Q: Why is internal separation of assemblies used?
Forms of internal separation are aimed at providing a base to:
• Protect operator against contact with live parts belonging to adjacent functional units,
busbars and terminals
• Limit the probability of initiating an arc fault
• Protect passage of solid foreign objects from one unit of assembly to another (achieved by
using IP2x separation between each unit)
Q: Will internal separation guarantee the integrity of the assembly (switchboard) in the event of
an arcing fault?
No. this will only limit the probability of an arcing fault and extra measure to be taken as per section
2.5.5 of AS/NZS 3000:2007 and Annex ZC of AS/NZS 3439.1
Q: How is internal separation achieved?
There are two methods of achieving this:
• Standard construction
 By barriers or partitions (these can be metallic or non-metallic)
 Form 1, 2a, 2b, 3a, 3b, 4a, 4b
• Alternative construction
 By using integral housing (IP2x) of functional unit denoted by ‘h’. Applicable forms
are 3ah,3bh, 4ah and 4bh
 Insulation of busbars or shrouds denoted by ‘I’. Applicable forms are 2bi,3bi & 4bi
 The combination of housing (h) and insulation (i). Applicable form are 3bih, 4aih and
4bih
Q: Who decides the appropriate form of separation?
Internal separation is agreed upon by the manufacturer (eg. Dara Switchboards) and user (eg. BHP
Billiton) as per section 7.7 of AS/NZS 3439.1
Following points are considered in deciding on the appropriate internal separation by the user, or in
absence of specification by the switchboard manufacturer?
• Is the rated current of the switchboard less than 800A? If YES, you are free to select any
form of separation (eg. Form 1, 2a, 2b, 3a, 3b, 4a, 4b etc)
• Is the rated current of the switchboard more than 800A? If YES, you are restricted to use
one of the prescribed forms of separations as per section 2.5.5.2 of AS3000:2007 to reduce
the probability of initiating an arcing fault. (eg. Form 3b, 3bi, 3bih, 4a, 4ah, 4aih, 4b, 4bi, 4bh
and 4bih)
• Can the assembly be isolated elsewhere before removing covers etc ? (If the answer is YES,
you may decide to go with the lowest form of separation [form 1] without adding pressure
on the switchboard price)
• Do you require additional integrity by having separation between functional units and
busbars where the access of busbars in live conditions result in risk of contact with live
busbars? (If the answer is YES, you will need to go with minimum form 2 construction)
• Do you require access to functional units (eg. Circuit breakers) for limited maintenance (eg.
Changing the settings) with adjacent circuits live? (If the answer is YES, you will need to go
with minimum form 3 construction providing also separation between functional units)
• Do you require access to cable terminals (eg. Connecting cables to a spare circuit breaker in
future while the switchboard is live) of a functional unit with adjacent functional units live?
(If the answer is YES, you will need to go with the maximum form of separation-form 4)
Q: What are the typical switchboard arrangements for each internal separation?
• Form 1 construction
As illustrated in the above general arrangement, there is no internal separation between, busbars,
functional units and terminals for external conductors
 Generally used for Load Centres, Distribution boards, meter panels, Main
switchboards upto 800A
 In a scale of 10 (1 for the lowest price and 10 for the highest price) form 1
construction is at 1 in price.
• Form 2 Construction
• Form 2a construction
As illustrated in the above general arrangement, in form 2a construction the busbars are separated
from functional units but the terminals for external conductors are in the same compartment as the
live busbars.
• Generally used for distribution switchboards upto 800A where there is no access to
the cable zone is required once all the cables are terminated. This construction also
provides safe access to functional units separated from the live busbars. However
this construction is not commonly used in Australia
• In a scale of 10 (1 for the lowest price and 10 for the highest price) form 2a
construction is at 3 in price
• Form 2b
As illustrated in the above general arrangement, in form 2b construction the busbars are separated
from functional units and the terminals for external conductors. However the functional units and its
terminals for external conductors can be in the same compartment.
 Generally used for distribution switchboards upto 800A where opening the cable
zone or the functional unit compartment will not expose the live busbars. This
construction is used in Main Distribution boards in Australia.
• In a scale of 10 (1 for the lowest price and 10 for the highest price) form 2b
construction is at 3 in price.
• This construction is also possible for smaller Distribution boards in Australia using
encapsulated busbar chassis
• Form 2bi
As illustrated in the above general arrangement, in form 2bi construction the separation between
busbars and both functional units and terminals for external conductors achieved by insulation of
busbars. This insulation however needs to fully comply as per section 7.4.2.1 of AS/NZS 3439.1
