1. Risk Assessment
Production: Mushaboom Music Video Producer: Ciara Kataria
Types of Risk: Personal Injury /Health & Safety / Damageto equipment/Halting Production
Risk Type Details of Risk Ways to Minimise Risk Person(s) Responsible
Tripping over wires Due to using a camera and lighting
there is a lot of wire on thefloor that
can beeasily tripped over.
Taping thewire to the floor to reduce
therisk of tripping over. Using bright
tapeto warn peopleof thedanger.
Ciara Kataria
Leaving lighting on Electrical fire caused by overheating. Making surethelights areonly when
we are not using them.
Ciara Kataria
Leaving lighting on As thelights areused morefrequently
over a period of timethey become
hotter and can cause a burn to the
person involved.
Turning thelights off when they are
not being used, as well as warning
people of their risk.
Ciara Kataria
Damageto equipment With a lot of expensive equipment,
there is a lot that could break or
becomedamaged.
Making surepeopledo not takethe
equipment for granted as well as
checking theequipment regularly.
Ciara Kataria
Firerisk I will be filming a small fireso a person
or something surrounding it could
catch on fire.
Makesurethat everyoneis careful
around thefire and keep all
flammableitem away from it.
Ciara Kataria