KPI’s for Measuring & Controlling STO Projects E.J. (Ted) Lister Lister Management Inc.
Agenda ,[object Object]
Definitive Definitions
The 4+ Key Performance Indicators
Measuring Performance
Trending, Forecasting
Questions,[object Object]
 Slide 4 Project Controls / Project Management Overview – cont’d… Establish Project Controls at project kick-off Work-list / Work-scope Budget What-if scenarios / Risk Management KPI’s and Targets Project Management begins at Work-list cut-off Work Management (Direct) Resource Management (Indirect)
 Slide 5 Definitive Definitions Planned Value Estimate of Wrench-hours for an activity Earned Value % complete of a planned activity based on field status  Actual Value Cost measurement; also used to measure worker performance Longest Job Zero-float, determines the duration of the outage Not to be confused with critical path, which accounts for risk
 Slide 6 Definitive Definitions – cont’d S-Curve Chart of values distributed along wrench-hour/time x y axis Baseline A snapshot of the initial plan/schedule before feed-out Performance Earned vs. Planned, Actual vs. Earned, Actual vs. Planned What-if Scenarios Leveling a programmed plan to determine the best case scenario based on cost, schedule duration, and wrench-hours
 Slide 7 The 4+ Key Performance Indicators In Order of Magnitude… Safety, Health & Environment Worker Performance ,[object Object]
QA/QC (rework)Schedule (earned vs. planned) Cost (actual vs. planned) ,[object Object]
Indirect,[object Object]
QA/QC						= 0 ReworkSchedule (Feed-in – Feed-out)		= 31 Days Cost						= $41.2M	 ,[object Object]
Indirect (115% of Direct) 			= $21.5M
Planning, Pre-Work, Post, Contingency	= $1.5M,[object Object]
 Slide 10 The 4+ Key Performance Indicators Worker Performance… Set realistic direct wrench-time for worker performance No more than 75% Remember, once you determine direct wrench-hours all indirect resources and logistics are based on this number If you don’t use strategic planning to support this number your chances of achieving this target will be diminished Use productivity factors based on: season, location, worker experience, resource availability (inspectors, cranes, etc.)
 Slide 11 The 4+ Key Performance Indicators Schedule… Establish a schedule in your planning software with a clearly defined WBS (Work Breakdown Structure) and Phase The WBS is a vertical hierarchy of physical locations The Phase is a horizontal section of work types Use What-if Scenarios to determine the longest job (series of planned activities with no float) Control the longest job; manage the remaining tasks
 Slide 12 The 4+ Key Performance Indicators Cost… The cost is based on Work-scope + Indirects + Contingency = Budget Costs can only be controlled through Work-scope changes Costs are managed, not controlled, through performance Costs need to be measurable based on direct and indirect; found and added; WBS and Phase

More Related Content

What's hot

project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 waleed hamdy
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementSerdar Temiz
 
Top Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh MahasnehTop Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh MahasnehTop Pillars
 
L05 time management
L05 time managementL05 time management
L05 time managementAsa Chan
 
Program Management 2.0: Risk Management
Program Management 2.0: Risk ManagementProgram Management 2.0: Risk Management
Program Management 2.0: Risk ManagementJohn Carter
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniquesShivangi Saini
 
Earned value analysis training
Earned value analysis trainingEarned value analysis training
Earned value analysis trainingPaul King
 
Earned value
Earned valueEarned value
Earned valueOliver
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementHayat Denzi
 
Project Scheduling
Project Scheduling Project Scheduling
Project Scheduling Reema
 
Software engineering 11 project scheduling
Software engineering 11 project schedulingSoftware engineering 11 project scheduling
Software engineering 11 project schedulingVaibhav Khanna
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost controlGuhan M
 

What's hot (20)

project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 project control using earned value analysis - Part 01
project control using earned value analysis - Part 01
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value Management
 
Top Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh MahasnehTop Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh Mahasneh
 
Project Control Process
Project Control ProcessProject Control Process
Project Control Process
 
Project management
Project managementProject management
Project management
 
L05 time management
L05 time managementL05 time management
L05 time management
 
Program Management 2.0: Risk Management
Program Management 2.0: Risk ManagementProgram Management 2.0: Risk Management
Program Management 2.0: Risk Management
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniques
 
Earned value analysis training
Earned value analysis trainingEarned value analysis training
Earned value analysis training
 
Earned value
Earned valueEarned value
Earned value
 
Cost management
Cost managementCost management
Cost management
 
Earned Value
Earned ValueEarned Value
Earned Value
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Project Scheduling
Project Scheduling Project Scheduling
Project Scheduling
 
