10’ x 10’ Frame Tent Directions


         Corner
         F01COR
                                                                           Frame Tent Poles
                                                          Description          Size             Color        Qty.
                                                          Spreader             9’4”             White         4
                                                          Hip Rafter          6’10”             Green         4
                                                          Legs              6’8”(7’8”)       Brown(Black)     4


      Spreader
                                4 Way Crown
                                  F064WC
                                                                 Frame Fittings
                                                          Description                 Qty.
                                                          Corner                       4
                                                          4 Way Crown                  1
                  Hip Rafters
                                                          Base Plates                  4
                                                          R Pin (Pin & Bail)          28




1. The layout begins with the frame parts being laid out on the ground in the approximate location that they will be when
the frame is assembled. The perimeter parts are laid out to form the perimeter, and the roof support parts are placed in the
interior in their general locations. Laying out the parts in this way facilitates the assembly. (See Diagram)

2. Begin with the 4 way crown. Attach the hip rafters (6’10’’ green) to the 4 way crown by sliding the pole over the fitting
and lining up the holes in the pole with those in the fitting. Place a pin in the first hole to secure the pole in place.
	
3. Attach the corner fitting to the hip rafters by sliding the pole over the fitting. Line up the hole of the pole with those
of the fitting and place a pin.


4. Now, the perimeter is ready for assembly. Connect the corners to the corners using the spreaders (9’4” white). Slide
the poles over the fittings, line up the holes, and pin the pole and fitting together. When all of the spreaders have been
secured in place, the frame will be complete.

5. Place the tent top over the frame, by spreading the tent out on one end and “flapping” the tent top while pulling it over
the top.

6. Secure the tent top to the frame by fastening the straps on the inside of the tent at each corner location.

7. Attach all of the base plates to the legs by sliding the leg (6’8” brown / 7’8” black) over the base plate and securing it
with a pin. Now the tent is ready to be raised.

8. Start at one corner and manually lift the frame so that the leg (6’8” brown / 7’8” black) can slide over the corner fitting.
Pin the leg to the fitting.

9. Proceed to work your way around the tent putting one leg in at a time until all legs are standing and pinned.

10. Now that the frame tent is standing, fasten the tent top completely to the frame, using the straps on the inside of the
tent. Make sure that all of the straps are tight and that the tent top is sitting evenly over the frame.




                                           www.GetTent.com/instructions.htm                                   Page 1 of 2
10’ x 10’ Frame Tent Directions

11. Fasten either a ratchet strap or rope to the fitting at each leg location. Drive a stake approximately four feet out from
each leg.

12. Attach the anchoring device (ratchets or ropes) to the stakes at each leg location.

- Ratchets- turn the 6” loop at the end of the ratchet inside out and pull the strap through the loop to create a noose and
pull tight over the stake. Take the strap from the tent and pull it through the reel bars slot of the ratchet (ratchet buckle
needs to have handle facing upward at all time) and pull the strap back towards the tent approximately 1 ½ feet. Hold
the strap at this point with one hand and begin to crank the ratchet handle back and forth with the other hand until the
reel bars have turned at least 2 times, this eliminates the chance of slippage. Repeat at all leg locations.

- Ropes- use a Double Loop Clove Hitch Knot - grip the rope in your left hand approximately 8’ down from the 	 rom-g
met, at this point, take your right hand and create a loop (approximately 6”) with the excess rope and place it in your
left hand. Repeat and create another loop and place on the right side of the previous loop (should have 2 and half loops
in your left hand). Take the right loop and pull it up and over so it is now on the left side. Now place both loops over
the stake and pull tight with the excess rope. Repeat at all leg locations.

13. The tent top should now be complete! If sidewalls are desired, unroll the sidewalls between the stakes and the side
poles around the perimeter of the tent. Starting at a side pole, clip the sidewall snap hooks to the rope line that is attached
to the tent top.




                                  Why two sets of holes in frame fittings?
Two holes are located in each protrusion of almost every frame tent fitting. The first hole (furthest from the center of the
fitting) is for the pin that holds the pole in place. The second pin (located closest to the center of the fitting) is an alignment
hole. When a pin is placed in this alignment hole, it prevents the frame pole from moving to far.

1.	     Insert the pin in the hole closest to the center of the fitting (alignment hole).
2.	     Slide the pole on the protrusion until it meets the pin.
3.	     Rotate the pole until the holes on the pole and fitting is aligned properly.
4.	     Insert the pin through the pole and fitting.
5.	     Remove the first pin (the alignment pin).