 Generally used for small light and power Distribution Switchboards and Main
Distribution boards up to 800A
• In a scale of 10 (1 for the lowest price and 10 for the highest price) form 2bi
construction is at 3 in price.
• Form 3 construction
• Form 3a
As illustrated in the above general arrangement, in form 3a construction the functional units are
separated from each other allowing maintenance of such functional unit without been exposed to
other functional units adjacent to each other. The functional units are separated from busbars and
terminals for external conductors. However, the busbars and functional units can be in the same
compartment.
• Generally used for distribution switchboards upto 800A. Not commonly used in
Australia though.
• In a scale of 10 (1 for the lowest price and 10 for the highest price) form 3a
construction is at 4 in price.
• Form 3b
As illustrated in the above general arrangement, in form 3b construction the functional units are
separated from each other allowing maintenance of such functional unit without been exposed to
other functional units adjacent to each other. The functional units are separated from busbars and
terminals for external conductors. Also this construction separates the busbars from the terminals
for external conductors.
• Generally used for distribution switchboards above 800A and is the most commonly
used construction for high current switchboards
• Used where maintenance of functional units (eg. Changing the trip settings of the
circuit breaker) is possible while the adjacent functional units are live.
• In a scale of 10 (1 for the lowest price and 10 for the highest price) form 3b
construction is at 5 in price.
• Form 3bih
As illustrated in the above general arrangement, in form 3bih construction the separation between
functional units and busbars and busbars and terminals for external conductors is achieved by the
use of insulation of busbars and housings of circuit breakers.
• Most commonly used construction for Main Switchboards above 800A with busbar
chassis. This construction however is limited up to the current rating of the suitable
busbar chassis manufactured by the manufacturer with insulation in compliance
with AS/NZS 3439.1
• Used in Main switchboard applications where there is straight constraints on
budget.
• In a scale of 10 (1 for the lowest price and 10 for the highest price) form 3bih
construction is at 4 in price.
• Form 4 construction
• Form 4a
As illustrated in the above general arrangement, in form 4a construction the busbars are separated
from functional units and terminals for external conductors. However, functional units and terminals
for external conductors can be on its own compartment
• Another most commonly used construction for Main Switchboards above 800A.
Used in Main switchboard applications where there is straight constraints on
budget.
• In a scale of 10 (1 for the lowest price and 10 for the highest price) form 4a
construction is at 5 in price.
• Form 4ah
As illustrated in the above general arrangement, in form 4ah construction the separation between
busbars and both functional units and terminals for external conductors is achieved by using
enclosed/encapsulated busbars and integral housings of circuit breakers providing IP2x protection.
• Used in some distribution board applications and is limited by the available busbar
chassis that will be provide fully encapsulated construction to the required rating.
• In a scale of 10 (1 for the lowest price and 10 for the highest price) form 4ah
construction is at 5 in price.
• Form 4aih
As illustrated in the above general arrangement, in form 4aih construction the separation between
busbars and both functional units and terminals for external conductors is achieved by using
insulated busbars. The separation between busbars achieved by use of the functional units own
integral IP2x rated housings
• Used in some Main Switchboard applications and is limited by the available
insulated busbar chassis that will be provide to the required rating.
• In a scale of 10 (1 for the lowest price and 10 for the highest price) form 4aih
construction is at 5 in price.
• Form 4b
As illustrated in the above general arrangement, in form 4b construction the bus bars are separated
from functional units and terminals for external conductors. Functional units are separated from
each other and the terminals for external conductors are also separated from each other providing
the highest level of separation that will maximize the possibility of initiating an arcing fault in a
switchboard. In an unlikely event of a fault, the effect of fault is more contained to its zone where it
was originated without affecting the other parts of the assembly.
• Used in switchboards rated above 800A and is installed in supplying critical
applications. (eg. Hospitals, mines etc)
• In a scale of 10 (1 for the lowest price and 10 for the highest price) form 4b
construction is at 10 in price.
There are more variations of form of separation that are not illustrated above. Those however are
not commonly used switchboard constructions.
Reference: AS/NZS 3439.1:2002 and AS/NZS 3000:2007
Prepared By:
Shanaka Unantenne Bsc. Eng (Hons), MIEAust, MIET, MIEEE
Engineering Division- Dara Switchboards