Software engineering 11 project scheduling
Software engineering 11 project schedulingSoftware engineering 11 project scheduling
Software engineering 11 project scheduling
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost control
 
Project milestone
Project milestoneProject milestone
Project milestone
 
ACH 216 Lecture 07 (Project Funding)
ACH 216 Lecture 07 (Project Funding)ACH 216 Lecture 07 (Project Funding)
ACH 216 Lecture 07 (Project Funding)
 
Project cost management
Project cost managementProject cost management
Project cost management
 

Similar to Kpi Lister Sto 061411

The Project Management Process - Week 9 Performance Management
The Project Management Process - Week 9   Performance ManagementThe Project Management Process - Week 9   Performance Management
The Project Management Process - Week 9 Performance ManagementCraig Brown
 
Project Planning and Excution chapter 4.ppt
Project Planning and Excution chapter 4.pptProject Planning and Excution chapter 4.ppt
Project Planning and Excution chapter 4.pptadabotor7
 
PMP preparation and PMI Framework
PMP preparation and PMI FrameworkPMP preparation and PMI Framework
PMP preparation and PMI FrameworkUzma Khan
 
The Disciplined Management Process
The Disciplined Management ProcessThe Disciplined Management Process
The Disciplined Management Processvcfo
 
A/E Accounting For Firm Leaders by Axium
A/E Accounting For Firm Leaders by Axium A/E Accounting For Firm Leaders by Axium
A/E Accounting For Firm Leaders by Axium Axium
 
Training Operational Planning
Training Operational PlanningTraining Operational Planning
Training Operational PlanningRa Gri
 
Project Management.pptx
Project Management.pptxProject Management.pptx
Project Management.pptxYogesh Singh
 
Earned Value Managed Services
Earned Value Managed ServicesEarned Value Managed Services
Earned Value Managed ServicesGlen Alleman
 
Earned Value Management Essentials
Earned Value Management EssentialsEarned Value Management Essentials
Earned Value Management EssentialsGlen Alleman
 
Chap05_Project Monitoring and Control.pdf
Chap05_Project Monitoring and Control.pdfChap05_Project Monitoring and Control.pdf
Chap05_Project Monitoring and Control.pdfVarunSubramanyam
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part twoHossam Maghrabi
 
Earned Value Management Essentials
Earned Value Management EssentialsEarned Value Management Essentials
Earned Value Management EssentialsGlen Alleman
 
Projects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part OneProjects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part OneWaleed Hamdy Albana
 
7 monitor control-performancemeasurement
7 monitor control-performancemeasurement7 monitor control-performancemeasurement
7 monitor control-performancemeasurementMarken2010
 

Similar to Kpi Lister Sto 061411 (20)

The Project Management Process - Week 9 Performance Management
The Project Management Process - Week 9   Performance ManagementThe Project Management Process - Week 9   Performance Management
The Project Management Process - Week 9 Performance Management
 
Project Planning and Excution chapter 4.ppt
Project Planning and Excution chapter 4.pptProject Planning and Excution chapter 4.ppt
Project Planning and Excution chapter 4.ppt
 
PMP preparation and PMI Framework
PMP preparation and PMI FrameworkPMP preparation and PMI Framework
PMP preparation and PMI Framework
 
Earned value
Earned valueEarned value
Earned value
 
The Disciplined Management Process
The Disciplined Management ProcessThe Disciplined Management Process
The Disciplined Management Process
 
Process development and implementation
Process development and implementationProcess development and implementation
Process development and implementation
 
A/E Accounting For Firm Leaders by Axium
A/E Accounting For Firm Leaders by Axium A/E Accounting For Firm Leaders by Axium
A/E Accounting For Firm Leaders by Axium
 
Keynote Lister Sto 061411
Keynote Lister Sto 061411Keynote Lister Sto 061411
Keynote Lister Sto 061411
 
Training Operational Planning
Training Operational PlanningTraining Operational Planning
Training Operational Planning
 
Project Management.pptx
Project Management.pptxProject Management.pptx
Project Management.pptx
 
Earned Value Managed Services
Earned Value Managed ServicesEarned Value Managed Services
Earned Value Managed Services
 
Earned Value Management Essentials
Earned Value Management EssentialsEarned Value Management Essentials
Earned Value Management Essentials
 
Chap05_Project Monitoring and Control.pdf
Chap05_Project Monitoring and Control.pdfChap05_Project Monitoring and Control.pdf
Chap05_Project Monitoring and Control.pdf
 
Dynamic Schedule Management
Dynamic Schedule ManagementDynamic Schedule Management
Dynamic Schedule Management
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part two
 
Earned Value Management Essentials
Earned Value Management EssentialsEarned Value Management Essentials
Earned Value Management Essentials
 
