaporative Cooling
What Is Evaporative CoolingWhat Is Evaporative Cooling
What Is Evaporative Cooling
 
FLOOR FINISHES AND COVERINGS
FLOOR FINISHES AND COVERINGSFLOOR FINISHES AND COVERINGS
FLOOR FINISHES AND COVERINGS
 
Seasoning of timber
Seasoning of timberSeasoning of timber
Seasoning of timber
 
Air cooled chillers
Air cooled  chillersAir cooled  chillers
Air cooled chillers
 

Similar to Wetback vs Dryback: How Marine Boiler Design Affects Efficiency and Costs

Historic Windows
Historic WindowsHistoric Windows
Historic Windowsaiahouston
 
Sustainability engineering beyond limits.
Sustainability engineering beyond limits.Sustainability engineering beyond limits.
Sustainability engineering beyond limits.BRONSWERK
 
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsStep 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsSynergy Airflow and Ventilation
 
Net Zero Energy in Very Cold Climates by Peter Amerongen
Net Zero Energy in Very Cold Climates by Peter AmerongenNet Zero Energy in Very Cold Climates by Peter Amerongen
Net Zero Energy in Very Cold Climates by Peter AmerongenMBHomeBuilders
 
Building enclosure design presentation 1
Building enclosure design presentation 1Building enclosure design presentation 1
Building enclosure design presentation 1melanie_bissonnette
 
Airtight Construction - Step 1 of The Seven Steps of Building a Synergy Home
Airtight Construction - Step 1 of The Seven Steps of Building a Synergy HomeAirtight Construction - Step 1 of The Seven Steps of Building a Synergy Home
Airtight Construction - Step 1 of The Seven Steps of Building a Synergy HomeSynergy Airflow and Ventilation
 
Hydro crackers do you like cracks?
Hydro crackers do you like cracks?Hydro crackers do you like cracks?
Hydro crackers do you like cracks?BRONSWERK
 
Step 3 - Improved Thermal Systems of the Seven Steps of Building a Synergy Home
Step 3 - Improved Thermal Systems of the Seven Steps of Building a Synergy HomeStep 3 - Improved Thermal Systems of the Seven Steps of Building a Synergy Home
Step 3 - Improved Thermal Systems of the Seven Steps of Building a Synergy HomeSynergy Airflow and Ventilation
 
Ultra compact air cooled coolers : A cool story?
Ultra compact air cooled coolers : A cool story?Ultra compact air cooled coolers : A cool story?
Ultra compact air cooled coolers : A cool story?BRONSWERK
 
Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10SmarterHomeGuide
 
New Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USNew Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USKristopher Vardell
 
Evacuated tube collectors specifications
Evacuated tube collectors specificationsEvacuated tube collectors specifications
Evacuated tube collectors specificationsDaniel Henny
 
Airtight Construction - Step 1 of The Seven Steps of Building a Synergy Home
Airtight Construction - Step 1 of The Seven Steps of Building a Synergy HomeAirtight Construction - Step 1 of The Seven Steps of Building a Synergy Home
Airtight Construction - Step 1 of The Seven Steps of Building a Synergy HomeTodd Witt
 
Is Passivhaus a step too far? South Pacific Passive House Conference Auckland...
Is Passivhaus a step too far? South Pacific Passive House Conference Auckland...Is Passivhaus a step too far? South Pacific Passive House Conference Auckland...
Is Passivhaus a step too far? South Pacific Passive House Conference Auckland...Nick Grant
 
Bradford white water heater information
Bradford white water heater information Bradford white water heater information
Bradford white water heater information Kylie Kieffer
 
Energy savings using IntelliCOOL cassette smart integrated variable speed coo...
Energy savings using IntelliCOOL cassette smart integrated variable speed coo...Energy savings using IntelliCOOL cassette smart integrated variable speed coo...
Energy savings using IntelliCOOL cassette smart integrated variable speed coo...ATMOsphere Conferences & Events
 
Sustainable Facility Life Cycle Management
Sustainable Facility Life Cycle ManagementSustainable Facility Life Cycle Management
Sustainable Facility Life Cycle ManagementTony Loup
 

Similar to Wetback vs Dryback: How Marine Boiler Design Affects Efficiency and Costs (20)

Historic Windows
Historic WindowsHistoric Windows
Historic Windows
 
Sustainability engineering beyond limits.
Sustainability engineering beyond limits.Sustainability engineering beyond limits.
Sustainability engineering beyond limits.
 