More Related Content

What's hot

Basics Of Electrical Wires & Cables - Residential & Commercial Projects
Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects
Basics Of Electrical Wires & Cables - Residential & Commercial Projects SSudhaVelan
 
Electrical installation guide 2013
Electrical installation guide 2013 Electrical installation guide 2013
Electrical installation guide 2013 Amila Srimaal Gamage
 
MCB And Earth Leakage Circuit
MCB And Earth Leakage CircuitMCB And Earth Leakage Circuit
MCB And Earth Leakage CircuitNavin Patle
 
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB System Protection
 
Coaxial cable research report by alina baber
Coaxial cable research report by alina baberCoaxial cable research report by alina baber
Coaxial cable research report by alina baberAlina Baber
 
Electrical services of bs by krt
Electrical services of bs by krt Electrical services of bs by krt
Electrical services of bs by krt Krunal Thanki
 
Electrical Installation in Buildings
Electrical Installation in BuildingsElectrical Installation in Buildings
Electrical Installation in Buildingsramnathpanwar
 
Single line diagram ats apfc
Single line diagram ats apfcSingle line diagram ats apfc
Single line diagram ats apfcSajeewa Lakmal
 
Principles Of Cable Manufacturing Followed By Electric Cable Manufacturers
Principles Of Cable Manufacturing Followed By Electric Cable ManufacturersPrinciples Of Cable Manufacturing Followed By Electric Cable Manufacturers
Principles Of Cable Manufacturing Followed By Electric Cable Manufacturersneskkebcables
 
Presentation on cables
Presentation on cablesPresentation on cables
Presentation on cablesFaizanAli244
 
Cable joint n end connector
Cable joint n end connectorCable joint n end connector
Cable joint n end connectorBHAGWAN PRASAD
 
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARDINSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARDhussein ibrahim
 
Transformer Accessories for Testing and Protection
Transformer Accessories for Testing and ProtectionTransformer Accessories for Testing and Protection
Transformer Accessories for Testing and ProtectionSAGAR D
 
UNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATIONUNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATIONPremanandDesai
 

What's hot (20)

Basics Of Electrical Wires & Cables - Residential & Commercial Projects
Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects
Basics Of Electrical Wires & Cables - Residential & Commercial Projects
 
Electrical installation guide 2013
Electrical installation guide 2013 Electrical installation guide 2013
Electrical installation guide 2013
 
MCB And Earth Leakage Circuit
MCB And Earth Leakage CircuitMCB And Earth Leakage Circuit
MCB And Earth Leakage Circuit
 
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
 
Electrical services
Electrical servicesElectrical services
Electrical services
 
MV Switchgear from IEEE
MV Switchgear from IEEEMV Switchgear from IEEE
MV Switchgear from IEEE
 
Power cables
Power cablesPower cables
Power cables
 
Coaxial cable research report by alina baber
Coaxial cable research report by alina baberCoaxial cable research report by alina baber
Coaxial cable research report by alina baber
 
