Actual costs are determined by plugging the actual level of activity for the period into the cost formulas used in flexible budgets. Solution False, Actual costs are not determined by plugging the actual level of activity for the period into the cost formulas used in flexible budgets. Actual costs are the actual amounts paid for expenses..