Saving Energy in Existing Multifamily Buildings
Saving Energy in Existing Multifamily BuildingsSaving Energy in Existing Multifamily Buildings
Saving Energy in Existing Multifamily Buildings
 
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsStep 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
 
Net Zero Energy in Very Cold Climates by Peter Amerongen
Net Zero Energy in Very Cold Climates by Peter AmerongenNet Zero Energy in Very Cold Climates by Peter Amerongen
Net Zero Energy in Very Cold Climates by Peter Amerongen
 
Building enclosure design presentation 1
Building enclosure design presentation 1Building enclosure design presentation 1
Building enclosure design presentation 1
 
Improved closed loop cooling arrangement
Improved closed loop cooling arrangementImproved closed loop cooling arrangement
Improved closed loop cooling arrangement
 
Airtight Construction - Step 1 of The Seven Steps of Building a Synergy Home
Airtight Construction - Step 1 of The Seven Steps of Building a Synergy HomeAirtight Construction - Step 1 of The Seven Steps of Building a Synergy Home
Airtight Construction - Step 1 of The Seven Steps of Building a Synergy Home
 
Hydro crackers do you like cracks?
Hydro crackers do you like cracks?Hydro crackers do you like cracks?
Hydro crackers do you like cracks?
 
Step 3 - Improved Thermal Systems of the Seven Steps of Building a Synergy Home
Step 3 - Improved Thermal Systems of the Seven Steps of Building a Synergy HomeStep 3 - Improved Thermal Systems of the Seven Steps of Building a Synergy Home
Step 3 - Improved Thermal Systems of the Seven Steps of Building a Synergy Home
 
Ultra compact air cooled coolers : A cool story?
Ultra compact air cooled coolers : A cool story?Ultra compact air cooled coolers : A cool story?
Ultra compact air cooled coolers : A cool story?
 
Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10
 
New Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USNew Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 US
 
Evacuated tube collectors specifications
Evacuated tube collectors specificationsEvacuated tube collectors specifications
Evacuated tube collectors specifications
 
Airtight Construction - Step 1 of The Seven Steps of Building a Synergy Home
Airtight Construction - Step 1 of The Seven Steps of Building a Synergy HomeAirtight Construction - Step 1 of The Seven Steps of Building a Synergy Home
Airtight Construction - Step 1 of The Seven Steps of Building a Synergy Home
 
Is Passivhaus a step too far? South Pacific Passive House Conference Auckland...
Is Passivhaus a step too far? South Pacific Passive House Conference Auckland...Is Passivhaus a step too far? South Pacific Passive House Conference Auckland...
Is Passivhaus a step too far? South Pacific Passive House Conference Auckland...
 
Bradford white water heater information
Bradford white water heater information Bradford white water heater information
Bradford white water heater information
 
Energy savings using IntelliCOOL cassette smart integrated variable speed coo...
Energy savings using IntelliCOOL cassette smart integrated variable speed coo...Energy savings using IntelliCOOL cassette smart integrated variable speed coo...
Energy savings using IntelliCOOL cassette smart integrated variable speed coo...
 
Condensing Boilers
Condensing BoilersCondensing Boilers
Condensing Boilers
 
Sustainable Facility Life Cycle Management
Sustainable Facility Life Cycle ManagementSustainable Facility Life Cycle Management
Sustainable Facility Life Cycle Management
 

Recently uploaded

DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 

Recently uploaded (20)

DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

Wetback vs Dryback: How Marine Boiler Design Affects Efficiency and Costs

  • 1. 1 Wetback vs Dryback Scotch Marine Boiler Design
  • 2. 2 Wetback vs Dryback Goal The purpose of this presentation is to provide project decision-makers with fundamental, and critical, boiler design information.
  • 3. 3 Wetback vs Dryback Two Basic Designs Dominate the Scotch Marine Boiler Market: Wetback Dryback
  • 4. 4 Wetback vs Dryback Wetback vs. Dryback • Basic construction comparison • Design principles • Technical considerations • Total operating costs comparison This presentation will show you the differences
  • 6. 6 Wetback vs Dryback Wetback Design Principles • Separate tube sheets between all major temperature changes (between tube passes) • Rear turnaround is totally surrounded by water • No expensive refractory to maintain • Rear doors are either lightweight lift off type or split-hinged • Sealing materials are inexpensive, non-proprietary • Efficient “functional footprint”
  • 8. 8 Wetback vs Dryback Dryback Design Principles • Common rear tube sheet between passes • Rear turnaround is a refractory wall • Door refractory is a maintenance item • Rear door is vessel-sized in diameter, extremely heavy, and hinged or davited • Sealing materials are typically proprietary • Large “functional footprint”
  • 9. 9 Wetback vs Dryback Tube Sheets Wetback Separate rear tube sheets • Separate tube sheets are free to expand and contract at their own rate in response to the 1300 – 1600 F temp. differential between passes. Dryback Common rear tube sheet • Common tube sheet experiences extreme thermal stress in response to temp. differentials, increasing the likelihood of leaks.
  • 10. 10 Wetback vs Dryback Rear Tube Sheets Wetback is Separate Dryback is Common
  • 11. 11 Wetback vs Dryback Rear Turnaround Wetback • Surrounding water absorbs burner heat, improving efficiency by 1 to 3%. • Efficiency is sustainable, as turnaround does not deteriorate over time. Dryback • Rear refractory wall reflects burner heat, promoting greater exterior radiation losses. • Hot flue gases erode refractory baffle resulting in “short circuiting,” and loss of efficiency.
  • 12. 14 Wetback vs Dryback Rear Refractory Replacement Wetback • NO expensive refractory to maintain • Significant maintenance cost savings over the life of ownership Dryback • Refractory must be inspected regularly and replaced periodically • Replacement costs are burdensome, involving proprietary sealing kits, special rigging and down time
  • 13. 15 Wetback vs Dryback Doors Wetback • Front Doors are typically split-hinged, or davited • Rear Doors are lightweight (< 60#) lift-type
  • 14. 16 Wetback vs Dryback Doors Wetback • Larger models typically feature hinged, or davited rear doors • Split doors maintain efficient “functional footprint”
  • 15. 17 Wetback vs Dryback Doors Dryback Annual inspections are typically more costly for the dryback, requiring proprietary door sealing kits, special tools, and considerable manpower in “muscling” massive, and typically sagging, doors into “bolt-thru” alignment.
  • 16. 18 Wetback vs Dryback Doors Dryback • Large, heavy, single front door offers complicated multi- sectioned design • Additional costs for seal kits and labor can significantly impact annual operating expenses
  • 17. 19 Wetback vs Dryback Simplified design requires far fewer seals All are non-proprietary, inexpensive, and easy to install Sealing Kits Wetback
  • 18. 20 Wetback vs Dryback Sealing Kits Dryback “Watch Case” design requires numerous proprietary sealing kits for each inspection, and every vessel service
  • 19. 21 Wetback vs Dryback Functional Footprint Dryback Wetback • Dryback: Vessel-diameter door means a larger functional footprint, demanding additional floorspace •Wetback: Lift-type or split-hinged doors have minimal impact on floorspace requirements
  • 20. 23 Wetback vs Dryback The Wetback Advantage: Summary • Offer far fewer maintenance concerns: - No rear door refractory to repair - No refractory baffling to burn-out - Far less thermal stress on tube sheets, and tube ends • Don’t require proprietary parts • Offer maximum sustainable efficiency: Maintenance- free water backed turnaround provides better heat absorption at the most critical heat transfer point. Wetback Boilers -
  • 21. 24 Wetback vs Dryback Maintenance Costs Comparison Bottom Line We surveyed a few of our service reps who perform repair/maintenance work on boilers and specifically asked them to share dryback expenses. We averaged them together and came up with the following maintenance report;
  • 22. 25 Wetback vs Dryback Based on repairs costs of a 300 HP boiler with a life span of 25 years • Average cost to replace refractory rear door; $6,000 each time • Average cost to replace proprietary door gaskets; $500 each time
  • 23. 26 Wetback vs Dryback The rear door needs to be replaced every 3 years, or 8 times. The gaskets need replaced 2-3 times per year. • Refractory door; $6,000 x 8 times = $48,000 • Door gaskets; $500 x 2 times/year x 25 = $25,000 • Wetback gaskets; $30 x 1/year x 25 years = $750 Total maintenance costs for 25 years $72,250 They could have bought a new boiler and burner!!
  • 24. 27 Wetback vs Dryback Add In Consideration to Sustainable Efficiency Improvement. Don’t You Think Someone Should Know That Before Making an Equipment Decision? Any Questions?