1. CLIENT : NBCC, NATIONAL BUILDING CONSULTANT CORPORATION
ARCHITECT : STUP CONSULTANTS, MUMBAI
CLIMATIC CONDITIONS : SEMI ARID CLIMATE
COST : 8.5 MILLION
YEAR OF COMPLETION : 1997
SITE AREA : 4.5 ACERS
NO. OF FLOORS : G+2/G+3
BUILT UP AREA : 15654 SQ m
PLOT COVERAGE : 34%
MAIN FOCUS
OAT, ITS ALL
OTHER
ACTIVITIES ARE
RADIATING FROM
THIS STRUCTURE
BUILDING DESCRIPTION
• THE ARRANGEMENT OF SPACES IS CONCENTRATED TOWARDS THE CENTRE
• ALL THE BLOCKS HAVE 3 OR 4 FLOORS
• EACH BLOCK IS CONNECTED BY COVERED PASSAGES
• OAT IS THE MAIN FOCUS OF THE BUILDING
• THE CONCEPT OF THE BUILDING IS SNAIL
• 3.7m WIDE SERVICE ROAD, RUNNING ALONG THE PERIPHERY OF THE SITE
• 3 ENTRIES ARE PROVIDED MAIN ENTRY, ENTRY TO THE CLASSROOM AND SERVICE ENTRY
LIGHTS AND SHADOW
USED PERGOLAS TO CREATE LIGHT AND
SHADOW IN DIFFERENT SPACES
ONLY ENTRY IS EMPHASISED USING PERGOLAS
CORRIDORS ARE MORE OF CLOSED TYPE WITH NO
DOUBLE HEIGHTS SKYLIGHTS
MATERIALS
PLASTERED LATERITE
WALLS AND
OPENINGS WITH
STEEL OR WOODEN
FRAME
CLASSROOMS- LESS CROSS
VENTILATION
FORM
THEY TRIED TO REDUCE THE MASSIVENESS BY GIVING OPENINGS
THE ARCHITECTURAL ELEMENTS ARE USED TO THE CONTEMPORARY STYLE
USE OF SOLIDS AND VOIDS
EACH BLOCKS ARE DESIGNED TO INTEGRATE WITH THE SITE
3D COMPOSITION OF THE MASSING IS NOT INTERESTING AND EMPHASISING
2. PLAN AND SECTION OF AUDITORUIM
USE OF SOLIDS AND
VOIDS
IMAGE SHOWING THE LEVEL DIFFERENCE LOCATED AT THE CENTRE OF ALL THE BUILDING
SURROUNDING ARE FULLY
LANDSCAPED
OAT USED FOR RAMP
SHOWS,GAMES,PARTIES ETC
GOOD
DRAINAGE
SYSTEM
SINCE THE PLAN IS IN RADIAL PATTERN
THERE IS A FLOW FROM THE ENTRANCE TO THE OTHER
PART OF THE BUILDINGS
THUS IT REPRESENTS THE UNFURLING OF SNAIL