Electrical wiring
Electrical wiringElectrical wiring
Electrical wiring
 
Electrical services of bs by krt
Electrical services of bs by krt Electrical services of bs by krt
Electrical services of bs by krt
 
Electrical Installation in Buildings
Electrical Installation in BuildingsElectrical Installation in Buildings
Electrical Installation in Buildings
 
Single line diagram ats apfc
Single line diagram ats apfcSingle line diagram ats apfc
Single line diagram ats apfc
 
System of wiring
System of wiringSystem of wiring
System of wiring
 
Principles Of Cable Manufacturing Followed By Electric Cable Manufacturers
Principles Of Cable Manufacturing Followed By Electric Cable ManufacturersPrinciples Of Cable Manufacturing Followed By Electric Cable Manufacturers
Principles Of Cable Manufacturing Followed By Electric Cable Manufacturers
 
Presentation on cables
Presentation on cablesPresentation on cables
Presentation on cables
 
Cable joint n end connector
Cable joint n end connectorCable joint n end connector
Cable joint n end connector
 
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARDINSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
 
Vcb ppt.
Vcb ppt.Vcb ppt.
Vcb ppt.
 
Transformer Accessories for Testing and Protection
Transformer Accessories for Testing and ProtectionTransformer Accessories for Testing and Protection
Transformer Accessories for Testing and Protection
 
UNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATIONUNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATION
 

Similar to Guide to forms of separation

MCC Enclosure Catalogue
MCC Enclosure CatalogueMCC Enclosure Catalogue
MCC Enclosure CatalogueMansiKhurana14
 
305 task B electronic
305 task B  electronic305 task B  electronic
305 task B electronicAndrew Flynn
 
substation 101
substation 101substation 101
substation 101danica11
 
Company Profile NEW 2014
Company Profile NEW 2014Company Profile NEW 2014
Company Profile NEW 2014Arjun Reddiar
 
TRAING PPT FOR CABLE ACCESSORIES BY TBEA CHINA.PPT
TRAING PPT FOR CABLE ACCESSORIES BY TBEA CHINA.PPTTRAING PPT FOR CABLE ACCESSORIES BY TBEA CHINA.PPT
TRAING PPT FOR CABLE ACCESSORIES BY TBEA CHINA.PPTMuhammadOvais34
 
Catalog Mitsubishi Inverter FR D700 Global-Beeteco.com
Catalog Mitsubishi Inverter FR D700 Global-Beeteco.comCatalog Mitsubishi Inverter FR D700 Global-Beeteco.com
Catalog Mitsubishi Inverter FR D700 Global-Beeteco.comBeeteco
 
Abb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAIL
Abb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAILAbb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAIL
Abb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAILAKBAR TRADING
 
Catalog Inverter FR-E700 Mitsubishi Electric-Beeteco.com
Catalog Inverter FR-E700 Mitsubishi Electric-Beeteco.comCatalog Inverter FR-E700 Mitsubishi Electric-Beeteco.com
Catalog Inverter FR-E700 Mitsubishi Electric-Beeteco.comBeeteco
 
Nexans Euromold K400TB 630A 24kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...
Nexans Euromold K400TB 630A 24kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...Nexans Euromold K400TB 630A 24kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...
Nexans Euromold K400TB 630A 24kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...Thorne & Derrick International
 
K440TB Nexans Euromold 1250A 24kV Bolted Tee Connectors 150-800sqmm - Nexans ...
K440TB Nexans Euromold 1250A 24kV Bolted Tee Connectors 150-800sqmm - Nexans ...K440TB Nexans Euromold 1250A 24kV Bolted Tee Connectors 150-800sqmm - Nexans ...
K440TB Nexans Euromold 1250A 24kV Bolted Tee Connectors 150-800sqmm - Nexans ...Thorne & Derrick International
 