Projects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part OneProjects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part One
 
Project monitoring lecture 1
Project monitoring lecture 1Project monitoring lecture 1
Project monitoring lecture 1
 
Performance Management System
Performance Management SystemPerformance Management System
Performance Management System
 
7 monitor control-performancemeasurement
7 monitor control-performancemeasurement7 monitor control-performancemeasurement
7 monitor control-performancemeasurement
 

More from Edmund (Ted) Lister

More from Edmund (Ted) Lister (8)

STOworx Petronas Presentation
STOworx Petronas PresentationSTOworx Petronas Presentation
STOworx Petronas Presentation
 
One-page
One-pageOne-page
One-page
 
Dynamic Scheduling Methodology
Dynamic Scheduling MethodologyDynamic Scheduling Methodology
Dynamic Scheduling Methodology
 
The perfect st orm presentation ej lister
The perfect st orm presentation ej listerThe perfect st orm presentation ej lister
The perfect st orm presentation ej lister
 
Sto 3 Day Course Presentation
Sto 3 Day Course PresentationSto 3 Day Course Presentation
Sto 3 Day Course Presentation
 
Change Management 2
Change Management 2Change Management 2
Change Management 2
 
Human Resources
Human ResourcesHuman Resources
Human Resources
 
Wrench Time
Wrench TimeWrench Time
Wrench Time
 

Recently uploaded

Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...lizamodels9
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escortdlhescort
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 

Recently uploaded (20)

Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 

Kpi Lister Sto 061411

  • 1. KPI’s for Measuring & Controlling STO Projects E.J. (Ted) Lister Lister Management Inc.
  • 2.
  • 4. The 4+ Key Performance Indicators
  • 7.
  • 8. Slide 4 Project Controls / Project Management Overview – cont’d… Establish Project Controls at project kick-off Work-list / Work-scope Budget What-if scenarios / Risk Management KPI’s and Targets Project Management begins at Work-list cut-off Work Management (Direct) Resource Management (Indirect)
  • 9. Slide 5 Definitive Definitions Planned Value Estimate of Wrench-hours for an activity Earned Value % complete of a planned activity based on field status Actual Value Cost measurement; also used to measure worker performance Longest Job Zero-float, determines the duration of the outage Not to be confused with critical path, which accounts for risk
  • 10. Slide 6 Definitive Definitions – cont’d S-Curve Chart of values distributed along wrench-hour/time x y axis Baseline A snapshot of the initial plan/schedule before feed-out Performance Earned vs. Planned, Actual vs. Earned, Actual vs. Planned What-if Scenarios Leveling a programmed plan to determine the best case scenario based on cost, schedule duration, and wrench-hours
  • 11.
  • 12.
  • 13.
  • 14.
  • 15. Indirect (115% of Direct) = $21.5M
  • 16.
  • 17. Slide 10 The 4+ Key Performance Indicators Worker Performance… Set realistic direct wrench-time for worker performance No more than 75% Remember, once you determine direct wrench-hours all indirect resources and logistics are based on this number If you don’t use strategic planning to support this number your chances of achieving this target will be diminished Use productivity factors based on: season, location, worker experience, resource availability (inspectors, cranes, etc.)
  • 18. Slide 11 The 4+ Key Performance Indicators Schedule… Establish a schedule in your planning software with a clearly defined WBS (Work Breakdown Structure) and Phase The WBS is a vertical hierarchy of physical locations The Phase is a horizontal section of work types Use What-if Scenarios to determine the longest job (series of planned activities with no float) Control the longest job; manage the remaining tasks
  • 19. Slide 12 The 4+ Key Performance Indicators Cost… The cost is based on Work-scope + Indirects + Contingency = Budget Costs can only be controlled through Work-scope changes Costs are managed, not controlled, through performance Costs need to be measurable based on direct and indirect; found and added; WBS and Phase
  • 20. Slide 13 100% Or Total Planned Man-hours Original Man-hour Overrun Schedule Slippage STATUS = % COMPLETE or MHRS Schedule Variance New Scheduled Man-hours New schedule affected by activities not completed as per schedule plus added and extra work Original Baseline Scheduled Man-hours Earned Man-hours Original Target Current Day New Target Focus on Work Ahead History TIME Measuring Performance Project Performance S-Curve… Baseline Planned Earned Value - WP Actual Value - $ Found/Added Work Historical Trend Forecast
  • 21.
  • 22.
  • 23. Slide 16 Measuring Performance Updating – cont’d… No uncompleted work can ever appear behind the status date line Use earned value % complete; do not try to capture actual start and finish times
  • 24.
  • 25.
  • 26. E.J. (Ted) Lister Lister Management Inc. akaboreese@hotmail.com