  If you have any questions, please contact Celina Tents support department at:
                                              support@celinatent.com
                                          1-866-GET-TENT /419-586-3610
                                                 www.GetTent.com                                                 Page 2 of 2

More Related Content

Similar to 10 x 10 Frame Tent Installation Instructions

Solar cooker installation
Solar cooker installationSolar cooker installation
Solar cooker installation
Prabhat Kumar
 
Victory rig
Victory rigVictory rig
Victory rig
JLRev
 
Mitra Stats Project Final
Mitra Stats Project FinalMitra Stats Project Final
Mitra Stats Project Final
shonabunch1
 
apeluri ieftine internationale
apeluri ieftine internationaleapeluri ieftine internationale
apeluri ieftine internationale
zobcornel
 

Similar to 10 x 10 Frame Tent Installation Instructions (20)

10 x 20 Frame Tent Installation Instructions
10 x 20 Frame Tent Installation Instructions10 x 20 Frame Tent Installation Instructions
10 x 20 Frame Tent Installation Instructions
 
8 x 10 Frame Tent Installation Instructions
8 x 10 Frame Tent Installation Instructions8 x 10 Frame Tent Installation Instructions
8 x 10 Frame Tent Installation Instructions
 
10 x 40 Frame Tent Installation Instructions
10 x 40 Frame Tent Installation Instructions10 x 40 Frame Tent Installation Instructions
10 x 40 Frame Tent Installation Instructions
 
8 x 12 Frame Tent Installation Instructions
8 x 12 Frame Tent Installation Instructions8 x 12 Frame Tent Installation Instructions
8 x 12 Frame Tent Installation Instructions
 
8 x 16 Frame Tent Installation Instructions
8 x 16 Frame Tent Installation Instructions8 x 16 Frame Tent Installation Instructions
8 x 16 Frame Tent Installation Instructions
 
12 x 20 Frame Tent Installation Instructions
12 x 20 Frame Tent Installation Instructions12 x 20 Frame Tent Installation Instructions
12 x 20 Frame Tent Installation Instructions
 
Solar cooker installation
Solar cooker installationSolar cooker installation
Solar cooker installation
 
Victory rig
Victory rigVictory rig
Victory rig
 
F-F-Fiddle Assembly Instructions
F-F-Fiddle Assembly InstructionsF-F-Fiddle Assembly Instructions
F-F-Fiddle Assembly Instructions
 
Construção de Violões
Construção de ViolõesConstrução de Violões
Construção de Violões
 
Build instructions Homeslice Tower ver 070514
Build instructions   Homeslice Tower ver 070514Build instructions   Homeslice Tower ver 070514
Build instructions Homeslice Tower ver 070514
 
F-F-Fiddle Assembly Instructions
F-F-Fiddle Assembly InstructionsF-F-Fiddle Assembly Instructions
F-F-Fiddle Assembly Instructions
 
4. How to build shed roof rafters
4. How to build shed roof rafters4. How to build shed roof rafters
4. How to build shed roof rafters
 
How to Make and Wire a Lamp
How to Make and Wire a LampHow to Make and Wire a Lamp
How to Make and Wire a Lamp
 
Mitra Stats Project Final
Mitra Stats Project FinalMitra Stats Project Final
Mitra Stats Project Final
 
접이식 자가제작 베틀제작 도면
접이식 자가제작 베틀제작 도면접이식 자가제작 베틀제작 도면
접이식 자가제작 베틀제작 도면
 
apeluri ieftine internationale
apeluri ieftine internationaleapeluri ieftine internationale
apeluri ieftine internationale
 
소형베틀도면
소형베틀도면소형베틀도면
소형베틀도면
 
RWM Tapered Casters Terms
RWM Tapered Casters TermsRWM Tapered Casters Terms
RWM Tapered Casters Terms
 
A rope shackle with a cover
A rope shackle with a coverA rope shackle with a cover
A rope shackle with a cover
 

More from celinatent

More from celinatent (20)

40 x 300 Pole Tent Installation Instructions
40 x 300 Pole Tent Installation Instructions40 x 300 Pole Tent Installation Instructions
40 x 300 Pole Tent Installation Instructions
 
40 x 280 Pole Tent Installation Instructions
40 x 280 Pole Tent Installation Instructions40 x 280 Pole Tent Installation Instructions
40 x 280 Pole Tent Installation Instructions
 
40 x 260 Pole Tent Installation Instructions
40 x 260 Pole Tent Installation Instructions40 x 260 Pole Tent Installation Instructions
40 x 260 Pole Tent Installation Instructions
 