Nexans Euromold M400TB 630A 33kV Bolted Tee Connectors 35-185sqmm - Nexans Eu...
Nexans Euromold M400TB 630A 33kV Bolted Tee Connectors 35-185sqmm - Nexans Eu...Nexans Euromold M400TB 630A 33kV Bolted Tee Connectors 35-185sqmm - Nexans Eu...
Nexans Euromold M400TB 630A 33kV Bolted Tee Connectors 35-185sqmm - Nexans Eu...Thorne & Derrick International
 
Nexans Euromold 400TB 630A 11kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...
Nexans Euromold 400TB  630A 11kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...Nexans Euromold 400TB  630A 11kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...
Nexans Euromold 400TB 630A 11kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...Thorne & Derrick International
 
440TB Nexans Euromold 1250A 11kV Bolted Tee Connectors 240-800sqmm - Nexans E...
440TB Nexans Euromold 1250A 11kV Bolted Tee Connectors 240-800sqmm - Nexans E...440TB Nexans Euromold 1250A 11kV Bolted Tee Connectors 240-800sqmm - Nexans E...
440TB Nexans Euromold 1250A 11kV Bolted Tee Connectors 240-800sqmm - Nexans E...Thorne & Derrick International
 
M440TB Nexans Euromold 1250A 33kV Bolted Tee Connectors 70-630sqmm - Nexans E...
M440TB Nexans Euromold 1250A 33kV Bolted Tee Connectors 70-630sqmm - Nexans E...M440TB Nexans Euromold 1250A 33kV Bolted Tee Connectors 70-630sqmm - Nexans E...
M440TB Nexans Euromold 1250A 33kV Bolted Tee Connectors 70-630sqmm - Nexans E...Thorne & Derrick International
 
Ls busduct -tnhh kimxuan
Ls busduct -tnhh kimxuanLs busduct -tnhh kimxuan
Ls busduct -tnhh kimxuanNgan TNHH
 
Elastimold - Cable Connectors, Joints, Terminations Catalogue
Elastimold - Cable Connectors, Joints, Terminations CatalogueElastimold - Cable Connectors, Joints, Terminations Catalogue
Elastimold - Cable Connectors, Joints, Terminations CatalogueThorne & Derrick International
 

Similar to Guide to forms of separation (20)

MCC Enclosure Catalogue
MCC Enclosure CatalogueMCC Enclosure Catalogue
MCC Enclosure Catalogue
 
305 task B electronic
305 task B  electronic305 task B  electronic
305 task B electronic
 
substation 101
substation 101substation 101
substation 101
 
Company Profile NEW 2014
Company Profile NEW 2014Company Profile NEW 2014
Company Profile NEW 2014
 
Product Catalogue
Product CatalogueProduct Catalogue
Product Catalogue
 
TRAING PPT FOR CABLE ACCESSORIES BY TBEA CHINA.PPT
TRAING PPT FOR CABLE ACCESSORIES BY TBEA CHINA.PPTTRAING PPT FOR CABLE ACCESSORIES BY TBEA CHINA.PPT
TRAING PPT FOR CABLE ACCESSORIES BY TBEA CHINA.PPT
 
GIS 400kv substation
GIS  400kv substationGIS  400kv substation
GIS 400kv substation
 
Catalog Mitsubishi Inverter FR D700 Global-Beeteco.com
Catalog Mitsubishi Inverter FR D700 Global-Beeteco.comCatalog Mitsubishi Inverter FR D700 Global-Beeteco.com
Catalog Mitsubishi Inverter FR D700 Global-Beeteco.com
 
Abb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAIL
Abb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAILAbb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAIL
Abb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAIL
 
1228808532(2)
1228808532(2)1228808532(2)
1228808532(2)
 
zte mobilink bts swap
zte mobilink bts swapzte mobilink bts swap
zte mobilink bts swap
 
Catalog Inverter FR-E700 Mitsubishi Electric-Beeteco.com
Catalog Inverter FR-E700 Mitsubishi Electric-Beeteco.comCatalog Inverter FR-E700 Mitsubishi Electric-Beeteco.com
Catalog Inverter FR-E700 Mitsubishi Electric-Beeteco.com
 
Nexans Euromold K400TB 630A 24kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...
Nexans Euromold K400TB 630A 24kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...Nexans Euromold K400TB 630A 24kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...
Nexans Euromold K400TB 630A 24kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...
 
