1. [INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT] March 7, 2012
Name-Surname Suchol Tiewcharoen
Student ID. 53211844
Group Name Fuang
Engineering Opor, Sanook ,Fam, Arm, Kwang, Mart, Art,
Team Members Nueng, Peag
Product Design
P'Best, P'Pump, P'Mhor, P'Mint, P'Pin
Team Members
Weekly Progress
Explain your engineering job of each week.
On 1st March 2012, I met my group at Bangkhuntian. We discussed about electric appliances. We
thought, we did a kettle. Last week, My group presented about the internal kettle circuit. But, it
didn't perfect. So, Aj.Panutut assigned my group to search more information.Thus, I searched about
thermostat working. It looked just like the same circuit as an electrical light, except it had two
switches instead of one in the power supply, one switch turned on the power, the other switch was
normally closed , this other switch was called a 'thermostat' it would open and interrupt the power
supply and switch off the kettle when the water temperature reached boiling point. This second
switch would reset its self when the power was switched back on (if the temperature was below
boiling point).
Engineering Analysis
Strong Point
- We've known about kettle circuit. It makes us to easier to work.
Week Point
- If it has more functions. We have to search the information.
Next Week Job
Next week, We are going to think a kettle circuit to make our project.
Department of Control System and Instrumentation Engineering
KING MONGKUT’s UNIVERSITY OF TECHNOLOGY THONBURI