40 x 240 Pole Tent Installation Instructions
40 x 240 Pole Tent Installation Instructions40 x 240 Pole Tent Installation Instructions
40 x 240 Pole Tent Installation Instructions
 
40 x 220 Pole Tent Installation Instructions
40 x 220 Pole Tent Installation Instructions40 x 220 Pole Tent Installation Instructions
40 x 220 Pole Tent Installation Instructions
 
40 x 200 Pole Tent Installation Instructions
40 x 200 Pole Tent Installation Instructions40 x 200 Pole Tent Installation Instructions
40 x 200 Pole Tent Installation Instructions
 
40 x 180 Pole Tent Installation Instructions
40 x 180 Pole Tent Installation Instructions40 x 180 Pole Tent Installation Instructions
40 x 180 Pole Tent Installation Instructions
 
40 x 160 Pole Tent Installation Instructions
40 x 160 Pole Tent Installation Instructions40 x 160 Pole Tent Installation Instructions
40 x 160 Pole Tent Installation Instructions
 
40 x 140 Pole Tent Installation Instructions
40 x 140 Pole Tent Installation Instructions40 x 140 Pole Tent Installation Instructions
40 x 140 Pole Tent Installation Instructions
 
40 x 120 Pole Tent Installation Instructions
40 x 120 Pole Tent Installation Instructions40 x 120 Pole Tent Installation Instructions
40 x 120 Pole Tent Installation Instructions
 
40 x 100 Pole Tent Installation Instructions
40 x 100 Pole Tent Installation Instructions40 x 100 Pole Tent Installation Instructions
40 x 100 Pole Tent Installation Instructions
 
40 x 80 Pole Tent Installation Instructions
40 x 80 Pole Tent Installation Instructions40 x 80 Pole Tent Installation Instructions
40 x 80 Pole Tent Installation Instructions
 
40 x 60 Pole Tent Installation Instructions
40 x 60 Pole Tent Installation Instructions40 x 60 Pole Tent Installation Instructions
40 x 60 Pole Tent Installation Instructions
 
40 x 40 Pole Tent Installation Instructions
40 x 40 Pole Tent Installation Instructions40 x 40 Pole Tent Installation Instructions
40 x 40 Pole Tent Installation Instructions
 
30 x 255 Pole Tent Installation Instructions
30 x 255 Pole Tent Installation Instructions30 x 255 Pole Tent Installation Instructions
30 x 255 Pole Tent Installation Instructions
 
30 x 210 Pole Tent Installation Instructions
30 x 210 Pole Tent Installation Instructions30 x 210 Pole Tent Installation Instructions
30 x 210 Pole Tent Installation Instructions
 
30 x 195 Pole Tent Installation Instructions
30 x 195 Pole Tent Installation Instructions30 x 195 Pole Tent Installation Instructions
30 x 195 Pole Tent Installation Instructions
 
30 x 180 Pole Tent Installation Instructions
30 x 180 Pole Tent Installation Instructions30 x 180 Pole Tent Installation Instructions
30 x 180 Pole Tent Installation Instructions
 
30 x 165 Pole Tent Installation Instructions
30 x 165 Pole Tent Installation Instructions30 x 165 Pole Tent Installation Instructions
30 x 165 Pole Tent Installation Instructions
 
30 x 150 Pole Tent Installation Instructions
30 x 150 Pole Tent Installation Instructions30 x 150 Pole Tent Installation Instructions
30 x 150 Pole Tent Installation Instructions
 

Recently uploaded (6)

Social Learning Theory presentation.pptx
Social Learning Theory presentation.pptxSocial Learning Theory presentation.pptx
Social Learning Theory presentation.pptx
 
February 2024 Recommendations for newsletter
February 2024 Recommendations for newsletterFebruary 2024 Recommendations for newsletter
February 2024 Recommendations for newsletter
 
How to command respect as a man, in relationships or how you deals with peopl...
How to command respect as a man, in relationships or how you deals with peopl...How to command respect as a man, in relationships or how you deals with peopl...
How to command respect as a man, in relationships or how you deals with peopl...
 