K440TB Nexans Euromold 1250A 24kV Bolted Tee Connectors 150-800sqmm - Nexans ...
K440TB Nexans Euromold 1250A 24kV Bolted Tee Connectors 150-800sqmm - Nexans ...K440TB Nexans Euromold 1250A 24kV Bolted Tee Connectors 150-800sqmm - Nexans ...
K440TB Nexans Euromold 1250A 24kV Bolted Tee Connectors 150-800sqmm - Nexans ...
 
Nexans Euromold M400TB 630A 33kV Bolted Tee Connectors 35-185sqmm - Nexans Eu...
Nexans Euromold M400TB 630A 33kV Bolted Tee Connectors 35-185sqmm - Nexans Eu...Nexans Euromold M400TB 630A 33kV Bolted Tee Connectors 35-185sqmm - Nexans Eu...
Nexans Euromold M400TB 630A 33kV Bolted Tee Connectors 35-185sqmm - Nexans Eu...
 
Nexans Euromold 400TB 630A 11kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...
Nexans Euromold 400TB  630A 11kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...Nexans Euromold 400TB  630A 11kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...
Nexans Euromold 400TB 630A 11kV Bolted Tee Connectors 35-300sqmm - Nexans Eu...
 
440TB Nexans Euromold 1250A 11kV Bolted Tee Connectors 240-800sqmm - Nexans E...
440TB Nexans Euromold 1250A 11kV Bolted Tee Connectors 240-800sqmm - Nexans E...440TB Nexans Euromold 1250A 11kV Bolted Tee Connectors 240-800sqmm - Nexans E...
440TB Nexans Euromold 1250A 11kV Bolted Tee Connectors 240-800sqmm - Nexans E...
 
M440TB Nexans Euromold 1250A 33kV Bolted Tee Connectors 70-630sqmm - Nexans E...
M440TB Nexans Euromold 1250A 33kV Bolted Tee Connectors 70-630sqmm - Nexans E...M440TB Nexans Euromold 1250A 33kV Bolted Tee Connectors 70-630sqmm - Nexans E...
M440TB Nexans Euromold 1250A 33kV Bolted Tee Connectors 70-630sqmm - Nexans E...
 
Ls busduct -tnhh kimxuan
Ls busduct -tnhh kimxuanLs busduct -tnhh kimxuan
Ls busduct -tnhh kimxuan
 
Elastimold - Cable Connectors, Joints, Terminations Catalogue
Elastimold - Cable Connectors, Joints, Terminations CatalogueElastimold - Cable Connectors, Joints, Terminations Catalogue
Elastimold - Cable Connectors, Joints, Terminations Catalogue
 

Recently uploaded

Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 

Recently uploaded (20)

Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 

Guide to forms of separation

  • 1. Guide to forms of separation Q: Why is internal separation of assemblies used? Forms of internal separation are aimed at providing a base to: • Protect operator against contact with live parts belonging to adjacent functional units, busbars and terminals • Limit the probability of initiating an arc fault • Protect passage of solid foreign objects from one unit of assembly to another (achieved by using IP2x separation between each unit) Q: Will internal separation guarantee the integrity of the assembly (switchboard) in the event of an arcing fault? No. this will only limit the probability of an arcing fault and extra measure to be taken as per section 2.5.5 of AS/NZS 3000:2007 and Annex ZC of AS/NZS 3439.1 Q: How is internal separation achieved? There are two methods of achieving this: • Standard construction  By barriers or partitions (these can be metallic or non-metallic)  Form 1, 2a, 2b, 3a, 3b, 4a, 4b • Alternative construction  By using integral housing (IP2x) of functional unit denoted by ‘h’. Applicable forms are 3ah,3bh, 4ah and 4bh  Insulation of busbars or shrouds denoted by ‘I’. Applicable forms are 2bi,3bi & 4bi  The combination of housing (h) and insulation (i). Applicable form are 3bih, 4aih and 4bih Q: Who decides the appropriate form of separation? Internal separation is agreed upon by the manufacturer (eg. Dara Switchboards) and user (eg. BHP Billiton) as per section 7.7 of AS/NZS 3439.1 Following points are considered in deciding on the appropriate internal separation by the user, or in absence of specification by the switchboard manufacturer? • Is the rated current of the switchboard less than 800A? If YES, you are free to select any form of separation (eg. Form 1, 2a, 2b, 3a, 3b, 4a, 4b etc) • Is the rated current of the switchboard more than 800A? If YES, you are restricted to use one of the prescribed forms of separations as per section 2.5.5.2 of AS3000:2007 to reduce the probability of initiating an arcing fault. (eg. Form 3b, 3bi, 3bih, 4a, 4ah, 4aih, 4b, 4bi, 4bh and 4bih) • Can the assembly be isolated elsewhere before removing covers etc ? (If the answer is YES, you may decide to go with the lowest form of separation [form 1] without adding pressure on the switchboard price)
  • 2. • Do you require additional integrity by having separation between functional units and busbars where the access of busbars in live conditions result in risk of contact with live busbars? (If the answer is YES, you will need to go with minimum form 2 construction) • Do you require access to functional units (eg. Circuit breakers) for limited maintenance (eg. Changing the settings) with adjacent circuits live? (If the answer is YES, you will need to go with minimum form 3 construction providing also separation between functional units) • Do you require access to cable terminals (eg. Connecting cables to a spare circuit breaker in future while the switchboard is live) of a functional unit with adjacent functional units live? (If the answer is YES, you will need to go with the maximum form of separation-form 4) Q: What are the typical switchboard arrangements for each internal separation? • Form 1 construction As illustrated in the above general arrangement, there is no internal separation between, busbars, functional units and terminals for external conductors
  • 3.  Generally used for Load Centres, Distribution boards, meter panels, Main switchboards upto 800A  In a scale of 10 (1 for the lowest price and 10 for the highest price) form 1 construction is at 1 in price. • Form 2 Construction • Form 2a construction
  • 4. As illustrated in the above general arrangement, in form 2a construction the busbars are separated from functional units but the terminals for external conductors are in the same compartment as the live busbars. • Generally used for distribution switchboards upto 800A where there is no access to the cable zone is required once all the cables are terminated. This construction also provides safe access to functional units separated from the live busbars. However this construction is not commonly used in Australia • In a scale of 10 (1 for the lowest price and 10 for the highest price) form 2a construction is at 3 in price • Form 2b
  • 5. As illustrated in the above general arrangement, in form 2b construction the busbars are separated from functional units and the terminals for external conductors. However the functional units and its terminals for external conductors can be in the same compartment.  Generally used for distribution switchboards upto 800A where opening the cable zone or the functional unit compartment will not expose the live busbars. This construction is used in Main Distribution boards in Australia. • In a scale of 10 (1 for the lowest price and 10 for the highest price) form 2b construction is at 3 in price. • This construction is also possible for smaller Distribution boards in Australia using encapsulated busbar chassis
  • 6. • Form 2bi As illustrated in the above general arrangement, in form 2bi construction the separation between busbars and both functional units and terminals for external conductors achieved by insulation of busbars. This insulation however needs to fully comply as per section 7.4.2.1 of AS/NZS 3439.1  Generally used for small light and power Distribution Switchboards and Main Distribution boards up to 800A • In a scale of 10 (1 for the lowest price and 10 for the highest price) form 2bi construction is at 3 in price.
  • 7. • Form 3 construction • Form 3a As illustrated in the above general arrangement, in form 3a construction the functional units are separated from each other allowing maintenance of such functional unit without been exposed to other functional units adjacent to each other. The functional units are separated from busbars and terminals for external conductors. However, the busbars and functional units can be in the same compartment. • Generally used for distribution switchboards upto 800A. Not commonly used in Australia though. • In a scale of 10 (1 for the lowest price and 10 for the highest price) form 3a construction is at 4 in price.
  • 9. As illustrated in the above general arrangement, in form 3b construction the functional units are separated from each other allowing maintenance of such functional unit without been exposed to other functional units adjacent to each other. The functional units are separated from busbars and terminals for external conductors. Also this construction separates the busbars from the terminals for external conductors. • Generally used for distribution switchboards above 800A and is the most commonly used construction for high current switchboards • Used where maintenance of functional units (eg. Changing the trip settings of the circuit breaker) is possible while the adjacent functional units are live. • In a scale of 10 (1 for the lowest price and 10 for the highest price) form 3b construction is at 5 in price. • Form 3bih
  • 10. As illustrated in the above general arrangement, in form 3bih construction the separation between functional units and busbars and busbars and terminals for external conductors is achieved by the use of insulation of busbars and housings of circuit breakers. • Most commonly used construction for Main Switchboards above 800A with busbar chassis. This construction however is limited up to the current rating of the suitable busbar chassis manufactured by the manufacturer with insulation in compliance with AS/NZS 3439.1 • Used in Main switchboard applications where there is straight constraints on budget. • In a scale of 10 (1 for the lowest price and 10 for the highest price) form 3bih construction is at 4 in price. • Form 4 construction • Form 4a
  • 11. As illustrated in the above general arrangement, in form 4a construction the busbars are separated from functional units and terminals for external conductors. However, functional units and terminals for external conductors can be on its own compartment • Another most commonly used construction for Main Switchboards above 800A. Used in Main switchboard applications where there is straight constraints on budget. • In a scale of 10 (1 for the lowest price and 10 for the highest price) form 4a construction is at 5 in price. • Form 4ah
  • 12. As illustrated in the above general arrangement, in form 4ah construction the separation between busbars and both functional units and terminals for external conductors is achieved by using enclosed/encapsulated busbars and integral housings of circuit breakers providing IP2x protection. • Used in some distribution board applications and is limited by the available busbar chassis that will be provide fully encapsulated construction to the required rating. • In a scale of 10 (1 for the lowest price and 10 for the highest price) form 4ah construction is at 5 in price. • Form 4aih As illustrated in the above general arrangement, in form 4aih construction the separation between busbars and both functional units and terminals for external conductors is achieved by using insulated busbars. The separation between busbars achieved by use of the functional units own integral IP2x rated housings • Used in some Main Switchboard applications and is limited by the available insulated busbar chassis that will be provide to the required rating.
  • 13. • In a scale of 10 (1 for the lowest price and 10 for the highest price) form 4aih construction is at 5 in price. • Form 4b As illustrated in the above general arrangement, in form 4b construction the bus bars are separated from functional units and terminals for external conductors. Functional units are separated from each other and the terminals for external conductors are also separated from each other providing the highest level of separation that will maximize the possibility of initiating an arcing fault in a switchboard. In an unlikely event of a fault, the effect of fault is more contained to its zone where it was originated without affecting the other parts of the assembly.
  • 14. • Used in switchboards rated above 800A and is installed in supplying critical applications. (eg. Hospitals, mines etc) • In a scale of 10 (1 for the lowest price and 10 for the highest price) form 4b construction is at 10 in price. There are more variations of form of separation that are not illustrated above. Those however are not commonly used switchboard constructions. Reference: AS/NZS 3439.1:2002 and AS/NZS 3000:2007 Prepared By: Shanaka Unantenne Bsc. Eng (Hons), MIEAust, MIET, MIEEE Engineering Division- Dara Switchboards