2023 - Between Philosophy and Practice: Introducing Yoga
2023 - Between Philosophy and Practice: Introducing Yoga2023 - Between Philosophy and Practice: Introducing Yoga
2023 - Between Philosophy and Practice: Introducing Yoga
 
March 2023 Recommendations for newsletter
March 2023 Recommendations for newsletterMarch 2023 Recommendations for newsletter
March 2023 Recommendations for newsletter
 
communication-skills-training-excerpt.pdf
communication-skills-training-excerpt.pdfcommunication-skills-training-excerpt.pdf
communication-skills-training-excerpt.pdf
 

10 x 10 Frame Tent Installation Instructions

  • 1. 10’ x 10’ Frame Tent Directions Corner F01COR Frame Tent Poles Description Size Color Qty. Spreader 9’4” White 4 Hip Rafter 6’10” Green 4 Legs 6’8”(7’8”) Brown(Black) 4 Spreader 4 Way Crown F064WC Frame Fittings Description Qty. Corner 4 4 Way Crown 1 Hip Rafters Base Plates 4 R Pin (Pin & Bail) 28 1. The layout begins with the frame parts being laid out on the ground in the approximate location that they will be when the frame is assembled. The perimeter parts are laid out to form the perimeter, and the roof support parts are placed in the interior in their general locations. Laying out the parts in this way facilitates the assembly. (See Diagram) 2. Begin with the 4 way crown. Attach the hip rafters (6’10’’ green) to the 4 way crown by sliding the pole over the fitting and lining up the holes in the pole with those in the fitting. Place a pin in the first hole to secure the pole in place. 3. Attach the corner fitting to the hip rafters by sliding the pole over the fitting. Line up the hole of the pole with those of the fitting and place a pin. 4. Now, the perimeter is ready for assembly. Connect the corners to the corners using the spreaders (9’4” white). Slide the poles over the fittings, line up the holes, and pin the pole and fitting together. When all of the spreaders have been secured in place, the frame will be complete. 5. Place the tent top over the frame, by spreading the tent out on one end and “flapping” the tent top while pulling it over the top. 6. Secure the tent top to the frame by fastening the straps on the inside of the tent at each corner location. 7. Attach all of the base plates to the legs by sliding the leg (6’8” brown / 7’8” black) over the base plate and securing it with a pin. Now the tent is ready to be raised. 8. Start at one corner and manually lift the frame so that the leg (6’8” brown / 7’8” black) can slide over the corner fitting. Pin the leg to the fitting. 9. Proceed to work your way around the tent putting one leg in at a time until all legs are standing and pinned. 10. Now that the frame tent is standing, fasten the tent top completely to the frame, using the straps on the inside of the tent. Make sure that all of the straps are tight and that the tent top is sitting evenly over the frame. www.GetTent.com/instructions.htm Page 1 of 2
  • 2. 10’ x 10’ Frame Tent Directions 11. Fasten either a ratchet strap or rope to the fitting at each leg location. Drive a stake approximately four feet out from each leg. 12. Attach the anchoring device (ratchets or ropes) to the stakes at each leg location. - Ratchets- turn the 6” loop at the end of the ratchet inside out and pull the strap through the loop to create a noose and pull tight over the stake. Take the strap from the tent and pull it through the reel bars slot of the ratchet (ratchet buckle needs to have handle facing upward at all time) and pull the strap back towards the tent approximately 1 ½ feet. Hold the strap at this point with one hand and begin to crank the ratchet handle back and forth with the other hand until the reel bars have turned at least 2 times, this eliminates the chance of slippage. Repeat at all leg locations. - Ropes- use a Double Loop Clove Hitch Knot - grip the rope in your left hand approximately 8’ down from the rom-g met, at this point, take your right hand and create a loop (approximately 6”) with the excess rope and place it in your left hand. Repeat and create another loop and place on the right side of the previous loop (should have 2 and half loops in your left hand). Take the right loop and pull it up and over so it is now on the left side. Now place both loops over the stake and pull tight with the excess rope. Repeat at all leg locations. 13. The tent top should now be complete! If sidewalls are desired, unroll the sidewalls between the stakes and the side poles around the perimeter of the tent. Starting at a side pole, clip the sidewall snap hooks to the rope line that is attached to the tent top. Why two sets of holes in frame fittings? Two holes are located in each protrusion of almost every frame tent fitting. The first hole (furthest from the center of the fitting) is for the pin that holds the pole in place. The second pin (located closest to the center of the fitting) is an alignment hole. When a pin is placed in this alignment hole, it prevents the frame pole from moving to far. 1. Insert the pin in the hole closest to the center of the fitting (alignment hole). 2. Slide the pole on the protrusion until it meets the pin. 3. Rotate the pole until the holes on the pole and fitting is aligned properly. 4. Insert the pin through the pole and fitting. 5. Remove the first pin (the alignment pin). If you have any questions, please contact Celina Tents support department at: support@celinatent.com 1-866-GET-TENT /419-586-3610 www.GetTent.com Page 2 of 2